SPEARHEAD_RFC_008.doc

DOC document 38 KB Posted

Attached to
USNS SPEARHEAD ROH/DD
Solicitation number
N32205-17-R-4150
Issued by

About this file

RFC 008

View the file

Other files

File Type Posted
17-R-4150_SOLICITATION_FINAL.docx DOCX document
N32205-17-R-4150_amendment_2.docx DOCX document
n32205-17-R-4150_amendment_1.docx DOCX document
final_solicitation_to_amendment_one.docx DOCX document
Spearhead_RFC_14.doc DOC document
Spearhead_RFC_23.doc DOC document
Spearhead_RFC_20_21_22.doc DOC document
Spearhead_RFC_18.doc DOC document
Spearhead_RFC_19_resp.doc DOC document
Spearhead_RFC_11_12_13.doc DOC document
Spearhead_RFC_14.doc DOC document
Spearhead_RFC_15_16_17.doc DOC document
Spearhead_RFCS_009-0011.doc DOC document
Spearhead_RFCS_CONSOLIDATED.doc DOC document
SPEARHEAD_RFC_1.doc DOC document
J-4_GOVERNMENT_FURNISHED_PROPERTY.pdf PDF
J_-_2_Category_A_Items_-_FINAL.xlsx XLSX spreadsheet
J_-_12_Past_Performance_Data_-_SPEARHEAD.doc DOC document
J_-_9_Disclosure_of_Lobbying_Activities_-_SPEARHEAD.doc DOC document
J_-_7_MSC_Ship_Repair_Facility_Survey_-_SPEARHEAD.docx DOCX document
J_-_8_Request_for_Spec_Clarification_-_SPEARHEAD.doc DOC document
17-R-4150_SOLICITATION_FINAL.docx DOCX document
J_-_11_Dry_Dock_Evaluation_Form_-_SPEARHEAD.docx DOCX document
J_-_3_Category_B_Items_-SPEARHEAD.xls XLS spreadsheet
J_-_10_Interport_Differential_-_SPEARHEAD.doc DOC document
J_-_13_Past_Performance_Questionnaire_-_SPEARHEAD.docx DOCX document
USNS_SPEARHEAD_-_Sources_Sought_Notice.doc DOC document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SPEARHEAD (T-EPF 1)

N32205-17-R-4150

REQUEST FOR SPECIFICATION CLARIFICATION 008

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.: 0107

PARAGRAPH / SECTION NO: PER BELOW

TITLE: PUMPROOM BILGE COATING

QUESTION: BOTH PARAGRAPHS 3.2.1 AND 3.2.2 REFERENCE “PUMPROOM”…SHOULD PARAGRAPH 3.2.2 IDICATE VOIDS #5 & #6?

PARAGRAPH 7.1 REFERENCES PUMP ROOM BILGES AND PARAGRAPH 3.0…SHOULD THIS PARAGRAPH INDICATE VOIDS #5 & #6?

IS IT THE CONTRACT INTENT TO ACCOMPLISH THIS WORK ONCE THE WORK IN ITEM 0108 IS COMPLETE?

ANSWER:

Para 3.2.2 discusses voids 5 and 6. The mention of pump rooms 5 and 6 is only to provide a reference location.

Para 7.1 references all areas listed in para 3.0. Refering to above, this includes pump room 5, pump room 6, void 5 and vod 6.

It is not the governments intent to paint the bilge surfaces prior to cropping the bilge surfaces out. Coating shall be applied to renewed bilge surfaces.

ATTACHMENT J - 8