J-3_Category_B_Item_Revised.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
USNS GRASP ROH/DD Federal contract opportunity
Solicitation number
N3220518R4555
Issued by
Department of the Navy Military Sealift Command

About this file

J-3

View the file

Other files for this federal contract opportunity

Other files attached to USNS GRASP ROH/DD, newest first.
File Type Posted
Amendment.docx DOCX document
Q&A__6_Answer.docx DOCX document
Extension_Request_Answer.docx DOCX document
QA__5_Answers.docx DOCX document
J_-_2_Category_A_Item_Revised.xlsx XLSX spreadsheet
Amendment_3.docx DOCX document
QA__4_Answers.docx DOCX document
Amendment_0002.docx DOCX document
QA__3_Answer.doc.rtf RTF text file
Q&A__2_Answer.rtf RTF text file
Q&A__1_PPE_Answer.rtf RTF text file
Amendment0001.docx DOCX document
J&A_Redacted.pdf PDF
N3220518R4555_SOLICITATION.docx DOCX document
J-Attachments.zip ZIP file
SYNOPSIS_N3220518R4555.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat B Items

GENERAL REQUIREMENTQTYUIUnit PriceTotalPRIME ContractorSUBCONTRACTOROTHER COSTS
ITEM NO.TITLE CAT B ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
25Cost to Establish and Maintain Physical Security At Private Contractors Facility
7.1COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY FROM BRAVO to FORCE PROTECTION CONDITION CHARLIE1Days$ - 0$ - 0
7.1COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY FROM CHARLIE to FORCE PROTECTION CONDITION DELTA1Days$ - 0$ - 0
7.1COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE10Days$ - 0$ - 0
7.1COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA10Days$ - 0$ - 0
WI 025 SUBTOTAL$ - 0
030Continutation of Services
7.1Overhaul Management Team15Days$ - 0$ - 0
7.2General Services For The Ship15Days$ - 0$ - 0
7.3Telephone Services15Days$ - 0$ - 0
7.4Project Planning and Monitoring15Days$ - 0$ - 0
7.5Fire Protection and Ship's Safety15Days$ - 0$ - 0
7.6Delivery, Care and Redelivery of the Vessel15Days$ - 0$ - 0
7.7Shipboard Access and Security15Days$ - 0$ - 0
7.8Gas Free Certificates15Days$ - 0$ - 0
WI 030 SUBTOTAL$ - 0

0504 Firemain Overhaul $ - 0 $ - 0 $ - 0

0513Miscellaneous Valves
150# Flanged Bronze Gate Valve, up to 2"5EA$ - 0$ - 0
150# Flanged Bronze Gate Valve, up to 4"5EA$ - 0$ - 0
150# Flanged Bronze Globe Valve, up to 2"5EA$ - 0$ - 0
150# Flanged Bronze Globe Valve, up to 4"5EA$ - 0$ - 0
150# Flanged Steel Globe Valve, up to 2"5EA$ - 0$ - 0
150# Union End, Bronze Globe Valve, up to 4"5EA$ - 0$ - 0
150# Braised Bronze Gate Valve, up to 1”5EA$ - 0$ - 0
150# Braised Bronze Gate Valve, up to 1.5”5EA$ - 0$ - 0
150# Braised Bronze Gate Valve, up to 2”5EA$ - 0$ - 0
150# Braised Bronze Globe Valve, up to 1”5EA$ - 0$ - 0
150# Braised Bronze Globe Valve, up to 1.5”5EA$ - 0$ - 0
150# Braised Bronze Globe Valve, up to 2”5EA$ - 0$ - 0
WI 0513 SUBTOTAL$ - 0
0514Miscellaneous Piping
ASTM A53 Sched. 80: Up to 2-1/2” inch IPS10Units$ - 0$ - 0
ASTM A53 Sched. 80: Up to 4 inch IPS5Units$ - 0$ - 0
ASTM A53 Sched. 80: Up to 6 inch IPS5Units$ - 0$ - 0
CU-NI 90/10 Class 200: Up to 2-1/2”” IPS10Units$ - 0$ - 0
CU-NI 90/10 Class 200: Up to 4 inch IPS10Units$ - 0$ - 0
CU-NI 90/10 Class 200: Up to 6 inch IPS5Units$ - 0$ - 0
CU-NI 70/30 HP 3300#: Up to 2” IPS (Seamless)5Units$ - 0$ - 0
WI 0514 SUBTOTAL$ - 0

0604 Gallery and Scullery Renewal $ - 0 $ - 0 $ - 0

0606Lead Abatement
Overhead surfaces1,250SQ. FT.$ - 0$ - 0
Horizontal surfaces1,250SQ. FT.$ - 0$ - 0
Vertical surfaces1,250SQ. FT.$ - 0$ - 0
Piping of various sizes1,250SQ. FT.$ - 0$ - 0
WI 0606 SUBTOTAL$ - 0

0801 Fan Room Overhaul $ - 0 $ - 0 $ - 0

0805Lagging
Hard faced 2” thermal insulation1,500SQ FT$ - 0
1” fiberglass insulation1,500SQ FT$ - 0
Non-Steam Insulation Up to 1” IPS Pipe Rubatex or equal1,000L FT$ - 0
Non-Steam Insulation Up to 3” IPS Pipe Rubatex or equal750L FT$ - 0
Non-Steam Insulation Up to 6” IPS Pipe Rubatex or equal500L FT$ - 0
WI 0805 Subtotal$ - 0
0912Docking and Undocking
Price Per Day - TOTAL 14 Days14Days$ - 0$ - 0
0913Steel Renewal
7.4.1Tank bulkhead plating20,000lbs$ - 0
7.4.2Tank top plating in machinery spaces5,000lbs$ - 0
7.4.3Floors and intercostals in double bottoms10,000lbs$ - 0
7.4.4Double bottom stiffeners and bulkheads5,000lbs$ - 0
7.4.5Machinery Foundations2,000lbs$ - 0
7.4.6Miscellaneous bulkheads & decks2,000lbs$ - 0
7.4.7Miscellaneous Safety Rails2,000lbs$ - 0
7.4.8Miscellaneous CLAD welding500sq. ft.$ - 0
WI 0913 SUBTOTAL$ - 0

0914 Rudder Overhaul $ - 0 $ - 0 $ - 0

0915 Propulsion System Overhaul $ - 0 $ - 0 $ - 0

TOTAL ALL CAT 'B' $ - 0

&14USNS GRASP (T-ARS 51)&14CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "B" ITEMS&14N3220518R4555

ATTACHMENT J-3

File details come from the government source that posted it.