J-8_RFC_003_answer.pdf

PDF 26 KB Posted

Attached to
Regular Overhaul/Dry-docking of USNS GUADALUPE
Solicitation number
N32205-17-R-4005
Issued by

About this file

RFC 003 answer

View the file

Other files

File Type Posted
0605_A_TILE_REPLACEMENT_Rev..pdf PDF
N32205-17-R-4005_0002_rel.pdf PDF
J-8_RFC_006_answer_-_Item_903__Freeboard_sqft.pdf PDF
Capacity_Plan_6580569_C.pdf PDF
J-8_RFC_005_Answer.pdf PDF
J-8_RFC_004_Answer.pdf PDF
J-8_RFC_007_Answer_-_Item_1002__Spanwire_Winch_ASD.pdf PDF
J_-_3_Category_B_Items.xlsx XLSX spreadsheet
J-8_RFC_002_answer.pdf PDF
J-8_RFC_001_Answer.pdf PDF
CDRL,_SWI-0012.pdf PDF
J - 3 Category B Items.xlsx XLSX spreadsheet
CDRL,_SWI-0014.pdf PDF
CDRL,_SWI-0018.pdf PDF
J-9,_Disclsr_Lobbying_Activities_SF-LLL.doc DOC document
CDRL,_SWI-001.pdf PDF
J-2 CAT A ITEMS.xlsx XLSX spreadsheet
N32205-17-R-4005_rel.pdf PDF
CDRL,_SWI-0022.pdf PDF
CDRL,_SWI-0023.pdf PDF
J-6_WI_015_CDRL.pdf PDF
CDRL,_SWI-0019.pdf PDF
CDRL,_SWI-0010.pdf PDF
J-10 WEST COAST ONLY Guadalupe.pdf PDF
CDRL,_SWI-0013.pdf PDF
J-14_NON_Discl_Agreement,Govnt_Tech-Data.docx DOCX document
J-7,_GUAD_Ship-Rpr-Facility-Surv.pdf PDF
J-13,_PAX,_Past_Perf_Questionaire.docx DOCX document
J-11 Dry Dock Evaluation Form.docx DOCX document
J-8_RFC.doc DOC document
CDRL,_SWI-0016.pdf PDF
CDRL,_SWI-0024.pdf PDF
CDRL,_SWI-0020.pdf PDF
J-4_GUADALUPE_GFP_-_11232016.xlsx XLSX spreadsheet
J-5_Subcontracting_Plan.docx DOCX document
CDRL,_SWI-0017.pdf PDF
CDRL,_SWI-0021.pdf PDF
CDRL,_SWI-0015.pdf PDF
J-12_Past_Perf_Data.docx DOCX document
CDRL,_SWI-006.pdf PDF
SYNOPSIS.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-17-R-4005

USNS GUADALUPE (T-AO 200) ROH/DD

ATTACHMENT J - 8

REQUEST FOR SPECIFICATION CLARIFICATION #03_

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.: 021

PARAGRAPH / SECTION NO: Paragraph 7.4 & Enclosure 2.2.1

TITLE: CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES

Specification paragraph 7.4 states, “Contractor shall be responsible to provide all pumps, hoses, fittings and personnel to safely remove all remaining tank contents as identified in enclosure 2.2.1.”

1) In review of Enclosure 2.2.1, we note the table for the Ballast Water and Fresh Water tanks cited on page 021-8 is illegible due an apparent “over lay” of the Fresh Water and Ballast Water tanks on top of each other during the development process.

2) In review of enclosure 2.2.1 USNS GUADALUPE (T-AO 200) List of Applicable Tanks, Voids and Cofferdams; we find no information reflecting the arrival condition & liquid loading of the ship. We do note the 100% capacity for each tank is shown in the enclosure for various tanks listed in the specification.

3) The San Francisco Shipyard Facility has no local fuel storage facility within the bay area to offload the fuel and store for the duration of the availability while performing tank inspections. Standard practice is to bring the ships in with minimal fuel onboard to allow onboard transfer of fuels and lubes to mitigate the amount of fuel required for offloading.

QUESTION:

1). Please provide a replacement copy of page 021-8 so the FW & SWB tanks are legible.

2). For estimating purposes, please review and provide a revised enclosure 2.2.1 that reflects the estimated fuel onboard at arrival in each of the specific tanks listed.

3). Please provide a trim & stability report for the ship that identifies the Ship’s anticipated liquid loading at arrival, to allow calculations for temporary storage means (available tankage onboard) to mitigate or even eliminate the amount of fuel requiring off loading from the Ship.

ANSWER:

FW & SWB tank chart shown below.

1) FW & SWB tank chart shown below. Capacity plan attached.

2) All cargo tanks will be cleaned butterworthed and stripped by ships crew and be at low suction with residual slops other tanks see load case

3) This will be provided separately

N32205-17-R-4005

USNS GUADALUPE (T-AO 200) ROH/DD

ATTACHMENT J - 8

Ballast Tanks

Description Tank Location 100%

Capacity (gals)

Area (sqft)

Fore Peak 5-C-0 82,177 19,100 1C Deep 5-18-0 261,475 23,000 #02P 5-28-2 137,536 13,920 #02S 5-28-1 137,536 13,920 Pump Room Double Bottom 5-33-0 101,132 17,500 #04P 5-35-2 166,834 12,000 #04S 5-35-1 166,834 12,000 #06P 5-39-2 371,822 24,000 #06S 5-39-1 371,822 24,000 #08P 5-47-2 377,459 24,000 #08S 5-47-1 377,459 24,000 Aft 5-110-0 59,596 15,250 Aft Peak 5-119-0 307,521 45,080

Fresh Water Tanks

Description Tank Location 100%

Capacity (gals)

Cargo Potable 2-102-4 51,994 Cargo Potable 2-102-7 51,994 Cargo Feed Water 5-107-2 48,470 Cargo Feed Water 5-107-1 48,470 Potable Water 2-80-2 18,805 Potable Water 2-73-2 12,263 Reserve Feed 2-88-1 5,999