J-2 CAT A ITEMS.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Regular Overhaul/Dry-docking of USNS GUADALUPE
Solicitation number
N32205-17-R-4005
Issued by

About this file

J FILE

View the file

Other files

File Type Posted
0605_A_TILE_REPLACEMENT_Rev..pdf PDF
N32205-17-R-4005_0002_rel.pdf PDF
J-8_RFC_003_answer.pdf PDF
J-8_RFC_006_answer_-_Item_903__Freeboard_sqft.pdf PDF
Capacity_Plan_6580569_C.pdf PDF
J-8_RFC_005_Answer.pdf PDF
J-8_RFC_004_Answer.pdf PDF
J-8_RFC_007_Answer_-_Item_1002__Spanwire_Winch_ASD.pdf PDF
J_-_3_Category_B_Items.xlsx XLSX spreadsheet
J-8_RFC_002_answer.pdf PDF
J-8_RFC_001_Answer.pdf PDF
CDRL,_SWI-0012.pdf PDF
J - 3 Category B Items.xlsx XLSX spreadsheet
CDRL,_SWI-0014.pdf PDF
CDRL,_SWI-0018.pdf PDF
J-9,_Disclsr_Lobbying_Activities_SF-LLL.doc DOC document
CDRL,_SWI-001.pdf PDF
N32205-17-R-4005_rel.pdf PDF
CDRL,_SWI-0022.pdf PDF
CDRL,_SWI-0023.pdf PDF
J-6_WI_015_CDRL.pdf PDF
CDRL,_SWI-0019.pdf PDF
CDRL,_SWI-0010.pdf PDF
J-10 WEST COAST ONLY Guadalupe.pdf PDF
CDRL,_SWI-0013.pdf PDF
J-14_NON_Discl_Agreement,Govnt_Tech-Data.docx DOCX document
J-7,_GUAD_Ship-Rpr-Facility-Surv.pdf PDF
J-13,_PAX,_Past_Perf_Questionaire.docx DOCX document
J-11 Dry Dock Evaluation Form.docx DOCX document
J-8_RFC.doc DOC document
CDRL,_SWI-0016.pdf PDF
CDRL,_SWI-0024.pdf PDF
CDRL,_SWI-0020.pdf PDF
J-4_GUADALUPE_GFP_-_11232016.xlsx XLSX spreadsheet
J-5_Subcontracting_Plan.docx DOCX document
CDRL,_SWI-0017.pdf PDF
CDRL,_SWI-0021.pdf PDF
CDRL,_SWI-0015.pdf PDF
J-12_Past_Perf_Data.docx DOCX document
CDRL,_SWI-006.pdf PDF
SYNOPSIS.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat A Items

CATEGORY “A” ITEMS
GENERAL REQUIREMENTPRIME ContractorSUB ContractorOTHER COSTSTOTAL PRICE
ITEM NO.TITLE CAT A ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICEPriceTOTAL LABOR HOURSTOTAL MATERIAL
CATEGORY "A"
000GENERAL REQUIREMENTS
001INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONSNSP
002TECHNICAL AND MANUFACTURER’S REPRESENTATIVESNSP
003APPROACH, BERTH, AND MOORING REQUIREMENTSNSP
004TESTING AND QUALITY ASSURANCENSP
005ELECTRICAL SAFETY PROCEDURES REQUIREMENTSNSP
006HEAVY WEATHER PLANNSP
010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM
011FURNISH GENERAL SERVICES (T-AO)
012TELEPHONE SERVICES
013PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT
014PREPARATION OF WEIGHT AND MOMENT REPORT
015INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS
016FIRE PROTECTION AND SHIP'S SAFETY PROGRAM
017HANDLING SHIP'S STORES
018DELIVERY AND REDELIVERY OF VESSEL
019SHIPBOARD ACCESS AND SECURITY
020GAS FREE CERTIFICATES
021CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES
022DOCK TRIALS AND SEA TRIALS
023HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY
024PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY
100HULL STRUCTURES
101NDT KING POST AREAS (ABS)
102UT READINGS
103CLOSE-U SURVEY
104FORWARD PUMP ROOM BILGE PRESERVATION
105FLIGHT DECK PRESERVATION
106TANK VENT PIPE REPLACEMENT
107FLIGHT DECK SAFETY NETS WEIGHT TEST
109INSPECTION OF PRESSURE VACUUM (PC) VALVES
200MAIN PROPULSION
201STARBOARD MAIN ENGINE SHAFT BRAKE
202MAIN ENGINE FUEL INJECTORS (23) REBUILD
203MAIN ENGINE AIR START DISTRIBUTORS OVL
300ELECTRICAL
301MAIN AND EMERGENCY SWITCHBOARD CLEANING
302OVERHAUL CIRCUIT BREAKERS
303GROUP CONTROL CENTER & MOTOR CONTROLS
304VARIOUS MOTORS OVERHAUL
305ANNUAL PTO CONTROLLERS GROOM
400COMMUNIC ATION & NAV AIDS
401GMDSS RECERTIFICATION ANNUAL (USCG & ABS)
402SVDR RECERTIFICATION ANNUAL (USCG & ABS)
403RADAR MAINTENANCE ANNUAL (USCG & ABS)
404MAGNETIC COMPASS
405NAVIGAT X GYRO SYSTEM PREVENTATIVE MAINTENANCE
406ANTENNA MAINTENANCE WHIP AND DIPOLE
500AUXILIARY MACHINERY
501VARIOUS PUMPS OVERHAUL
502INSTALLATION OF NEW DISTILLERS (T-ALT)
503STEERING GEAR CONTROL SYSTEM REPAIR
504INCINERATOR SERVICE MANUAL
505CARGO OIL CONTENT MONITOR CALIBRATION & REPAIR
506NO. 2 CT WINCH OVERHAUL
507AUXILLARY BOILERS INSPECTION, GROOMING & TEST
508OILY WATER SEPARATOR CALIBRATION AND REPAIR
509NO. 3 & 4 SSDG FUEL PUMP REPLACEMENT
510GRAVITY DRAINS REPAIR
600HABITABILITY
601STATEROOM CARPET
602HEAD AND SHOWER DECK TERRAZZO
603HEAD & SHOWER DECK TERRAZZO SAND & SEAL
604JOINER BULKHEAD & PANEL REPLACEMENT
605DECK TILE REPLACE
607SCBA EQUIPMENT ANNUAL SERVICING
608SCBA COPRESSOR
609PORT RESCUE BOAT DAVIT CERTIFICATION
610STBD RESCUE BOAT WINCH DAVIT CERTIFICATION
611RECERTIFICATION/WEIGHT TEST LIFE BOAT WINCHES AND DAVIT
612ANNUAL LIFERAFT RECERTIFICATION
613LIFEBOAT RECERTIFICATION
614ANNUAL INSPECTION OF FIREFIGHTING EQUIPMENT
615RESCUE BOATS RECERTIFICATION
616ELEVATOR, ANNUAL
617ANNUAL ACCOMODATION LADDER INSPECTION
800HEATING, VENTILATION, AND AIR CONDITIONING
801GALLEY & SCULLERY SUPPLY & EXHAUST VENT DUCT CLEANING
802CLEANING VENTILATION SYSTEMS
900DRY-DOCKING AND UNDOCKING
901DRY-DOCKING AND UNDOCKING
902UNDERWATER HULL PRESERVATION
903FREEBOARD PRESERVATION
904SEA VALVES REPAIR & INSPECTION
905ANCHORS, CHAINS, AND CHAIN LOCKER PRESERVATION
906CATHODIC PROTECTION SYSTEM, INSPECT & REPAIR
907RUDDER/STERN FRAME EXAM & RUDDER POST PACKING
909PROPELLER SYSTEM MAINTENANCE
910STERN TUBE SEAL MAINTENANCE
911SPUR LINE & NET CUTTERS REPLACE
913MARINE GROWTH INHIBITOR ANODE REPLACEMENT
1000UNREP EQUIPMENT
1001RAM TENSIONER ACCUMULATOR PISTON SEAL REPLACEMENT
1002REFURBISH SPANWIRE WINCH ANTI-SLACK DEVICE (ASD) ASSEMBLE
1003UNREP PRESSURE VESSEL REPAIR & RECERTIFICATION
1004FAS UNREP BLOCK & SHEAVE OVERHAUL
TOTAL
USNS GUADALUPE (T-AO 200)CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMSN32205-17-R-4005

ATTACHMENT J-2

File details come from the government source that posted it. Updated .