Cover Page DRAFT CONTRACT DATA REQUIREMENTS LIST, DD-1423 to RFP # N00024-x-xxxx
The required delivrable data is dscribed in this file in leieu of a pdf file in order to provide a usable data management framework. This file has 4 tabs:
Tabs 1. Key Coded Form. Data items can be virewed in traditional format on this tab. Enter CDRL Number in the form on the top right to see the data in the traditional DD-1423 Format.
Tab 2: Flat File. Data in sortable format. Can be captured for contractor data management tools.
Tab 3: Distributionb Tab. Notes applicable to all Data Items.
Tab 4: Glossary and Addresses: Addresses for recipients of data items when using electronic notification system.
Tab 5: A Visual Schedule of the Data Deliveries
Tab 6: A Tailoring Order Form, To indicate whether data is applicable to an RTI project. Assume all data is applicable if this form is not filled in.
frank.caponiti: frank.caponiti:
typo: deliverable, lieu, viewed; Distribution, Akiyama Phonecall
| Data Item Number | Title of Data Item | Subtitle | Authority | |||||
| (Data Acquisition Doc Number) | Contract Reference | Column1 | Column2 | Column3 | Column4 | |||
| A001 | MANAGEMENT PLAN | Program Management Plan (PMP) | DI-MGMT-80004A | 3.2.1 | With proposal | |||
| A002 | MANAGEMENT PLAN | Open System Management Plan (OSMP) | DI-MGMT-80004A | 3.2.1, 3.3.2 | With proposal - Tailor the requmt | |||
| A003 | SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP) | N/A | DI-SESS-81785 | 3.2.1, 3.3.3 | With proposal | |||
| A004 With proposal | QUALITY PROGRAM PLAN (QPP) | Quality Assurance Management Plan (QMP) | DI-QCIC-81722 | 3.2.1, 3.5.1 | With proposal | |||
| A005 | SYSTEM SAFETY PROGRAM PLAN (SSPP) | N/A | DI-SAFT-81626 | 3.2.1, 3.xx | ||||
| A007 | Contract Operational Security (OPSEC) Plan | DI-MGMT-80934C | 3.2.1, | |||||
| A008 | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT | Including Risk Assessment, X, y, and z. | DI-MGMT-80227 | 3.2.4 | ||||
| A009 | CONFERENCE AGENDA | N/A | DI-ADMIN-81249A | 3.2.5 | ||||
| A010 | PRESENTATION MATERIAL | N/A | DI-ADMIN-81373 | 3.2.5, 3.5 | ||||
| A011 | REPORT, RECORD OF MEETING/ MINUTES | N/A | DI-ADMN-81505 | 3.2.5 | ||||
| A012 | GOVERNMENT FURNISHED INFORMATION DEFICIENCY REPORT | N/A | DI-MGMT-80596 | 4 | ||||
| A013 | INTEGRATED MASTER SCHEDULE (IMS) | N/A | DI-MGMT-81650 | 14.2 | ||||
| A014 | CONTRACTOR'S WORK BREAKDOWN STRUCTURE (CWBS) | 14.2 | ||||||
| A015 ?? LOE clins for DE labor | CONTRACT PERFORMANCE REPORT (CPR) | Earned Value Status Report | DI-MGMT-81466A | 3.3.2 | NRE - ASW & Griffin | Get other $$ data in monthly PM Rpt for LOE | ||
| A015 | CONFIGURATION MANAGEMENT PLAN (CM PLAN) | DI-CMAN-80858B | 10 | |||||
| A016 | AS-BUILT CONFIGURATION LIST | N/A | 4.3 | |||||
| A017 | REQUEST FOR DEVIATION (RFD) / REQUEST FOR WAIVER (RFW) | 10.1 | ||||||
| A018 | ENGINEERING CHANGE PROPOSAL (ECP) | Prelim an dFinal | DI-CMAN-80639C | 10.3 | ||||
| A019 | BASELINE DESCRIPTION DOCUMENT | Configuration Identification Baseline Report | DI-CMAN-81121 | NONE | ||||
| A020 | DMSMS FORECASTING SOURCE DATA | 12.1 | ||||||
| A021 | DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS) | Bill of Material Source Data | OT-12-20002 | 12 | ||||
| A022 | SYSTEM SAFETY ASSESSMENT REPORT | (for Griffin and ASW - NRE) | DI-SAFT-80102B | 11 | ||||
| A023 | PACKAGING HANDLING STORAGE AND TRANSPORTATION (PHS&T) | 13 | ||||||
| A024 | MATERIAL INSPECTION AND RECEIVING REPORT | 13.1 | ||||||
| A025 | STATUS REPORT | Trip Report | DI-MGMT-80368A | NONE | ||||
| A026 | SCIENTIFIC AND TECHNICAL REPORTS | See Technical Instruction (TI) | DI-MISC-80711A | |||||
| A027 | DESIGN REVIEW INFORMATION PACKAGE (DRIP) | N/A | DI-SESS-81757A | ASW and griffin | and if designs change of productin hw | |||
| A028 | TECHNICAL REPORT-STUDY/SERVICES | Reliability Allocation, Assessment and Analysis Report | DI-MISC-80508B | NONE | Griffin and ASW | Griffin and ASW | ||
| A029 | Failure Mode Effects and Criticality Analysis Report (FMECA) | N/A | DI-ILSS-81495 | NONE | New Eng projects MMs | |||
| A030 | SPECIFICATION REQUIREMENT VERIFICATION MATRIX | DOORS Data Base Revisions | DI-MISC-81283 | NONE | DE - Griffin, ASW ? | |||
| A031 | SPECIFICATION CHANGE NOTICE (SCN) | N/A | DI-CMAN-80643C | NONE |
| A033 | REVISIONS TO EXISTING GOVERNMENT DOCUMENTS | DI-ADMN-80925 | NONE | |||
| A034 | INTERFACE REQUIREMENTS SPECIFICATION (IRS) | IRS (Updates and Revisions), Hardware Products and System Interfaces | DI-IPSC-81434A | NONE | ||
| A035 | SCHEMATIC BLOCK DIAGRAMS | Electrical Drawing and Associated List | DI-GDRQ-81223 | NONE | ||
| A036 | INSTALLATION CONTROL DRAWINGS | Updates and Revisions | DI-DRPR-81242 | NONE | ||
| A037 | TEST PLAN | Master Test and Evaluation Program Plan (MTEPP) (System Level ) | DI-NDTI-80566A | NONE | One for each MP? NO - for program | NRE - ASW & Griffin |
| A038 | TEST PLANS / TEST PROCEDURES | Test Procedures, System Level | DI-SESS-81704 | NONE | NRE - ASW & Griffin | |
| A039 | PRODUCTION ACCEPTANCE TEST PROCEDURE | |||||
| A040 | TEST PROCEDURE | Unit Test Procedure (Hardware Items) | DI-NDTI-80603A | NONE | ||
| A041 | TEST REPORTS | Hardware or Systems Testing | DI-NDTI-80809B | NONE | NRE - ASW & Griffin | |
| A0142 | TEST/INSPECTION REPORT | 4.2 | ||||
| A043 | WORK INSTRUCTIONS | Manufacturing Drawings | 4.1 | |||
| A044 | PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS | N/A | DI-SESS-81000D | NONE | ||
| A045 | COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS | N/A | DI-SESS-81003D | NONE | ||
| A046 | DRAWING NUMBER ASSIGNMENT REPORT | N/A | D-SESS-81011D | NONE | ||
| A047 | PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION (PCMPD) | N/A | DI-SESS-81012D | NONE | compre to other process dwgs | |
| A048 | SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS | N/A | DI-SESS-81004D | NONE | ||
| A049 | TECHNICAL INFORMATION REPORT | Commercial-Off-The-Shelf (COTS) Data Sheets (Updates and Revisions) | DI-MISC-80652 | 4.2 | ||
| A050 | SPECIAL TOOLING (ST) DRAWINGS/MODELS AND ASSOCIATED LISTS | N/A | DI-SESS-81008D | NONE | ||
| A051 | PROVISIONING TECHNICAL DOCUMENTATION | Design Change Notice | DI-ILSS-81285 |
Sharon Washington: Sharon Washington:
Cancelled with no superseded document.
| Renee Hicks is to send out alternate DID for consideration. | NONE | both look likechanges only - original ptd = ?? | ||||
| A052 | SUPPLEMENTARY PROVISIONING TECHNICAL DOCUMENTATION | Post Production Updates and Revisions | DI-SESS-81716 | NONE | ||
| A053 | TECHNICAL MANUAL VALIDATION PLAN | Technical Manual and MRC Validation/Verification Plan | TI-TMSS-81701 | NONE | ||
| A054 | TECHNICAL MANUALS | Development Maintenance (Updates and Revisions) | N/A | NONE | In same style as exists | |
| A055 | REVISIONS TO EXISTING GOVERNMENT DOCUMENTS | Training Material | DI-ADMIN-80925 | NONE | ||
| A056 | PLANNED MAINTENANCE SYSTEM (PMS) TASK DEFINITION | Corrective Maintenance Exercises | DI-SESS-80988A | NONE | ||
| A057 | PLANNED MAINTENANCE SYSTEM (PMS) | Maintenance Index Page (MIP) | DI-MNTY-80992 | NONE | ||
| A058 | PLANNED MAINTENANCE SYSTEM (PMS) | Maintenance Requirements Card (MRC) | DI-MNTY-80991 | NONE |
FlatFile
| Contract Line | ||||||||||||||||||||||||||
| Item Number | Exhibit | Category | System/Item | Contract/PR No. | Contractor | Data Item Number | Title of Data Item | Subtitle | 4. Authority (Data Acquisition Doc Number) | Contract Reference | Referenced in Contract | Requiring Office | DD 250 Req | App. Code | 9. Dist. Statement | |||||||||||
| Required | 10. Frequency | 11. As of date | 12. Date of first submission | 13. Date of subsequent submission | Addressee | COPIES: | ||||||||||||||||||||
| Draft | COPIES: | |||||||||||||||||||||||||
| Final Reg | COPIES: | |||||||||||||||||||||||||
| Final Repro | Addressee | COPIES: | ||||||||||||||||||||||||
| Draft | COPIES: | |||||||||||||||||||||||||
| Final Reg | COPIES: | |||||||||||||||||||||||||
| Final Repro | Addressee | COPIES: | ||||||||||||||||||||||||
| Draft | COPIES: | |||||||||||||||||||||||||
| Final Reg | COPIES: | |||||||||||||||||||||||||
| Final Repro | Addressee | COPIES: | ||||||||||||||||||||||||
| Draft | COPIES: | |||||||||||||||||||||||||
| Final Reg | COPIES: | |||||||||||||||||||||||||
| Final Repro | Addressee | COPIES: | ||||||||||||||||||||||||
| Draft | COPIES: | |||||||||||||||||||||||||
| Final Reg | COPIES: | |||||||||||||||||||||||||
| Final Repro | Addressee | COPIES: | ||||||||||||||||||||||||
| Draft | COPIES: | |||||||||||||||||||||||||
| Final Reg | COPIES: | |||||||||||||||||||||||||
| Final Repro | REMARKS: | |||||||||||||||||||||||||
| Format called out per DID | Which TI ? | MP Design Eng | Production | MP Sustainment | ||||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A001 | Management Plan | Program Management Plan (PMP) | DI-MGMT-80004A (See Blk. 16) | SOW PARA 3.2,1 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | One / R | N/A | 30 DAC | N/A | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 7: Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval. | ||
| Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL. | 13. The Government will provide comments or approval within 30 working days after receipt. Final copy is due NLT 30 calendar days after receipt of comments or approval. | Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL. | ||||||||||||||||||||||||
| Block 14b.: Form ofElectronic Delivery of Data: see Attachment 3 to the CDRL | CF, and some minimal | A002 | ||||||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A002 | Management Plan | Open System Management Plan (OSMP) | DI-MGMT-80004A (See Blk. 16) | SOW PARA 3.2.1 | ||||||||||||||||
| SOW PARA 3.3.2 | Yes | |||||||||||||||||||||||||
| Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | One / R | N/A | 45 DAC | |||||||||||||||||||
| See Blk 16 | N/A | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 7: Electronic delivery is acceptable. Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval. |
Block 9: Distribution Statements: see paragraph 1 of Attachment 4 to the
CDRL.
Block 12: Submit draft 45 DAC. The Government will provide comments or approval within 30 working days after receipt. Final copy is due NLT 30 calendar days after receipt of comments or approval. Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.
Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | CF, and some minimal | A014 | ||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A003 | System Engineering Management Plan (SEMP) | N/A | DI-SESS-81785 (See Blk 16) | SOW PARA 3.2.1 | ||
| SOW PARA 3.3.3 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | One / R | N/A | AT SRR | ||||
| See Blk. 16 | N/A | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | (7) PEO IWS-D | 1 | 1 | 0 | Block 7: Letter of Transmittal shall be via e-mail with notification offile attributes and directory information for retrieval. |
Block 9:Wording of Distribution Statements: see paragraph 7 of Attachment 4 to the CDRL.
Block 12: Submit 30 days prior to Systems Requirements Review (SRR). The Government will provide comments or approval within 30 working days after receipt. Final copy is due NLT 30 calendar days after receipt of comments or approval. Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.
Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | CF ok | A011 | 1 | |||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A004 | Quality Program Plan (QPP) | Quality Assurance Program Plan (QAPP) | DI-QCIC-81722 (SEE BLK 16) | SOW PARA 3.2.1 | ||
| SOW PARA 3.5.1 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | One / R | N/A | 60 DAC | ||||
| SEE BLK 16 | SEE BLK 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 4: Contractor's format is acceptable. |
Block 7: Letter of Transmittal shall be via e-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.
Blocks 12/13: 'The Government will provide comments or approval within 10 working days after contract award. Final copy is due NLT 30 calendar days after receipt of comments or approval. Block 14a.l: Data transmittals shall be marked with applicable Technical Instruction Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL | CF ok, PAPER | A029 | |||||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A005 | System Safety Program Plan (SSPP) | N/A | DI-SAFT-81626 (See Blk 16) | SOW PARA 3.9 | Mentioned, but only references SSAR.. Is the SSPP going to be GFI ??? | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | One / R | N/A | See blk. 16 | N/A | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 7: Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval. |
Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.
Block 12: Submit draft 45 DAC. The Government will provide comments or approval within 10 days after contract award. Final copy is due NLT 30 calendar days after receipt of comments or approval. Block 14a.1: See Data Distribution Profile, Attachment 2 to the CDRL.
Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | Block 8: | ||||||
| Approval will be for format and technical content. Allow forty-five (45) days for Government review. | CF ok | A016 | |||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A006 |
Jorgensen Jr., John M.: Jorgensen Jr., John M.:
| Mismatched DIN when compared to Akiyama list | Contract Operational Security (OPSEC) Plan | DI-MGMT-80934C | SOW PARA 3.2.8.2 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | One / R | N/A | ||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A007 | Contractor's Progress, Status and Management Report | Including Monthly Risk Assessment and Eng. Services CLIN Financial Data. | DI-MGMT-80227 (See Blk. 16) | SOW PARA 3.2.4 | yes | PEO LCS, PMS420 | LT (SEE BLK 16) | N/A | D See Blk 16 | Monthly | N/A | 60DAC | 10 DARP | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 4: Paragraphs 10.2 & 10.3.j. do not apply. | ||
| Block 7: Electronic delivery is acceptable. Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval. | Block 9: Wording of Distribution Statements: see paragraph 1 Attachment 4 to the CDRL. | Blk 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL | ||||||||||||||||||||||||
| Blk 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | CF and PAPER (need to say elx) | A004 | 1 | 1 | 1 | |||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A008 | DATA ACCESSION LIST | N/A | DI-MGMT-81453A | SOW PARA 3.2.1 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | N/A | D See Blk 16 | MONTHLY | N/A | See Blk 9 | ||||||||
| 60 DAC | See Blk 9 | |||||||||||||||||||||||||
| 20 DARP | Via IDE | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) |
Block 4: Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via e-mail with notification of file attributes and drectory information for retrieval.
Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL. Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.
Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | CF ok | A009 | 1 | 1 | 1 | ||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A009 | Conference Agenda | N/A | DI-ADMIN-81249A | SOW PARA 3.2.5 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | N/A | D See Blk 16 | See Blk 16 | N/A | See Blk 16 | See Blk 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 3: Subtitle to be determined by applicable review. |
Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.
| Block 7: Letter of transmittal shan be via e-mail with notification of file attributes and drectory information for retrieval. | Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL. | ||||||||||||||||||||||||||
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | CF ok | A006 | 1 | 1 | 1 | ||||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A010 | Presentation Material | N/A | DI-ADMIN-81373 | SOW PARA 3.2.5 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | N/A | D See Blk 16 | See Blk 16 | N/A | See Blk 16 | See blk 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Blocks 10/12/13: Submit (7) seven calendar days or longer before each Program Management Review, Contract Milestone Review or any other meeting with Government attendance, and at last 2 days prior to any other meetings when an agenda is requested. | Block 14a.l: Data transmittals shall be marked with applicable Technical Instruction number(s). see Data Distribution Profile, Attacbment 2 to the CDRL. Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL. | ||
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | CF ok | A005 | 1 | 1 | 1 | ||||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A011 | REPORT, RECORD OF MEETING MINUTES | N/A | DI-ADMN-81505 | SOW PARA 3.2.5 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | SEE BLK 16 | See Blk 16 | SEE BLK 16 | See blk 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 7: Letter of transmittal shall be via e-mail with notification offile attributes and directory information for retrieval. | |||
| Block 9: 'Wording of Distribution Statements: see paragraph 1 ofAttachment 4 to the CDRL. | Block 12: Submit within five (7) calendar days after completion of each meeting/review. Subsequent submission will be seven (7) calendar days after receipt of comments. | Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction |
Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.
Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | CF ok | A007 | 1 | 1 | 1 | ||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A012 | Government Furnished Information Deficiency Report | N/A | DI-MGMT-80596 | SOW PARA 3.4.3 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | N/A | D See Blk 16 | See Blk. 16 | N/A | See Blk. 16 | See Blk. 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 7: Letter of transmittal shall be via e-mail with notification of file attributes and I directory information for retrieval. | |
| Block 9: Wording of Distribution Statements: see paragraph 1 ofAttachment 4 to the CDRL. | Blocks 10, 11, 12 & 13: A GFI Deficiency Report shall be submitted in accordance with the following guidelines: |
a. If GFI is not received within fourteen (14) days after the date it is scheduled to be delivered.
B. Within twenty (21) calendar days after contractor receipt of the GFI and inspection for patent defects such as quantity, identification, description, and readability, or if it differs in some other significant respect from that expected to be delivered.
| C. Within fourteen (14) calendar days after contractor determination that GFI has latent defects such as technical, engineering, or design deficiencies that existed at the time of delivery, but which were not discovered until actual attempted use of the GFI. | Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL. | ||||||||||||||||||||
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | CF ok | A001 | 1 | 1 | 1 | ||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A013 | Integrated Master Schedule (IMS) | N/A | DI-MGMT-81650 (See Blk 16) (look at new IPMR did) | SOW PARA 3.2.6 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | See Blk 16 | N/A | See blk. 16 | QRTLY | ||
| 10 DARP | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) |
Block 4: Contractor's format is acceptable Block 7: Letter of transmittal shall be via e-mail with notification offile attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL. Block 12: Submit 90 days after first full quarter is complete. The Government will provide comments or approval within 30 working days after receipt. Final copy is due NLT 30 calendar days after receipt of comments or approval.
Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction number(s). see Data Distribution Profile, Attachment 2 to the CDRL. Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
Block 14b.: Distribution shall be made via electronic means or media. Documents shall be produced using Microsoft Office personal computer software and shall be saved in the application's native file format. All objects (charts, graphs, etc.) imbedded within or linked to the report shall also use one ofthose applications as the originating application.
Pictures shall be saved using either a compressed Tagged Image File Format (TIFF) or Joint Pictures Experts Group (JPEG) file format. Documents shall also be provided in
| Adobe Acrobat Portable Document Format (PDF). For other forms ofElectronic Delivery ofData: see Attachment 3 to the CDRL. | Elx file, native tool. | A003 | 1 | 1 | |||||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A014 | Contract Work Breakdown Structure | DI-MGMT-81334D DTD07APR20 | SOW PARA 3.2.6 | Yes | PEO LCS, PMS420 | LTR | N/A | D See Blk 16 | As Requ Per TI | Per TI | Per TI | Via IDE | NA | NA | NA | NA | NA | OK now A014 | |||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A015 | Contract Performance Report (CPR) | Earned Value Status Report | DI-MGMT-81466A (See Blk. 16) | None | No mention or reference | PEO LCS, PMS420 | LT (SEE BLK 16) | N/A | D See Blk 16 | MONTHLY | SEE BLK 16 | 60 Days after Start of covered period. | |||||||||
| 60 DAC | See Blk 10, 11. | ||||||||||||||||||||||||||
| 20 DARP | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) |
Block 4: Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via e-mail with notification offile attributes and directory information for retrieval.
Block 9: 'Wording of Distribution Statements: see paragraph 1 ofAttachment 4 to the CDRL.
Block 11: Close of contractor's accounting period. Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.
Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | Readable Elx File, not pdf | A008 | 1 | 1 | 1 | |||||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A016 | Contractor's Configuration Management Plan | N/A | DI-CMAN-80858B (See Blk 16) | SOW PARA 3.8 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | ONETIME | N/A | 60 DAC | See BLK 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 8: | |||
| Approval will be for format and technical content. Allow forty-five (45) days for Government review. | Block 4: | |||||||||||||||||||||||||||
| DID may be used for guidance. Use existing document format. | Block 14: | |||||||||||||||||||||||||||
| Distribution shall be made via electronic means or media. | CF ok | A047 | ||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A017 | AS-BUILT CONFIGURATION LIST | N/A | DI-CMAN-81516 | SOW PARA 3.4.3 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | With Each TI-16 Design Package Delivery | N/A | See blk. 16 | See blk 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 4: | |||
| DID may be used for guidance and contractor format is acceptable . Use existing drawing package format for revisions. Deliver all design files in Native Tool formats.. | Block 8: | |||||||||||||||||||||||||||
| Approval will be for format and technical content. Allow sixty (60) days for Government review. | Block 14: | |||||||||||||||||||||||||||
| Distribution shall be made via electronic means or media. Red-Lined "As-Built" versions will be provided in hard copy only. Data submittals shall be marked with applicable TI number. | BLK 12/13: Draft due 180 days after CDR. Allow 60 dyas for' Government Comments or Approval. Final Copy is due 30 days after receipt of comments. | CF or GF per Contr PO | A060 | 1 | ||||||||||||||||||||||||
| r | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A106 | FCA/PCA Report | DI-CMAN-81022 | ||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A018 | Request for Deviation (RFD) / Request for Waiver (RFW) | N/A | DI-CMAN-80640C (See Blk. 16) | SOW PARA 3.8.4 | Only mentioned | |||||||||||||||||
| Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | ASREQ | N/A | ASREQ | ASREQ | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 4: | ||||||||||||||
| Replace form with 9470-002-A-X-C form | Block 8: | |||||||||||||||||||||||||||
| Government review and approval will be via Local Change Control Board (LCCB) process. | [[FOR SOW _ ADD WORDS That prevent use of funds unless authorized per TI..addendum - - | Block 14: | ||||||||||||||||||||||||||
| Distribution shall be made via electronic means or media. Documents shall be produced using Microsoft Office personal computer software and shall be saved in the application's native file format. All objects (charts, graphs, etc.) imbedded within or linked to the report shall also use one of those applications as the originating application. Pictures shall be saved using either a compressed Tagged Image Fille Format (TIFF) or Joint Pictures Experts Group (JPEG) file format. Documents shall also be provided in Adobe Acrobat Portable Document Format (PDF). | CF ok | A044 | 1 | 1 | ||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A019 | Engineering Change Proposal (ECP) | N/A | DI-CMAN-80639C (See Blk. 16) | SOW PARA 3.8.3 | Only mentioned |
Yes Only mentioned
| Only mentioned | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | ASREQ | N/A | See blk. 16 | See blk 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 8: | ||||||||||||||
| Government review and approval will be via Local Change Control Board (LCCB) process. | Block 10 to 13: ECPs shall be developed when tasked and funded for either new software or hardware capabilities. | Block 4: | ||||||||||||||||||||||||||
| Replace form with 9470-002-A-X-C form | Block 14: | |||||||||||||||||||||||||||
| Distribution shall be made via electronic means or media. Documents shall be produced using Microsoft Office personal computer software and shall be saved in the application's native file format. All objects (charts, graphs, etc.) imbedded within or linked to the report shall also use one of those applications as the originating application. Pictures shall be saved using either a compressed Tagged Image Fille Format (TIFF) or Joint Pictures Experts Group (JPEG) file format. Documents shall also be provided in Adobe Acrobat Portable Document Format (PDF). Data submittals shall be marked with applicable TI number, if required. | CF ok | A048 | ||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A020 | Baseline Description Document | Configuration Identification Baseline Report | DI-CMAN-81121 | SOW PARA 3.8.1 | No mention or reference | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | AS REQ | N/A | See blk. 16 | See blk 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 8: | |||
| Approval will be for format and technical content. Allow thirty (30) days for Government review. | Block 4: Deliver electronically via the IDE. Contractor format is acceptable if reviewed and approved by the Navy within 60 days of contract award. | Blocks 10,12 & 13: | ||||||||||||||||||||||||||
| Submit and deliver concurrently with Computer Software Product End Item. | Block 5: Provided at system level, using reference to SVDs for software baseline and Drawings for Technical Insertion hardware products. | DID says specific format | A049 | 1 | ||||||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A021 | DMSMS FORECASTING SOURCE DATA | Bill of Materials | DI-SESS-81656 | SOW PARA 3.10 | ||||||||||||||||||
| PEO LCS, PMS420 | LT (SEE BLK 16) | N/A | D See Blk 16 | |||||||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A022 | Safety Assessment Report (SAR) | N/A | DI-SAFT-80102B (See Blk. 16) | SOW PARA 3.9 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | See BLK 16 | N/A | See Blk. 16 | See Blk. 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 7: Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval. |
Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.
Blocks 12/13: Submit 10 calendar days prior to CDR for new design and ECP'd items. The Government will provide comments or approval within 30 working days after receipt. Final copy is due NLT 30 calendar days after receipt of comments or approval. Block 14a.l: Data transmittals shall be marked with applicable Technical Instruction number(s). see Data Distribution Profile, Attachment 2 to the CDRL.
Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | CF ok | A020 | |||||||||||||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A023 | PACKAGING HANDLING STORAGE AND TRANSPORTATION (PHS&T) Plan | N/A | DI-PACK-80455 | SOW PARA 3.11 | Yes | A | D See Blk 16 | ||||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A024 | STATUS REPORT | Trip Report | DI-MGMT-80368A | SOW PARA 3.15.4 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | ||||||||||
| 6000 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A025 | Scientific and Technical Reports | SEE TECHNICAL INSTRUCTION (TI) | DI-MISC-80711A (See Blk. 16) | SOW PARA 3.3.1 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | See Blk. 16 | N/A | See Blk. 16 | See Blk. 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) |
Block 4: Contractor's format is acceptable.
Block 7: Letter of Transmittal shall be via e-mail with notification offile attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements: see paragraph 1 ofAttachment 4 to the CDRL.
Blocks 10/12/13: As required per Technical Instruction. BLK 5: Delivered as a section of the Monthly Progress Reports.
Block 14a: Data transmittals shall be marked with applicable Technical Instruction I number(s). See Data Distribution Profile, Attachment 2 to the CDRL
| Block 14b: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | Block 7: | |||||||||||||||||
| Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval. | Refs ANSI std. | A012 | 1 | 1 | ||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A026 | Design Review Information Package (DRIP) | N/A | DI-SESS-81757A (See Blk. 16) | SOW PARA 3.3.1 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | For ALL Design Reviews per TRM | ||
| See Blk 16 | Fifteen (15) Days prior to Formal Design Reviews. | |||||||||||||||||
| N/A | See Blk 16. | N/A | ||||||||||||||||
| See Blk. 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) |
Block 7: Letter of transmittal shall be via e-mail with notification of file attributes andI directory information for retrieval.
Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the I
CDRL.
Blocks 10/12/13: As required per Techncial Instruction. Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.
Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | Block 7: | |||||||||||||||||||||||||||||
| Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval. | CF ok | A013 | 1 | 1 | ||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A027 | Technical Report - Study /Services | Reliability Allocation, Assessment, and Analysis Report | DI-RELI-81497 | SOW PARA 3.15.9 | Is there a real Reliab. Report DID to use? | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | A113 | 1 | |||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A028 | Failure Mode Effects and Criticality Analysis Report (FMECA) | N/A | DI-RELI-80687 | SOW PARA 3.15.9 | Yes | New Eng projects MMs | A | D See Blk 16 | ||||||||||||||||
| 0004 | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A029 | Failure Analysis and Corrective Action Report | Failure Reporting and Corrective Action Report (FRACAR) (see blck 16) | DI-SESS-81315A | SOW PARA 3.15.9 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | N/A | D See Blk 16 | MNTHLY | N/A | 120 DAC | MNTHLY | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 7: Letter of Transmittal shall be via e-mail with notification of file attributes and directory information for retrieval. | ||||||
| Block 9: Wording of Distribution Statements: see paragraph 3 of Attachment 4 to the CDRL. | Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL. | |||||||||||||||||||||||||||||
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL. | CF ok | A024 | 1 | |||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A030 | Specification Requirement Verification Matrix | DOORS Data Base Revisions | DI-MISC-81283 See Blk 16 | SOW PARA 3.3.2.c | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | See BLK 16 | N/A | See BLK 16 | See BLK 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | NSWC / DD (3, 4, 5, 6) | 1 | 1 |
Block 4: Paragraph 10.1.3 does not apply.
Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.
Block 10: Due 120 Days after start of 1st Article program.
| Block 12: The Government will provide comments or approval within 20 working days after receipt of each submission. Final copy due 10 calendar days after receipt of review comments. | Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL. | |||||||||||||||||||||||||||||||||
| Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL | DID says explicit, PAPER. | A030 | 1 | |||||||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A031 | Specification Change Notice (SCN) | N/A | DI-CMAN-80643C (See Blk. 16) | SOW PARA 3.8.3 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | NA | D See Blk 16 | ASREQ | N/A | ASREQ | ASREQ | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 8: | |||||||||
| Government review will be via Local Change Control Board (LCCB) process. [[MOVE TO SOW ]] | Block 14: | |||||||||||||||||||||||||||||||||
| Distribution shall be made via electronic means or media. Documents shall be produced using Microsoft Office personal computer software and shall be saved in the application's native file format. All objects (charts, graphs, etc.) imbedded within or linked to the report shall also use one of those applications as the originating application. Pictures shall be saved using either a compressed Tagged Image Fille Format (TIFF) or Joint Pictures Experts Group (JPEG) file format. Documents shall also be provided in Adobe Acrobat Portable Document Format (PDF). Data submittals shall be marked with applicable TI number. | CF ok | A045 | 1 | 1 | ||||||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A032 | Revisions to Existing Government Documents | DI-ADMN-80925 (See Blk. 16) | SOW PARA 3.12.7 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | ASREQ | N/A | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 3: | ||||||||||||
| TYPE A, WS-21200. | Block 4: Update documentation using consistent format and methods to previous delivery. Requirements shall be exported from requirements management tool when applicable | Blocks 10/12/13: | ||||||||||||||||||||||||||||||||
| As required to support the design process. Draft SCNs shall be provided with DRAFT ECPs as an attachment.. | Block 14a: | |||||||||||||||||||||||||||||||||
| Data transmittals shall be marked with applicable Technical Instruction number(s). See Data Distribution Profile, Attachment 2 to the CDRL. Block 14b: See Attachment 3 to the CDRL for form of electronic delivery. | requ use orig. doc format | A050 | 1 | 1 | ||||||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A033 | Interface Requirements Specification (IRS) | IRS (Updates and Revisions), Hardware Products and System Interfaces | DI-IPSC-81434A (See Blk 16) | SOW PARA 3.12.7 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | ASREQ | N/A | See blk. 16 | See blk 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | NSWC / DD (3, 4, 5, 6) | 1 | 1 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 8: | ||||||
| Block 4: Deliver electronic va the IDE. | BLK 16: Draft due 180 days after CR. | BLK 12/13: Draft due 180 days after CDR. Allow 60 dyas for' Government Comments or Approval. Final Copy is due 30 days after receipt of comments. | CF, Only: DID to say paper or Elx | A057 | 1 | 1 | ||||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A034 | Schematic Block Diagrams | Electrical Drawing and Associated List | DI-GDRQ-81223 | SOW PARA 3.12.7 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | ASREQ | N/A | See Blk. 16 | See Blk. 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | NSWC / DD (3, 4, 5, 6) | 1 | 1 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 4: | ||||||
| Contractor format and content are acceptable.. Delivery shall include native design tool files. | Block 9: | |||||||||||||||||||||||||||||||||
| Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL. | Block 14a: | |||||||||||||||||||||||||||||||||
| Data transmittals shall be marked with applicable Technical Instruction number(s). See Data Distribution Profile, Attachment 2 to the CDRL. 14b: See Attachment 3 to the CDRL for the form of electronic delivery. | BLK 12/13: Draft due 180 days after CDR. Allow 60 dyas for' Government Comments or Approval. Final Copy is due 30 days after receipt of comments. | System Level Blk Diag, no clear format requ | A058 | 1 | 1 | |||||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A035 | Installation Control Drawings | Updates and Revisions | DI-DRPR-81242 (See Blk. 16) | SOW PARA 3.15.4 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | ASREQ | N/A | See blk. 16 | See blk 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 4: | |||||||||
| DID may be used for guidance. Use existing drawing package format. | Block 8: | |||||||||||||||||||||||||||||||||
| Approval will be for format and technical content. Allow sixty (60) days for Government review. | Block 14: | |||||||||||||||||||||||||||||||||
| Distribution shall be made via electronic means or media. | BLK 12/13: Draft due 180 days after CDR. Allow 60 dyas for' Government Comments or Approval. Final Copy is due 30 days after receipt of comments. | Ref Mil-D-23140 | A061 | 1 | ||||||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A036 | Test Plan (MTEPP) | Master Test and Evaluation Program Plan (First Article) | DI-NDTI-80566A | SOW PARA 3.12 | Yes. Q: Who is developing the table of 1st article test requirements? Govt. needs to provide this with the RFP. | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | 30 DAC | SEE BLK 11 | 90 DAC | SEE BLK 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 5: Deliverable plan shall detail content and planning for all of the incremental builds of the ACB. | Block 8: | ||||||||
| Approval will be for format and technical content. Allow forty-five (45) days for Government review. | Blocks 10: | |||||||||||||||||||||||||||||||||
| Due within two (2) weeks prior to Level 3 test of each build. | Per Mil Std 3022 | A079 | 1 | |||||||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A037 | Test Plans / Test Procedures | Test Procedures, System Level, First Article | DI-SESS-81704 DTD06NOV22 | SOW PARA 3.12 | Kind of mentioned maybe | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | 180 DAC | N/A | 60 Days Prior to Testing | 10 Days priort to testing. | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 4: | |||||||||
| Contractor format is acceptable. | Block 8: | |||||||||||||||||||||||||||||||||
| Approval will be for format and technical content. Allow thirty (30) days for Government review. | Block 14: | |||||||||||||||||||||||||||||||||
| Distribution shall be made via electronic means or media. Data submittals shall be marked with applicable TI number. | CF ok | A081 | 1 | |||||||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A038 | PRODUCTION ACCEPTANCE TEST PROCEDURE | DI-SESS-81704 | SOW PARA 3.4.2 | Yes | A | D See Blk 16 | 120 DA OPTION 1 | |||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A039 | Test Procedure | Unit Test Procedure (HARDWARE ITEMS) | DI-NDTI-80603A | SOW PARA 3.4.2 | Yes - the CDRL item below has similar name and used DID DI-SESS-81704. better? Difference? | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | 120 DA OPTION 1 | N/A | See blk. 16 | See blk 16 | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 8: | |||||||||
| Approval will be for format and technical content. Allow forty-five (45) days for Government review. | Blocks 12 & 13: | |||||||||||||||||||||||||||||||||
| Preliminary procedures due forty-five (45) days prior to start of test. Final procedures due to TECHREP for signature fifteen (15) days prior to test. Final signature copy delivery to distribution not later than five (5) days prior to test. | BLK 12/13: Draft due 180 days after CDR. Allow 60 dyas for' Government Comments or Approval. Final Copy is due 30 days after receipt of comments. | CF ok | A059 | 1 | ||||||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A040 | Test/Inspection Report | Unit Test Results | DI-NDTI-80809B (See Blk. 16) | SOW PARA 3.4.2 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | SEE BLK 16 | N/A | See blk. 16 | N/A | Standard Distribution, See Blk 16 | See Blk 16 | See Blk 16 | See Blk 16 | Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab) | Block 8: | |||||||||
| Allow thirty (30) days for Government review. | 10. 360 DAC for First Article Testing. With each DD250 for Production Testing. | BLK 10. ONE TIME per each Incremental Build.. | ||||||||||||||||||||||||||||||||
| BLK 12/13: Submit NLT 30 days after completion of each incremental build. Final submission is due 30 days after Final System Certification testing is complete. | Block 12: | |||||||||||||||||||||||||||||||||
| Submit no later than sixty (60) days after Unit Test, or as directed by PEO IWS1. | Block 14: | |||||||||||||||||||||||||||||||||
| Distribution shall be made via electronic means or media. Data submittals shall be marked with applicable TI number. | CF ok | A042 | 1 | 1 | ||||||||||||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A041 | WORK INSTRUCTIONS | Manufacturing Drawings | DI-SESS-81012D | SOW PARA 3.4.1 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | SEE BLK 16 | N/A | See blk. 16 | N/A | Block 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware. | ||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A042 | Product Drawings/Models and Associated Lists | N/A | DI-SESS-81000D | SOW PARA 3.12.7 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | SEE BLK 16 | N/A | See blk. 16 | N/A | Block 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware. | A100 | 1 | ||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A043 | Commercial Drawings/ Models and Associated Lists | N/A | DI-SESS-81003D | SOW PARA 3.12.7 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | SEE BLK 16 | N/A | See blk. 16 | N/A | Block 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware. | A101 | 1 | ||||||||||||
| r | A | TDP [ ] TM [ ] OTHER [ X ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A044 | Source Control Drawings Approval Request | N/A | SOW PARA 3.12.7 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A106 | 1 | ||||||||||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A045 | Drawing Number Assignment Report | N/A | DI-SESS-81011D | SOW PARA 3.12.7 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | SEE BLK 16 | N/A | See blk. 16 | N/A | Block 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware. | A102 | 1 | ||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A046 | Proposed Critical Manufacturing Process Description | N/A | DI-SESS-81012D | SOW PARA 3.12.7 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | SEE BLK 16 | N/A | See blk. 16 | N/A | Block 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware. | A103 | 1 | ||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A047 | Special Inspection Equipment (SIE), Drawings/Models and Associated Lists | N/A | DI-SESS-81004D | SOW PARA 3.12.7 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | SEE BLK 16 | N/A | See blk. 16 | N/A | Block 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware. | A104 | 1 | ||||||||||||
| 6000 | A | TDP [ X ] TM [ ] OTHER [ ] | LCS MP DEPS | N00024-13-NR-xxxx | TBD (COMPET) | A048 | Special Tooling (ST) Drawings/Models and Associated Lists | N/A | DI-SESS-81008D | SOW PARA 3.12.7 | Yes | PEO LCS, PMS420 | LT (SEE BLK 16) | A | D See Blk 16 | SEE BLK 16 | N/A | See blk. 16 | N/A | Block 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware. | A105 | 1 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .