RFP N62473-13-R-3011

REQUEST FOR PROPOSALS

INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) UNRESTRICTED

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR

NEW CONSTRUCTION, REPAIR, AND RENOVATION OF HEAVY

HORIZONTAL AND CIVIL ENGINEERING CONSTRUCTION PROJECTS

AT VARIOUS LOCATIONS WITHIN THE NAVFAC SOUTHWEST AREA

OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO CALIFORNIA,

ARIZONA, NEVADA, UTAH, COLORADO, AND NEW MEXICO

BASIC Contract

BASIC RFP

TABLE OF CONTENTS

Part 1 - Proposal Forms and Documents SF 1442 Solicitation, Offer, and Award Section 00100 - Instructions to Offerors Section 00210 - Basis of Award and Evaluation Factors Section 00600 - Representations and Certifications Section 00700 - Contract Clauses Section 00801 - Contract Type/Performance/Special Contract Requirements Section 00802 - Contract Administration Data Section 00803 - Task Order Issuance Procedures

Part 2 - General Requirements for Design-Build [See individual task order]

Part 3 - Project Program

Part 4 - Performance Technical Specifications A10 Foundations A20 Basement Construction B10 Superstructure B20 Exterior Enclosure B30 Roofing C10 Interior Construction C20 Stairs C30 Interior Finishes D10 Conveying D20 Plumbing

D30 HVAC

D40 Fire Protection D50 Electrical E10 Equipment E20 Furnishings F10 Special Construction F20 Selective Building Demolition G10 Site Preparation G20 Site Improvements G30 Site Civil / Mechanical Utilities G40 Site Electrical Utilities Z10 - General Performance Technical Specification

Part 5 - Prescriptive Technical Specifications

Part 6 - Attachments Sample Forms:

A - Performance Assessment Plan (PAP) – Monthly Evaluation B - Permits Record of Decision (PROD) C - Project Signs

[See individual task order for additional Part 6 attachments.]

RFP N62473-13-R-3011

Heavy Horizontal and

Civil Engineering Construction MACC

BASIC Contract

PART 1

Contract Requirements

Proposal Forms and Documents

R30001

INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) UNRESTRICTED MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF HEAVY HORIZONTAL AND CIVIL ENGINEERING CONSTRUCTION PROJECTS AT VARIOUS LOCATIONS WITHIN THE NAVFAC SOUTHWEST AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO CALIFORNIA, ARIZONA, NEVADA, UTAH, COLORADO, AND NEW MEXICO

This is an unrestricted procurement w ith a reserve for tw o or more highly qualif ied small businesses. Price evaluation preference w ill be given to HUBZone firms, in accordance w ith FAR 52.219-4.

NAICS: 237990 Size Standard: $33.5 Million Maximum dollar amount for all contracts combined is $99,000,000.

Estimated Task Order range is $500,000 to $30,000,000 Minimum Guarantee is $5,000

Offerors must demonstrate a minimum aggregate bonding capacity of $35 million to allow for the management of multiple, concurrent projects at the higher dollar magnitude w ithin the task order price range.

Construction Contract – Net 14 days for payment (FAR 52.232-27)

TANYA J. FOSTER 619-532-4157

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

20-Sep-2013

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______1 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Task Order

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________22 Oct 2013 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC SOUTHWEST

CAPITAL IMPROVEMENTS CONTRACTS CORE

CODE RAQ20

1220 PACIFIC HWY

SAN DIEGO CA 92132-5190

N62473

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

619-532-4789FAX:TEL: TEL: FAX:

N62473-13-R-3011 119

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 99,000,000 Each Heavy Horizontal/Civil II MACC

FFP

This is an indefinite delivery indefinite quantity (IDIQ) contract with no pre-established fixed contract prices. The actual amount of work to be performed and the time of such performance will be determined by the Contracting Officer or his/her properly authorized representative, who will issue written task orders to the Contractor. Award of the task order will be on a firm-fixed price basis.

Maximum of $99,000,000 is for all contracts combined and will serve as the maximum/NTE amount of the entire contract period. The Government has the option to extend the term of the contract for a term of one (1) to forty-eight (48) months by written notice to the Contractor within the performance period specified in the Schedule.

FOB: Destination

PURCHASE REQUEST NUMBER: R30001

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0002 1 Each Proposed Task Order (PTO) 0001

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: R30001

MAX

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government 0002 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

Section 00100 - Bidding Schedule/Instructions to Bidders

INSTRUCTIONS TO OFFERORS

INSTRUCTION TO OFFERORS

1. Inquiries

Inquiries regarding the Request for Proposal (RFP) shall be submitted electronically using the Request for Information (RFI) form provided as an attachment. The Point of Contact (POC) for inquiries is Tanya Foster at 619-532-4513, or e-mail at tanya.foster@navy.mil. The Government does not intend to respond to inquiries submitted less than 10 days before the proposal receipt date.

2. Proposal Submittal Requirements

Proposals submitted in response to this solicitation shall be formatted as follows and furnished in the number of copies stated herein. A cover letter shall accompany the proposal.

The cover letter shall include—

(a) The solicitation number;

(b) The name, address, telephone and facsimile numbers, and email address of the Offeror;

(c) The DUNS Number, CAGE Code, and Tax Identification Number (TIN) of the Offeror;

(d) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(e) Names, titles, phone and facsimile numbers, and email addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation and;

(f) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

In addition to the cover letter, the Offeror shall submit an Offeror’s Team Consent Form for each major subcontractor/teaming partner (e.g., team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.) identified in the Offeror’s proposal.

Proposals shall be submitted in three ring binders or bound, with tabs or separators. Page limits, if stipulated, must be adhered to. Proposals shall be submitted on 8.5” X 11” paper, utilizing both sides of the paper.

The format for the proposal is as follows:

Phase One:

Cover Letter Offeror’s Team Consent Form(s) First two pages of SF1442 - with blocks 14 through 20c completed Financial Questionnaire (Original in sealed envelope from financial institution in original proposal folder only) Surety Form FAR Clause 52.209-7 - with (b) completed & DFARS Clause 252.209-7999 with (b) completed VETS-100 and/or VETS-100A Report Submission Confirmation (or Statement of Non-applicability) Tab 1 - Factor 1, Technical Approach (Exhibit “A,” Organizational Chart, and signed copies of agreements or letters of commitment for each member of the Offeror’s Team) Tab 2 - Factor 2, Experience (Exhibits “B”)

- Factor 3, Past Performance (Exhibits “C” or CCASS/ACASS evaluations) (Evaluations should immediately follow the project shown on Exhibit “B” to which they pertain)

Tab 4 - Factor 4, Safety (Narrative)

THE FOLLOWING EVALUATION FACTORS ARE APPLICABLE ONLY TO THOSE OFFERORS

WHO ARE SELECTED TO PROCEED TO PHASE TWO OF THE SOURCE SELECTION PROCESS. DO

NOT SUBMIT TABS 5 THROUGH 7 IN PHASE ONE PROPOSALS.

Phase Two:

Tab 5 - Factor 5, Technical Solution (Narrative and Drawings) Tab 6 - Factor 6, Small Business Utilization (Offeror Only)

6A – Small Business Support Past Performance (Exhibit “D” or SF294/ISR) 6B – Small Business Participation (Exhibit “E” and Exhibit “F”)

Tab 7 - Factor 7, Price (In sealed envelope in original proposal folder only) – The envelope shall contain the following original documents: SF1442 (Solicitation, Offer, and Award) with blocks 14 through 20c completed; Bid Bond (in the amount of 20% for PTO #0001)

Representations and Certifications, Financial Questionnaires, and Surety Forms will not be rated. However, they will be considered in assessing the Offeror’s responsibility.

Offerors are asked to submit only the information/exhibits required. Do not submit any additional information such as brochures, CDs, or other pre-printed materials.

A total of one (1) original and three (3) hard copies of the complete Phase One proposal in response to this RFP must be received by this office no later than the date and time stated in Block 13 of the SF1442. Offerors should address all Phase One evaluation factors and shall submit the proposal to the following address:

Naval Facilities Engineering Command Southwest Capital Improvements Contracts Core /RAQ20.TF Attention: Tanya Foster 1220 Pacific Highway, Building 127 San Diego, CA 92132-5190

Proposal must be clearly marked on the outside of the package with the solicitation number.

LATE SUBMITTALS WILL NOT BE CONSIDERED.

It is an Offeror's responsibility to deliver its proposal to the proper place at the proper time, which includes allowing a reasonable amount of time for the delivery of the proposal. (See FAR 15.208(a)). Proposals that are received after the stated date and time in Block 13 of the SF1442 will not be considered.

Offerors shall ensure that proposals are mailed or sent by courier in a timely manner to be delivered to the NAVFAC Southwest facility no later than the date and time stated in Block 13 of the SF1442.

Offerors intending to deliver the proposals in person to the facility at the address above are cautioned that this NAVFAC Southwest facility is located in downtown San Diego. An Offeror risks the late receipt and rejection of a proposal where it delays delivering its proposal until the last few minutes before the time set for receipt of proposals. It is recommended that the Offeror allows for delays in driving through downtown San Diego caused by traffic (both freeway and downtown), construction projects, train/trolley crossing, parking at the pay lots/meters near the facility, and gaining access to a secure Government facility. No parking or offloading of proposals is available at the Government facility. Proposals are to be delivered to personnel in the mailroom in Building 128, and reasonable time shall be allowed for the person in the mailroom to receive and time stamp the proposal. The stamp time is determined from the NAVFAC Southwest facility mailroom time stamp and not any other time keeping equipment that the Offeror may own.

Immediately upon proposal delivery, the Offeror shall leave the Government facility. An Offeror that does not leave the premises may be requested to leave or escorted by security personnel.

3. Electronic Pre-Proposal Conference

(a) A formal "in-person" pre-proposal conference and site visit will not be conducted at this time. The pre-proposal presentation will be posted on the website at : http://www.fbo.gov . Prospective Offerors are urged to view the pre-proposal presentation. The pre-proposal presentation should be viewed prior to submitting any questions regarding the RFP. Prospective Offerors are advised that the pre-proposal presentation is provided solely for the purpose of explaining the concepts involved in the project and the specifications, terms, and conditions of this solicitation.

(b) A list of Frequently-Asked-Questions (FAQ) with appropriate responses is also provided as an attachment to the RFP. As with the pre-proposal presentation, all firms are encouraged to review the FAQ. The FAQ should be viewed prior to submitting any questions regarding the RFP.

(c) Failure of a prospective Offeror to submit any questions will be construed to mean that the Offeror fully understands all requirements of the solicitation.

(d) All prospective Offerors are advised that this solicitation will remain unchanged unless it is amended in writing. Amendments will be posted on the website at: http://www.fbo.gov. However, if an amendment is issued, normal procedures relating to the acknowledgment and receipt of any such amendment as described in Contract Clause “Amendment to Solicitations” of this section shall be applicable.

4. Financial Questionnaire

Offerors shall submit the Financial Questionnaire to their financial institution and request the financial institution complete the questionnaire with regard to the Offeror’s firm. Upon completion of the questionnaire, the financial institution should place the completed questionnaire in a sealed envelope showing the return address of the financial institution and forward it to the Offeror so that the Offeror can include the questionnaire (in the sealed envelope) with the Offeror’s proposal.

If the Offeror is a joint venture, information should be submitted for the joint venture. If there is no information for the joint venture, information should be submitted for each joint venture partner.

5. Surety Form

Offerors shall submit the Surety Form to report their surety bonding information, verifying aggregate bonding capacity, current available bonding, as well as single project limit. Ensure the name of the Offeror’s surety, including the name and phone number of the Offeror’s agent within the surety, is shown on the form.

If the Offeror is a joint venture, one Surety Form shall be submitted for the joint venture, not the individual partners.

6. System for Award Management

The System for Award Management (SAM) is combining federal procurement systems and the Catalog of Federal Domestic Assistance into one new system. This consolidation includes the functionality from the following systems:

* Central Contractor Registry (CCR)

* Federal Agency Registration (Fedreg)

* Online Representations and Certifications Application (ORCA)

* Excluded Parties List System (EPLS)

Contractors must be registered in the System for Award Management (SAM) prior to award of a DoD contract. In order to participate on this solicitation, contractors must also complete electronic representations and certifications.

For more information and to complete the electronic Reps & Certs, see the SAM website at http://www.sam.gov. A contract cannot be awarded to a contractor not registered in SAM. Remember to review the NAICS codes listed in your SAM record and make sure that you have listed the NAICS code for this procurement.

Note: FAR Clause 52.209-7 and DFARS Clause 252.209-7999 are not found in the electronic Reps & Certs in SAM; therefore, Offerors shall submit FAR Clause 52.209-7 with paragraph (b) completed to report whether or not they have current active Federal contracts and grants with a total value greater than $10,000,000 and Offerors shall submit DFARS Clause 252.209-7999 with paragraph (b) completed to report whether or not they have any unpaid Federal tax liability or were convicted of a felony criminal violation under a Federal law within the preceding 24 months.

7. Federal Contractor Program

In accordance with Federal Acquisition Regulation (FAR) 22.1303, any contractor or subcontractor with a contract of $100,000 or more with the Federal Government must take affirmative action to hire and promote qualified targeted veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized.

If subject to the reporting requirements, companies must file an annual VETS-100 and/or VETS-100A Report, which shows the number of targeted veterans in their work force by job category, hiring location, and number of new hires, including targeted veterans hired during the reporting period and the maximum number and minimum number of employees of such contractor during the period covered by the report. Instructions, information and follow-up assistance is provided at VETS-100 Internet site at http://www.dol.gov/vets/vets-100.html or employers may contact the VETS-100 customer support at (866) 237-0275 or e-mail at VETS100-customersupport@dol.gov.

Upon the successful submission of a VETS-100 and/or VETS-100A report(s), federal contractors will receive an email confirmation of receipt notification for their records. Offerors shall include a copy of their confirmation notification email in their proposal as verification of submission. If this requirement is not applicable to your firm, provide a statement that your firm does not have any contracts subject to this requirement.

A contract cannot be awarded to a contractor that has not submitted a required annual form VETS-100A, Federal Contractor Veterans’ Employment Report (VETS-100 and/or VETS-100A Report) if subject to the reporting requirements of 38 U.S.C. 4212(d) for that fiscal year.

8. Incurred Expenses

The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

9. No Alternate or Multiple Proposals

Neither multiple proposals, nor proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.

SECTION 00210

BASIS OF AWARD AND EVALUATION FACTORS

1. BASIS OF AWARD

Selection of contractor(s) will be accomplished using Source Selection Procedures on the basis of Best Value to the Government, considering price and other factors combined. Interested firms are expected to review the RFP and if necessary, participate in a pre-proposal conference and site visit, provide proposed prices for the initial project, and provide proposal information requested to evaluate their technical and past performance factors.

The Two Phase Design-Build procedures of FAR 36.3 will be used for this procurement. Phase One of the solicitation is in accordance with FAR Part 36.3. Phase One evaluation will result in a determination of the most highly qualified Offerors. These Offerors will be requested to submit a Phase Two proposal. The maximum number of Offerors that will be selected to submit a Phase Two proposal is five (5), unless the contracting officer determines that a number greater than five (5) is in the Government’s interest and is consistent with the purposes and objectives of two-phase design-build contracting. Phase Two of the solicitation shall require submission of technical and price proposals by the Offerors selected in Phase One, which will be evaluated separately in accordance with Part 15. The Government intends to evaluate proposals and award contract(s) without discussions.

The Government anticipates awarding three (3) or more multiple award construction contracts, with a reserve to two

(2) or more highly qualified small businesses. Offerors are advised that those Offerors who are selected to proceed to Phase Two are not guaranteed receipt of a contract award. The Offerors whose proposals conforming to the solicitation are determined to be the most advantageous to the Government considering past performance, technical, and price factors. The Government reserves the right to award three or more contracts under this solicitation or to award only the initial project (Proposed Task Order 0001) identified in the RFP as a single-action contract. The Government reserves the right not to award the Proposed Task Order 0001. The Government reserves the right to substitute or add other design-build projects that meet the scope of the MACC.

The Government reserves the right to reject any or all basic contract offers at any time prior to award; to negotiate with any one or all Offerors; to award the contract to other than the Offeror submitting the lowest total price; and to award contracts to three or more Offerors submitting proposals determined by the Source Selection Authority to be the most advantageous to the Government.

OFFERORS ARE ADVISED THAT IT IS DEFINITELY POSSIBLE THAT AN AWARD MAY BE MADE

WITHOUT DISCUSSIONS OR ANY CONTACT CONCERNING THE PROPOSALS RECEIVED.

Therefore, proposals should be submitted initially on the most favorable price and technical terms. Offerors should not assume that they would be contacted or afforded the opportunity to qualify, discuss, or revise their proposal.

Firms participating in the pre-proposal conference and site visit will not be compensated for their participation.

Successful Offerors will receive the following contract awards:

Best Value receives award with a minimum guarantee and the initial project, if the Government chooses to award it.

Second, third, and any additional selected contractor will each receive award with a minimum guarantee, and selection will be based on the same criteria as the first selection.

2. DEFINITIONS

DEFICIENCY: A material failure of a proposal to meet a solicitation requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

WEAKNESS: A flaw in the proposal that increases the risk of unsuccessful contract performance.

SIGNIFICANT WEAKNESS: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

STRENGTH: An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

ACCEPTABLE FEATURES: A proposed method or technique in the proposal that addresses solicitation requirements such that no further explanation or documentation is necessary.

PAST PERFORMANCE: Relates to how well an Offeror has performed; e.g., the quality of work accomplished, schedule compliance, customer satisfaction.

EXPERIENCE: Pertains to work performed by an Offeror, within the prescribed timeframe, which is the same or similar to the work that may be ordered under this contract in terms of size, scope, and complexity.

Experience is distinct from past performance (how well an Offeror has performed).

SUSTAINABLE FEATURES: Features in the design, construction, and operation of facilities with the goal of conserving resources and minimizing adverse effects on the environment while enhancing occupant productivity, minimizing energy use, improving quality and durability of materials, increasing recycling and use of recycled products, waste reduction, etc.

PROJECT: A design-build or design-bid-build construction activity or task, with a single starting point and a single ending point.

COMBINED PROJECT(S): Projects with multiple starting and ending points, performed under separate task orders, delivery orders, or multiple contracts combined in a single description. No credit will be given for work performed under MACC/IDIQ contracts in the aggregate or for multiple projects completed under more than one task/delivery order.

RENOVATION, REPAIR, ALTERATION PROJECT TYPES: Refers to projects where the work modifies existing facilities.

NEW CONSTRUCTION: Refers to creating entirely new facilities (or new expansions to existing facilities where a new structure and foundation is provided as part of the expansion).

100% COMPLETE:

For construction projects: The facility is completely constructed and ready for the intended use.

For design projects: 100% plans and specifications signed off by an Architect-Engineer and ready for construction with final cost estimate. Does not include any Post Construction Award Support (PCAS).

OFFEROR: Refers to the Contractor submitting the proposal as Offeror, including joint ventures, whose name appears in Block 14 of Standard Form (SF) 1442 (Solicitation, Offer and Award). In the event of a conflict or inconsistency between the Offeror’s name cited on the SF 1442 and any other part of the proposal, the SF 1442 is the conclusive document in determining the Offeror who is submitting the proposal.

OFFEROR'S TEAM: Applies to the Offeror, the Offeror's outside Lead Design Firm, and/or in-house Lead Designer(s) only; does not include subcontractors or consultants.

LEAD DESIGN FIRM: Applies to the Offeror’s primary design consultant firm(s) and any in-house lead designer(s).

JOINT VENTURE (JV): A legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together.

FIVE-YEAR PERIOD: The prescribed timeframe for this solicitation that refers to the period of time for which projects may be submitted for experience or past performance. The five-year period is calculated by counting back five years from the initial RFP issuance date.

DESIGN-BUILD: Refers to combining design and construction in a single contract with one contractor.

Design-build projects require design of the project by a licensed professional (i.e. engineer, architect).

Projects that only require shop drawing level effort are not design-build projects.

DESIGN –BID-BUILD: Refers to the traditional delivery method where design and construction are sequential and contracted for separately with two contracts and two contractors.

SELF-PERFORM: Refers to performing relevant major trade work in-house without subcontractors. This does not include administrative or management functions. Relevant major trade work is that which is the same or similar to the work that may be ordered under this contract.

PAGE: Refers to one printed side of a piece of paper. (For example, 5 pieces of paper printed on both sides would result in 10 pages of narrative.)

3. RELATIVE IMPORTANCE OF THE EVALUATION FACTORS

The relative importance of the evaluation factors is as follows:

a. Phase One: Phase One shall consist of Factors 1, 2, 3 and 4. Factor 1 (Technical Approach) will be rated as either Acceptable or Unacceptable. If an Offeror is rated Unacceptable for Factor 1, they will not be invited to participate in Phase Two.

Factors 2, 3, and 4 are of equal importance to each other.

b. Phase Two: In making the best value award decision in Phase Two, Factors 2-6 and price will be considered. The technical factors (2, 4, 5, and 6) are of equal importance to each other and when combined are of equal importance to the performance confidence assessment (Factor 3, Past Performance). The combined non-price factors (2, 3, 4, 5, and 6) are approximately equal to price. The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high, or low, as to significantly diminish the value of a non-price proposal’s superiority to the Government.

According to FAR 15.304, the evaluation factors that apply to this acquisition are a part of this RFP and are evaluated individually. The applicable evaluation factors and submission requirements are identified below.

4. EVALUATION FACTORS

The evaluation factors for this procurement are:

PHASE ONE Basis of Evaluation/Submission Requirements/Criteria Description for Each Factor:

FACTOR 1: TECHNICAL APPROACH

a. Proposal Submission Requirements:

The composition and management of the firms proposed as the design-build (DB) team for this contract will be evaluated in this factor.

The Offeror shall submit the following information under Tab “1”:

(1) Using Exhibit “A” (Offeror Team Composition and Management), provide a narrative describing the proposed primary construction firm(s) and primary design firm(s) for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. If the experience of an entity is being claimed in Factor 2, the firm must be named in the above narrative and organizational chart.

The technical approach narrative shall be limited to one (1) double-sided page (or two (2) single-sided pages) excluding the organizational chart. The information requested in item #2 below is not included in this page limitation.

(2) In addition to the narrative, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, or letter of commitment for each member of the Offeror’s team identified above (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.).

b. Basis of Evaluation:

The assessment of the Offeror’s technical approach will be used as a means to evaluate the organizational structure and teaming relationships proposed by the Offeror. This factor will be rated on an Acceptable or Unacceptable basis.

FACTOR 2: EXPERIENCE (See definition)

Submit Exhibit “B” (Construction/Design Experience Project Data Sheet) under Tab “2.”

(1) Construction Experience:

Submit a minimum of three (3) and maximum of five (5) relevant construction projects for the Offeror that best demonstrate your experience on relevant projects that are similar in size, scope, and complexity to the projects that may be ordered under this contract. For purposes of this evaluation, relevant projects are further defined as new construction and/or repair of heavy horizontal or civil engineering construction projects, by design-build or design-bid-build, with a construction cost of $500,000 or greater, of the following types of projects: Outdoor Shooting & Combat Training Ranges & Terrains, Canals & Channels, Dams & Embankments, Bridges, Stormwater Management Structures, Ammunition/Weapons Magazines, and Outdoor Recreational/Athletic Fields & Parks.

• At least one (1) relevant construction project shall demonstrate the Offeror’s experience in construction of outdoor shooting and/or combat training ranges.

• At least one (1) relevant construction project shall demonstrate the Offeror’s self-performed (see definition) experience in construction of erosion control and/or storm drainage structures such as retention basins or detention basins.

• At least one (1) relevant construction project shall demonstrate the Offeror’s self-performed (see definition) experience in construction of outdoor recreational/athletic fields or parks (i.e.

athletic field, community park, obstacle course, or similar project).

• At least one (1) relevant construction project shall demonstrate the Offeror’s experience in design-build projects.

• At least three (3) relevant construction projects shall have been self-performed by the Offeror identified on the SF1442.

Projects submitted for the Offeror shall be 100% complete (see definition) within the past five (5) years of the date of issuance of this RFP.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction/Design Experience Project Data Sheet (Exhibit “B”) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design.

Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower. Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. For purposes of this solicitation, “major or critical aspects” is defined as outdoor shooting and combat training ranges. The Offer must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract.

(2) Design Experience:

Submit a minimum of three (3) and a maximum of five (5) relevant design projects for the design team that best demonstrates design experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, relevant projects are further defined as new construction and/or repair of heavy horizontal or civil engineering construction projects, by design-build or design-bid-build, with a construction cost of $500,000 or greater, of the following types of projects:

Outdoor Shooting & Combat Training Ranges & Terrains, Canals & Channels, Dams & Embankments, Bridges, Stormwater Management Structures, Ammunition/Weapons Magazines, and Outdoor Recreational/Athletic Fields & Parks.

• At least one (1) relevant design project shall demonstrate the design team’s experience in design of outdoor shooting and/or combat training ranges.

• At least one (1) relevant design project shall demonstrate the design team’s experience in design of erosion control and/or storm drainage retention basins or detention basins.

• At least one (1) relevant design project shall demonstrate the design team’s experience in design of outdoor recreational/athletic fields or parks (i.e. athletic field, community park, obstacle course, or similar project).

• At least one (1) relevant design project shall demonstrate the design team’s experience in design-build projects.

Projects submitted for the design team shall be 100% complete (see definition) within the past five (5) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past five (5) years of the date of issuance of this RFP.

A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Exhibit “B”) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design.

Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a design subcontractor to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor.

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements.

The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five projects

(5) for construction and five (5) for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered.

Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.

Relevant projects that demonstrate design-build experience may be considered more favorably than those that do not have design-build experience.

Relevant projects that demonstrate experience with sustainable features may be considered more favorably than those that do not demonstrate experience with sustainable features.

Offerors who submit more than three (3) relevant projects that demonstrate construction experience by the Offeror identified on the SF1442 may be considered more favorably than those who submit the minimum required relevant project experience.

FACTOR 3: PAST PERFORMANCE

Submit Past Performance Questionnaires (Exhibit “C”) and CCASS/ACASS evaluations under Tab “2” immediately following each of the project data sheets to which they pertain. Submit any other past performance information under Tab “3.”

If a completed Construction Contractor Appraisal Support System (CCASS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for construction experience. If a completed AE Contractor Appraisal Support System (ACASS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for design experience. If there is not a completed CCASS or ACASS evaluation, submit a Past Performance Questionnaire (Exhibit “C”) for each project included in Factor 2 for both Construction Experience and Design Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience. Offerors may also address any adverse past performance issues.

Explanations shall not exceed one (1) double-sided page (or two (2) single-sided pages) in total.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

Performance award or additional information submitted will not be considered.

This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 2

– Experience and past performance on other projects currently documented in known sources. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s past performance will be used as a means of evaluating the Offeror’s probability to successfully meet the requirements of the RFP.

Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance and will receive an Unknown Confidence rating.

FACTOR 4: SAFETY

Submit Exhibit “D” (Safety Data Sheet / Safety Narrative) under Tab “4.”

a. Proposal Submission Requirements:

The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture;

however, only one safety narrative is required. EMR and DART Rates shall not be submitted for subcontractors.)

(1) Experience Modification Rate (EMR):

For the three (3) previous complete calendar years (2010, 2011, 2012), submit your EMR (which compares your company’s annual losses in insurance claims against its policy premiums over a three (3) year period).

If you have no EMR, affirmatively state so and explain why. Any extenuating circumstances that affected the EMR and upward or downward trends should be addressed as part of this element. Lower EMRs will be given greater weight in the evaluation.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

For the three (3) previous complete calendar years (2010, 2011, 2012), submit your OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA DART Rate, affirmatively state so, and explain why. Any extenuating circumstances that affected the OSHA DART Rate data and upward or downward trends should be addressed as part of this element. Lower OSHA DART Rates will be given greater weight in the evaluation.

(3) Technical Approach for Safety:

Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety narrative shall be limited to two pages.

b. Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government will evaluate the Offeror’s overall safety record, the Offeror’s plan to select and monitor subcontractors, any and innovative safety methods that the Offeror plans to implement for this procurement. The Government’s sources of information for evaluating safety may include, but are not limited to, OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS), and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The evaluation will collectively consider the following:

- Experience Modification Rate (EMR)

- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate

- Offeror Technical Approach to Safety

- Other…