File Type Posted
N66604-14-R-1120_Amendment_8.pdf PDF
N66604-14-R-1120_Amendment_7.pdf PDF
N66604-14-R-1120_Amendment_6.pdf PDF
N66604-14-R-1120_Amendment_5.pdf PDF
N66604-14-R-1120-0004.pdf PDF
QA_Master_List_7_October_2014.docx DOCX document
N6660414R1120A00003.pdf PDF
QA_Master_Lis_30_September_2014.docx DOCX document
Q A_Master_List_26_September_2014.docx DOCX document
B017.pdf PDF
F008.pdf PDF
Q A_Master_List_23_September_2014.docx DOCX document
B018.pdf PDF
B019.pdf PDF
N66604-14-R-1120-0002.pdf PDF
F010.pdf PDF
Q A_Master_List_19_September_2014.docx DOCX document
RFP_QUESTIONS_AND_ANSWERS_27_August.docx DOCX document
N66604-14-R-1120-0001.pdf PDF
Q A_Master_List_12_September_2014.docx DOCX document
CDRL_Data_Item_B020.pdf PDF
RFP_QUESTIONS_AND_ANSWERS_22_August.docx DOCX document
RFP_with_attachments.pdf PDF
QAs.docx DOCX document
DD_254.pdf PDF
SOW_Addendum_1_-_Rapid_Technology_Insertion_Overview.docx DOCX document
Draft_Section_B.docx DOCX document
White_Paper_Synopsis.docx DOCX document
SOW_Addendum_2_-_Topic_Description.docx DOCX document
Draft_Statement_of_Work_(SOW).doc DOC document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page DRAFT CONTRACT DATA REQUIREMENTS LIST, DD-1423 to RFP # N00024-x-xxxx

The required delivrable data is dscribed in this file in leieu of a pdf file in order to provide a usable data management framework. This file has 4 tabs:

Tabs 1. Key Coded Form. Data items can be virewed in traditional format on this tab. Enter CDRL Number in the form on the top right to see the data in the traditional DD-1423 Format.

Tab 2: Flat File. Data in sortable format. Can be captured for contractor data management tools.

Tab 3: Distributionb Tab. Notes applicable to all Data Items.

Tab 4: Glossary and Addresses: Addresses for recipients of data items when using electronic notification system.

Tab 5: A Visual Schedule of the Data Deliveries

Tab 6: A Tailoring Order Form, To indicate whether data is applicable to an RTI project. Assume all data is applicable if this form is not filled in.

frank.caponiti: frank.caponiti:

typo: deliverable, lieu, viewed; Distribution, Akiyama Phonecall

Data Item NumberTitle of Data ItemSubtitleAuthority
(Data Acquisition Doc Number)Contract ReferenceColumn1Column2Column3Column4
A001MANAGEMENT PLANProgram Management Plan (PMP)DI-MGMT-80004A3.2.1With proposal
A002MANAGEMENT PLANOpen System Management Plan (OSMP)DI-MGMT-80004A3.2.1, 3.3.2With proposal - Tailor the requmt
A003SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP)N/ADI-SESS-817853.2.1, 3.3.3With proposal
A004 With proposalQUALITY PROGRAM PLAN (QPP)Quality Assurance Management Plan (QMP)DI-QCIC-817223.2.1, 3.5.1With proposal
A005SYSTEM SAFETY PROGRAM PLAN (SSPP)N/ADI-SAFT-816263.2.1, 3.xx
A007Contract Operational Security (OPSEC) PlanDI-MGMT-80934C3.2.1,
A008CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORTIncluding Risk Assessment, X, y, and z.DI-MGMT-802273.2.4
A009CONFERENCE AGENDAN/ADI-ADMIN-81249A3.2.5
A010PRESENTATION MATERIALN/ADI-ADMIN-813733.2.5, 3.5
A011REPORT, RECORD OF MEETING/ MINUTESN/ADI-ADMN-815053.2.5
A012GOVERNMENT FURNISHED INFORMATION DEFICIENCY REPORTN/ADI-MGMT-805964
A013INTEGRATED MASTER SCHEDULE (IMS)N/ADI-MGMT-8165014.2
A014CONTRACTOR'S WORK BREAKDOWN STRUCTURE (CWBS)14.2
A015 ?? LOE clins for DE laborCONTRACT PERFORMANCE REPORT (CPR)Earned Value Status ReportDI-MGMT-81466A3.3.2NRE - ASW & GriffinGet other $$ data in monthly PM Rpt for LOE
A015CONFIGURATION MANAGEMENT PLAN (CM PLAN)DI-CMAN-80858B10
A016AS-BUILT CONFIGURATION LISTN/A4.3
A017REQUEST FOR DEVIATION (RFD) / REQUEST FOR WAIVER (RFW)10.1
A018ENGINEERING CHANGE PROPOSAL (ECP)Prelim an dFinalDI-CMAN-80639C10.3
A019BASELINE DESCRIPTION DOCUMENTConfiguration Identification Baseline ReportDI-CMAN-81121NONE
A020DMSMS FORECASTING SOURCE DATA12.1
A021DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS)Bill of Material Source DataOT-12-2000212
A022SYSTEM SAFETY ASSESSMENT REPORT(for Griffin and ASW - NRE)DI-SAFT-80102B11
A023PACKAGING HANDLING STORAGE AND TRANSPORTATION (PHS&T)13
A024MATERIAL INSPECTION AND RECEIVING REPORT13.1
A025STATUS REPORTTrip ReportDI-MGMT-80368ANONE
A026SCIENTIFIC AND TECHNICAL REPORTSSee Technical Instruction (TI)DI-MISC-80711A
A027DESIGN REVIEW INFORMATION PACKAGE (DRIP)N/ADI-SESS-81757AASW and griffinand if designs change of productin hw
A028TECHNICAL REPORT-STUDY/SERVICESReliability Allocation, Assessment and Analysis ReportDI-MISC-80508BNONEGriffin and ASWGriffin and ASW
A029Failure Mode Effects and Criticality Analysis Report (FMECA)N/ADI-ILSS-81495NONENew Eng projects MMs
A030SPECIFICATION REQUIREMENT VERIFICATION MATRIXDOORS Data Base RevisionsDI-MISC-81283NONEDE - Griffin, ASW ?
A031SPECIFICATION CHANGE NOTICE (SCN)N/ADI-CMAN-80643CNONE
A033REVISIONS TO EXISTING GOVERNMENT DOCUMENTSDI-ADMN-80925NONE
A034INTERFACE REQUIREMENTS SPECIFICATION (IRS)IRS (Updates and Revisions), Hardware Products and System InterfacesDI-IPSC-81434ANONE
A035SCHEMATIC BLOCK DIAGRAMSElectrical Drawing and Associated ListDI-GDRQ-81223NONE
A036INSTALLATION CONTROL DRAWINGSUpdates and RevisionsDI-DRPR-81242NONE
A037TEST PLANMaster Test and Evaluation Program Plan (MTEPP) (System Level )DI-NDTI-80566ANONEOne for each MP? NO - for programNRE - ASW & Griffin
A038TEST PLANS / TEST PROCEDURESTest Procedures, System LevelDI-SESS-81704NONENRE - ASW & Griffin
A039PRODUCTION ACCEPTANCE TEST PROCEDURE
A040TEST PROCEDUREUnit Test Procedure (Hardware Items)DI-NDTI-80603ANONE
A041TEST REPORTSHardware or Systems TestingDI-NDTI-80809BNONENRE - ASW & Griffin
A0142TEST/INSPECTION REPORT4.2
A043WORK INSTRUCTIONSManufacturing Drawings4.1
A044PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTSN/ADI-SESS-81000DNONE
A045COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTSN/ADI-SESS-81003DNONE
A046DRAWING NUMBER ASSIGNMENT REPORTN/AD-SESS-81011DNONE
A047PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION (PCMPD)N/ADI-SESS-81012DNONEcompre to other process dwgs
A048SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTSN/ADI-SESS-81004DNONE
A049TECHNICAL INFORMATION REPORTCommercial-Off-The-Shelf (COTS) Data Sheets (Updates and Revisions)DI-MISC-806524.2
A050SPECIAL TOOLING (ST) DRAWINGS/MODELS AND ASSOCIATED LISTSN/ADI-SESS-81008DNONE
A051PROVISIONING TECHNICAL DOCUMENTATIONDesign Change NoticeDI-ILSS-81285

Sharon Washington: Sharon Washington:

Cancelled with no superseded document.

Renee Hicks is to send out alternate DID for consideration.NONEboth look likechanges only - original ptd = ??
A052SUPPLEMENTARY PROVISIONING TECHNICAL DOCUMENTATIONPost Production Updates and RevisionsDI-SESS-81716NONE
A053TECHNICAL MANUAL VALIDATION PLANTechnical Manual and MRC Validation/Verification PlanTI-TMSS-81701NONE
A054TECHNICAL MANUALSDevelopment Maintenance (Updates and Revisions)N/ANONEIn same style as exists
A055REVISIONS TO EXISTING GOVERNMENT DOCUMENTSTraining MaterialDI-ADMIN-80925NONE
A056PLANNED MAINTENANCE SYSTEM (PMS) TASK DEFINITIONCorrective Maintenance ExercisesDI-SESS-80988ANONE
A057PLANNED MAINTENANCE SYSTEM (PMS)Maintenance Index Page (MIP)DI-MNTY-80992NONE
A058PLANNED MAINTENANCE SYSTEM (PMS)Maintenance Requirements Card (MRC)DI-MNTY-80991NONE

FlatFile

Contract Line
Item NumberExhibitCategorySystem/ItemContract/PR No.ContractorData Item NumberTitle of Data ItemSubtitle4. Authority (Data Acquisition Doc Number)Contract ReferenceReferenced in ContractRequiring OfficeDD 250 ReqApp. Code9. Dist. Statement
Required10. Frequency11. As of date12. Date of first submission13. Date of subsequent submissionAddresseeCOPIES:
DraftCOPIES:
Final RegCOPIES:
Final ReproAddresseeCOPIES:
DraftCOPIES:
Final RegCOPIES:
Final ReproAddresseeCOPIES:
DraftCOPIES:
Final RegCOPIES:
Final ReproAddresseeCOPIES:
DraftCOPIES:
Final RegCOPIES:
Final ReproAddresseeCOPIES:
DraftCOPIES:
Final RegCOPIES:
Final ReproAddresseeCOPIES:
DraftCOPIES:
Final RegCOPIES:
Final ReproREMARKS:
Format called out per DIDWhich TI ?MP Design EngProductionMP Sustainment
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A001Management PlanProgram Management Plan (PMP)DI-MGMT-80004A (See Blk. 16)SOW PARA 3.2,1YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16One / RN/A30 DACN/AStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 7: Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.13. The Government will provide comments or approval within 30 working days after receipt. Final copy is due NLT 30 calendar days after receipt of comments or approval.Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
Block 14b.: Form ofElectronic Delivery of Data: see Attachment 3 to the CDRLCF, and some minimalA002
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A002Management PlanOpen System Management Plan (OSMP)DI-MGMT-80004A (See Blk. 16)SOW PARA 3.2.1
SOW PARA 3.3.2Yes
YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16One / RN/A45 DAC
See Blk 16N/AStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 7: Electronic delivery is acceptable. Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval.

Block 9: Distribution Statements: see paragraph 1 of Attachment 4 to the

CDRL.

Block 12: Submit draft 45 DAC. The Government will provide comments or approval within 30 working days after receipt. Final copy is due NLT 30 calendar days after receipt of comments or approval. Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.

Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.

Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.CF, and some minimalA014
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A003System Engineering Management Plan (SEMP)N/ADI-SESS-81785 (See Blk 16)SOW PARA 3.2.1
SOW PARA 3.3.3YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16One / RN/AAT SRR
See Blk. 16N/AStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16(7) PEO IWS-D110Block 7: Letter of Transmittal shall be via e-mail with notification offile attributes and directory information for retrieval.

Block 9:Wording of Distribution Statements: see paragraph 7 of Attachment 4 to the CDRL.

Block 12: Submit 30 days prior to Systems Requirements Review (SRR). The Government will provide comments or approval within 30 working days after receipt. Final copy is due NLT 30 calendar days after receipt of comments or approval. Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.

Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.

Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.CF okA0111
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A004Quality Program Plan (QPP)Quality Assurance Program Plan (QAPP)DI-QCIC-81722 (SEE BLK 16)SOW PARA 3.2.1
SOW PARA 3.5.1YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16One / RN/A60 DAC
SEE BLK 16SEE BLK 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 4: Contractor's format is acceptable.

Block 7: Letter of Transmittal shall be via e-mail with notification of file attributes and directory information for retrieval.

Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.

Blocks 12/13: 'The Government will provide comments or approval within 10 working days after contract award. Final copy is due NLT 30 calendar days after receipt of comments or approval. Block 14a.l: Data transmittals shall be marked with applicable Technical Instruction Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.

Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRLCF ok, PAPERA029
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A005System Safety Program Plan (SSPP)N/ADI-SAFT-81626 (See Blk 16)SOW PARA 3.9Mentioned, but only references SSAR.. Is the SSPP going to be GFI ???PEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16One / RN/ASee blk. 16N/AStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 7: Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval.

Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.

Block 12: Submit draft 45 DAC. The Government will provide comments or approval within 10 days after contract award. Final copy is due NLT 30 calendar days after receipt of comments or approval. Block 14a.1: See Data Distribution Profile, Attachment 2 to the CDRL.

Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.

Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.Block 8:
Approval will be for format and technical content. Allow forty-five (45) days for Government review.CF okA016
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A006

Jorgensen Jr., John M.: Jorgensen Jr., John M.:

Mismatched DIN when compared to Akiyama listContract Operational Security (OPSEC) PlanDI-MGMT-80934CSOW PARA 3.2.8.2YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16One / RN/A
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A007Contractor's Progress, Status and Management ReportIncluding Monthly Risk Assessment and Eng. Services CLIN Financial Data.DI-MGMT-80227 (See Blk. 16)SOW PARA 3.2.4yesPEO LCS, PMS420LT (SEE BLK 16)N/AD See Blk 16MonthlyN/A60DAC10 DARPStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 4: Paragraphs 10.2 & 10.3.j. do not apply.
Block 7: Electronic delivery is acceptable. Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval.Block 9: Wording of Distribution Statements: see paragraph 1 Attachment 4 to the CDRL.Blk 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL
Blk 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.CF and PAPER (need to say elx)A004111
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A008DATA ACCESSION LISTN/ADI-MGMT-81453ASOW PARA 3.2.1YesPEO LCS, PMS420LT (SEE BLK 16)N/AD See Blk 16MONTHLYN/ASee Blk 9
60 DACSee Blk 9
20 DARPVia IDEStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)

Block 4: Contractor's format is acceptable.

Block 7: Letter of transmittal shall be via e-mail with notification of file attributes and drectory information for retrieval.

Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL. Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.

Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.

Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.CF okA009111
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A009Conference AgendaN/ADI-ADMIN-81249ASOW PARA 3.2.5YesPEO LCS, PMS420LT (SEE BLK 16)N/AD See Blk 16See Blk 16N/ASee Blk 16See Blk 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 3: Subtitle to be determined by applicable review.

Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.

Block 7: Letter of transmittal shan be via e-mail with notification of file attributes and drectory information for retrieval.Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.CF okA006111
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A010Presentation MaterialN/ADI-ADMIN-81373SOW PARA 3.2.5YesPEO LCS, PMS420LT (SEE BLK 16)N/AD See Blk 16See Blk 16N/ASee Blk 16See blk 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Blocks 10/12/13: Submit (7) seven calendar days or longer before each Program Management Review, Contract Milestone Review or any other meeting with Government attendance, and at last 2 days prior to any other meetings when an agenda is requested.Block 14a.l: Data transmittals shall be marked with applicable Technical Instruction number(s). see Data Distribution Profile, Attacbment 2 to the CDRL. Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.CF okA005111
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A011REPORT, RECORD OF MEETING MINUTESN/ADI-ADMN-81505SOW PARA 3.2.5YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16SEE BLK 16See Blk 16SEE BLK 16See blk 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 7: Letter of transmittal shall be via e-mail with notification offile attributes and directory information for retrieval.
Block 9: 'Wording of Distribution Statements: see paragraph 1 ofAttachment 4 to the CDRL.Block 12: Submit within five (7) calendar days after completion of each meeting/review. Subsequent submission will be seven (7) calendar days after receipt of comments.Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction

Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.

Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.

Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.CF okA007111
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A012Government Furnished Information Deficiency ReportN/ADI-MGMT-80596SOW PARA 3.4.3YesPEO LCS, PMS420LT (SEE BLK 16)N/AD See Blk 16See Blk. 16N/ASee Blk. 16See Blk. 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 7: Letter of transmittal shall be via e-mail with notification of file attributes and I directory information for retrieval.
Block 9: Wording of Distribution Statements: see paragraph 1 ofAttachment 4 to the CDRL.Blocks 10, 11, 12 & 13: A GFI Deficiency Report shall be submitted in accordance with the following guidelines:

a. If GFI is not received within fourteen (14) days after the date it is scheduled to be delivered.

B. Within twenty (21) calendar days after contractor receipt of the GFI and inspection for patent defects such as quantity, identification, description, and readability, or if it differs in some other significant respect from that expected to be delivered.

C. Within fourteen (14) calendar days after contractor determination that GFI has latent defects such as technical, engineering, or design deficiencies that existed at the time of delivery, but which were not discovered until actual attempted use of the GFI.Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.CF okA001111
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A013Integrated Master Schedule (IMS)N/ADI-MGMT-81650 (See Blk 16) (look at new IPMR did)SOW PARA 3.2.6YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16See Blk 16N/ASee blk. 16QRTLY
10 DARPStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)

Block 4: Contractor's format is acceptable Block 7: Letter of transmittal shall be via e-mail with notification offile attributes and directory information for retrieval.

Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL. Block 12: Submit 90 days after first full quarter is complete. The Government will provide comments or approval within 30 working days after receipt. Final copy is due NLT 30 calendar days after receipt of comments or approval.

Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction number(s). see Data Distribution Profile, Attachment 2 to the CDRL. Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.

Block 14b.: Distribution shall be made via electronic means or media. Documents shall be produced using Microsoft Office personal computer software and shall be saved in the application's native file format. All objects (charts, graphs, etc.) imbedded within or linked to the report shall also use one ofthose applications as the originating application.

Pictures shall be saved using either a compressed Tagged Image File Format (TIFF) or Joint Pictures Experts Group (JPEG) file format. Documents shall also be provided in

Adobe Acrobat Portable Document Format (PDF). For other forms ofElectronic Delivery ofData: see Attachment 3 to the CDRL.Elx file, native tool.A00311
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A014Contract Work Breakdown StructureDI-MGMT-81334D DTD07APR20SOW PARA 3.2.6YesPEO LCS, PMS420LTRN/AD See Blk 16As Requ Per TIPer TIPer TIVia IDENANANANANAOK now A014
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A015Contract Performance Report (CPR)Earned Value Status ReportDI-MGMT-81466A (See Blk. 16)NoneNo mention or referencePEO LCS, PMS420LT (SEE BLK 16)N/AD See Blk 16MONTHLYSEE BLK 1660 Days after Start of covered period.
60 DACSee Blk 10, 11.
20 DARPStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)

Block 4: Contractor's format is acceptable.

Block 7: Letter of transmittal shall be via e-mail with notification offile attributes and directory information for retrieval.

Block 9: 'Wording of Distribution Statements: see paragraph 1 ofAttachment 4 to the CDRL.

Block 11: Close of contractor's accounting period. Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.

Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.

Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.Readable Elx File, not pdfA008111
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A016Contractor's Configuration Management PlanN/ADI-CMAN-80858B (See Blk 16)SOW PARA 3.8YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16ONETIMEN/A60 DACSee BLK 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 8:
Approval will be for format and technical content. Allow forty-five (45) days for Government review.Block 4:
DID may be used for guidance. Use existing document format.Block 14:
Distribution shall be made via electronic means or media.CF okA047
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A017AS-BUILT CONFIGURATION LISTN/ADI-CMAN-81516SOW PARA 3.4.3YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16With Each TI-16 Design Package DeliveryN/ASee blk. 16See blk 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 4:
DID may be used for guidance and contractor format is acceptable . Use existing drawing package format for revisions. Deliver all design files in Native Tool formats..Block 8:
Approval will be for format and technical content. Allow sixty (60) days for Government review.Block 14:
Distribution shall be made via electronic means or media. Red-Lined "As-Built" versions will be provided in hard copy only. Data submittals shall be marked with applicable TI number.BLK 12/13: Draft due 180 days after CDR. Allow 60 dyas for' Government Comments or Approval. Final Copy is due 30 days after receipt of comments.CF or GF per Contr POA0601
rATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A106FCA/PCA ReportDI-CMAN-81022
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A018Request for Deviation (RFD) / Request for Waiver (RFW)N/ADI-CMAN-80640C (See Blk. 16)SOW PARA 3.8.4Only mentioned
YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16ASREQN/AASREQASREQStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 4:
Replace form with 9470-002-A-X-C formBlock 8:
Government review and approval will be via Local Change Control Board (LCCB) process.[[FOR SOW _ ADD WORDS That prevent use of funds unless authorized per TI..addendum - -Block 14:
Distribution shall be made via electronic means or media. Documents shall be produced using Microsoft Office personal computer software and shall be saved in the application's native file format. All objects (charts, graphs, etc.) imbedded within or linked to the report shall also use one of those applications as the originating application. Pictures shall be saved using either a compressed Tagged Image Fille Format (TIFF) or Joint Pictures Experts Group (JPEG) file format. Documents shall also be provided in Adobe Acrobat Portable Document Format (PDF).CF okA04411
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A019Engineering Change Proposal (ECP)N/ADI-CMAN-80639C (See Blk. 16)SOW PARA 3.8.3Only mentioned

Yes Only mentioned

Only mentionedPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16ASREQN/ASee blk. 16See blk 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 8:
Government review and approval will be via Local Change Control Board (LCCB) process.Block 10 to 13: ECPs shall be developed when tasked and funded for either new software or hardware capabilities.Block 4:
Replace form with 9470-002-A-X-C formBlock 14:
Distribution shall be made via electronic means or media. Documents shall be produced using Microsoft Office personal computer software and shall be saved in the application's native file format. All objects (charts, graphs, etc.) imbedded within or linked to the report shall also use one of those applications as the originating application. Pictures shall be saved using either a compressed Tagged Image Fille Format (TIFF) or Joint Pictures Experts Group (JPEG) file format. Documents shall also be provided in Adobe Acrobat Portable Document Format (PDF). Data submittals shall be marked with applicable TI number, if required.CF okA048
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A020Baseline Description DocumentConfiguration Identification Baseline ReportDI-CMAN-81121SOW PARA 3.8.1No mention or referencePEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16AS REQN/ASee blk. 16See blk 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 8:
Approval will be for format and technical content. Allow thirty (30) days for Government review.Block 4: Deliver electronically via the IDE. Contractor format is acceptable if reviewed and approved by the Navy within 60 days of contract award.Blocks 10,12 & 13:
Submit and deliver concurrently with Computer Software Product End Item.Block 5: Provided at system level, using reference to SVDs for software baseline and Drawings for Technical Insertion hardware products.DID says specific formatA0491
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A021DMSMS FORECASTING SOURCE DATABill of MaterialsDI-SESS-81656SOW PARA 3.10
PEO LCS, PMS420LT (SEE BLK 16)N/AD See Blk 16
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A022Safety Assessment Report (SAR)N/ADI-SAFT-80102B (See Blk. 16)SOW PARA 3.9YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16See BLK 16N/ASee Blk. 16See Blk. 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 7: Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval.

Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.

Blocks 12/13: Submit 10 calendar days prior to CDR for new design and ECP'd items. The Government will provide comments or approval within 30 working days after receipt. Final copy is due NLT 30 calendar days after receipt of comments or approval. Block 14a.l: Data transmittals shall be marked with applicable Technical Instruction number(s). see Data Distribution Profile, Attachment 2 to the CDRL.

Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.

Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.CF okA020
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A023PACKAGING HANDLING STORAGE AND TRANSPORTATION (PHS&T) PlanN/ADI-PACK-80455SOW PARA 3.11YesAD See Blk 16
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A024STATUS REPORTTrip ReportDI-MGMT-80368ASOW PARA 3.15.4YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16
6000ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A025Scientific and Technical ReportsSEE TECHNICAL INSTRUCTION (TI)DI-MISC-80711A (See Blk. 16)SOW PARA 3.3.1YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16See Blk. 16N/ASee Blk. 16See Blk. 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)

Block 4: Contractor's format is acceptable.

Block 7: Letter of Transmittal shall be via e-mail with notification offile attributes and directory information for retrieval.

Block 9: Wording of Distribution Statements: see paragraph 1 ofAttachment 4 to the CDRL.

Blocks 10/12/13: As required per Technical Instruction. BLK 5: Delivered as a section of the Monthly Progress Reports.

Block 14a: Data transmittals shall be marked with applicable Technical Instruction I number(s). See Data Distribution Profile, Attachment 2 to the CDRL

Block 14b: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.Block 7:
Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval.Refs ANSI std.A01211
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A026Design Review Information Package (DRIP)N/ADI-SESS-81757A (See Blk. 16)SOW PARA 3.3.1YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16For ALL Design Reviews per TRM
See Blk 16Fifteen (15) Days prior to Formal Design Reviews.
N/ASee Blk 16.N/A
See Blk. 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)

Block 7: Letter of transmittal shall be via e-mail with notification of file attributes andI directory information for retrieval.

Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the I

CDRL.

Blocks 10/12/13: As required per Techncial Instruction. Block 14a.1: Data transmittals shall be marked with applicable Technical Instruction Dumber(s). See Data Distribution Profile, Attachment 2 to the CDRL.

Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.

Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.Block 7:
Letter of transmittal shall be via e-mail with notification of file attributes and directory information for retrieval.CF okA01311
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A027Technical Report - Study /ServicesReliability Allocation, Assessment, and Analysis ReportDI-RELI-81497SOW PARA 3.15.9Is there a real Reliab. Report DID to use?PEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16A1131
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A028Failure Mode Effects and Criticality Analysis Report (FMECA)N/ADI-RELI-80687SOW PARA 3.15.9YesNew Eng projects MMsAD See Blk 16
0004ATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A029Failure Analysis and Corrective Action ReportFailure Reporting and Corrective Action Report (FRACAR) (see blck 16)DI-SESS-81315ASOW PARA 3.15.9YesPEO LCS, PMS420LT (SEE BLK 16)N/AD See Blk 16MNTHLYN/A120 DACMNTHLYStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 7: Letter of Transmittal shall be via e-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements: see paragraph 3 of Attachment 4 to the CDRL.Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRL.CF okA0241
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A030Specification Requirement Verification MatrixDOORS Data Base RevisionsDI-MISC-81283 See Blk 16SOW PARA 3.3.2.cYesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16See BLK 16N/ASee BLK 16See BLK 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16NSWC / DD (3, 4, 5, 6)11

Block 4: Paragraph 10.1.3 does not apply.

Block 9: Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.

Block 10: Due 120 Days after start of 1st Article program.

Block 12: The Government will provide comments or approval within 20 working days after receipt of each submission. Final copy due 10 calendar days after receipt of review comments.Block 14a.2: Special Provision Regarding Electronic Administrative Changes to the CDRL Data Package: see Attachment 5 to the CDRL.
Block 14b.: Form of Electronic Delivery of Data: see Attachment 3 to the CDRLDID says explicit, PAPER.A0301
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A031Specification Change Notice (SCN)N/ADI-CMAN-80643C (See Blk. 16)SOW PARA 3.8.3YesPEO LCS, PMS420LT (SEE BLK 16)NAD See Blk 16ASREQN/AASREQASREQStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 8:
Government review will be via Local Change Control Board (LCCB) process. [[MOVE TO SOW ]]Block 14:
Distribution shall be made via electronic means or media. Documents shall be produced using Microsoft Office personal computer software and shall be saved in the application's native file format. All objects (charts, graphs, etc.) imbedded within or linked to the report shall also use one of those applications as the originating application. Pictures shall be saved using either a compressed Tagged Image Fille Format (TIFF) or Joint Pictures Experts Group (JPEG) file format. Documents shall also be provided in Adobe Acrobat Portable Document Format (PDF). Data submittals shall be marked with applicable TI number.CF okA04511
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A032Revisions to Existing Government DocumentsDI-ADMN-80925 (See Blk. 16)SOW PARA 3.12.7YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16ASREQN/AStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 3:
TYPE A, WS-21200.Block 4: Update documentation using consistent format and methods to previous delivery. Requirements shall be exported from requirements management tool when applicableBlocks 10/12/13:
As required to support the design process. Draft SCNs shall be provided with DRAFT ECPs as an attachment..Block 14a:
Data transmittals shall be marked with applicable Technical Instruction number(s). See Data Distribution Profile, Attachment 2 to the CDRL. Block 14b: See Attachment 3 to the CDRL for form of electronic delivery.requ use orig. doc formatA05011
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A033Interface Requirements Specification (IRS)IRS (Updates and Revisions), Hardware Products and System InterfacesDI-IPSC-81434A (See Blk 16)SOW PARA 3.12.7YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16ASREQN/ASee blk. 16See blk 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16NSWC / DD (3, 4, 5, 6)11Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 8:
Block 4: Deliver electronic va the IDE.BLK 16: Draft due 180 days after CR.BLK 12/13: Draft due 180 days after CDR. Allow 60 dyas for' Government Comments or Approval. Final Copy is due 30 days after receipt of comments.CF, Only: DID to say paper or ElxA05711
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A034Schematic Block DiagramsElectrical Drawing and Associated ListDI-GDRQ-81223SOW PARA 3.12.7YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16ASREQN/ASee Blk. 16See Blk. 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16NSWC / DD (3, 4, 5, 6)11Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 4:
Contractor format and content are acceptable.. Delivery shall include native design tool files.Block 9:
Wording of Distribution Statements: see paragraph 1 of Attachment 4 to the CDRL.Block 14a:
Data transmittals shall be marked with applicable Technical Instruction number(s). See Data Distribution Profile, Attachment 2 to the CDRL. 14b: See Attachment 3 to the CDRL for the form of electronic delivery.BLK 12/13: Draft due 180 days after CDR. Allow 60 dyas for' Government Comments or Approval. Final Copy is due 30 days after receipt of comments.System Level Blk Diag, no clear format requA05811
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A035Installation Control DrawingsUpdates and RevisionsDI-DRPR-81242 (See Blk. 16)SOW PARA 3.15.4YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16ASREQN/ASee blk. 16See blk 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 4:
DID may be used for guidance. Use existing drawing package format.Block 8:
Approval will be for format and technical content. Allow sixty (60) days for Government review.Block 14:
Distribution shall be made via electronic means or media.BLK 12/13: Draft due 180 days after CDR. Allow 60 dyas for' Government Comments or Approval. Final Copy is due 30 days after receipt of comments.Ref Mil-D-23140A0611
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A036Test Plan (MTEPP)Master Test and Evaluation Program Plan (First Article)DI-NDTI-80566ASOW PARA 3.12Yes. Q: Who is developing the table of 1st article test requirements? Govt. needs to provide this with the RFP.PEO LCS, PMS420LT (SEE BLK 16)AD See Blk 1630 DACSEE BLK 1190 DACSEE BLK 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 5: Deliverable plan shall detail content and planning for all of the incremental builds of the ACB.Block 8:
Approval will be for format and technical content. Allow forty-five (45) days for Government review.Blocks 10:
Due within two (2) weeks prior to Level 3 test of each build.Per Mil Std 3022A0791
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A037Test Plans / Test ProceduresTest Procedures, System Level, First ArticleDI-SESS-81704 DTD06NOV22SOW PARA 3.12Kind of mentioned maybePEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16180 DACN/A60 Days Prior to Testing10 Days priort to testing.Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 4:
Contractor format is acceptable.Block 8:
Approval will be for format and technical content. Allow thirty (30) days for Government review.Block 14:
Distribution shall be made via electronic means or media. Data submittals shall be marked with applicable TI number.CF okA0811
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A038PRODUCTION ACCEPTANCE TEST PROCEDUREDI-SESS-81704SOW PARA 3.4.2YesAD See Blk 16120 DA OPTION 1
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A039Test ProcedureUnit Test Procedure (HARDWARE ITEMS)DI-NDTI-80603ASOW PARA 3.4.2Yes - the CDRL item below has similar name and used DID DI-SESS-81704. better? Difference?PEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16120 DA OPTION 1N/ASee blk. 16See blk 16Standard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 8:
Approval will be for format and technical content. Allow forty-five (45) days for Government review.Blocks 12 & 13:
Preliminary procedures due forty-five (45) days prior to start of test. Final procedures due to TECHREP for signature fifteen (15) days prior to test. Final signature copy delivery to distribution not later than five (5) days prior to test.BLK 12/13: Draft due 180 days after CDR. Allow 60 dyas for' Government Comments or Approval. Final Copy is due 30 days after receipt of comments.CF okA0591
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A040Test/Inspection ReportUnit Test ResultsDI-NDTI-80809B (See Blk. 16)SOW PARA 3.4.2YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16SEE BLK 16N/ASee blk. 16N/AStandard Distribution, See Blk 16See Blk 16See Blk 16See Blk 16Block 9 and 14: Standard Distribtion Statement and Distribution Listing apply (See "Distribution" Tab)Block 8:
Allow thirty (30) days for Government review.10. 360 DAC for First Article Testing. With each DD250 for Production Testing.BLK 10. ONE TIME per each Incremental Build..
BLK 12/13: Submit NLT 30 days after completion of each incremental build. Final submission is due 30 days after Final System Certification testing is complete.Block 12:
Submit no later than sixty (60) days after Unit Test, or as directed by PEO IWS1.Block 14:
Distribution shall be made via electronic means or media. Data submittals shall be marked with applicable TI number.CF okA04211
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A041WORK INSTRUCTIONSManufacturing DrawingsDI-SESS-81012DSOW PARA 3.4.1YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16SEE BLK 16N/ASee blk. 16N/ABlock 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware.
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A042Product Drawings/Models and Associated ListsN/ADI-SESS-81000DSOW PARA 3.12.7YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16SEE BLK 16N/ASee blk. 16N/ABlock 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware.A1001
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A043Commercial Drawings/ Models and Associated ListsN/ADI-SESS-81003DSOW PARA 3.12.7YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16SEE BLK 16N/ASee blk. 16N/ABlock 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware.A1011
rATDP [ ] TM [ ] OTHER [ X ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A044Source Control Drawings Approval RequestN/ASOW PARA 3.12.7YesPEO LCS, PMS420LT (SEE BLK 16)A1061
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A045Drawing Number Assignment ReportN/ADI-SESS-81011DSOW PARA 3.12.7YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16SEE BLK 16N/ASee blk. 16N/ABlock 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware.A1021
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A046Proposed Critical Manufacturing Process DescriptionN/ADI-SESS-81012DSOW PARA 3.12.7YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16SEE BLK 16N/ASee blk. 16N/ABlock 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware.A1031
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A047Special Inspection Equipment (SIE), Drawings/Models and Associated ListsN/ADI-SESS-81004DSOW PARA 3.12.7YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16SEE BLK 16N/ASee blk. 16N/ABlock 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware.A1041
6000ATDP [ X ] TM [ ] OTHER [ ]LCS MP DEPSN00024-13-NR-xxxxTBD (COMPET)A048Special Tooling (ST) Drawings/Models and Associated ListsN/ADI-SESS-81008DSOW PARA 3.12.7YesPEO LCS, PMS420LT (SEE BLK 16)AD See Blk 16SEE BLK 16N/ASee blk. 16N/ABlock 10, 12: Deliver with TDP, 180 Days After completion of 1st Article Testing and updated 30 days after each annual Option exercise for production hardware.A1051

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .