J-8_RFC_004_Answer.pdf
PDF 13 KB Posted
- Attached to
- Regular Overhaul/Dry-docking of USNS GUADALUPE
- Solicitation number
- N32205-17-R-4005
About this file
RFC 004 response
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N32205-17-R-4005
USNS GUADALUPE (TAO-200)
ATTACHMENT J - 8
Valerie.taylor@navy.mil
REQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR: ________
SPECIFICATION ITEM NO.: _______510
PARAGRAPH / SECTION NO:______7.1
TITLE: GRAVITY DRAINS RENEW
QUESTION:
7.1.1 Piping for replacement on port and stbd sides starts at and includes the hull penetrations to each overboard valve. From each overboard valve on port and stbd sides the piping replacement shall extend inboard fifteen (15) feet on all branches of the piping system.
Question: It was noted during the ship check that 15ft of piping from the valves may extend into other compartments. Is the intent to renew piping and penetrations beyond the store room compartment? Please clarify exact scope of renewal.
ANSWER:
All piping replacement will be within the E-store room.