Attachment_6_Mission-Essential Contractor Services.docx
DOCX document 16 KB Posted
- Attached to
- Engineering, Ship Installation Drawing Support
- Solicitation number
- N42158-20-R-N001
About this file
This document contains a synopsis and attachment outlining requirements for engineering and technical services support for Landing Helicopter Dock ships. The Naval Sea Systems Command intends to award a cost-plus-fixed-fee level of effort contract to provide contractor support for ship checks, development of ship installation drawings, and execution of assigned work packages. The scope includes performing multiple ship checks and delivering an estimated 2,100-2,400 drawings in batches between April 2020 and April 2021. Contractors must be able to meet critical milestones and provide fully manned teams for pre-ship check, ship check, and drawing development phases. A draft request for proposal will be posted on SAM.gov by March 2020, with proposals due and award anticipated in April 2020. The North American Industry Classification System code is 541330 for engineering services up to $16.5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4215820RN001 - FINAL.pdf | ||
| Bidders Questions 20200410.pdf | ||
| Contract Data Requirements List - CDRLs - Exhibit A - FINAL.pdf | ||
| DRAFT N4215820RN001 08APRIL2020.docx | DOCX document | |
| DRAFT CDRLs 08APR2020.pdf | ||
| Attachment_5B_Past Performance_Information_Form.docx | DOCX document | |
| Attachment_5A_Contractor_Performance_Customer_Input_Sheet_Questionnaire.docx | DOCX document | |
| Attachment_2_Prime Offeror and SUB Cost Summary Format.xls | XLS spreadsheet | |
| Attachment_3_StaffingPlanWithoutCost.xlsx | XLSX spreadsheet | |
| Attachment_4_StaffingPlanWithCost.xlsx | XLSX spreadsheet | |
| Attachment_1_Contract Security Classification Specification DD Form 254.pdf | ||
| DRAFT N4215820RN001 07APRIL2020.docx | DOCX document | |
| Contract Data Requirement Lists (CDRLs) Exhibit A.docx | DOCX document | |
| DRAFT N4215820RN001.docx | DOCX document | |
| DRAFT PWS FOR LHD DRAWING SYNOPSIS.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mission Essential Contractor Services April 5, 2020
The below listed PWS paragraphs address functions that are Mission Essential
Paragraph 2 Scope of Work
Paragraph 6 Shipcheck Paragraph 6.3 Pre/post shipcheck efforts Paragraph 6.4 Shipcheck Paragraphs 6.4.1 – 6.4.3 Ship available windows Paragraph 7 SID Paragraph 7.3 SID Development Paragraph 7.3.1 SID Development for LHD-2 Initial Deliverables Paragraph 7.19 – 7.20 SID Development for LHD-2 Final Issue Paragraph 7.3.2 SID Development for LHD-7 Initial Deliverables Paragraph 7.23 SID Development for LHD-7 Final Issue
NORFOLK NAVAL SHIPYARD HULL PLANNING YARD MISSION ESSENTIAL CONTRACT SUPPORT
2020-04-01
NNSY C280 POC:
J. Gil Vieira, Code 280 Division Head
References:
a) NAVSEA Letter 5000 Ser 00/115 DTD 25 Mar 20- Continuation of Critical Work
| 1. | BLUF: |
| A. | Contractor support to perform Shipchecks and develop SIDs is mission essential. |
B. Development and issue of the modernization drawings for the LHD-2 FY22 DSRA and LHD-7 FY22 DSRA is required to support the execution of the CNO availabilities.
C. Modernization alterations are essential to maintain fleet readiness. Installation and upgrade of ships command, control and war fighting systems is required to be executed during scheduled CNO availabilities to ensure the ship can support its mission.
D. Without Ship Installation Drawings, the execution of modernization alteration and its precursor actions (ex: execution planning, material purchase, execution contract award) are not possible.
E. As indicated on reference (a), US Navy requires that NAVSEA and its components, including Norfolk Naval Shipyard (NNSY), remain operational during this time of extreme difficulty in order to support fleet readiness and operations.
F. Contractor support to execute NNSY HPY Shipchecks and SID development, is mission essential. Without contractor support, NNSY PY does not have the resources to shipcheck and develop SIDs for the LHD-2 FY22 DSRA and LHD-7 FY22 DSRA in time to support the new Ship Installation Drawing (SID) delivery milestone of start of the availability minus 435 days (A-435).
G. Without mission essential contractor support, NNSY HPY will not be able to deliver complete SID packages by the required milestone. This will jeopardize on time ordering of material, execution preplanning, contract award for modernization work execution and associated precursor actions and milestones.
File details come from the government source that posted it. Updated .