0200000 – Management and Administration
Table of Contents
| 2 |
| Management and Administration |
| 2.1 |
| Definitions and Acronyms |
| 2.2.1 |
| Government Regular Working Hours |
| 2.2.1.1 |
| Observed Federal Holidays |
| 2.2.2 |
| Wage Determinations |
| 2.2.3 |
| Requirements Hierarchy |
| 2.3 |
| General Administrative Requirements |
| 2.3.1 |
| Required Conferences and Meetings |
| 2.3.2.1 |
| Informal Partnering |
| 2.3.2.2 |
| Contract Partnering Administration |
| 2.3.2.3 |
| Contract Partnering Session Attendees |
| 2.3.3 |
| Permits and Licenses |
| 2.3.4.1 |
| Certificate of Insurance |
| 2.3.4.2 |
| Minimum Insurance Amounts |
| 2.3.5 |
| Protection of Government Property |
| 2.3.6 |
| Government Information Technology (IT) System |
| 2.3.7 |
| Directives, Instructions, and References |
| 2.3.8 |
| Invoicing Procedures |
| 2.4 |
| Government-Furnished Property, Materials and Services |
| 2.5 |
| Contractor-Furnished Items |
| 2.5.1 |
| Contractor- Furnished Items, General |
| 2.5.2 |
| Contractor-Furnished Items, Site Specific |
| 2.6.4 |
| Service Interruptions |
| 2.6.5 |
| Quality Management System (QMS) |
| 2.6.5.1 |
| Quality Control Plan (QCP) |
| 2.6.5.2 |
| Quality Inspection and Surveillance |
| 2.6.5.3 |
| Quality Inspection and Surveillance Report |
| 2.6.6 |
| Property Management Plan |
| 2.6.7 |
| System and Equipment Replacement |
| 2.6.8 |
| Contact Information |
| 2.7 |
| Personnel Requirements |
| 2.7.1.1 |
| Project Manager (PM) |
| 2.7.1.2 |
| Quality Control Manager (QCM) |
| 2.7.1.3 |
| Site Safety and Health Officer (SSHO) |
| 2.7.1.4 |
| Other Key Personnel |
| 2.7.2 |
| Employee Requirements |
| 2.7.2.1 |
| Employee Certification and Training |
| 2.7.2.2 |
| Employee Appearance |
| 2.7.2.4 |
| Identification as Contractor Employee |
| 2.7.2.5 |
| Removal of Employees |
| 2.7.2.6 |
| Proof of Legal Residency |
| 2.7.3 |
| Enterprise-wide Contractor Manpower Reporting Application (eCMRA) |
| 2.8 |
| Security Requirements |
| 2.8.4 |
| Access to Installation |
| 2.8.4.1 |
| Defense Biometric Identification System (DBIDS) |
| 2.8.5 |
| Access to Buildings |
| 2.8.6 |
| Access Arrangements |
| 2.8.6.1 |
| Escort Arrangement for Secured Areas |
| 2.8.7 |
| Security Clearances |
| 2.8.8 |
| Access to Sensitive Unclassified Information |
| 2.8.10 |
| Trustworthiness Security |
| 2.9 |
| Contractor Safety Program |
| 2.9.1 |
| Accident Prevention Plan (APP) |
| 2.9.2 |
| Activity Hazard Analysis (AHA) |
| 2.9.3 |
| Safety and Occupational Health (SOH) Risks and Compliance Plans |
| 2.9.3.1 |
| Alcohol and Drug Abuse Prevention Plan |
| 2.9.3.2 |
| Emergency Response Plan |
| 2.9.4 |
| Accident and Damage Reporting |
| 2.9.4.1 |
| Accident Reporting and Notification Criteria |
| 2.9.6 |
| Monthly On-Site Labor Report |
| 2.9.7 |
| OSHA Citations and Violations |
| 2.9.8 |
| Safety Inspections and Monitoring |
| 2.9.9 |
| Safety Certification |
| 2.9.10 |
| Safety Apparel on Jobsites |
| 2.9.11 |
| Emergency Medical Treatment |
| 2.10 |
| Environmental Protection |
| 2.10.1 |
| Non-Hazardous Waste Disposal |
| 2.10.2 |
| Hazardous Waste Disposal |
| 2.10.3 |
| Spill Prevention, Containment, and Clean-up |
| 2.10.4 |
| Hazardous Material Management |
| 2.10.5 |
| Protection of Endangered and Threatened Species (Flora and Fauna) |
| 2.10.7 |
| Asbestos Containing Material (ACM) |
| 2.11 |
| Disaster Preparedness |
| 2.13 |
| Recurring Work Procedures |
| 2.13.1 |
| Notification to the Government for Work Above the Recurring Work Limitations |
| 2.13.2 |
| Recurring Work Exhibit Line Item Numbers (ELINs) |
| 2.14.1 |
| Unit Priced Task (UPT) Work (Non-Negotiated) |
| 2.14.1.1 |
| Acceptance and Performance |
| 2.14.1.2 |
| Invoicing and Receiving Payment |
| 2.14.2 |
| Unit Priced Labor (UPL)Work (Negotiated) |
| 2.14.2.1 |
| Non-recurring Preparation of Proposals |
| 2.14.2.1.1 |
| Labor Requirements |
| 2.14.2.1.2 |
| Material and Equipment Requirements |
| 2.14.2.2 |
| Issuance of Final Task Order |
| 2.14.3 |
| Non-recurring ELINS |
0200000 - Management and Administration
| Spec Item |
| Title |
| Description |
| 2 |
| Management and Administration |
| 2.1 |
| Definitions and Acronyms |
| Definitions and Acronyms are listed in J-0200000-01. |
| 2.2.1 |
| Government Regular Working Hours |
| The Government's regular working hours are from 0630-1630, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval. NSA Bethesda contractors will follow the Office of Personnel Management’s (OPM) closures, delays, and early-dismissals when such action is caused by weather or natural disaster. |
| 2.2.1.1 |
| Observed Federal Holidays |
| The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. Any day the President declares as a federal holiday. |
| 2.2.2 |
| Wage Determinations |
| All work is subject to Contract Act and Davis-Bacon Act wage determinations in Section J. Wage Determinations are included in Attachment J-0200000-07. |
| 2.2.3 |
| Requirements Hierarchy |
| Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on. |
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
| 2.3 |
| General Administrative Requirements |
| 2.3.1 |
| Required Conferences and Meetings |
| The Contractor may be required to attend administrative and coordination meetings. The Contractor shall attend Pre-Performance conference, Partnering, and other meetings as indicated in this contract. |
| 2.3.2 |
| Partnering |
| To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractors’ teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps. |
Partnering should accomplish three goals:
· The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
· The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
· The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
| 2.3.2.1 |
| Informal Partnering |
| The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO. |
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
| 2.3.2.2 |
| Contract Partnering Administration |
| Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. |
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
| 2.3.2.3 |
| Contract Partnering Session Attendees |
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager
* Quality Manager
Site Safety and Health Officer
| 2.3.3 |
| Permits and Licenses |
| The Contractor shall obtain all current required permits, licenses, and authorizations to perform work under this contract from the applicable State licensing authority and comply with all the applicable federal, state and local laws and regulations. Many states require security officers be licensed. The contractor shall meet all state mandated licensing requirements at all times for each of the applicable states for the District of Columbia, Maryland and Virginia. The contractor shall be responsible for maintaining and renewing all licenses, including bearing the cost of such for the length of the contract for all personnel. Evidence of such permits and licenses shall be provided to the KO before work commences and at other times as requested by the KO. The Contractor shall submit copies of Permits and Licenses per Section F. |
| 2.3.4 |
| Insurance |
| The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period. |
| 2.3.4.1 |
| Certificate of Insurance |
| The Certificate of Insurance shall provide for at least 30 calendar days’ written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause. |
| 2.3.4.2 |
| Minimum Insurance Amounts |
| The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage: |
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other: As required by State or District of Columbia Law (whichever is applicable).
| 2.3.5 |
| Protection of Government Property |
| During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government. |
| 2.3.6 |
| Government Information Technology (IT) System |
| The Government utilizes various IT systems at the various sites. |
| 2.3.7 |
| Directives, Instructions, and References |
| Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-13. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract. |
| 2.3.8 |
| Invoicing Procedures |
| Refer to Section G for invoicing instructions. |
| 2.3.9 |
| Forms |
| Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-03. Form originals will be provided by the Government (either hardcopy or computer based for contractor’s local reproduction and use. |
| 2.4 |
| Government-Furnished Property, Materials and Services |
| In accordance with FAR 52.245, GOVERNMENT PROPERTY and NAVFAC Clause 5252.245-9300, GOVERNMENT-FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the Contractor, certain Government-owned facilities, utilities, materials, equipment and services for use in connection with this contract. |
A list of Government Furnished Property, Materials, and Services is provided in J-0200000-06.
| 2.5 |
| Contractor-Furnished Items |
| Except for items specifically identified as Government Furnished in Attachment J-0200000-06 (GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, SERVICES, and MATERIAL), the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. Fifteen days after contract award, Contractor shall furnish document submittals concerning vehicles, communications, weapons (if applicable), uniforms and related accessories and all other equipment and materials proposed to use in connection with the performance of this contract. Submittals may consist of: manufacturer’s product specifications and descriptive data sheets, product photographs, brochures, catalog cut sheets and/or actual samples of the items intended for use. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and PCB’s shall not be brought on site. The KO may at any time require samples, Safety Data Sheets (SDS), and manufacturer’s data cut sheets of materials used in this contract. |
| 2.5.1 |
| Contractor- Furnished Items, General |
| The Contractor shall provide the following for all work, employees and sites: |
1. Training Equipment, Aids, Course Materials, and all other training related Materials and Supplies the Contractor shall provide all training materials. Examples include, but are not limited to, the following:
· Training Plans
· Course Curricula and Lesson outlines and plans
· Student’s materials
· Class Handouts
· Homework and testing materials
· Instructors and Students Materials and references
· Administrative Items
· Firing Targets
· All other training services
2. Uniforms. Contractor shall provide all required uniform items including accessories and security equipment listed in Attachment J-0401060-08. Laundry, cleaning, pressing, maintenance and repair costs of employees’ uniforms and uniform equipment shall be the contractor’s responsibility and paid for as provided in the applicable Department of Labor Service Contract Act Wage Determination(s) or Collective Bargaining Agreement(s).
3. Materials and Supplies. Except where specifically stated elsewhere as Government provided, the Contractor shall provide all materials and supplies, including vehicle fuel and oil, required to perform the contract. Examples include, but are not limited to the following:
· Official Log Books
· Wireless devices where applicable such as tablets and phones
· Black or Blue pens, pencils, sharpeners, staplers, etc.
· Any and all necessary forms, permits, passes and badges.
· Blank Video Cassettes
· Office equipment and supplies (e.g., fax machine, computer, copier, typewriter, ink, paper, etc.).
4. Telephone Service. The Contractor shall provide any telephones or telephone services needed to perform the contract, beyond that provided by the government for local official use only purposes.
| 2.5.2 |
| Contractor-Furnished Items, Site Specific |
| Listed and described in Attachments J-0200000-06.1 through J-0200000-06.5 are additional, site-specific requirements that the Contractor must provide. |
| 2.6 |
| Management |
| The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met. |
| 2.6.1 |
| Work Control |
| The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and status updates shall be provided when requested by the KO. A written status report of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours. |
| 2.6.2 |
| Work Schedule |
| The Contractor's work shall not interfere with normal Government business. In those cases, where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls. |
| 2.6.3 |
| Deliverables |
| Records and reports are specified in Section C and listed as deliverables in Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Section F. |
Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
| 2.6.4 |
| Service Interruptions |
| If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable. |
| 2.6.5 |
| Quality Management System (QMS) |
| The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program (aka QMS or QC Program/Plan) shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. Contractor shall provide copies of its QMS/QC Program to the KO per Section F, for approval. The Contractor's QMS program shall address: |
· Accurate documentation of work processes, procedures, and output measures.
· A systematic procedure for assessing compliance with performance objectives and standards.
· Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
· Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
| 2.6.5.1 |
| Quality Control Plan (QCP) |
| The Contractor shall develop and submit a QCP per Section F. The QCP shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QCP for acceptance. |
The Contractor’s QCP shall include, at a minimum, the following:
· Policy and objectives of Quality Management System (QMS)
· Quality organization
· List of personnel
· Responsibilities & lines of authority
· Training and qualifications
· Approach to assuring quality of services provided and conformance with performance objectives and standards
· Methods and procedures for effective planning, operation and control of processes and performance of work
· Procedures for inspection and surveillance of services
· Scheduling and performance of inspection and surveillance
· Measurement, data collection and analysis
· Corrective action, preventive action, and continuous improvement
· Oversight of subcontracted work
· Documentation and records management
· Communication with government (customers).
| 2.6.5.2 |
| Quality Inspection and Surveillance |
| The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. Contractor QC shall perform not less than 20% inspections for each site per month. Contractor shall submit results to the government PAR within 24 hours of inspection. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract. |
| 2.6.5.3 |
| Quality Inspection and Surveillance Report |
| The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance. |
| 2.6.6 |
| Property Management Plan |
| The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Property, Materials and Services, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property Management Plan shall be submitted per Section F. |
| 2.6.7 |
| System and Equipment Replacement |
| The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment. |
2.6.8
Contact
Information Contractor shall provide and maintain at all times a Washington DC Area local (toll-free) telephone voice number and a telephone facsimile number which the Government can use to contact the Contractor during and/or after normal working hours, to initiate work and to conduct contractual business. Use of answering machines and beepers is not acceptable. Provide this information 24 Hours after contract award and at any changes thereafter.
| 2.7 |
| Personnel Requirements |
| The Contractor shall comply with the personnel requirements stated below. |
| 2.7.1 |
| Key Personnel |
| Within 15 calendar days after award of the contract, for other than qualification requirements required to be submitted with the offer, the Contractor shall submit to the KO a List of Key Personnel and Their Qualifications and any additional information requested by the KO to certify their qualifications. The PM, QCM, and SSHO need to be separate personnel. Within 15 calendar days after award of the contract, the Contractor shall submit to the KO an Organizational Chart showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, QCM, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract when staff changes are made. |
| 2.7.1.1 |
| Project Manager (PM) |
| The PM must have relevant experience at a comparable level of responsibility in projects of similar size, scope and complexity. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within one hour after the Government's regular working hours, if contacted and requested to be on-site. |
| 2.7.1.2 |
| Quality Control Manager (QCM) |
| The Contractor shall provide a Quality Control Manager who shall have full authority and responsibility for assuring performance objectives and standards identified in this contract are met. |
The Contractor shall provide a QCM or designated alternate shall be on-site within during the Government's regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The QCM must report directly to a senior corporate official and shall not report directly to the Project Manager.
| 2.7.1.3 |
| Site Safety and Health Officer (SSHO) |
| The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract: For contracts greater than $2M/year or for contracts of high safety risk, the SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past, and have completed the OSHA 30-hour construction safety class or equivalent within the last five years and an average of at least 24 hours of safety training per year for the past five years. The SSHO shall not be the same person as the Project Manager. |
Personnel Other Key Personnel include: NAVSEA Site Manager and Shift Supervisors, and NRL CBD Site Manager and Shift Supervisors. Refer to Attachment J-0401060-05 for employment suitability criteria for these personnel.
| 2.7.2 |
| Employee Requirements |
| The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can read and understand printed regulations, detailed written orders, operating procedures, training instructions and materials. They should also understand and comply with installation emergency procedures. Refer to Attachment J-0401060-05 for employment suitability criteria. Provide “Certifications of Employees Training” submittals as detailed in Section F. |
| 2.7.2.1 |
| Employee Certification and Training |
| The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 4 hours of request. |
| 2.7.2.2 |
| Employee Appearance |
| The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges. |
| 2.7.2.3 |
| Employee Conduct |
| Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner. |
| 2.7.2.4 |
| Identification as Contractor Employee |
| Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence. |
| 2.7.2.5 |
| Removal of Employees |
| The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security. |
| 2.7.2.6 |
| Proof of Legal Residency |
| No employee or representative of the Contractor will be admitted to the site of work unless satisfactory proof of citizenship is furnished, or, if an alien, legal residency within the United States is confirmed. Provide certifications of citizenship to the KO before the start of work and before assignment of any new employees. Maintain records of same. |
| 2.7.3 |
| Enterprise-wide Contractor Manpower Reporting Application (eCMRA) |
The following manpower reporting is required by NMCARS 5237.102.
The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://doncmra.nmci.navy.mil.
Per Section F, reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk , linked at https://doncmra.nmci.navy.mil.
| 2.8 |
| Security Requirements |
| The Contractor shall comply with all federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained. Provide proof of facility and employee clearances to the KO before the start of work and before assignment of any new employees. Maintain records of same. |
| 2.8.1 |
| Employee Listing |
| The Contractor shall maintain and provide upon request a current listing of employees. The list shall contain employee’s name, social security number, and level of security clearance, sites/posts normally assigned. |
| 2.8.2 |
| Vehicles |
| The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Codes. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration. |
| 2.8.3 |
| Passes and Badges |
| The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. |
All Contractor employees shall obtain the required employee and vehicle passes. The Government shall issue all Government badges. Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's pass and badge shall be returned to the facility the same day.
| 2.8.4 |
| Access to Installation |
| All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS). |
The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS. The Contractor shall furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges.
This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9).
Immediately report instances of lost or stolen badges to the Contracting Officer.
| 2.8.4.1 |
| Defense Biometric Identification System (DBIDS) |
| DBIDS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. |
The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. Under the DBIDS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON).
The following is required to obtain a DBIDS credential:
· Present a letter or official document from my government sponsoring organization that provides the purpose for your access.
· Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
· Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
· Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided.
There is no cost to obtain a DBIDS credential.
Information on requirements to participate and enroll in DBIDS is available at https://www.cnic.navy.mil/om/dbids.html or by calling 1-202-433-4784 For additional questions about obtaining a DBIDS card, contact your local base visitor control center.
| 2.8.4.2 |
| One-Day Passes |
| Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor’s personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. |
The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
| 2.8.5 |
| Access to Buildings |
| The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each workday or shift period, or as specified in Post Orders. |
| 2.8.6 |
| Access Arrangements |
| The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction. |
| 2.8.6.1 |
| Escort Arrangement for Secured Areas |
| The Contractor shall make arrangements for Government escort into secured areas requiring escort. The KO will provide information on applicable buildings, spaces and the appropriate point of contact. |
The Contractor may experience delays while waiting for escorts. The Government estimates the wait period can be up to 15 minutes. The Contractor shall notify the Government Performance Assessment Representative (PAR) and appropriate point of contract if an escort is not available after 15 minutes and access to accomplish the work is denied. Unscheduled requirements, e.g., trouble calls, may require a longer wait for an escort.
| 2.8.7 |
| Security Clearances |
| Employee Security Clearance requirements are specified in J-0401060-02 Post Orders and SOPs, and are summarized in J-0401060-14. Contractor Facility Clearance requirements are as indicated in DD Form 254 (DOD CONTRACT SECURITY CLASSIFICATION SPECIFICATION) in J-0200000-03. The Contractor shall obtain all required corporate and personnel Security Clearances prior to commencement of work. The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending. |
| 2.8.8 |
| Access to Sensitive Unclassified Information |
| The Contractor personnel whose work involves access to sensitive unclassified information shall undergo a National Agency Check Investigation (NACI) to verify their suitability. If the Contractor personnel currently have a favorably adjudicated NACI the Contractor shall notify the Government Command Security Manager who will validate this in the Joint Personnel Adjudication System (JPAS). |
The Contractor shall request from the Government for access to the E-QIP Direct program for the Contractor employees to complete the SF-85 form online for an NACI. The Security Manager will determine suitability. Upon a favorable NACI, the Contractor personnel shall provide the completed Personnel Security Investigation (PSI) to the Security Manager along with the original signed release statements, applicant fingerprint card (FD87), and an OF-306 Declaration for Federal Employment per Section F. The Contractor shall be responsible for providing the fingerprint card.
The request shall be renewed annually or for the duration of the contract if less than one year.
| 2.8.9 |
| Employee Status |
| The Contractor shall notify the KO of any changes to any employee’s status to include, but not limited to, termination, convictions/arrests, adverse actions taken on the job for any reason or any other documented misbehavior that may affect, or have the potential to affect, security standing in terms of access to federal facilities or IT systems. |
| 2.8.10 |
| Trustworthiness Security |
| Reference is hereby made to Navy awarded contracts requiring Contractor access to sensitive unclassified information. Although these contracts are not classified and Contractor employees are not required to have a security clearance, the Department of the Navy (DoN) has determined that all DoN information systems are sensitive regardless of whether the information is classified or unclassified. A Contractor whose work involves access to sensitive unclassified information warrants a judgment of an employee’s trustworthiness. Therefore, all personnel must undergo a National Agency Check to verify their trustworthiness. Also, the Government will include Facility Access Determination (FAD) program requirements in the contract specifications when trustworthiness determinations will be required on the Contractor employees. The following addresses those |
requirements for Trustworthiness Security.
a. Each Contractor employee must have a favorably completed National Agency Check (NAC).
b. If Contractor personnel currently have a favorably adjudicated NAC, the Contractor shall notify the Security Manager of the Government command they will visit who will validate this in the Joint Personnel Adjudication System (JPAS). The request shall be renewed annually or for the duration of the contract if less than one year.
c. If no previous investigation exists, the Contractor personnel shall complete the requirement for a Trustworthiness NAC.
Investigations for public trust positions, to include IT-II (Limited Privileged) and IT-III (Non-Privileged) positions that access unclassified sensitive information when clearance eligibility is not required, will be submitted to the Office of Personnel Management (OPM) utilizing the SF-85P (code 08B for IT-II and code 02B for IT-III) and will include the SF-87 Fingerprint Card or electronic fingerprint transmission. The Government Security Manager will process the Trustworthiness NAC. The contract employee shall provide the completed Personnel Security Investigation (PSI) to the Security Manager along with the original signed release statements and applicant fingerprint card (FD87). The responsibility for providing the fingerprint card rests with the Contractor. The Security Manager will review the form for completeness, accuracy and suitability issues and will forward the completed SF85P along with attachments to OPM. The Department of Navy Central Adjudication Facility (DoN CAF) will perform adjudicating contractor investigations for public trust positions. Contractor fitness determinations made by the DoN CAF will be maintained in the Joint Personnel Adjudication System (JPAS). Favorable fitness determinations will support public trust positions only and not national security eligibility. If no issues are discovered, according to respective guidelines a “Favorable Determination” will be populated in JPAS and will be reciprocal within DoN. If issues are discovered, the DoN CAF will place a “No Determination Made” in the JPAS and forward the investigation to the submitting office for Government command’s final determination.
| 2.9 |
| Contractor Safety Program |
| The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM-385-1-1 and Public Law 91-596, Occupational Safety and Health Act. |
| 2.9.1 |
| Accident Prevention Plan (APP) |
| The Contractor shall develop and implement a site Accident Prevention Plan (APP). The APP shall be prepared by the Contractor’s SSHO and shall be followed by all Contractor employees, subcontractors, and vendors at each service site. |
The APP shall follow the format and include all elements addressed in Appendix A of EM 385-1-1. The APP shall incorporate Activity Hazard Analyses (AHAs) and compliance plans addressing all applicable Safety and Occupational Health (SOH) risks that are relevant to the site specific hazards and controls for each activity and type of work that may be encountered in the performance of this contract.
The Contractor shall submit an APP for acceptance per Section F. The Contractor shall review, update, and submit revisions to the APP whenever a change in work conditions, hazards, or activities occur. Submittal of the APP shall include Activity Hazard Analyses (AHAs) and applicable compliance plans, programs, and procedures as specified below.
The Contractor shall not commence work until the APP has been accepted and no activity shall be started on site until the applicable AHAs and compliance plans have been accepted.
Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.
| 2.9.2 |
| Activity Hazard Analysis (AHA) |
| The Contractor shall prepare Activity Hazard Analyses (AHAs) for all applicable common recurring work activities performed under this contract. AHAs for recurring work shall be submitted with the APP and shall be updated as work activities or conditions change and additional AHAs prepared as new work activities are required. |
Specifically:
· For contract modifications to recurring work requirements where changes are germane to the original contract, the Contractor shall revise applicable AHAs within 15 calendar days after modification is signed.
· For contracts with non-recurring work ELINs, the Contractor shall submit an AHA on non-recurring work task orders, with the associated proposal, whenever the service environment or required task is different from the recurring work priced services. AHAs for non-recurring and one-time work occurrences shall be submitted at least two working days prior to start of work.
The Contractor shall follow the Risk Management Process for the development of Activity Hazard Analysis (AHA) in accordance with paragraph 01.A.14 and Appendix A of EM 385-1-1. A formatted outline of an AHA is provided in Figure 1-2 of EM 385-1-1.
AHAs shall follow format of Figure 1-1 of EM-385-1-1 and shall explain the following as detailed in the EM-385-1-1:
· The steps of the service process;
· Identify potential hazards that exist as a result of the Contractor’s service process within the environment;
· Measures or plans of actions to safely remove potential hazards away from people in and around the service process and environment;
· Specific materials and equipment necessary to safely remove potential hazards away from people in and around the service process and environment;
· Inspection requirements to assure service activity is safe; and
· Training of service personnel to be aware of potential hazards and measures or plans of actions to be used to remove hazards from service environment.
During performance of services, the SSHO shall periodically review the AHA at each service site and for each sub-annex to assess the effectiveness of the Contractor’s overall APP. If changes to the AHAs are required, such changes shall be submitted to the KO for review and acceptance.
| 2.9.3 |
| Safety and Occupational Health (SOH) Risks and Compliance Plans |
| Based on a risk assessment of recurring and non-recurring work requirements and on mandatory OSHA compliance programs, the Contractor shall develop, provide and implement all applicable compliance plans, as necessary for the situation or types of work to be performed under this contract. Compliance plans, programs, and procedures along with their respective references are detailed in Appendix A, paragraph 3.i of EM 385-1-1. |
These plans shall be submitted with the APP and shall be updated as situations change. Additional compliance plans, programs, and procedures shall be developed as applicable when new types of work are required under this contract.
| 2.9.3.1 |
| Alcohol and Drug Abuse Prevention Plan |
| The Contractor shall develop an alcohol and drug abuse prevention plan to explain how it will satisfy the drug-free work force requirement as stated in DFARS Clause 252.223-7004 and include elements addressed in paragraph 01.C.02 of EM 385-1-1. |
| 2.9.3.2 |
| Emergency Response Plan |
| The Contractor shall develop an emergency response plan to ensure safe |
evacuation of people during emergencies, before the hazard or natural disaster is imminent, and to minimize the consequences of accidents during evacuations. See Section 01E of EM 385-1-1.
| 2.9.4 |
| Accident and Damage Reporting |
| The Contractor shall notify the KO of all damages, accidents, mishaps, and near misses that occur on or related to Government property immediately. |
For recordable injuries and illnesses, property damage accidents resulting in at least $2,000 in damages, the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident.
(a) For recordable injuries and illnesses and property damage accidents resulting in at least $2,000 in damages complete the Navy Contractor
Significant Incident Report (CSIR) form and provide the report to the KO within 1 calendar day of the accident. The KO will provide a blank copy of any required or special forms.
(1) Recordable Injuries or Illnesses. Any work-related injury or illness that results in:
i. Death, regardless of the time between the injury and death, or the length of the illness;
ii. Days away from work (any time lost after day of injury/illness onset);
iii. Restricted work;
iv. Transfer to another job;
v. Medical treatment beyond first aid;
vi. Loss of consciousness; or
vii. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.
Comply with current 29CFR1904 for OSHA/HIOSH record keeping and reporting requirements.
| 2.9.4.1 |
| Accident Reporting Notification |
| The Contractor shall report all accidents, mishaps, and near misses to the KO in a timely manner as described below: |
An Initial Accident Reporting Notification Report shall be developed by the Contractor and provided to the KO immediately after that an accident, or near miss, has occurred. The Contractor may not have all the facts and information regarding the actual incident or near miss at the time of the initial report. However, it is the Government’s desire to receive notification of all mishap situations as early as possible.
The Contractor shall develop a Follow-on Accident Reporting Notification Report and shall and provide a copy to the KO close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning. Follow-on reports shall be required daily until the Contractor can send a final, conclusive report of the nature, cause, and outcome of the accident.
The Contractor shall provide a Final Accident Reporting Notification Report of the accident to the KO within 48 hours after completing the investigation of the accident.
This is the start of the file's text. The full file is on GovTribe.