N40085-19-B-9158_Short-term_Vehicle_Rentals.pdf

PDF 736 KB Posted

Attached to
SHORT-TERM VEHICLE RENTALS
Solicitation number
N4008519B9158
Issued by

About this file

SOLICITATION N4008519B9158

View the file

Other files

File Type Posted
N4008519B9158_AMENDMENT_02.pdf PDF
N4008519B9158_AMENDMENT_0001.pdf PDF
J-0200000-04_ELINS_N40019-R-9158.xls XLS spreadsheet
1700000_FAP_BSVE_v2.2.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 12 Nov 2019

X

A X B X C

D

EX

X G F 90 - 98

99 - 102 X H 103 susan.roberts2@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-C2 1 103

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N40085 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

BLDG Z140, Room 216 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

SUSAN C. ROBERTS (757) 341-0091

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 4 5 - 12

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

13 - 33 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

34 - 36 37 - 40

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 41 - 46 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 47 - 48 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

49 - 75

PART II - CONTRACT CLAUSES

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

76 - 89

6. REQUISITION/PURCHASE NO.

ACQR5676134

5. DATE ISSUED

08 Oct 2019

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N4008519B9158

Section A - Solicitation/Contract Form

COVER SHEET

COMMANDER

NAVAL FACILITIES ENGINEERING COMMAND

MID-ATLANTIC DIVISION

ACQUISITION

NORFOLK, VIRGINIA 23511-3095

REQUEST FOR BID – N40085-19-B-9158

SHORT TERM RENTAL OF VEHICLES FOR NAVFAC MIDLANT’S HAMPTON

ROADS AREA OF RESPONSIBILITY (AOR), and NAVFAC MIDLANT’S NORTH

EAST AREA.

NAVFAC MIDLANT’S HAMPTON ROADS AOR:

Locations include but are not limited to Naval Station, Norfolk, Virginia, Naval Amphibious Base Little Creek, Norfolk VA. including Fort Story, Virginia Beach, Virginia. Naval Air Station Oceana, Virginia Beach, VA. including Dam Neck Naval Training Center, Virginia Beach, Virginia. Naval Weapons Station Yorktown, York County, VA. including Cheatham Annex, Williamsburg, Virginia. Norfolk Naval Shipyard, Portsmouth, VA including Portsmouth Naval Hospital, and St. Julians Creek Annex, Portsmouth Virginia. Marine Corps, Camp Allen, Norfolk Va., Marine Corps, Camp Elmore, Norfolk Va., Marine Corps Air Station, Cherry Point North Carolina, Marine Corps Base Camp Lejeune, North Carolina, Marine Corps Base Paris Island, North Carolina, Marine Corps Base Beaufort, South Carolina, Marine Corps Base Albany, Georgia.

NAVFAC MIDLANT’S NORTH EAST AREA:

Locations include but are not limited to Naval Station Newport, Newport, Rhode Island, Navy Submarine Base, New London, Connecticut, Portsmouth Naval Station, Kittery, Maine, Naval Weapons Station Earle, New Jersey, Naval Support Activity, Philadelphia, Pennsylvania, Philadelphia Naval Business Center, Philadelphia, Pennsylvania, Naval Support Activity, Mechanicsburg, Pennsylvania. The government reserves the right under the changes clause to add to the following areas based on the proposed expansion of the NAVFAC MIDLANT AOR:

Crane, Indiana and, Great Lakes, Illinois.

NAVFAC SPECIFICATION NO. 05-19-9158

NOTICE:

Proposals to be submitted by 2:00 P.M. 12 NOV 2019 At the office of:

Mid-Atlantic Division Facility Support Contract, Building Z-140 Room 216 (Acquisition) Attn: Susan Roberts

9324 Virginia Avenue Norfolk, Virginia 23511-3095

All inquiries concerning any phase of the specification, prior to the proposal due date shall be made to the Commander, Naval Facilities Engineering Command, Mid-Atlantic Division, Facility Support Contract Branch, 9324 Virginia Avenue, Norfolk, Virginia 23511; telephone

(757) 341-0091, Attn: Susan Roberts.

Due to increased security at all military installations, Offerors who do not currently have a valid Contractor’s ID and Vehicle Decal issued by the Department of Defense (DoD), must allow sufficient time to obtain a one-day pass to permit entry to the base. In accordance with Naval Station security regulations all prospective visitors and contractor personnel are hereby notified that in order to obtain a one-day visitor’s pass the person must present their driver’s license and vehicle registration and/or rental car contract.

Contractor personnel planning to hand deliver their bids, who do not have a valid Contractor’s ID and a DoD decal on their vehicle, must request a one-day pass to access the Naval Station, submitted in writing, email or fax. The written request shall include the company name, complete address, point of contact, phone number, fax number, and e-mail address. In addition, for each representative requiring access to the Naval Station for the purpose of submitting bids for this solicitation, you must submit the full legal name (first, last and middle initial), place of birth, date of birth, full SSN and citizenship. The request shall be sent to: Susan Roberts, Contract Specialist, via e-mail to susan.roberts2@navy.mil, or fax to (757) 341- 0091, at least five (5) business days prior to the date roposals are due.

Personnel and vehicle one-day pass must be obtained at the Norfolk Naval Station Pass Office located on Hampton Boulevard across from Gate #5.

It is imperative that all potential offerors adhere to this notice in order to avoid delay in submitting your bid. Also, be advised by this notice that the level of security at the Norfolk Naval Station may change at any time. As the level of security heightens, the amount of time required to gain access to the Naval Station also increases.

INVITATION FOR BID (IFB) INFORMATION/CLARIFICATION QUESTIONS:

Contractors are required to review the entire solicitation package before submitting questions.

Submit all questions via one document, by E-mail to susan.roberts2@navy.mil at least ten (10) days before proposals are due. This is the most efficient way to ensure all questions are addressed in a timely manner.

REQUEST FOR BID (IFB) FILES

Solicitations are posted to the Navy Electronic Commerce Online (NECO) website as mandated by our agency. By necessity, these files are protected to prevent unauthorized editing. The Contract Specialist will post the RFB files to a single website Federal Business Opportunities (FBO) at https://www.fbo.gov/ . It is the sole responsibility of the Offeror to obtain the RFB files, along with any amendments, from the FBO website. Unprotected editable electronic file copies of the RFB documents, including Word, Excel, and/or Adobe files will not be provided.

Please plan accordingly.

Section B - Supplies or Services and Prices

GENERAL INFORMATION

B.1 Contract Title: Short Term Rental of Vehicles for NAVFAC Mid-Lant’s Hampton

Roads, Virginia Areas of Responsibility (AOR), And NAVFAC Mid-Lant’s North East Areas of Responsibility

B.2 Type of Contract: Base Support Vehicle and Equipment (BSVE) Indefinite Delivery

Indefinite Quantity Contract with Non-Recurring services as noted in Section L, Instructions, Conditions, and Notices to Offeror.

B.3 Minimum Guarantee: The minimum guarantee is $5,000.00 and is applicable to the base year only.

B.4 Set-Aside: This is a Full and Open/Unrestricted Competitive Procurement. Refer to

Section I, FAR Clause 52.219-6

B.5 NAICS Code: The NAICS Code assigned to this procurement is 532111 with a small business size standard of $30,000,000.00. Refer to On-Line Representations and Certifications Application (ORCA) via System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM .

B.6 Wage Determination (Service)/Wage Decision: N/A

B.7 Bid Guarantee/Bonding Requirements: NOT REQUIRED for this procurement.

B.8 Contract Term: This contract contains provisions for a Base Period with four (4) Option

Periods, not to exceed a total of sixty (60) months. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, 52.217-9, Option to Extend the Term of the Contract-Services (Mar 2000). In the option periods, the Government will adjust the prices, if applicable, based on the new Department of Labor Wage Determination.

B.9 Period of Performance: The period of performance will be determined at the time of award.

B.10 Evaluation of Proposal: Proposers shall submit a lump sum price for Section B, CLINs

0001 through 0005 and unit prices for Exhibit A through Exhibit E, referenced in Section J. For purposes of evaluating offers for award, the Government will utilize the pricing submitted for the base year and all option periods. Refer to Section M, FAR 52.217-5, Evaluation of Options (JUL 1990).

B.11 Contract Line Items And Contract Exhibit Line Items

a. Proposers shall enter unit prices and amounts for Contract Line Items (CLINs) and Contract Exhibit line items (ELINs) as indicated in the schedules and accompanying exhibits.

b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid and the total of the CLIN, the ELIN will be recomputed accordingly. The CLIN will also be recomputed to take into account the change in the contract ELINs. If the offeror provides a total amount for an ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price.

c. The Schedule of Non- Recurring Work (CLIN 0001, 0002, 0003, 0004, 0005) will be used as the basis for deductions in accordance with FAR Clause 52.246-4, "Inspection of Services – Fixed Price (AUG 1996)" Section E.

B.12 Unit Price Adjustments In Option Periods: N/A

B.13 Indefinite Quantity Individual Contract Line Item Quantities

Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.

B.14 Unit Prices For Labor- N/A

B.15 Period Of Performance – Less than One Year

Offer shall be submitted for the performance of work for a period of one year. The contractor is cautioned to recognize that the initial term of the contract may be for a period of less than one year in accordance with the “Term of Contract” clause in Section F. In the event that the period of performance is less than one year, the Government will reduce the individual line item quantities to reflect work remaining in the contract term and no other adjustments to the pro-rated contract price will be made.

B.16 Government Purchase Card

Non-Recurring quantity work may be ordered at the prices offered by two ways: 1) by the issuing activity using a DD Form 1155 “Order for Supplies and Services”; 2) by an authorized Government user via a Government Purchase Card (GPC). When receiving GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.

B.17 Contractor Support Of Electronic Facilities Support Contracting (e-FSC)

This procurement allows for the use of FEDMALL for issuing orders. Refer to Section H, Special Contract Requirement.

B.18 Contractor Payment Schedule - N/A

B.19 Incorporation of Technical Proposal

a. The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the technical proposal.

b. In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.

B.20 Request For Proposals (RFP) Information/Clarification Questions

Contractors are required to review the entire solicitation package before submitting questions. All questions must be submitted at least 10 days before proposals are due, either by email to susan.roberts2@navy.mil.or fax to: 757-341-0091. This is the most efficient way to ensure all questions are addressed in a timely manner.

B.21 Request for Proposal (RFP) Files:

Solicitations are posted to the Federal Business Opportunities (FBO) website https://www.fbo.gov/ as mandated by our Agency. By necessity, these files are protected to prevent unauthorized editing.

It is the sole responsibility of the offeror to obtain the RFP files, along with any amendments, from this website.

Unprotected editable file copies of the RFP documents including: Word, Excel and/or .pdf files (Adobe Acrobat Files) will not be provided. Please plan accordingly.

B.22 Solicitation

This solicitation incorporates by reference a Performance Work Statement (PWS) developed by using NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2, and 15. The contractor will be required to meet the specifications in those Annexes per Section C of this solicitation.

B.23 Notice to Offerors:

Offerors are required to submit Section B, Contract Line Items (CLINs) Schedule, and Section J, Exhibit Line Items (ELINs) with their proposal. The total of the CLIN is equal to the sum of the ELINs as shown below:

B.24 Proposal Delivery

CLINS ELINS LOCATION

0001 A700 – A759 Hampton Roads AOR A800 – A856 Northeast AOR 0002 B700 – B759 Hampton Roads AOR B800 – B856 Northeast AOR 0003 C700 – C759 Hampton Roads AOR C800 – C856 Northeast AOR 0004 D700 – D759 Hampton Roads AOR D800 – D856 Northeast AOR 0005 E700 – E759 Hampton Roads AOR E800 – E856 Northeast AOR

DBIDS INFORMATION:

Access to Installation: All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS).

The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into

DBIDS.

DBIDS Program: DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

DBIDS Credentials: Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at: https://www.cnic.navy.mil/om/dbids.html .

The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The Commanding Officer will be the final waiver determination authority.

The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:

(1) That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.

DBIDS Paper Passes: In the event that a visitor, vendor, or Contractor employee elects not to participate in DBIDS, the individual will be issued DBIDS paper pass from the Base Pass and

Identification Office in order to access to the installation. The time standard for the validity of a pass to access an installation will be not more than thirty (30) days and may be further restricted based on local policy or by Federal, DOD, Navy, and CNIC guidance.

The Government will not be responsible for any cost or lost time associated with obtaining paper passes or added vetting or inspections incurred by non-participants in the DBIDS credentialing process.

Submitting Your Bid

Proposals that are sent via the United States Postal Service or a commercial carrier, such as Federal Express, shall be addressed to:

NAVFAC MID-LANT

Attn: Susan Roberts 9324 Virginia Avenue Building Z-140¸ Room 216 Norfolk, Virginia 23511

Proposals that are hand carried excluding commercial carriers noted above shall be delivered to the Contracts Office in Building Z-140, 2nd Floor, Suite 216, front lobby located at 9324 Virginia Avenue, Norfolk, VA 23511 (Norfolk Naval Station).

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Each

BASE YEAR SHORT -TERM VEHICLE RENTAL

FFP

Total price for CLIN 0001 represents the total amount for Exhibit Line Items (ELINs) A700 through A759 - Hampton Roads AOR, and ELINs A800 - A856- Northeast Region AOR.

FOB: Destination

PURCHASE REQUEST NUMBER: ACQR5676134

PSC CD: W023

NET AMT

0002 Each

OPTION OPTION YR1-SHORT -TERM VEHICLE RENTAL

FFP

Total price for CLIN 0001 represents the total amount for Exhibit Line Items (ELINs) B700 through B759 - Hampton Roads AOR, and ELINs B800 - B856- Northeast Region AOR.

FOB: Destination

0003 Each

OPTION OPTION YR 2 - SHORT -TERM VEHICLE RENTAL

FFP

Total price for CLIN 0001 represents the total amount for Exhibit Line Items (ELINs) C700 through C759 - Hampton Roads AOR, and ELINs C800 - C856- Northeast Region AOR.

FOB: Destination

0004 Each

OPTION OPTION YR 3 - SHORT -TERM VEHICLE RENTAL

FFP

Total price for CLIN 0001 represents the total amount for Exhibit Line Items (ELINs) C700 through C759 - Hampton Roads AOR, and ELINs C800 - C856- Northeast Region AOR.

FOB: Destination

0005 Each

OPTION OPTION YR 4 - SHORT -TERM VEHICLE RENTAL

FFP

Total price for CLIN 0001 represents the total amount for Exhibit Line Items (ELINs) D700 through D759 - Hampton Roads AOR, and ELINs D800 - D856- Northeast Region AOR.

FOB: Destination

Section C - Descriptions and Specifications

ANNEXES 1, 2 AND 17

0100000 – General Information Spec Item Title 1 General Information

1.1 Outline of Services

1.2 Project Location

1.3 Acquisition of Additional Work

1.4 Background Information

1.5 Verification of Workload and Conditions

1.6 Climate Patterns

1.7 Related Information

1.8 Navy Approach to Service Contracting

1.8.1 Partnering Philosophy

1.8.2 Contractor's Knowledge

1.8.3 Industry Best Practices

1.9 Standard Template

1.10 Navy PBSA Approach

1.11 Technical Proposal Certification

0100000 – General Information Spec Item Title Description 1 General Information

1.1 Outline of Services The work shall be performed at various locations. The following is an example of the dispersion of work at the various locations for the following Naval Facilities Engineering Command, Mid-Atlantic Hampton Roads Virginia/North Carolina Area:

This area includes:

1) Naval Station, Norfolk, Virginia

2) Naval Amphibious Base Little Creek, Norfolk VA. Including Fort Story, Virginia Beach, Virginia

3) Naval Air Station Oceana, Virginia Beach, VA. Including Dam Neck Naval Training Center, Virginia Beach, Virginia

4) Naval Weapons Station Yorktown, York County, VA. Including Cheatham Annex, Williamsburg, Virginia

5) Norfolk Naval Shipyard, Portsmouth, VA. Including Portsmouth Naval Hospital, and St. Julians Creek Annex, Portsmouth Virginia

6) Marine Corps, Camp Allen, Norfolk Va.

7) Marine Corps, Camp Elmore, Norfolk Va.

6) Marine Corps Air Station, Cherry Point North Carolina

7) Marine Corps Base Camp Lejeune, North Carolina

8) Marine Corps Base Paris Island, North Carolina

9) Marine Corps Base Beaufort, South Carolina

10) Marine Corps Base Albany, Georgia

11) Naval Station Newport, Newport, Rhode Island

12) Navy Submarine Base, New London, Connecticut

13) Portsmouth Naval Station, Kittery, Maine

14) Naval Weapons Station Earle, New Jersey

15) Naval Support Activity, Philadelphia, Pennsylvania

16) Philadelphia Naval Business Center, Philadelphia, Pennsylvania

17) Naval Support Activity, Mechanicsburg, Pennsylvania

18) The government reserves the right under the changes clause to add to this area based on the proposed expansion of the NAVFAC MIDLANT

AOR.

1.2 Project Location The work shall be performed at various locations and could vary from location to location. The following is an example of the dispersion of work at the various locations.

(1) Vehicle Rental

1.3 Acquisition of

Additional Work

The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background Information As an integral part of the Naval Facilities Engineering Command (NAVFAC) enterprise, we at NAVFAC Mid-Atlantic (NAVFAC MIDLANT) are the Navy's installation facility experts, managing the planning, design, and construction of shore facilities for the U.S. Navy from Maine to North Carolina. Headquartered in Norfolk, Va., we fully support the mission of Commander, Navy Region Mid-Atlantic (CNRMA) and Commander, Navy Installations Command (CNIC) to enable and enhance Navy combat power by providing the most effective, efficient and cost-wise shore services and support. We operate with an annual Navy Working Capital Fund business volume of approximately $560 million and execute over $1.5 billion a year in construction, professional engineering and facilities services for the Navy and Marine Corps. On Jan. 22, 2006, we expanded to include Public Works operations in the North East region of the country, at Naval Station Newport, R.I., Naval Submarine Base, New London, Groton, Conn., and Portsmouth Naval Shipyard, Maine, as well as the North Carolina Integrated Product Team (IPT) and the ROICC (Resident Officers in Charge of Construction) offices at Marine Corps Base Camp Lejeune and Marine Corps Air Station, Cherry Point, N.C.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided.

As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.6 Climate Patterns Virginia's climate results from global-scale weather patterns that are modified by the diverse landscape of the Commonwealth. In the Hampton Roads Area, the Atlantic Ocean and its "river of warm water", commonly called the Gulf Stream, plays a dominant role in differentiating Virginia's precipitation and climate. Winter storms in the vicinity of the east coast generally move northeastward paralleling the coast and Gulf Stream. The climate is generally mild and wet, but with the exceptions, some period of years has had moderate to severe drought and some period of years have had very wet conditions. The summer months are mostly quite dry with some recovery during the fall and winter months. The Northeast includes dense cities and sparsely populated towns. The region extends from the coast to inland plateaus and mountains. Its climate varies as much as its geography. Portions of West Virginia, the region's southern-most state, typically experience more than 20 days per year of 90°F temperatures. In contrast, northern areas of Maine typically experience only one day per year above 90°F.

1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting

The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.

The Navy also supports the following principles:

1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.

Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle.

Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.

Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the management and administrative requirements. Specification Item 3 will always contain the Recurring Work requirements.

Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 must be priced and their price must be allocated across the Exhibit Line Items.

1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

0200000 – Management and Administration Spec Item Title 2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment

2.3.3 Permits and Licenses

2.3.4 Insurance

2.3.4.1 Certificate of Insurance

2.3.4.2 Minimum Insurance Amounts

2.3.5 Protection of Government Property

2.3.6 Directives, Instructions, and References

2.3.7 Invoicing Procedures

2.3.8 Forms

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Facilities (GFF)

2.4.2 Government-Furnished Utilities

2.4.3 Government-Furnished Materials (GFM)

2.4.4 Government-Furnished Equipment (GFE)

2.4.5 Government-Furnished Services (GFS)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

2.6.3 Work Schedule

2.6.4 Deliverables

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.2 Employee Requirements

2.7.2.1 Employee Appearance

2.7.2.2 Employee Conduct

2.7.2.3 Identification as Contractor Employee

2.7.2.4 Removal of Employees

2.7.2.5 Proof of Legal Residency

2.8 Security Requirements

2.8.1 Passes and Badges

2.8.2 Access to Installation

2.8.2.1 DBIDS Program

2.8.2.2 DBIDS Credentials

2.9 Contractor Safety Program

2.10 Environmental Management and Sustainability

2.11 Non-Recurring Work

2.11.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.11.1.1 Acceptance and Performance

2.11.1.2 Invoicing and Receiving Payment

2.11.2 Unit Priced Labor (UPL)Work (Negotiated)

2.11.2.1 Non-recurring Preparation of Proposals

2.11.2.1.1 Labor Requirements

2.11.2.1.2 Material and Equipment Requirements

2.11.2.2 Issuance of Final Task Order

2.11.3 Non-Recurring Work ELINS

0200000 - Management and Administration

2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General

Information

2.2.1 Government

Regular Working Hours

The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.

2.2.1.2 Restriction to

Contractor Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.

2.2.2 Wage

Determinations

Wage Determinations are included in J-0200000-02.

2.2.3 Requirements

Hierarchy

Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3 General

Administrative Requirements

2.3.1 Required

Conferences and Meetings

The Contractor shall attend administrative and coordination meetings as directed.

2.3.2 Training for

Maintenance and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Permits and

Licenses

The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.

2.3.4 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause

52.228-5, INSURANCE – WORK ON A GOVERNMENT

INSTALLATION. This insurance must be maintained during the performance period.

2.3.4.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days’ written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.4.2 Minimum

Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law

2.3.5 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.6 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.7 Invoicing

Procedures

Refer to Section G for invoicing instructions

2.3.8 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting will be provided upon request by the Contracting Officer.

2.4 Government-

Furnished Property, Materials and Services

NONE

2.4.1 Government-

Furnished Facilities

(GFF)

NONE

2.4.2 Government-

Furnished Utilities

The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

The Contractor is responsible for the cost of all utilities at all Government-provided facilities and any additional Contractor-owned facilities, at prevailing Naval Station rates. The Contractor will be billed directly for all utilities provided to all Contractor occupied facilities. Utility rates billed to the Contractor will be at the following rates. The quantities will be estimated where meters are not provided based on UFC 3-401-05N.

1. Electrical - the current rate for electrical services is $111.82 MWH

2. Water - the current rate for water is $13.23 per KGAL

3. Wastewater (Sewage) - the current rate for sewage services is $14.06 per

KGAL, based on 100% of the water consumption

Variations in Rates: Utility rates are subject to change. Changes in one or more utility rates shall not be basis for adjustment to the contract price or a claim unless the deviation from the quoted price for a utility rate exceeds 15%. When a utility rate varies by more than 15%, the contract price will be adjusted to reflect the amount the actual charge exceeds the rate quoted;

however, the Government will only be liable for the amount of cost exceeding 15% of the rate quoted. For example, if a quoted rate increases by 16%, the Government will only be liable for 1% of the rate increase. Vice versa if the quoted rate decreases by 16%.

Historically, electrical and water utility consumption at the Government- Furnished Facilities has averaged approximately 351 MWH of electricity and 316 KGAL annually. However, historical data associated with contracts prior to this solicitation may present data that may not be representative of the requirements specified in this contract.

2.4.3 Government-

Furnished Materials (GFM)

NONE

2.4.4 Government-

Furnished Equipment (GFE)

NONE

2.4.5 Government-

Furnished Services

(GFS)

NONE

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.

Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business.

In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.

2.6.4 Deliverables Records and reports are specified in Sections C, F, H, I, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government.

Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format.

Deliverables shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. All formulas shall be traceable.

Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

2.7 Personnel

The Contractor shall comply with the personnel requirements stated below.

2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.

The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract.

The key personnel shall be revised as applicable for the contract.

2.7.1.1 Project Manager

(PM)

The Contractor shall provide a PM and designated alternate, as applicable, who has the have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within one hour after the Government's regular working hours.

The PM shall have at least three years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.

2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager or designated alternate shall be on-site within during the Government's regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager.

The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract

The Quality Manager shall have at least three years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager may be the same person as the SSHO.

2.7.1.3 Site Safety and

Health Officer

(SSHO)

The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO).

The SSHO or an equally-qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.

The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract.

The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:

The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years’ experience if he possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO may be the same person as the project manager but shall have fulfilled the pre-requisite qualification and experience.

2.7.2 Employee

The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.