AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise Section C and attachment J-0200000-09.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4019220R7093
X 9B. DATED (SEE ITEM 11)
14-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Sep-2020
CODE
COMMANDING OFFICER - NAVFAC MARIANAS
36 CONS LGCB
UNIT 14040
BLDG 22026
FPO AP 96543
N40192 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4019220R7093
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
AMENDMENT 0002
Section C The following information is an update to PWS Spec Item 3.3.3 and 4, changes are in red text. For IDIQ work, the pricing will be established at the task order level.
3.3.3 HVAC/Boiler
Water Testing and Treatment
The Contractor shall perform maintenance on HVAC/Boiler Water Treatment systems to ensure safe, reliable, uninterrupted service.
003 – Technical Services Spec Item
Title Performance Objective
Related Information Performance Standard
3.3.3 HVAC/Boiler
Water Testing and Treatment
The Contractor shall provide preventative maintenance on Boiler water treatment system and closed loop water treatment system to ensure safe, reliable, uninterrupted service.
The word “treatment” shall strictly refer to the treatment side of the system.
The Contractor shall perform quarterly planned maintenance on HVAC/Boiler Water Testing and Treatment in accordance with manufacturers’ recommended procedures on a Monthly or Quarterly basis as indicated.
Contractor shall provide a cost estimate for repairs required for HVAC/Boiler Water Testing and Treatment chemical feed systems deemed non-operational.
HVAC/Boiler Water Testing and Treatment are identified in J-0200000-08.
Maintenance is performed in accordance with manufacturers’ recommended procedures.
PM of HVAC/Boiler Water Testing and Treatment in accordance with manufacturers’ recommended procedures.
004 – Indefinite Delivery/Indefinite Quantity (IDIQ) Spec Item
Title Performance Objective
Related Information Performance Standard
4 Indefinite Delivery/Indefinite Quantity (IDIQ)
Contractor shall perform necessary repairs on Commercial Exhaust Hoods, Fire Suppression for Commercial Exhaust
IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in
All work shall be performed in accordance with contract requirements, local, state and Federal
N4019220R7093
Hoods and HVAC/Boiler Water Testing and Treatment Chemical Feed System
Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to J-0200000-09, IDIQ ELINs for task listings, descriptions, and related requirements. Pricing will be established at the task order level. The intent of the above ELIN is to show the level of effort (Labor and Material) which may be required for this contract. Contractor pricing is not required prior to award.
All periods of performance are measured from issue date of order to acceptance of the work.
Identify required repairs to ensure accurate Cost Estimate is submitted to the Government for approval.
Ensure cost estimate reflects and shipping charges and lead time for delivery of materials.
laws and regulations and contractor’s accepted work schedule.
(End of Summary of Changes)