HEAVY HORIZ MACC - Exhibit D - Safety Data Narrative.docx
DOCX document 25 KB Posted
- Attached to
- Heavy Horizontal and Civil II MACC
- Solicitation number
- N62473-13-R-3011
About this file
Safety Data and Narrative
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment_1hhc.PDF | ||
| 12-R-3011 MACC Frequently Asked Questions.pdf | ||
| Heavy Horizontal - Surety Form.doc | DOC document | |
| HEAVY HORIZ MACC - Exhibit C - PPQ.docx | DOCX document | |
| HEAVY HORIZ MACC - Exhibit B - Experience - Offeror.docx | DOCX document | |
| HEAVY HORIZ MACC - Exhibit B - Experience - Designer.docx | DOCX document | |
| Heavy Horizontal - Offeror's Team Consent Form.doc | DOC document | |
| Heavy Horizontal - Financial Questionnaire.doc | DOC document | |
| 13-R-3011 FAR Clause 52.209-7 DFARS Clause 252.209-7999.pdf | ||
| Phase 1 RFP - Heavy Horizontal MACC.pdf | ||
| 13-R-3011 - ELECTRONIC PRE-PROPOSAL CONFERENCE HEAVY HORIZONTAL AND CIVIL MACC.ppt | PPT presentation | |
| HEAVY HORIZ MACC - Exhibit A - Offeror Team Composition Management.docx | DOCX document | |
| Heavy Horizontal - RFI Form.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT “D”
SAFETY DATA SHEET
N62473-13-R-3011
This form is to be completed by the Offeror. Use this form to provide safety information for the Safety factor. EMR and DART rates shall not be submitted for subcontractors.
Joint Venture (JV) or Partnership: Provide a Safety Data Sheet for each contractor who is part of the JV or partnership; however, only one safety narrative is required.
1. Offeror Name:
Name of JV partner providing the information below (if applicable):
Offeror’s Three Previous Complete Calendar Years of Reported Safety Data:
Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.
| 2. Experience Modification Rate (EMR): |
| 2010 |
| 2011 |
| 2012 |
3a. Explain any extenuating circumstances resulting in any EMRs greater than 1.0:
3b. Explain any upward or downward EMR trends:
3c. If you do not have an EMR for a given year, state so here and explain why:
4. Insurance Carrier Information:
Insurance Carrier Name:
| Agent’s name: |
| Phone No.: |
| Email: |
| 5. U.S. Dept. of Labor, OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate* |
| 2010 |
| 2011 |
| 2012 |
6a. Explain any extenuating circumstances resulting in any DART Rates of 3.0 or greater:
6b. Explain any upward or downward DART Rate trends:
6c. If you do not have a DART Rate for a given year, state so here and explain why:
Note: Form may be expanded.
EXHIBIT “D” (continuation)
SAFETY NARRATIVE
N62473-13-R-3011
7. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed 2 pages. Any additional pages will not be considered.
Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors:
Describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels:
Note: Form may be expanded up to 2 pages maximum.
Exhibit “D” – Safety Data Sheet/Safety Narrative, Page 2 of 2
(Rev 12/12)
File details come from the government source that posted it. Updated .