N61331-17-R-0004-0001_Summary_of_Changes.pdf

PDF 60 KB Posted

Attached to
Adaptive Persistent Awareness Systems (APAS) Program Support Federal contract opportunity
Solicitation number
N61331-17-R-0004
Issued by
Department of the Navy Naval Sea Systems Command

About this file

N61331-17-R-0004 Amendment 0001 Summary of Changes.

View the file

Other files for this federal contract opportunity

Other files attached to Adaptive Persistent Awareness Systems (APAS) Program Support, newest first.
File Type Posted
N61331-17-R-0004_Q&A_4.docx DOCX document
N61331-17-R-0004-0002_Conform_Copy.pdf PDF
N61331-17-R-0004_Q&A_2.docx DOCX document
N61331-17-R-0004_Q&A_3.xlsx XLSX spreadsheet
N61331-17-R-0004-0002_Summary_of_Changes.pdf PDF
N61331-17-R-0004_Q&A_1.docx DOCX document
Exhibit_A_-_Contract_Data_Requirements_List.pdf PDF
N61331-17-R-0004-0001_Conform_Copy.pdf PDF
N61331-17-R-0004_Final_RFP.pdf PDF
Attachment_J.3_-_Staffing_Plan_Without_Cost.xls XLS spreadsheet
Attachment_J.1_-_DD_254.pdf PDF
Attachment_J.2_-_Desired_Qualifications_of_Key_Personnel.pdf PDF
Draft_Statement_of_Work.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide clarifications in the follow ing areas:

1) Revised Section J List to correctly reference Exhibits and Attachments.

2) Revised Section L, subsection 3.2.1 General Guidance, Task Area #1 Task Breakout from "Systems Engineer" to "Systems Engineering".

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Dec-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N61331-17-R-0004

X 9B. DATED (SEE ITEM 11)

20-Dec-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Dec-2016

CODE

NSWC PANAMA CITY (S. DUBUQUE)

SCOTT.DUBUQUE@NAVY.MIL

850-234-4864

110 VERNON AVENUE

PANAMA CITY FL 32407-7001

N61331 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N61331-17-R-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A Contract Security

Classification Spec

4 07-NOV-2016

Attachment 1 Key Personnel 1 28-OCT-2016 Attachment 2 Contract Data

Requirements List

2 13-DEC-2016

Attachment 3 Attachment J.3 - Staffing Plan without Cost

1 16-DEC-2016

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A Contract Data

Requirements List

2 13-DEC-2016

Attachment 1 Contract Security Classification Spec

4 07-NOV-2016

Attachment 2 Desired Qualifications of Key Personnel

1 28-OCT-2016

Attachment 3 Staffing Plan without Cost

1 16-DEC-2016

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

ADDITIONAL INSTRUCTIONS

ADDITIONAL INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS.

1.0 GENERAL

To maximize efficiency and minimize the time for proposal evaluation, Offerors and their subcontractors shall submit their proposals in accordance with Section L.

It is the Offeror's responsibility to bring to the attention of the Contracting Officer at the earliest possible time, but prior to the closing date, any ambiguities, discrepancies, inconsistencies, or conflicts within the solicitation documents attached hereto or incorporated by reference. All questions should be submitted via email to the Contract

Specialist Scott Dubuque, email: Scott.Dubuque@navy.mil, prior to 1500 hrs. Central Time, 10 calendar days after issuance of this solicitation.

To allow for procurement lead time and a fair and equitable evaluation of all proposals submitted under this competitive procurement, all proposals shall be based on a contract start date of 19 November 2017. This date is only an estimate of the anticipated contract start date and will be used for the purpose of proposal evaluation only. A definitive Contract performance start date will be incorporated into the Contract award document.

2.0 INSTRUCTIONS FOR SUBMISSION OF OFFERS

2.1 Electronic Submission: Proposals must be submitted via email to the contract specialist by the solicitation closing date and time specified on the cover page of this solicitation, block (9). In the rare event the contract specialist’s email malfunctions, Offerors shall make arrangements with the Contracting Officer prior to the solicitation closing date and time to submit a proposal electronically. Failure to submit a complete proposal prior to the solicitation closing date and time will render the proposal late and unacceptable.

2.2 Proposal Format: Failure to comply with the detailed instructions of Section L may render the proposal non-responsive and ineligible for award.

2.2.1 Page Limits: Table 2.2.1 identifies page limitations for each volume of the proposal. If exceeded, excess pages will not be read or considered in proposal evaluation. When both sides of a sheet display printed material, it shall be counted as two pages. Graphs, charts, and tables are included in the page count.

TABLE 2.2.1 - PAGE LIMITATIONS

Volume Contents Page Limit

I Legal Offer No page limit

II Non-Price Proposal Limited to 30 pages

III Price Proposal No page limit

The following are not included in the page limitations above:

a. Title/Cover pages

b. Tables of contents

c. Glossaries of abbreviations and acronyms

d. Subcontracting/Teaming/Consulting Agreements, letters of intent for key personnel

e. Proposal Cross-Reference Tables

f. Past Performance Reference - limited to five pages each

g. Resumes - limited to three pages each

h. OCI Mitigation Plan (if required)

i. Quality Assurance Plan

j. Section J Attachments

2.2.2 Electronic Proposal Requirements:

The electronic proposal shall meet the following format requirements:

a. Instructions regarding use of certain electronic products (i.e., Microsoft Office Products, Adobe) listed herein shall not be construed as Government endorsement of specified products.

b. All file names shall include the Offeror's company name and title/subject of file content; all files shall be named with the file extension .doc, .xls, .ppt, or .pdf.

c. Compression tools are limited to PKZip or WinZip.

d. The electronic proposal, Volumes I and II, shall be prepared so that if printed, the proposal meets the following format requirements: 8.5 x 11 inch paper, 12 point times new roman font, single-spaced typed with 1 inch margins.

e. No graphics or pictures other than required or necessary graphs/tables/charts are allowable in any volume of the proposal.

f. The font size for text contained in embedded graphics (tables and illustrations) shall be no smaller than 8 point Times New Roman font.

g. Volume I and II shall be submitted utilizing Microsoft Office Word or Adobe (2003 or later).

2.2.3 Cover Page, Table of Contents, and Proposal Cross-Reference Table:

a. Each proposal volume must include a Cover Page and a Table of Contents.

b. Volume I shall include a Master Table of Contents and a Proposal Cross-Reference Table. The Proposal

Cross-Reference Table shall indicate the required proposal content and the section/page number where this content appears in the proposal.

c. The Cover Page shall identify the solicitation number, proposal volume and title, the Offeror’s name, address, phone number and electronic address.

2.2.4 GLOSSARY OF ABBREVIATIONS AND ACRONYMS:

Each volume shall contain a glossary including all abbreviations, acronyms and corresponding definitions.

2.2.5 No cost or pricing information shall be included Volume II, Non-Price Proposal.

3.0 PROPOSAL CONTENT AND DETAILED INSTRUCTIONS FOR EACH PROPOSAL SECTION

3.1 VOLUME I, LEGAL OFFER

The Legal Offer must include the following:

3.1.1 The Legal Offer must include the following:

a. Identifying: (1) the solicitation number, (2) all enclosures being transmitted as part of the proposal, and; (3) acknowledgement that it transmits an offer in response to the solicitation.

b. It shall state that the proposal is valid through 180 days after the proposal due date.

c. A statement specifying the Offeror’s unconditional agreement to the terms and conditions of the solicitation and agreement to furnish any and all items upon which prices are offered at the price set for each item.

d. Names, titles, phone numbers and electronic addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation.

e. Names, title and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority.

f. Per 3.1.3, Organizational Conflict of Interest, if no conflicts of interest exist, then the Offeror shall clearly state this in its cover letter.

3.1.2 SECTION B - Complete all CLIN and SLIN pricing.

3.1.3 ORGANIZATIONAL CONFLICT OF INTEREST (OCI) AND MITIGATION PLAN

Due to the nature and scope of the work encompassed by this solicitation, the Government requires that there be no conflict which would preclude the prime Contractor from performing any portion of the Statement of Work, regardless of whether it intends to subcontract that portion. Due to the nature of the work outlined in Section C, the Government anticipates that organizational conflicts of interest (OCIs), including impaired objectivity OCIs, will arise for Offerors that perform under other Federal contracts as prime Contractor or Subcontractor for hardware, software, system design, integration, or production of the systems that will be covered by this solicitation. The Government is most concerned about potential OCIs in the following scenarios: (1) when a Contractor’s work under one Government contract could entail its evaluating itself or a related entity, either through an assessment of performance under another contract or an evaluation of proposals (impaired objectivity OCIs); (2) when performance of the work under this solicitation would place an Offeror in a position to make technical, design, or programmatic recommendations that would include hardware, software, system design, integration, or production of systems provided by the Offeror’s organization; or (3) when the provision of the engineering and technical direction described in Section C and L would create the situation prohibited by FAR 9.505-1 because the Offeror is currently a prime Contractor, Subcontractor, or consultant on a contract for the supply of a system covered by this solicitation or any of its major components.

Therefore, if any Offeror may have an OCI, or if any Offeror has taken any steps to eliminate an OCI and the Offeror believes that the conflict no longer exists, the Offeror must notify the Government and must submit an OCI mitigation plan with its proposal. Failure by an Offeror that has identified a potential OCI or eliminated OCI to submit an OCI mitigation plan with its proposal shall be considered grounds for disqualification from award. The Government will not accept mitigation measures for impaired objectivity OCIs. For any OCI, the Government will not accept mitigation or elimination measures: (1) that create an additional burden on the Government to implement;

(2) that involve directed Subcontractors or creating separate lines of reporting or any modification to the Government/prime Contractor relationship; or (3) that are deemed in the sole discretion of the contracting officer to provide insufficient organizational independence between the prime Contractor or a Subcontractor under this contract and a prime Contractor or Subcontractor for hardware, software, system design, integration, or production of the systems that will be covered by this solicitation.

This is not an exhaustive list of measures that will be considered inadequate to protect the Government. It is an illustrative list provided in an effort to ensure that all Offerors understand the Government’s expectations and intent to avoid OCIs. The Government reserves the right to determine whether or not any mitigation plan provided by an Offeror is sufficient to protect the Government’s interests. The Government also does not intend to accept any mitigation measures that involve additional oversight or commitment of resources by the Government, such as agency review of Contractor deliverables, internal review of task assignments for OCI before issuance, or formalized monthly reviews of work performed and projected. All Offerors are directed to review and comply fully with the OCI clause included in Sections C and L of this solicitation (ORGANIZATIONAL CONFLICT OF INTEREST (NAVSEA) (JUL 2000) and NOTIFICATION OF POTENTIAL ORGANIZATIONAL CONFLICT(S) OF INTEREST (NAVSEA) (JUN 1994) respectively).

In accordance with Section C, the OCI clause of this section, and the Organizational Conflict of Interest Clause, Offerors shall identify any and all conflicts of interest or potential conflicts of interest related to this solicitation.

Offerors shall follow the below described two-step process for identifying known or potential OCI issues to the Government for this solicitation.

Step 1: If conflicts of interest are real, possible, or perceived, the Contractor shall submit a letter identifying those OCI issues and the strategy that the Offeror intends to use for mitigation, within fourteen days of the release of the solicitation. This letter will be for notification purposes only, for the Government to conduct any necessary research, and no determination will be made by the Government at that time. If no OCI issues are present or anticipated, no action is required of the Offeror within this window.

Step 2: If OCI issues are present or anticipated, Offerors shall submit an OCI mitigation plan as part of their proposal submission. If no conflicts of interest exist, then the Offeror shall clearly state this in its cover letter, in addition to providing their corporate policy for resolving OCIs. Organizational charts and/or corporate policy are authorized to be submitted in addition to the OCI Mitigation Plan. The Offeror’s OCI Mitigation Plan shall be provided as part of the price proposal.

3.1.4 SECTION K – Complete Section K – Representations, Certifications, and Other Statements of Offerors.

3.2 VOLUME II, NON-PRICE PROPOSAL

3.2.1 GENERAL GUIDANCE

a. The Non-Price Proposal shall not contain any reference to cost or price.

b. The Non-Price Proposal should be written so that management and engineering oriented personnel can evaluate the proposal and arrive at a sound determination as to whether the proposal meets the requirements of this solicitation. To this end, the proposal shall be specific, detailed and complete as to clearly and fully demonstrate that the prospective Contractor has a clear understanding of the technical requirements contained in Section C of this solicitation. Statements such as "the Offeror understands", "will comply with the Statement of Work," "standard procedures will be employed"; "well known techniques will be used" and general paraphrasing of the Statement of Work are considered inadequate.

c. In the event any portion of the Non-Price Proposal is written by anyone who is not a bona fide employee of the firm submitting the proposal, a certificate to this effect shall be furnished. It must be signed by a responsible officer of the Offeror and shall show the author's name, employment capacity, the name of the person's firm, the relationship of that firm to the Offeror's, and the portion of the Non-Price Proposal he/she wrote.

d. Technical information previously submitted, if any, may not be considered by the Government; hence, any such information should not be relied upon or incorporated in the Non-Price Proposal by reference.

e. To assist the Contractor with the scope of this requirement, the following Government estimate is provided:

Task Area

Task Breakout Base Year Hours

Option 1 Hours

Option 2 Hours

Option 3 Hours

Option 4 Hours

#1 Systems Engineering and Integration (SE&I)

1,824 1,824 1,824 1,824 1,824

#2 Hardware and Software Engineering

3,648 3,648 3,648 3,648 3,648

#3 Test and Evaluation 1,824 1,824 1,824 1,824 1,824 #4 Logistics 2,736 2,736 2,736 2,736 2,736 #5 Technology Insertion 5,472 5,472 5,472 5,472 5,472 #6 Installations 1,824 1,824 1,824 1,824 1,824 #7 Programmatic Support 912 912 912 912 912 Total Effort 18,240 18,240 18,240 18,240 18,240

3.2.2 EVALUATION FACTORS

Offerors must address each Factor.

FACTOR 1 – TECHNICAL APPROACH

Offeror shall describe its technical approach to:

a. Performing systems engineering and integration support of the APAS system at various locations and facilities.

b. Supporting Technology Refresh / Technology Insertion of APAS system equipment at existing and new installations.

c. Supporting test and evaluation of APAS at various locations. .

d. Performing: (1) logistics support analysis of APAS, and; (2) operation, maintenance and repair of APAS hardware, software and support infrastructure at existing and new test beds.

FACTOR 2 – MANAGEMENT APPROACH

Offeror shall provide the following:

1. Management Plan:

a. A Project Organizational Structure that shows how the Project Organizational Structure will be integrated into the corporate structure. The Project Organizational Structure shall identify key personnel and clear lines of authority.

b. Detail the Program Manager’s responsibilities and authority under this contract.

2. Quality Assurance Plan:

a. Includes: quality control chart with lines of authority, inspection methodology, assessment methodology, corrective procedures, and follow-up procedures.

b. Explains how the quality assurance process will ensure consistent, full compliance with this contract with minimal Government oversight.

FACTOR 3 – RESOURCE MANAGEMENT

Offeror shall provide the following:

1. Staffing Plan

a. Complete Attachment J.3, Staffing Plan WITHOUT Cost. Do not include "Cost/Price" information or provide information violating the Privacy Act in Attachment J.3.

b. Describe the recruitment and retention methodologies to fulfill the requirements of the SOW.

c. Describe your plan for training personnel to meet and maintain qualifications and certifications.

d. The Staffing Plan narrative shall be included in the page count for Volume II.

2. Estimated Labor Mix

a. Provide the proposed labor mix and rationale for the proposed labor mix. The proposed labor mix shall include the percentage of total senior, mid-level, and junior personnel proposed. The burden lies with the Offeror to balance staffing with their proposed labor mix and remain competitive at the same time. The Offeror shall explain deviations from the estimated labor mix provided in the table below. The estimated labor mix shown in the table below is provided for information purposes only.

Level Years of Experience % of Work

Senior More than 9 years of relevant experience 26% Mid-level From 5 years to 9 years of relevant experience 53% Junior Less than 5 years relevant experience 21%

3. Subcontracting

a. Discuss the SOW functions you intend to subcontract.

b. Describe how you will select and manage subcontractors.

c. Provide a copy of any subcontracting/teaming/consulting agreements, signed by both parties, proposed to fulfill any direct charged part of the solicitation. The agreement should show the specific technical work areas to be contracted and the projected labor categories (key/non-key support). It shall be fully consistent with other portions of the proposal to include resumes submitted and the Price Proposal. Agreements shall be submitted only for those Subcontractors or consultants who are priced in the Price Proposal. This documentation shall not be included in the Non-Price Proposal page limitation.

4. Key Personnel Resumes

a. Submit resumes for Key Personnel. Attachment J.2 lists the desired qualifications for Key Personnel. It is provided as a guide to notify Offerors of the types of experience and training that the Government considers important to successfully execute the Contract. It is the Offeror’s responsibility to provide information and evidence that clearly demonstrates the ability of proposed personnel to satisfactorily fulfill the Contract requirements. Do not provide information that will violate the Privacy Act.

b. If the proposed key personnel are not current employees of the Offeror or proposed Subcontractor, a signed copy of the acceptance letter shall be provided. An additional copy of this letter shall be provided in the Price Proposal which identifies a projected start date and agreed to annual salary.

c. Key Personnel Resumes shall contain the following information:

1. Years of Experience

2. New/Current Position/Title/Company

3. Education and work development history

4. Chronology of work experience with emphasis on SOW related experience

FACTOR 4 – PAST PERFORMANCE

a. Provide up to three past performance references that reflect recent, relevant experience within the last five years that demonstrate the Offeror’s ability to handle the scope and breadth of the SOW. Three of the Prime's relevant past performances are desired, however, the Government will accept two Prime past performance references and one past performance reference from a teamed subcontractor. Example contracts may have been performed for Federal, State, and/or local Governments, as well as private industry.

b. Include the following information for each past performance reference:

1. Contract/Task Order number

2. Contract type

3. Program name

4. Total contract price

5. Short description of work performed

6. Description of how the work performed is relevant to the requirements in the SOW

7. Names and valid phone number, e-mail address, and mailing address for the Procuring

Contracting Officer (PCO)

8. Contracting Officer’s Representative (COR) and Program Manager (PM)

c. Offerors are responsible for providing contract descriptions and applicable experience in sufficient detail to permit evaluation of the example contract’s relevancy. If the Offeror does not provide up to three past performance references during the last five years, the Offeror shall address this and provide a written narrative detailing the reasons for not providing three references.

d. The relevancy of Offerors’ past work and how this experience will assist in performing under this contract shall be explained in detail. Offerors are advised that: (1) the Government may contact any or all references in the proposal and third parties (such as other customers, the DoD Past Performance Information Retrieval System (PPIRS), other Government contractors, the Environmental Protection Agency, the Department of Labor, consumer protection organizations, etc.) for performance information; (2) the Government reserves the right to use any such information received as part of its evaluation of the Offeror’s past performance;

(3) the Government reserves the right to directly solicit input on the Offeror’s past performance from any other sources and the Government may use any other data available to its evaluators, including the personal knowledge of those individuals; and (4) if the Offeror omits projects of which the Government evaluation team is aware or becomes aware, customer assessments may be sought from the relevant organization.

e. The Government reserves the right to limit or expand the number of references it contacts and to contact references other than those provided by the Offeror. If subcontracting is proposed for subject Contract, past performance references where the Offeror has served as a prime Contractor with Subcontractors would be of interest.

f. If past performance is supplied for a firm who’s CAGE CODE and DUNS Number does not match the CAGE CODE and DUNS NUMBER for the offeror, the offeror MUST provide a DETAILED written explanation of how the past performance information is relevant. For example, if the offeror provides past performance data from a different firm with a different CAGE CODE and DUNS NUMBER, the offeror’s proposal MUST clearly demonstrate how Offerors will employ into this Contract the same policies, procedures, processes, management, and similar systems and delineate how the offeror will achieve the same high quality of past performance in performance of this Contract. The proposal must clearly show how experience from any other entity other than the offeror is relevant to the offeror’s ability to perform.

The relevant considerations are whether the resources of a different firm will be provided or relied upon for contract performance such that the other firms(s) will have meaningful involvement in contract performance. Failure to provide an adequate connection and link between the offeror and the submitted past performance from a different firm(s) may result in a lower relevancy rating.

3.3 VOLUME III - FACTOR 5 - PRICE PROPOSAL

3.3.1 GENERAL GUIDANCE

a. Pricing information shall be submitted by completing Section B of the solicitation.

b. If any amendments to the solicitation are issued the Offeror must ensure that such amendment(s) are signed, dated, and returned and/or acknowledged in Block 14 of the SF 33 (section A).

c. Please ensure all the information for your company is current within the System For Award Management.

3.3.2 MATERIAL AND TRAVEL

a. The Government’s unburdened totals for travel and material under this effort are listed below for tasking specified in the Statement of Work. The fully burdened material and travel amount MUST be included in Section B of the offer for all applicable CLINs. The management of travel between the prime and any subcontractors shall be described. Note: The amounts below have already been escalated and are unburdened.

Period Unburdened Material and Shipping Unburdened

Travel

Base $1,200,000 $160,000

Option 1 $1,242,000 $165,600 Option 2 $1,285,470 $171,396 Option 3 $1,330,461 $177,395 Option 4 $1,377,027 $183,604 Total all years $6,434,958 $857,995

b. The proposed direct charge of any item, such that title transfers to the Government under the provisions of

FAR 52.245-1, Government Property, is not acceptable unless specifically authorized in writing under this Contract.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .