Spearhead_RFC_15_16_17.doc

DOC document 45 KB Posted

Attached to
USNS SPEARHEAD ROH/DD
Solicitation number
N32205-17-R-4150
Issued by

About this file

RFC 15, 16, 17

View the file

Other files

File Type Posted
17-R-4150_SOLICITATION_FINAL.docx DOCX document
N32205-17-R-4150_amendment_2.docx DOCX document
n32205-17-R-4150_amendment_1.docx DOCX document
final_solicitation_to_amendment_one.docx DOCX document
Spearhead_RFC_14.doc DOC document
Spearhead_RFC_23.doc DOC document
Spearhead_RFC_20_21_22.doc DOC document
Spearhead_RFC_18.doc DOC document
Spearhead_RFC_19_resp.doc DOC document
Spearhead_RFC_11_12_13.doc DOC document
Spearhead_RFC_14.doc DOC document
SPEARHEAD_RFC_008.doc DOC document
Spearhead_RFCS_009-0011.doc DOC document
Spearhead_RFCS_CONSOLIDATED.doc DOC document
SPEARHEAD_RFC_1.doc DOC document
J-4_GOVERNMENT_FURNISHED_PROPERTY.pdf PDF
J_-_2_Category_A_Items_-_FINAL.xlsx XLSX spreadsheet
J_-_12_Past_Performance_Data_-_SPEARHEAD.doc DOC document
J_-_9_Disclosure_of_Lobbying_Activities_-_SPEARHEAD.doc DOC document
J_-_7_MSC_Ship_Repair_Facility_Survey_-_SPEARHEAD.docx DOCX document
J_-_8_Request_for_Spec_Clarification_-_SPEARHEAD.doc DOC document
17-R-4150_SOLICITATION_FINAL.docx DOCX document
J_-_11_Dry_Dock_Evaluation_Form_-_SPEARHEAD.docx DOCX document
J_-_3_Category_B_Items_-SPEARHEAD.xls XLS spreadsheet
J_-_10_Interport_Differential_-_SPEARHEAD.doc DOC document
J_-_13_Past_Performance_Questionnaire_-_SPEARHEAD.docx DOCX document
USNS_SPEARHEAD_-_Sources_Sought_Notice.doc DOC document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SPEARHEAD (T-EPF 1)

N32205-17-R-4150

REQUEST FOR SPECIFICATION CLARIFICATION

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.:

PARAGRAPH / SECTION NO:

TITLE: Extension of Clarifications Deadline

QUESTION:

Will the date of the closing requests for clarifications be extended due the extension of the deadline?

ANSWER:

Requests for clarifications will be extended through August 10, 2017, 4:00 p.m.

REQUEST FOR SPECIFICATION CLARIFICATION

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.: 103

PARAGRAPH / SECTION NO:

TITLE: CBG Panels

QUESTION:

Is the intent of the CBG Panel inspection to physically remove every single panel or every third panel to allow for inspection of adjacent panels from above?

ANSWER:

REQUEST FOR SPECIFICATION CLARIFICATION 002

NAME OF CONTRACTOR: ____________________

SPECIFICATION ITEM NO.: 108________________

PARAGRAPH / SECTION NO: 2.1.5_- 2.1.11______________

TITLE: PUMP ROOM 5 AND 6 SHELL REPLACEMENT____________________________

QUESTION:

Please provide References for Work Item 108 - PUMP ROOM 5 AND 6 SHELL REPLACEMENT

Missinf References:

2.1.5 NAVSEA Drawing 8443647, Module H03P Machinery Space Arrangement

2.1.6 NAVSEA Drawing 8443666, Module H03S Machinery Space Arrangement

2.1.7 NAVSEA Drawing 8442882, Structural Plan – Bottom Shell

2.1.8 NAVSEA Drawing 8444322, Additional Structural Frames Hull Void 25-41

2.1.9 NAVSEA Drawing 8442889, Typical Structural Frames Hull Void 25-41

2.1.11 NAVSEA Drawing 8444451, Naca Boxes - Details

ANSWER:

ATTACHMENT J - 8

File details come from the government source that posted it. Updated .