J-8_RFC_004_Answer.pdf

PDF 13 KB Posted

Attached to
Regular Overhaul/Dry-docking of USNS GUADALUPE
Solicitation number
N32205-17-R-4005
Issued by

About this file

RFC 004 response

View the file

Other files

File Type Posted
0605_A_TILE_REPLACEMENT_Rev..pdf PDF
N32205-17-R-4005_0002_rel.pdf PDF
J-8_RFC_003_answer.pdf PDF
J-8_RFC_006_answer_-_Item_903__Freeboard_sqft.pdf PDF
Capacity_Plan_6580569_C.pdf PDF
J-8_RFC_005_Answer.pdf PDF
J-8_RFC_007_Answer_-_Item_1002__Spanwire_Winch_ASD.pdf PDF
J_-_3_Category_B_Items.xlsx XLSX spreadsheet
J-8_RFC_002_answer.pdf PDF
J-8_RFC_001_Answer.pdf PDF
CDRL,_SWI-0012.pdf PDF
J - 3 Category B Items.xlsx XLSX spreadsheet
CDRL,_SWI-0014.pdf PDF
CDRL,_SWI-0018.pdf PDF
J-9,_Disclsr_Lobbying_Activities_SF-LLL.doc DOC document
CDRL,_SWI-001.pdf PDF
J-2 CAT A ITEMS.xlsx XLSX spreadsheet
N32205-17-R-4005_rel.pdf PDF
CDRL,_SWI-0022.pdf PDF
CDRL,_SWI-0023.pdf PDF
J-6_WI_015_CDRL.pdf PDF
CDRL,_SWI-0019.pdf PDF
CDRL,_SWI-0010.pdf PDF
J-10 WEST COAST ONLY Guadalupe.pdf PDF
CDRL,_SWI-0013.pdf PDF
J-14_NON_Discl_Agreement,Govnt_Tech-Data.docx DOCX document
J-7,_GUAD_Ship-Rpr-Facility-Surv.pdf PDF
J-13,_PAX,_Past_Perf_Questionaire.docx DOCX document
J-11 Dry Dock Evaluation Form.docx DOCX document
J-8_RFC.doc DOC document
CDRL,_SWI-0016.pdf PDF
CDRL,_SWI-0024.pdf PDF
CDRL,_SWI-0020.pdf PDF
J-4_GUADALUPE_GFP_-_11232016.xlsx XLSX spreadsheet
J-5_Subcontracting_Plan.docx DOCX document
CDRL,_SWI-0017.pdf PDF
CDRL,_SWI-0021.pdf PDF
CDRL,_SWI-0015.pdf PDF
J-12_Past_Perf_Data.docx DOCX document
CDRL,_SWI-006.pdf PDF
SYNOPSIS.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-17-R-4005

USNS GUADALUPE (TAO-200)

ATTACHMENT J - 8

Valerie.taylor@navy.mil

REQUEST FOR SPECIFICATION CLARIFICATION

NAME OF CONTRACTOR: ________

SPECIFICATION ITEM NO.: _______510

PARAGRAPH / SECTION NO:______7.1

TITLE: GRAVITY DRAINS RENEW

QUESTION:

7.1.1 Piping for replacement on port and stbd sides starts at and includes the hull penetrations to each overboard valve. From each overboard valve on port and stbd sides the piping replacement shall extend inboard fifteen (15) feet on all branches of the piping system.

Question: It was noted during the ship check that 15ft of piping from the valves may extend into other compartments. Is the intent to renew piping and penetrations beyond the store room compartment? Please clarify exact scope of renewal.

ANSWER:

All piping replacement will be within the E-store room.