N4033918RF014-_Amendment_09.pdf

PDF 255 KB Posted

Attached to
Selected Restricted Availability
Solicitation number
N4033918RF014
Issued by

About this file

Amendment 9

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N4891518RCBA097

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

USS GLADIATOR SRA Amendment - 9

1) The purpose of this amendment is provide responses to the clarif ications received from the industry for the USS GLADIATOR SRA upon

Ship check attend on 27 May 2018.

2) The proposal submission date is remain same on 30 May 2018 at (11:30AM).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4033918RF014

X 9B. DATED (SEE ITEM 11)

25-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-May-2018

CODE

NAVSUP FLC BAHRAIN CODE 200

PSC 851 BOX 430

FPO AE 09834-0005

N40339 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4033918RF014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

Work Item/

Description QUESTION/CLARIFICATION GOVERNMENT’s

RESPONSE/ANSWER

130-11-001: Exterior

Wood Repair Accomplish.

- Paragraph 3.2: Existing Polyurethane overlay removal will be for only for repair area instead of 100 percent.

- Comply with spec as written.

- Paragraph 3.2: We will allow to remove the existing polyurethane overlay only in-way of the rotten / damaged deck areas only, as per ship check. Please confirm.

- Comply with spec as written.

- Para 3.4: We will allow to renew the rotten/damaged deck plywood sheathing only and submit a CFR for the exposed deck planks.

Please confirm.

- Spec is written to replace all wood sheathing and planks. Contractor submit the proposal accordingly.

- Assumed that the renewal of deck beams are not required at the moment. We will submit a

CFR after inspection for the deck beams. Please confirm.

- The Government concur if the renewal deck beams are not required at the moment.

631-41-001: Freeboard;

preserve.

- Paragraph 3.1: Accomplish requirements of

009-32 of 2.1, Table 2, Line 66 – Power Tool

Cleaning shall be accomplished, since abrasive blasting is not technically approved in Afloat

Conditions.

- The Government concur to Accomplish requirements of 009-32 of 2.1, Table 2, Line 66 – Power Tool Cleaning shall be accomplished, since abrasive blasting is not technically approved in Afloat

Conditions.

634-11-003: Decking;

repair.

- Allow Wood Work repair with Area for Tender purpose, Include requirement of 009-37, GFM

Listed materials 5.1 - 7, 8 & 9.

- All Wood in GFM is for wood repair.

Throughout the ship.

(End of Summary of Changes)

N4033918RF014

File details come from the government source that posted it.