ITEM NO: Solicitation

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: 631-21-001 & 991-11-001

TITLE: Mn Mast Pres & Mn Mast Staging

PARA. NO:

PAGE NO:

ITEM NO: 523-80-001

TITLE: CMWD BHD Penetration Sleeve

Installation

PARA. NO: 2.8

PAGE NO: 1

ITEM NO: 165-80-001

TITLE: SA 83678D Sonar Dome Air Flow

Meter Replacement

PARA. NO: 2.3 & 2.4

PAGE NO: 1

ITEM NO: 588-21-001 & 634-21-001

TITLE: Flt Dk & RAST System;clean and preserve and Flt Dk Nonskid

PARA. NO:

PAGE NO:

REQUEST FOR SPECIFICATION CLARIFICATION

CONTRACTOR QUESTION 1: An Item index or the index of Standard

Items invoked to include the index of CAT I was not provided with the package. Please provide these indexes.

GOVERNMENT RESPONSE:

The index of Standard Items invoked under CAT I is hereby included as part of the solicitation. CAT II Standard Items are invoked and/or referenced in individual work items specified in NSSARM 501-16. As included in Section C, NAVSEA Standard Items may be found at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/default.aspx.

To receive a copy of the Standard Items invoked under CAT I, please send an email to MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 2: 631-21-001 directs contractor to accomplish preservation of the Mn Mast. Then 991-11-001 directs contractor to stage mast for the Ships force to accomplish preservation.

Contractor recommends deleting one of the items.

GOVERNMENT RESPONSE:

Government Response is forthcoming.

GOVERNMENT RESPONSE:

The Government will provide, upon request, CD/DVDs which will include Reference 2.8 RLAR 1138278. To request a copy of the

CD/DVD, please send an email request to Reagan Criddle, Contracting

Officer, and Morgan Myrick, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil. Offerors may pick up the CD/DVD at the MARMC Technical Library located at 9727

Avionics Loop, Bldg LF-18, Norfolk, VA 23511-2393. Dale Camat

Email: dale.camat@navy.mil Phone number: (757) 443-3872 ext 2546

OR Christopher Beckelhimer Email: chris.beckelhimer@navy.mil Phone number: (757) 443-3872 ext 1836.

CONTRACTOR QUESTION 3: Ref 2.8 RLAR 1138278 was not provided with the package. Please provide.

CONTRACTOR QUESTION 4: Ref. 2.3 or 2.4 was not provided with the package. Please Provide

Attachment J-6

DATE OF REQUEST: 6/15/15 SOLICITATION NO: N50054-15-R-0008

TITLE: USS JAMES E WILLIAMS (DDG-95) Dry-Docking Selected Restricted Availability

(DSRA)

MARMC POC: Morgan Myrick

MARMC PHONE: 757-396-5041 x462

GOVERNMENT RESPONSE:

The Government will provide, upon request, CD/DVDs which will include References 2.3 and 2.4. To request a copy of the CD/DVD, please send an email request to Reagan Criddle, Contracting Officer, and Morgan Myrick, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil. Offerors may pick up the CD/DVD at the MARMC Technical Library located at 9727

Avionics Loop, Bldg LF-18, Norfolk, VA 23511-2393. Dale Camat

Email: dale.camat@navy.mil Phone number: (757) 443-3872 ext 2546

OR Christopher Beckelhimer Email: chris.beckelhimer@navy.mil Phone number: (757) 443-3872 ext 1836.

CONTRACTOR QUESTION 5: Both items require the nonskid presevation of the flight deck. Recommend deleting item 634-21-001

GOVERNMENT RESPONSE:

Government Response is forthcoming.

ITEM NO: Solicitation

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: 110-90-001

TITLE: SA 70438K Bow Strengthening Mods

PARA. NO: 2.16 & 5.3

PAGE NO:

CONTRACTOR QUESTION 7: Para 5.3 states the Government will be providing kitted Material listed in the 4720. The 4720 does not list any material. Please provide a list of government provided material.

GOVERNMENT RESPONSE:

Government Response is forthcoming.

GOVERNMENT RESPONSE:

The Government's planned Production Complete Date (PCD) is hereby incorporated into Attachment J-3. To receive the updated Attachment J-

3, please send an email to

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 6: Contractor has received Attachment J-

3 detailing some of the milestones to support this DSRA. It would be beneficial to receive the Government's planned Production Complete Date

(PCD) along with completion date for Ancillary Systems. Please provide.