Text version

N4891518RCBA097

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

USS GLADIATOR SRA - Amendment – 5

1) The purpose of this amendment is to correct the section B table.

2) The proposal submission date is remains same on 21 May 2018 at (10:30AM).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4033918RF014

X 9B. DATED (SEE ITEM 11)

25-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-May-2018

CODE

NAVSUP FLC BAHRAIN CODE 200

PSC 851 BOX 430

FPO AE 09834-0005

N40339 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4033918RF014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

PRICE BREAKDOWN

CLIN

SOW

Paragraph

DESCRIPTION

MAN

HOU

RS

LABOR

COST

MATERIAL

COST

OTHE

R

COST*

TOTAL

COST

CLIN 0001 - MAINTENANCE AND REPAIR WORKS

042-00-001 Accountability of Man-hour and

Material Reservation; accomplish-

042-00-003 Work Completion Certification;

Accomplish.

(THIS WORK ITEM IS CANCELED AS PER AMENDMENT

04)

0001 110-11-001 Limber Chain; repair

0001 120-11-001 Tie Rod; inspect and repair

123-14-001 Potable Water Tank; clean, inspect, repair and test

130-11-001 Exterior Wood Repair; accomplish

0001 130-11-002 Overhead Repairs; accomplish

171-11-001 Main Mast; stage, repair and preserve

233-11-001 Main Propulsion Diesel Engine

(MPDE) Jacket Water Coolers; clean and test

233-11-002 No. 2A Main Propulsion Diesel

Engine (MPDE) Vibracon Mount;

replace

233-11-003 Main Reduction Gear (MRG to

Main Propulsion Diesel Engine

(MPDE) Alignment; accomplish

241-11-001 Main Propulsion Diesel Engine and

Reduction Gear Resilient Mounts;

252-11-001 MCM-11 SCD 89081/86374

Alteration Installation Team (AIT)

Industrial Support Service; provide

256-11-001 Auxiliary Seawater Cooling

Pumping Unit; overhaul

262-11-001 Reduction Gear Lube Oil Cooler;

clean and test

264-30-001 Main Reduction Gear (MRG) and

Controllable Pitch Propeller (CPP)

Lube Oil Polisher Heater; inspect and clean

0001 321-11-001 2SP Shore Power Cable; replace

442-11-001 AN/WQC-2 Sonar Communication

Set Transducer; replace

476-11-001 Vehicle Handling System (VHS);

repair

476-11-002 Minesweeping Winch Interlock

Display Cable; replace

505-00-002 Silicon Aluminum Bronze (SAB)

Union Fittings; inspect and replace

508-11-001 Machinery Spaces and Non

Machinery Interior Spaces Lagging and Insulation; repair

NTE Labor: 80 Man Days

NTE Materials: $20,000.00

512-11-001 Galley and Laundry Exhaust

Ventilation; clean

512-11-002 Ventilation Fan Motor Resilient

Mount; replace

0001 512-11-003 Ventilation Fan; repair and test

514-11-001 Number One & 2 AC Condenser

Retube; accomplish

514-11-002 A/C Plant Chill Water Pump and

Motor; repair

514-11-003 Air Conditioning Plant Compressor;

516-11-001 Refrigeration Plant Condenser

Retube; accomplish

516-11-002 Number 2 Refrigeration Plant Valve;

516-11-003 Refrigeration Plant Compressor;

overhaul and test

0001 521-11-001 Remote Operator Deck Box; replace

0001 521-11-002 Fire main Valve; replace

521-11-003 Fire Main Cascade Orifice Resistive

Device (CORD); rebuild

0001 521-21-001 Fire Pump and Motor; repair and test

0001 524-11-001 Sea Valves; remove and replace

524-11-002 Fire main Piping System; clean and flush

524-11-003 Auxiliary Sea Water Piping; clean and flush

526-11-001 Deck Drain and Deck Penetration;

533-11-001 Potable Water Pump and Motor;

overhaul

551-11-001 Medium Pressure Air Compressor

(MPAC); repair

0001 561-11-001 Hydraulic Power Unit Cooler; clean

561-11-002 Starboard Steering Gear Pump;

581-11-001 Anchor and Chain; clean, inspect and preserve

0001 581-11-002 Anchor Windlass; replace

583-11-001 Boat Davit: repair and weight test;

accomplish

0001 583-11-002 Boat Sling Weight Test; accomplish

583-31-001 Rigid Hull Inflatable Boat (RHIB);

593-11-001 Waste Water Ejection Pump;

overhaul

593-11-002 CHT Piping System Chemical

Cleaning; accomplish

0001 593-11-003 Waste Water Ejection Tank; repair

0001 622-11-001 GRP Deck Plate; replace

622-11-002 PVC Pipe Connector; fabricate and install

0001 624-11-001 Joiner Door; repair

0001 624-11-002 Fume tight Joiner Door; repair

0001 631-11-001 Superstructure; preserve

0001 631-11-002 Bilge; preserve

0001 631-41-001 Freeboard; preserve

0001 634-11-002 Nonskid; replace

0001 634-11-003 Decking; repair

0001 634-11-004 Electrical Grade Matting; replace

0001 641-11-001 Crew Head Counter Top; replace

0001 642-11-001 Watch Chair; repair

0001 651-11-001 Electric Steam Jacketed Kettle; test

0001 665-11-001 Furniture; replace

0001 837-11-001 Antenna Photographs; provide

897-12-001 Availability Program Management

AIT Integrator; provide

980-11-001 Alteration Installation Team (AIT)

Support Services (SA70392K BOW

THRUSTER MODS); provide

0001 980-11-002 Assist Ship's Force; provide

982-31-002

Preliminary Light-Off Assessment

(LOA) Discrepancy Correction for

Government Responsible

Discrepancies; provide

NTE Labor: 15 Man Days

NTE Materials: $5,000.00

992-21-001 Small Boat Storage and Repair

Facility; provide

0001 992-31-001 Cleaning and Pumping; accomplish

0001 993-11-001 Alteration Installation Team (AIT)

Support Services (SA87023K

CLASS 400HZ SFC UPGRADE)

provide.

0001 993-21-001 Crane, Rigging, Forklift and

Transportation Service; provide

CLIN 0001 Total:

Items with NTE are NOT TO EXCEED work items. As per the individual scope of work (para. 3.1), the contractor will have to provide up to the requested number of Man Days and Material Cost. The contractor is required to give the Contracting Officer a written notice when the total amount reaches 75 percent of the stated ceiling for this CLIN. The contractor WILL NOT BE reimbursed for anything above the stated amount without a prior written notice to the Contracting Officer and a modification to the contract.

CLIN 0002 –TEMPORARY SERVICES

077-11-001 Hazardous Waste Produced on Naval

Vessels; control

857-11-001 Temporary Off-Ship Galley and

Messing Facility; provide

857-11-002 Temporary Duty Section Berthing

Off-Ship; provide

991-12-001 Temporary Staging for Ship's Force

Use; install

992-00-001 Force Protection; provide

0002 992-11-002 Temporary Service; provide

0002 993-31-001 Temporary Deck Covering Install

CLIN 0002 Total:

CLIN 0003 – SEA TRIALS

982-31-003

Dock Trials, Fast Cruise and Sea

Trial; accomplish

CLIN 0004, 0005, 0006 and 0007 –OPTION WORK ITEMS EXTENSIONS

0004 042-00-002 Continuation of Temporary Services;

provide (First Option) (15 Days

Extension)

0005 042-00-002 Continuation of Temporary Services;

provide (Second Option) (15 Days

0006 042-00-002 Continuation of Temporary Services;

provide (First Option) (30 Days

0007 042-00-002 Continuation of Temporary Services;

provide (Second Option) (30 Days

CLIN 0008 – SHIP SERVICE - OPTION

0008 311-22-001 Ship Service Diesel Generator

(SSDG); clean, repair and test

(Option)

GRAND TOTAL:

* The contractor shall specify what other costs are for all above work items.

The Growth Work Labor rate for this SRA project is _______________.

If an offeror intends to propose $0.00 or NSP for any of the work items listed above, then the offeror shall explain the reasons for proposing $0.00 or NSP in their proposal.

(End of Summary of Changes)