N3220518R4555
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION / CONTRACT FORM
The required response date/time has changed from 02-Nov-2018 02:00 PM to 07-Nov-2018 02:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
USNS GRASP
( T-ARS 51 )
N3220518C4555
DD-2019-02-09
WORK ITEM INDEX REPORT
| ITEM NUMBER |
| TITLE |
| CATEGORY |
| SECTION 0000 |
| GENERAL SERVICES AND REQUIREMENTS |
| 0001 |
| SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS REV J |
| N |
| 0002 |
| TECHNICAL AND MANUFACTURERS REPRESENTATIVES REV MA |
| N |
| 0003 |
| APPROACH, BERTH, AND MOORING REQUIREMENTS REV NOV |
| N |
| 0004 |
| TESTING AND QUALITY ASSURANCE REV NOV 17 |
| N |
| 0005 |
| ELECTRICAL SAFETY PROCEDURE REQUIREMENTS |
| N |
| 0006 |
| HEAVY WEATHER PLAN |
| N |
| 0010 |
| FURNISH OFFICE FOR OMT |
| A |
| 0011 |
| GENERAL SERVICES FOR SHIP T ARS |
| A |
| 0012 |
| TELEPHONE SERVICES |
| A |
| 0013 |
| PROJECT PLANNING AND MONITORING REV MAY 18 |
| A |
| 0014 |
| WEIGHT MOMENT REPORT |
| A |
| 0016 |
| FIRE PROTECTION AND SHIPS SAFETY PROGRAM |
| A |
| 0017 |
| HANDLING SHIPS STORES |
| A |
| 0018 |
| DELIVERY AND REDELIVERY REV MAY 16 |
| A |
| 0020 |
| GAS FREE CERTIFICATES |
| A |
| 0021 |
| TANK INSPECTION AND GAS FREE |
| A |
| 0022 |
| MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRI |
| A |
| 0023 |
| HAZARDOUS WASTE DISPOSAL |
| A |
| 0024 |
| PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY |
| N |
| 0025 |
| PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY |
| B |
| 0030 |
| CONTINUATION OF SERVICES |
| B |
| SECTION 0100 |
| HULL AND STRUCTURAL |
| 0101 |
| BALLAST TANK SURVEY AND REPAIR |
| A |
| 0102 |
| AMR & FGR PRESERVATION |
| A |
| 0103 |
| CHT TANK PRESERVATION AND SYSTEM MAINTENANCE |
| A |
| 0104 |
| POTABLE WATER TANK REPAIR AND PRESERVATION |
| A |
| 0105 |
| WTD AND SCUTTLE RENEWAL |
| A |
| 0107 |
| MAIN MAST STEEL RENEWAL |
| A |
| SECTION 0200 |
| PROPULSION MACHINERY |
| 0201 |
| ENGINE AND GENERATOR REPAIRS |
| A |
| 0202 |
| MAIN REDUCTION GEAR & THRUST BEARING MAINTENANCE |
| A |
| 0301 |
| TANK LEVEL INDICATOR REPAIR AND CALIBRATION |
| A |
| 0302 |
| AUTOMATION SYSTEM SERVICE AND REPAIR |
| A |
| 0303 |
| GENERATOR CLEANING (2SGA) |
| A |
| 0304 |
| MCT INSTALLATION AND GROOMING |
| A |
| 0305 |
| SWITCHBOARD CLEANING |
| A |
| 0306 |
| CIRCUIT BREAKER INSPECTION AND SERVICING |
| A |
| SECTION 0400 |
| COMMUNICATION AND NAVIGATION |
| 0401 |
| NAVIGATIONAL RADAR ANNUAL GROOMING |
| A |
| 0402 |
| GYRO SYSTEM MAINTENANCE |
| A |
| 0403 |
| ECDIS ANNUAL SERVICING |
| A |
| 0405 |
| RADIO COMMUNICATIONS EQUIPMENT ANNUAL RECERTIFICAT |
| A |
| 0407 |
| COMMUNICATIONS PREVENTATIVE MAINTENANCE |
| A |
| 0408 |
| WIND BIRD CALIBRATION |
| A |
| SECTION 0500 |
| AUXILIARY MACHINERY |
| 0501 |
| 40 TON BOOM MAINTENANCE AND TESTING |
| A |
| 0502 |
| APPLETON CRANE INSPECTION AND REPAIR |
| A |
| 0503 |
| RHIB DAVIT OVERHAUL |
| A |
| 0504 |
| FIREMAIN VALVE OVERHAUL AMEND 1 |
| B |
| 0505 |
| FIREFIGHTING SYSTEM CERTIFICATION |
| A |
| 0506 |
| WORK BOAT DAVIT REPAIR |
| A |
| 0508 |
| REPLACE #1 & #2 AUX FIRE PUMP |
| A |
| 0509 |
| POTABLE WATER MANIFOLD REPLACEMENT |
| A |
| 0510 |
| #3 AC & #2 REFRIGERATION PLANT SERVICING |
| A |
| 0511 |
| NORMAN PIN REPLACEMENT |
| A |
| 0512 |
| OWS AND OIL CONTENT MONITOR ANNUAL |
| A |
| 0513 |
| MISCELLANEOUS VALVES |
| B |
| 0514 |
| MISCELLANEOUS PIPING |
| B |
| SECTION 0600 |
| HABITABILITY OUTFITTING AND FURNISHINGS |
| 0601 |
| RHIB SERVICE AND REPAIRS |
| A |
| 0602 |
| DECK REPAIRS/HAB MAINTENANCE |
| A |
| 0603 |
| LIFERAFT INSPECTION |
| A |
| 0604 |
| GALLEY AND SCULLARY RENEWAL AMEND 1 |
| B |
| 0605 |
| SCBA ANNUAL RECERTIFICATION |
| A |
| 0801 |
| FAN ROOM OVERHAUL AMEND 1 |
| B |
| 0802 |
| VENT PLENUM PRESERVATION |
| A |
| 0803 |
| VENTILATION RENEWAL |
| A |
| 0804 |
| RADIO ROOM STAND ALONE A/C (T-ARS 17-004) |
| A |
| 0901 |
| DRY DOCKING AND UNDOCKING |
| A |
| 0902 |
| PROPULSION SHAFT REPAIRS |
| A |
| 0903 |
| BOW THRUSTER OVERHAUL |
| A |
| 0906 |
| SEACHEST GRATING REMOVAL AND ANODE REPLACEMENT |
| A |
| 0907 |
| CATHODIC PROTECTION SYSTEM |
| A |
| 0908 |
| UNDERWATER HULL BLAST AND COAT |
| A |
| 0909 |
| PROPULSION SYSTEM INSPECTION AND MAINTENANCE |
| A |
| 0910 |
| UNDERWATER SHELL PLATING RENEWAL |
| A |
| 0911 |
| SHAFT SEAL REFURBISHMENT |
| A |
| 0912 |
| DOCKING AND UNDOCKING |
| B |
| 0915 |
| PROPULSION SYTEM OVERHAUL Rev 1 |
| B |
(End of Summary of Changes) image1.wmf