1700000_FAP_BSVE_v2.2.doc
DOC document 69 KB Posted
- Attached to
- SHORT-TERM VEHICLE RENTALS
- Solicitation number
- N4008519B9158
About this file
1700000 FAP- SHORT-TERM VEHICLE RENTALS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008519B9158_AMENDMENT_02.pdf | ||
| N4008519B9158_AMENDMENT_0001.pdf | ||
| J-0200000-04_ELINS_N40019-R-9158.xls | XLS spreadsheet | |
| N40085-19-B-9158_Short-term_Vehicle_Rentals.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FUNCTIONAL ASSESSMENT PLAN (FAP)
BASE SUPPORT VEHICLES AND EQUIPMENT (BSVE)
N40085-19-B-9158 1700000
BSVE FAP
| Assessment Levels (AL) |
| Assessment Frequency (Freq) |
A – Annually
Q – Quarterly
M – Once per month
BW – Once every 13-16 days
W – Once per week
R – As required
Method of Assessment (MOA)
PS – Periodic Sampling
VCC – Validated Customer Complaints
UV – Unscheduled Visits
CE – Customer’s Evaluation
| AL1 |
| Start assessment at this Level |
| AL2 |
| Add this Level if Contractor performance for AL1 is Unsatisfactory |
| AL3 |
| Add this Level if Contractor performance at AL1 or AL2 is Unsatisfactory |
Note: Return to appropriate Assessment Level when performance improves.
Note: The first method listed in the MOA column below is the primary assessment method.
Spec
Item
| Performance Objective |
| Performance Standard |
| MOA |
| Assessment Level |
| Sample Size |
| Freq |
| AL1 |
| AL2 |
| AL3 |
| UOM (total) |
| Normal |
| Reduced |
VCC
| N/A |
| N/A |
| 10% |
| 5% |
| M |
| 4 |
| IDIQ Work |
IDIQ work may be ordered utilizing DoD FEDMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
| Periods of performance (measured from the issue date of the order to work completion) have been met. Work performed meets established expectations. Debris generated is removed and disposed of in accordance with requirements. Establishment or warranty periods are confirmed. |
| PS |
| N/A |
| N/A |
| N/A |
| As Required |
| N/A |
| R |
Monthly Performance Assessment Summary
Contract #: N40085-19-B-9158 Installation/Site:
Annex/sub-annex: 1700000 BSVE
Month/Year:
| Spec |
| Title |
| AL1 Rating |
| AL2/AL3 Rating |
Safety
Item
| E |
| VG |
| S |
| M |
| U |
| # Samples |
| A |
| U |
| # Samples |
| VCC |
| Issues |
| # Samples |
| 4 |
| NON-RECURRING |
Comments:
Recommended Actions:
Technical Ratings (mark using "X")
| E |
| VG |
| S |
| M |
| U |
Overall Technical Rating for Non-Recurring Work
SPAR Signature:
Date:
PAGE
File details come from the government source that posted it.