Attachment_I _II_and_III-Amendment_1.docx
DOCX document 111 KB Posted
- Attached to
- N7 Ship Inspection Services
- Solicitation number
- N32205-16-R-2012
About this file
Attachment I II and II Revised
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N32205-16-R-2012_Amendment_5.pdf | ||
| Attachment_I _II_and_III-Amendment-5Mar16.docx | DOCX document | |
| N32205-16-R-201204.pdf | ||
| Attachment_VIII_-_Rate_table_Pricing_Spreadsheet__Amendment_4.xls | XLS spreadsheet | |
| Amendment_3.pdf | ||
| Attachment_VIII_-_Rate_table_Pricing_Spreadsheet-rev10Feb16.xls | XLS spreadsheet | |
| Amendment_2.pdf | ||
| Attachment_VIV__DD_254_-_Amendment_1.pdf | ||
| Amendment_1.pdf | ||
| Attachment_IV_Past_Performance_Data_Sheet.pdf | ||
| N32205-16-R-2012_29_Jan_16.pdf | ||
| SIP-Sample_Tasks-6Jan16.docx | DOCX document | |
| Attachment_VII_QASP_-_SIP_-_2016.docx | DOCX document | |
| Attachment_VIII_-_Rate_table_Pricing_Spreadsheet.xls | XLS spreadsheet | |
| Attachment_I _II_and_III-2016.docx | DOCX document | |
| Exhibits_A-E_(CDRLs).pdf | ||
| Attachment_VIV__DD_254.pdf | ||
| Attachment_VI_Nondisclosure_Agreement.docx | DOCX document | |
| Attachment_V_Past_Performance_Questionairre.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A1
MRE TEST PLAN EXAMPLE/FORMAT
Contained in this document are three sample sections from a Material Readiness Evaluation (MRE) Test Plan. The sample sections enclosed are used for the Full Power Run, Auxiliary Systems Inspections, and Thermography Analysis.
Other sections that are contained in a typical test plan are: Air Compressors, Anchor Windlass, Boilers, Deck Machinery, Electrical Insulation and Resistance, Emergency Generator, Distilling Plants, Habilability, Hull Survey, Environmental Pollution Control, Pumps, Refrigeration, SSDG’s, Steering Gear, and Structural Survey.
Description Pages
Full Power Run 2 - 12
Auxiliary Systems Inspections 13 - 22
Thermography Analysis 23 - 26
| MATERIAL READINESS EVALUATION |
| SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
| PROPULSION FULL POWER TRIAL |
| MRE TEST # |
THE FOLLOWING FULL POWER TRIAL TEST PROCEDURE HAS BEEN PREPARED IN ACCORDANCE WITH COMMANDING OFFICER MILITARY SEALIFT COMMAND (COMSC) INSTRUCTION 9094.1B ENTITLED "FULL POWER TRIAL REQUIREMENTS FOR MSC SHIPS".
TEST PROCEDURES
PRE-TRIAL PREPARATION
PRIOR TO CONDUCTING FULL POWER TRIALS, THE FOLLOWING PREPARATIONS SHOULD BE MADE:
A. ALL PROPULSION PLANT MACHINERY SAFETY DEVICES (OVERSPEEDS, LIMITS, ALARMS, ETC.) SHOULD BE CHECKED AGAINST DESIGN SETTINGS AND/OR VERIFIED THAT THEY HAVE BEEN TESTED TO THE REQUIREMENTS OF APPLICABLE REGULATORY BODIES.
B. A LIST SHOULD BE MADE OF ALL SAFETY DEVICES WHICH ARE OVERDUE FOR INSPECTION OR WHICH HAVE TESTED UNSATISFACTORILY.
C. ALL CRITICAL INSTRUMENTATION SHOULD BE CALIBRATED. A LIST SHOULD BE PREPARED IDENTIFYING ALL CRITICAL INSTRUMENTS, THEIR LOCATION AND THEIR LAST DATE OF CALIBRATION.
MACHINERY WARM-UP
THE SHIP'S PROPULSION MACHINERY SHOULD BE LINED-UP TO PROVIDE ALL NORMAL SERVICES WHILE UNDERGOING FULL POWER TRIALS. MACHINERY DESIGN PRESSURES, TEMPERATURES AND OTHER LIMITATIONS SHALL NOT BE EXCEEDED. MACHINERY NOT MAINTAINING OR TENDING TO EXCEED DESIGN PARAMETERS SHALL BE NOTED IN THE ENGINE ROOM LOG AND THE FULL POWER TRIAL REPORT. PRIOR TO FULL POWER TRIALS, THE PROPULSION PLANT SHOULD BE OPERATED AT A HIGH PARTIAL LOAD POWER LEVEL FOR A MINIMUM OF TWO HOURS TO THOROUGHLY WARM UP MACHINERY AND STABILIZE OPERATING TEMPERATURES.
PROPULSION FULL POWER TRIAL
A. FOLLOWING MACHINERY WARM-UP, THE SHIP'S PROPULSION PLANT SHALL BE GRADUALLY INCREASED TO FULL SHAFT HORSEPOWER AS LISTED IN COMSCINST 9094.1B. POWER DEVELOPMENT SHALL BE DETERMINED USING A CALIBRATED SHAFT HORSEPOWER METER AND/OR BY THE ENGINE MANUFACTURER'S NOMOGRAPHS AND BRAKE SPECIFIC FUEL CONSUMPTION CURVES.
B. ONCE LISTED FULL POWER HAS BEEN ACHIEVED, A MINIMUM PERIOD OF 30 MINUTES SHALL BE PROVIDED FOR PROPULSION PLANT STABILIZATION PRIOR TO COMMENCEMENT OF THE PROPULSION FULL POWER TRIAL.
MATERIAL READINESS EVALUATION
SHIP & HULL NUMBER
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
| PROPULSION FULL POWER TRIAL |
| MRE TEST # |
INSPECTION/TEST PROCEDURES
C. THE PROPULSION FULL POWER TRIAL SHALL BE CONDUCTED FOR A MINIMUM OF FOUR (4) HOURS. DURING THIS TIME ALL VITAL PROPULSION PLANT PERFORMANCE RELATED OPERATIONAL DATA AND SPECIFIC BRIDGE DATA SHALL BE RECORDED HOURLY.
NOTE: UNDER NO CIRCUMSTANCES SHALL THE REQUIREMENTS OF COMSCINST 9094.1B RELIEVE THE MASTERS AND CHIEF ENGINEERS OF THE RESPONSIBILITY OF OPERATING THEIR SHIPS IN A SAFE AND EFFICIENT MANNER AND OF EXERCISING GOOD JUDGMENT WHEN ENCOUNTERING ADVERSE WEATHER, EXCESSIVE SEA CONDITIONS, VIBRATION OR SIMILAR CONDITIONS.
N00033-13-R-8035 Shipboard Inspection Program
Attachment A-1: MRE TEST PLAN
Attachment A-1
| MATERIAL READINESS EVALUATION |
| SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
| PROPULSION DIESEL ENGINE |
| MRE TEST # |
INSPECTION/TEST PROCEDURES (CONT) INSPECTOR ________________________________________
RECORD THE FOLLOWING OPERATIONAL DATA DURING THE FULL POWER RUN:
OPERATION DESIGN START 1 HR 2 HR 3 HR END
| ENGINE SPEED RPM | 122 | ||
| GOVERNOR POSITION | 9 | ||
| LOAD INDICATOR | 8.6 | ||
| DEVELOPED SHAFT HP | 12,800 | ||
| AMBIENT TEMPERATURE,F | 75 |
JACKET WATER
| PUMP DISCH PRESSURE | 36 – 57 | ||
| TEMP. TO ENGINE,F | 130 – 135 | ||
| TEMP. FROM ENGINE,F | 145 – 155 | #1 | |
| #2 | |||
| #3 | |||
| #4 | |||
| #5 | |||
| #6 | |||
| #7 | |||
| #8 |
PISTON COOLING WATER
| PUMP DISCH PRESSURE | 50 - 60 | ||
| TEMP. TO ENGINE,F | 110 - 115 | ||
| TEMP. FROM ENGINE,F | 120 - 135 | #1 | |
| #2 | |||
| #3 | |||
| #4 | |||
| #5 | |||
| #6 | |||
| #7 | |||
| #8 |
SHIP & HULL NUMBER
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
| PROPULSION DIESEL ENGINE |
| MRE TEST # |
INSPECTION/TEST PROCEDURES (CONT) INSPECTOR ________________________________________
RECORD THE FOLLOWING OPERATIONAL DATA DURING THE FULL POWER RUN:
PARAMETER DESIGN START 1 HR 2 HR 3 HR END
FUEL VALVE COOLING WATER
| PUMP DISCH PRESSURE | 26 - 43 | ||
| TEMP. TO ENGINE,F | 180 – 190 | ||
| TEMP. FROM ENGINE,F | 185 - 194 | #1 | |
| #2 | |||
| #3 | |||
| #4 | |||
| #5 | |||
| #6 | |||
| #7 | |||
| #8 |
TURBO & EXHAUST VALVE WATER
| TEMP. TO TURBO,F | 140 – 158 | |||
| TEMP. OUT,F | 160 – 175 TUR #1 | |||
| TUR #2 | ||||
| TUR #3 | ||||
| EXHAUST VALVE #1 | ||||
| #2 | ||||
| #3 | ||||
| #4 | ||||
| #5 | ||||
| #6 | ||||
| #7 | ||||
| #8 |
| SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
| PROPULSION DIESEL ENGINE |
| MRE TEST # |
| 200 |
INSPECTION/TEST PROCEDURES (CONT) INSPECTOR ________________________________________
PARAMETER DESIGN START 1 HR 2 HR 3 HR END
COOLING SEA WATER
SEA WATER TEMP., F 50
SW TEMP. INTO JW CLR, F
SW TEMP OUT JW CLR, F
SW TEMP. INTO PCW CLR, F
SW TEMP. OUT PCW CLR, F
SW TEMP. INTO LO CLR, F
SW TEMP OUT LO CLR, F
| TEMP. RISE FROM JW CLR,F | 35 - 41 | |
| TEMP. PISTON WTR CLR,F | 19 - 21 | |
| TEMP. LUBE OIL CLR,F | 5 - 10 |
PRESSURE
LUBE OIL
| TEMP. TO ENGINE,F | 95 - 110 | ||
| TEMP. FROM ENGINE,F | 106 - 116 | ||
| THRUST BLOCK,F | 115 - 125 |
PRESS. TO CROSS HEADS,PSIG 45 - 58
BEARINGS, PSIG 25 - 36
FUEL OIL
PRESSURE AFTER FILTER 60 - 80
TRUST BEARING TEMP. FWD,F
THRUST BEARING TEMP. AFT,F
AIR PRESSURE
CONTROL AIR PRESSURE, PSIG
STARTING AIR PRESSURE, PSIG
| EXHAUST TEMPERATURES,F | 575 - 755 | #1 | |
| #2 | |||
| #3 | |||
| #4 | |||
| #5 | |||
| #6 |
SHIP & HULL NUMBER
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
| PROPULSION DIESEL ENGINE |
| MRE TEST # |
INSPECTION/TEST PROCEDURES (CONT) INSPECTOR ____________________________________
PARAMETER DESIGN START 1 HR 2 HR 3 HR 4 HR
MAIN BEARING TEMPERATURES,F
| NO. 1 | UPPER BEARING | |
| LOWER BEARING |
| NO. 2 | UPPER BEARING | |
| LOWER BEARING |
| NO. 3 | UPPER BEARING | |
| LOWER BEARING |
| NO. 4 | UPPER BEARING | |
| LOWER BEARING |
| NO. 5 | UPPER BEARING | |
| LOWER BEARING |
| NO. 6 | UPPER BEARING | |
| LOWER BEARING |
| NO. 7 | UPPER BEARING | |
| LOWER BEARING |
| NO. 8 | UPPER BEARING | |
| LOWER BEARING |
| NO. 9 | UPPER BEARING | |
| LOWER BEARING |
| NO. 10 | UPPER BEARING | |
| LOWER BEARING |
| SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
| PROPULSION DIESEL ENGINE |
| MRE TEST # |
| 200 |
INSPECTION/TEST PROCEDURES (CONT) INSPECTOR ________________________________________
PARAMETER DESIGN START 1 HR 2 HR 3 HR END
SCAVENGING TRUNK PRESS,"Hg 22.3
NO. 1 TURBO-BLOWER
| GAS TEMP TO TURBO,F | MAX 750 | |
| TEMP. DROP FROM TURBO,F | 225 | |
| AIR TEMP. FROM TURBO,F | 200 - 220 | |
| AIR PRESS. FROM TURBO,PSIG | 11 | |
| REVOLUTIONS PER MINUTE | 9,600 |
BEARING OIL TEMP,F
| BLOWER SIDE | 145 - 160 |
| TURBINE SIDE | 180 - 190 |
AIR INTERCOOLER,F
| WATER TEMP. IN | 50 | |
| WATER TEMP. OUT | 75 - 85 | |
| AIR TEMP. OUT | 80 - 105 |
NO. 2 TURBO-BLOWER
| GAS TEMP TO TURBO,F | MAX 750 | |
| TEMP. DROP FROM TURBO,F | 225 | |
| AIR TEMP. FROM TURBO,F | 200 - 220 | |
| AIR PRESS. FROM TURBO, PSIG | 11 | |
| REVOLUTIONS PER MINUTE | 9,600 |
BEARING OIL TEMP,F
| BLOWER SIDE | 145 - 160 |
| TURBINE SIDE | 180 - 190 |
AIR INTERCOOLER,F
| WATER TEMP. IN | 50 | |
| WATER TEMP. OUT | 75 - 85 | |
| AIR TEMP. OUT | 80 - 105 |
| SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
| PROPULSION DIESEL ENGINE |
| MRE TEST # |
| 200 |
INSPECTION/TEST PROCEDURES (CONT) INSPECTOR ________________________________________
PARAMETER DESIGN START 1 HR 2 HR 3 HR 4 HR
NO. 3 TURBO-BLOWER
| GAS TEMP TO TURBO,F | MAX 750 | |
| TEMP. DROP FROM TURBO,F | 225 | |
| AIR TEMP. FROM TURBO,F | 200 - 220 | |
| AIR PRESS. FROM TURBO, PSIG | 11 | |
| REVOLUTIONS PER MINUTE | 9,600 |
BEARING OIL TEMP,F
| BLOWER SIDE | 145 - 160 |
| TURBINE SIDE | 180 - 190 |
AIR INTERCOOLER,F
| WATER TEMP. IN | 50 | |
| WATER TEMP. OUT | 75 - 85 | |
| AIR TEMP. OUT | 80 - 105 |
COMPRESSION PRESSURES (TAKEN ONCE AT FULL POWER)
CYLINDER NUMBER
MEASUREMENT 1 2 3 4 5 6 7 8
INDICATED MEAN PRESSURE*
(137.5 PSI)
MAXIMUM PRESSURE
(1060 - 1120 PSI)
COMPRESSION PRESSURE
(645 - 695 PSI)
INDICATED HORSEPOWER*
* IF AVAILABLE
1. SHIP & HULL NUMBER
| USNS SIRIUS (T-AFS 8) |
| 2. EQUIPMENT NAME |
| PROPULSION DIESEL ENGINE |
| 3. MRE # |
4. IDENT
5. LOCATION
| ENGINE ROOM |
| 6. TECH MANUAL |
7. INSPECTOR
NAME PLATE/DESIGN DATA
MAIN ENGINE
| MFG: | WALLSEND SULZER | SERIAL NO: | 80784/91 | |||||
| MFG. DWG: | CYL DISP: | 24.831 CUBIC FEET/CYL | ||||||
| MFG ID: | 8RD76 | FUEL: | UNIT INJECTION | |||||
| POWER RATING: | 12,800 | BORE: | 760 mm (29.921 INCHES) | |||||
| NO. OF CYL: | 8 | STROKE: | 1,550 mm (61.024 INCHES) | |||||
| CYCLE: | 2 | CYL ARR: | IN-LINE | |||||
| SPEED: | 122 RPM | MECH EFF: | 88.9% | |||||
| INJECTOR ID: | BMEP: | 137 PSI | ||||||
| FUEL RATE: | 0.324 LBS/BHP-HR @ 100% | |||||||
| 0.323 LBS/BHP-HR @ 90% | ||||||||
| 0.319 LBS/BHP-HR @ 50% |
INSPECTION/TEST PROCEDURES
TEST THE FOLLOWING ALARMS AND TRIPS:
DESIGN OBSERVED
| MIST DECTECTOR | SAT/UNSAT | |
| LOW JACKET WATER PRESSURE ALARM | 29 |
LOW JACKET WATER PRESSURE TRIP
LOW PISTON WATER PRESSURE ALARM 50
LOW PISTON WATER PRESSURE TRIP
| LOW LUBE OIL PRESSURE ALARM | 22 | |
| LOW LUBE OIL PRESSURE TRIP | 17 | |
| LUBE OIL PUMPS AUTO SWITCHOVER* | ON FAILURE | |
| JACKET WATER PUMPS AUTO SWITCHOVER* | ON FAILURE | |
| PISTON COOLING PUMPS AUTO SWITCHOVER* | ON FAILURE |
* NOTE: THE M.E. PUMPS AUTO SWITCHOVERS WILL NOT OPERATE IF THE RESET BUTTON ON THE CENTER SECTION OF THE MAIN SWITCHBOARD IS NOT PRESSED AFTER ANY LOSS OF POWER.
| 1. | INSPECT FOR LEAKS, DAMAGE OR MISSING HARDWARE. INSPECT COVER GASKETS. |
| 2. | INSPECT CONDITION OF COMPRESSION/BLOWDOWN TEST COCKS DURING BLOWDOWNS. |
| 3. | INSPECT FOUNDATION BOLTS/NUTS FOR INTEGRITY. |
| 4. | INSPECT PISTON COOLING, STAND PIPE AND PISTON ROD STUFFING BOXES. |
| 5. | INSPECT HAND CRANK LUBRICATORS FOR PROPER OPERATION. |
| 6. | INSPECT CONTROL LINKAGE AND FUEL INJECTION PUMPS FOR FREE MOTION. |
| 7. | INSPECT RUNNING GEAR BEARINGS FOR OIL FLOW DURING PRELUBE. |
| MATERIAL READINESS EVALUATION |
| 1. SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| 2. EQUIPMENT NAME |
| PROPULSION THRUST BEARING |
| 3. MRE # |
4. IDENT
| THRUST BEARING |
| 5. LOCATION |
| MAIN ENGINE ROOM |
| 6. TECH MANUAL |
7. INSPECTOR
NAME PLATE/DESIGN DATA
| MFG: | MITCHELL BEARING LTD. | |
| MFG DWG: | BUSHIP 203-2669601 | |
| MFG ID: | ||
| BORE DIA: | ||
| LENGTH: | ||
| BEARING SURFACE: |
INSPECTION/TEST PROCEDURES
1. CONDUCT VISUAL INSPECTION, RECORD RUNNING TEMPERATURE.
THRUST BEARING READING HOURLY
| 1 | ____________________ |
| 2 | ____________________ |
| 3 | ____________________ |
| 4 | ____________________ |
COMMENTS:
| MATERIAL READINESS EVALUATION |
| 1. SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| 2. EQUIPMENT NAME |
| PROPULSION CONTROL SYSTEM |
| 3. MRE # |
| 4. IDENT |
| LINE SHAFT |
| BEARING |
| 5. LOCATION |
| SHAFT ALLEY |
| 6. TECH MANUAL |
7. INSPECTOR
INSPECTION/TEST PROCEDURES
1. CONDUCT VISUAL INSPECTION FOR DETERIORATION, CORROSION, AND MIS-ALIGNED SENSORS, CABLES, INSTRUMENTATION, RESILIENT MOUNTS, CONTACTORS AND LATCH MECHANISMS.
2. CHECK OPERATION OF ALL SIGNAL LAMPS.
3. OBSERVE OPERATION AND RESPONSE TIME.
4. CHECK SHIFTING OF CONTROL BETWEEN CONTROL SPACES.
5. LEVEL ALARMS - TEMPORARILY FILL OR DRAIN A LEVEL SENSOR. WHERE THIS IS NOT POSSIBLE, REMOVE THE FLOAT SWITCH FROM IT'S RESERVOIR AND SLIDE THE FLOAT UP AND ON IT'S STEM.
6. TEMPERATURE ALARMS - TEMPORARILY PLACE THE SENSOR CAPILLARY BULB IN AN ELECTRIC DEEP FRYER WITH OIL, AND SLOWLY INCREASE THE TEMPERATURE TO THE ALARM SET POINT. USING A PORTABLE PYROMETER, OBSERVE AND RECORD THE ACTUAL SET POINT.
7. PRESSURE ALARMS - SENSOR SHOULD BE TEMPORARILY CONNECTED TO A COMPRESSED AIR BOTTLE OR LINE WITH A PRESSURE GAUGE AND REGULATING VALVE. THE PRESSURE SHOULD BE INCREASED OR DECREASED TO THE ALARM SET POINT AND THE ACTUAL SET POINT PRESSURE SHOULD BE OBSERVED AND RECORDED.
8. MISCELLANEOUS INDICATORS - OTHER INDICATORS AND ALARMS SHOULD BE OBSERVED BY ACTUALLY CAUSING THE MALFUNCTION OR INDICATION TO OCCUR IF NOT DETRIMENTAL TO ANY EQUIPMENT. SIMULATIONS SHOULD TEST AS MANY COMPONENTS IN THE ALARM SYSTEM AS POSSIBLE.
| MATERIAL READINESS EVALUATION |
| SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
| SYSTEMS INSPECTION |
| MRE TEST # |
VARIOUS
AREAS COVERED BY MEMO: INSPECTOR___________________________________
AS LISTED
PERSONNEL REQUIRED:
A. ONE ENGINEERING SURVEYOR
INSTRUMENTATION/EQUIPMENT REQUIRED:
A. NONE
TEST PROCEDURES
A. VISUALLY EXAMINE/INSPECT THE LISTED SYSTEMS PIPING, VALVES, FLANGES AND OTHER COMPONENTS FOR SIGNS OF LEAKAGE, DAMAGE, DETERIORATION OR IMPROPER OPERATION. SPECIAL ATTENTION SHOULD BE PAID TO THE FOLLOWING COMPONENTS IN PARTICULAR:
| 1. STRAINERS |
| 2. FILTERS |
| 3. COOLERS |
| 4. PUMPS |
| 5. REGULATING VALVES |
| 6. INDICATORS |
| 7. PIPE HANGERS |
| 8. EXPANSION JOINTS |
| 9. INSTRUMENTATION (LOCAL) |
ANY MISSING SAFETY RELATED ITEMS SUCH AS LAGGING, FLANGE SHIELDS, STRAINER SHIELDS AND CONTAINMENTS SHOULD BE NOTED AND BROUGHT TO THE IMMEDIATE ATTENTION OF WATCH PERSONNEL. ALL DEFICIENCIES ARE TO BE NOTED ON THE COMMENT SHEET (LAST PAGE) LISTING THE MRE NO., DETAILED LOCATION AND DESCRIPTIVE SUMMARY OF DEFECT. CONCURRENT EXAMINATIONS OF ADJACENTLY PIPED SYSTEMS ARE ENCOURAGED.
| MATERIAL READINESS EVALUATION |
| SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
SYSTEMS INSPECTION
INSPECTION/TEST PROCEDURES (CONT)
MRE NO. EQUIPMENT
| SAT | UNSAT* | |||
| 256 | - | PIPING, CIRC AND COOL SEA WATER |
261 - PIPING AND MISC. FUEL OIL SERVICE
262 - PIPING AND ACC, MAIN LUBE OIL
342 - * GENERATOR SUPPORT SYSTEMS
521 - FIREMAIN AND FLUSHING PIPING SYSTEM
524 - PIPING, AUXILIARY SALT WATER
529 - DRAINAGE AND BALLASTING
533 - * WATER, POTABLE SERVICE SYSTEM
542 - AVIATION AND GENERAL PURPOSE FUELS
543 - * LUBE OIL FILL, TRANSFER, PURIFICATION
559 - * UPTAKES, BAFFLES AND INNER CASING
* SEE ATTACHED SHEETS
| MATERIAL READINESS EVALUATION |
| SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
SYSTEMS INSPECTION
INSPECTION/TEST PROCEDURES (CONT)
MRE NO. DEFICIENCY
| MATERIAL READINESS EVALUATION |
| SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
SYSTEMS INSPECTION
INSPECTION/TEST PROCEDURES (CONT)
MRE NO. DEFICIENCY
| MATERIAL READINESS EVALUATION |
| 1. SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| 2. EQUIPMENT NAME |
| POTABLE WATER SERVICE SYSTEM |
| 3. MRE # |
4. IDENT
| HOT WATER HEATERS |
| 5. LOCATION |
6. TECH MANUAL
7. INSPECTOR
INSPECTION/TEST PROCEDURES
NO. 1 NO. 2 NO. 3 NO. 4
APL: N990ARRZ01 N990ARRZ11 N990ARRZ12 N990ARRZ17
MFG:
MFG DWG:
MFG ID:
CAP:
HEAT RATE:
HEAT SURF:
CHECK HEATER FOR TEMPERATURE, DEFORMATION, CAPACITY OF RELIEF VALVE AND TEMPERATURE CONTROL EQUIPMENT.
| MATERIAL READINESS EVALUATION |
| 1. SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| 2. EQUIPMENT NAME |
| JACKING GEAR |
| 3. MRE # |
4. IDENT
5. LOCATION
| LOWER ENGINE ROOM |
| 6. TECH MANUAL |
7. INSPECTOR
NAME PLATE/DESIGN DATA
GEAR MOTOR
| MFG: | MFG: | ||
| MFG DWG: | MFG DWG: | ||
| MFG ID: | MFG ID: | ||
| GEAR RATIO: | FRAME: | ||
| INPUT SPEED: | TYPE: | ||
| OUTPUT SPEED: | AMB: | ||
| RISE: | |||
| DUTY: |
INSPECTION/TEST PROCEDURES
1. INSPECT FOR DAMAGE, DETERIORATION, MISSING OR INOPERATIVE COMPONENTS, UNUSUAL NOISE, VIBRATION AND TEMPERATURES.
2. OBSERVE ENGAGING AND DISENGAGING OPERATIONS.
3. OBSERVE AND RECORD THE FOLLOWING DATA.
DESIGN ACTUAL
MOTOR SERIAL # _____
| VAC: | 440 | _____ |
| AMPS: | _____ | |
| HP: | _____ | |
| RPM: | _____ | |
| PHASE: | 3 | _____ |
| HZ: | 60 | _____ |
MOTOR RESISTANCE
MEGGER READING ( F) _____
| MATERIAL READINESS EVALUATION |
| 1. SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| 2. EQUIPMENT NAME |
| PROPULSION SHAFT |
| 3. MRE # |
4. IDENT
5. LOCATION
| SHAFT ALLEY |
| 6. TECH MANUAL |
7. INSPECTOR
INSPECTION/TEST PROCEDURES
1. INSPECT PROPULSION SHAFTING FOR CORROSION, CRACKS, EXCESSIVE ECCENTRICITY AND INTERFERENCE WITH OTHER OBJECTS.
2. INSPECT COUPLINGS FOR BOLTING.
3. OBSERVE DURING FULL POWER RUN.
4. INSPECT STERN TUBE SEAL ASSEMBLY FOR LEAKS, CORROSION, VIBRATION AND DAMAGE.
A. INFLATABLE SEAL
B. PACKING GLAND AND CASTING
C. STERN TUBE PACKING GLAND
| MATERIAL READINESS EVALUATION |
| 1. SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| 2. EQUIPMENT NAME |
| UPTAKES, BAFFLES & INNER CASING |
| 3. MRE # |
4. IDENT
5. LOCATION
| MACHINERY SPACE |
| 6. TECH MANUAL |
7. INSPECTOR
INSPECTION/TEST PROCEDURES
1. INSPECT INNER CASING UPTAKES FOR DAMAGE, PITTING, DETERIORATION AND TYPE OF INSULATION.
2. TEST FLAPPER VALVE FOR OPERATION AND FULL TRAVEL.
3. INSPECT SPARK ARRESTOR/MUFFLER FOR INTACTNESS, DAMAGE AND DETERIORATION.
4. INSPECT SOOT POTS AND DRAINS AND TEST OPERATE VALVES.
| MATERIAL READINESS EVALUATION |
| 1. SHIP & HULL NUMBER |
| USNS SIRIUS (T-AFS 8) |
| 2. EQUIPMENT NAME |
| LUBE OIL FILL, TRANSFER |
| PURIFICATION SYSTEM |
| 3. MRE # |
4. IDENT
| PURIFIERS |
| 5. LOCATION |
6. TECH MANUAL
7. INSPECTOR
NAME PLATE/DESIGN DATA
PURIFIER MOTOR
| MFG: | ALFA-LAVAL | MFG: | TOSHIBA | ||||
| MFG DWG: | MFG DWG: | ||||||
| MFG ID: | WHPX-407-TGD-24-60 | MFG ID: | B0154FLC2U3R | ||||
| CAPACITY: | 760 GPH | FRAME: | 254 TC | ||||
| TOTAL HEAD PRESS: | TYPE: | 1KK | |||||
| TYPE: | WHPX-407-TGD-24-60 | AMB: | 50C | ||||
| SPEED: | 5175 | RISE: | |||||
| BHP: | DUTY: |
INSPECTION/TEST PROCEDURES
1. INSPECT FOR DAMAGE, DETERIORATION, MISSING OR INOPERATIVE COMPONENTS, UNUSUAL NOISE, VIBRATION AND TEMPERATURES.
2. OBSERVE ENGAGING AND DISENGAGING OPERATIONS.
3. OBSERVE AND RECORD THE FOLLOWING DATA.
| NO. 1 | NO. 2 | NO. 3 | |||
| DESIGN | ACTUAL | ACTUAL | ACTUAL |
| SERVICE: | L.O. | |
| VAC: | 460 | |
| AMPS: | 19.7 | |
| HP: | 15 | |
| RPM: | 1755 |
DISCH. PRESSURE
INLET TEMPERATURE, F
1. SHIP & HULL NUMBER
| USNS SIRIUS (T-AFS 8) |
| 2. EQUIPMENT NAME |
| GENERATOR SUPPORT SYSTEMS |
| 3. MRE # |
4. IDENT
| SSDG'S |
| 5. LOCATION |
6. TECH MANUAL
7. INSPECTOR
INSPECTION/TEST PROCEDURES
1. INSPECT PIPING, FLANGES AND VALVES FOR DAMAGE, DETERIORATION AND LEAKAGE.
| A. | LUBE OIL SYSTEMS |
| B. | FUEL OIL SYSTEMS |
| C. | COOLING WATER SYSTEMS |
| D. | STARTING AIR SYSTEMS |
| E. | FOUNDATIONS AND SUPPORTS |
| F. | TURBO BLOWERS |
| G. | AIR COOLERS |
| a. | TURBO BLOWER INTERCOOLER |
| b. | GENERATOR |
SHIP & HULL NUMBER
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
| THERMOGRAPHY |
| MRE TEST # |
AREAS COVERED BY MEMO: INSPECTOR___________________________________
| 301 | THERMOGRAPHIC INSPECTION |
| 320 | POWER DISTRIBUTION SYSTEM |
| 330 | LIGHTING DISTRIBUTION |
PERSONNEL REQUIRED:
| A. | THERMOGRAPHIC INSPECTOR |
| B. | SHIP'S ELECTRICIAN |
INSTRUMENTATION/EQUIPMENT REQUIRED:
| A. | PREVIOUS THERMOGRAPHIC REPORT |
| B. | SUMMARY OF VRR'S FOR AREAS BEING INSPECTED |
INSPECTION/TEST PROCEDURES
A. CONDUCT THERMOGRAPHIC INSPECTION OF EQUIPMENT LISTED IN THE FOLLOWING SHEETS.
B. INSPECT MOTOR CONTROLLERS, SWITCHBOARDS AND DISTRIBUTION PANELS FOR CLEANLINESS AND OVERALL CONDITION OF WIRING, BUS BAR MOUNTINGS AND INSULATION.
SHIP & HULL NUMBER
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
THERMOGRAPHIC INSPECTION
INSPECTION/PROCEDURES
EQUIPMENT SPACE REMARKS
| Power Panel C4-101-1 | Chart Room | _____________________ |
| Power Panel 03-126-1 | Chart Room | _____________________ |
| Red Floodlights | Pilot House | _____________________ |
| Switch Fuse Board | Pilot House | _____________________ |
| Power Panel 04-119-1 | 04 Lev. Passageway | _____________________ |
| Nav Aids Junction Box 1A2 | 04-120-10-C | _____________________ |
| Nav Aids Junction Box 188 | 04-120-10-C | _____________________ |
| Power Panel 04-106-2 | 04-106-0 | _____________________ |
| Power Panel Seat Box 4S | Elec. Locker Rm B7 FR 115 | _____________________ |
| Power Panel Seat Box 4P | Elec. Locker Rm B7 FR 115 | _____________________ |
| Power Panel Computer Room | 0-100-0 Ships Supp. Rm | _____________________ |
| Power Panel 1-134-1 Fwd. Refrig Def Htr | 1-139-2 Clearway | _____________________ |
| Power Panel 1-176-2 Dk Mach. Fwd. | Winch Gen. Rm 75 | _____________________ |
| Power Panel 1-176-4 Dk Mach. Fwd. | Winch Gen. Rm 75 | _____________________ |
| Fuse Panel (1-173-2) 1-B | Winch Gen. Rm 75 | _____________________ |
| Power Panel 1-176-4 Dk Mach. Fwd. | Winch Gen. Rm 75 | _____________________ |
| Power Panel 1-166-0 | Winch Gen. Rm 75 | _____________________ |
| Power Panel 1-87-2 | 1-86-2 | _____________________ |
| Power Panel 02-031-2 | Helo Hanger | _____________________ |
| ABT 02-032-2 | Helo Hanger | _____________________ |
| Power Panel 02-034-2 | Helo Hanger | _____________________ |
| Power Panel 02-035-2 | Helo Hanger | _____________________ |
| Power Panel 02-45-2 | Helo Hanger | _____________________ |
| Power Panel 02-038-2 | 02-45-0 Heli. Fac. Wks | _____________________ |
| Power Panel 02-045-1 | 02-45-0 Heli. Fac. Wks | _____________________ |
| Accomodation Lighting Dist. Box 1A2/1 | 04-123-0 | _____________________ |
| Accomodation Lighting Dist. Box 1B2/1 | 04-122-0 | _____________________ |
| Accomodation Lighting Dist. Box 1A2/1 | 03-111-2 Passageway | _____________________ |
| Accomodation Lighting Dist. Box 1B2/2 | 03-110-2 Passageway | _____________________ |
| Accomodation Lighting Dist. Box 1A2/3 | 02-109-2 Passageway | _____________________ |
| Accomodation Lighting Dist. Box 1B2/3 | 02-109-1 Passageway | _____________________ |
| Accomodation Lighting Sec. Box 1B2 | FR 155 Broadcast Rm 96 | _____________________ |
| Accomodation Lighting Sec. Box 1A2 | 01-115-0 Broadcast Rm 96 | _____________________ |
| Accomodation Lighting Dist. Box 1A2/5 | 01-115-1 Passageway | _____________________ |
| Accomodation Lighting Dist. Box 1B2/4 | 01-115-1 Passageway | _____________________ |
| Accomodation Lighting Dist. Box 1B2/5 | 01-115-1 Passageway | _____________________ |
| Accomodation Lighting Dist. Box 1A3/6 | 01-105-1 Dk Sec. Locker | _____________________ |
| Accomodation Lighting Dist. Box 1A3/1 | 1-108-2 Passageway | _____________________ |
| Accomodation Lighting Dist. Box 1B3/1 | 1-101-1 Passageway | _____________________ |
| Accomodation Lighting Dist. Box 1A4/21 | 1-30-1 Gallery Swbd. | _____________________ |
| Accomodation Lighting Dist. Box 1B4/2 | 1-30-1 Gallery Swbd. | _____________________ |
| Accomodation Lighting Sec. Box 1A4 | 2-33-1 Vent Unit Rm 175 | _____________________ |
| Accomodation Lighting Sec. Box 1B4 | 2-33-1 Vent Unit Rm 175 | _____________________ |
| Accomodation Lighting Sec. Box 1A3 | Swbd. Rm 168 | _____________________ |
| Accomodation Lighting Sec. Box 1A3 | Swbd. Rm 168 | _____________________ |
| Accomodation Lighting Sec. Box 1B3 | 2-80-1 Swbd. Rm 168 | _____________________ |
SHIP & HULL NUMBER
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
THERMOGRAPHIC INSPECTION
INSPECTION/PROCEDURES
EQUIPMENT SPACE REMARKS
| Accomodation Lighting Sec. Box 1B3 | 2-80-1 Swbd. Rm 168 | _____________________ |
| Accomodation Lighting Sec. Box 1B3 | 2-80-1 Swbd. Rm 168 | _____________________ |
| Emergency Lighting Dist. Box 1E1 | 03-10802-E Passageway | _____________________ |
| Space Heating Dist. Box 1A8/2 | 02-124-0 Log Rm 60 Library | _____________________ |
| Life Boat Winches Junc. Box 4B | 01-105-1 Dk Sec. Locker | _____________________ |
| Deck Flood Lights White Dist. Box 1A2/7 | 1-92-CL Clearway | _____________________ |
| Deck Flood Lights White Dist. Box 1B2/7 | 1-92-2 Clearway | _____________________ |
| Clearway Lights Dist. Box 1B3/9 | 1-92-2 Clearway | _____________________ |
| Motor Heaters Dist. Box 1A5/2 | Winch Gen. Rm 75 | _____________________ |
| Watertight Doors Sec. Box 4W3 | Winch Gen. Rm 75 | _____________________ |
| Space Heating Dist. Box 1A8/1 | Winch Gen. Rm 75 | _____________________ |
| Elevator Lift Sec. Box 4L2 | 1-129-1 Clearway | _____________________ |
| 5 Ton Crane Heaters Sec. Box 1A7 | 1-129-1 Clearway | _____________________ |
| 5 Ton Crane Heaters Sec. Box 1A7 | 1-129-1 Clearway | _____________________ |
| Lighting Panel SL-101 | 1-105-2 Clearway | _____________________ |
| Lighting Contractor | 1-105-2 | _____________________ |
| Interlock BAT Charge/Exh Fan | 1-86-2 | _____________________ |
| 10 Ton Crane Heaters Sec. Box 1B5 | 1-70-2 | _____________________ |
| Hold Lighting Sec. Box 1B1 | 1-75-1 Top of ladder | _____________________ |
| Hold Lighting Sec. Box 1A1 | 1-75-1 Top of ladder | _____________________ |
| Controller Steering Gear Port | 3-17-1 Comp 218 M&T Str.Gr.Rm | _____________________ |
| Controller Supply Fan | 3-17-1 Comp 218 M&T Str.Gr.Rm | _____________________ |
| Controller Exhaust Fan | 3-17-1 Comp 218 Aft. Str. | _____________________ |
| Controller Mooring Capstan, Stbd. | 3-17-1 Comp 218 Aft Str | _____________________ |
| Controller Mooring Capstan, Port | 3-17-1 Comp 218 Aft Str | _____________________ |
| Space Heating Dist. Box 1B6/2 | 3-17-1 Comp 218 Aft Str | _____________________ |
| Thermascreen&Ozone Gen. Dist. Box 1A4/9 | 4-24-1 Chill Box Rm | _____________________ |
| Domestic Defrosting Htrs Sec. Box 4DD | 4-24-1 Chill Box Rm | _____________________ |
| Circuit Breaker Panel | 4-24-1 Chill Box Rm | _____________________ |
| Portable Apparatus Dist. Box 1B4/2 | 1-30-1 Gallery Swbd | _____________________ |
| Controller Exhaust Fan Galley | 1-30-1 Gallery Swbd | _____________________ |
| Switchboard Galley | 1-30-1 Gallery Swbd | _____________________ |
| Motor Heaters Dist. Box 1A5/3 | FR 86 Control Rm 197 | _____________________ |
| Motor Heaters Dist. Box 1B7/2 | FR 86 Control Rm 197 | _____________________ |
| Main Swbd Lighting | FR 85 Control Rm | _____________________ |
| Portable Apparatus Dist. Box 1B3/6 | FR 96 Comp 200 Schramm Rm | _____________________ |
| Emergency Lighting Dist. Box 1E2&1E3 | FR 86 Comp 200 Schramm Rm | _____________________ |
| Engine Room Lighting Dist. Box 1B3/5 | FR 86 Comp 200 Schramm Rm | _____________________ |
| Cargo Hold&Domestic Fans Dist Box 4H/1 | FR 86 Comp 200 Schramm Rm | _____________________ |
| Power Panel 3-085-1 Afff Hanger | FR 86 Comp 200 Schramm Rm | _____________________ |
| Claorifier Sec. Box 4C #1 | FR 85 Stbd. | _____________________ |
| Engine Room Aux. Sec. Box 4ER/4 | FR 82 Port Engine Room | _____________________ |
| Engine Room Lighting Dist. Box 1A3/5 | FR 81P(202) Eng. Workshop | _____________________ |
| Accomodation Lighting Dist. Box 1A26 | Winch Gen. Room 75 | _____________________ |
| Accomodation Lighting Dist Box 1B26 | Winch Gen. Room 75 | _____________________ |
| No. 3 Hold Lighting Dist Box 1B1/4 | 1-92-95-2 No. 3 Hold Ladder | _____________________ |
SHIP & HULL NUMBER
| USNS SIRIUS (T-AFS 8) |
| TEST MEMO |
THERMOGRAPHIC INSPECTION
INSPECTION/PROCEDURES
EQUIPMENT SPACE REMARKS
| No. 3 Hold Lighting Dist Box 1A1/5 | 1-92-95-2 No. 3 Hold Ladder | _____________________ |
| No. 3 Hold Lighting Dist Box 1B1/3 | 1-92-95-2 No. 3 Hold Ladder | _____________________ |
| No. 2 Hold Lighting Dist Box 1A1/7 | 1-125-2 No. 2 Hold Ladder | _____________________ |
| No. 2 Hold Lighting Dist Box 1Ba/6 | 1-125-2 No. 2 Hold Ladder | _____________________ |
| No. 2 Hold Lighting Dist Box 1A1/3 | Port Passageway | _____________________ |
| No. 1 Hold Lighting Dist Box 1A1/1 | 1-130-2 No. 1 Hold Ladder | _____________________ |
| No. 1 Hold Lighting Dist Box 1A1/2 | 1-130-2 No. 1 Hold Ladder | _____________________ |
| No. 1 Hold Lighting Dist Box 1B1/2 | 1-130-2 No. 1 Hold Ladder | _____________________ |
| No. 1 Hold Lighting Dist Box 1B1/1 | 1-130-2 No. 1 Hold Ladder | _____________________ |
Attachment A-1
ATTACHMENT A2
SMART TEST PLAN EXAMPLE/FORMAT
SHIP & HULL NUMBER
TEST MEMO
STEERING SYSTEM
SWBS TEST #
56110
REVISION: 1
DATE: JANUARY, 1999
COMSC APPROVAL:
PRESINSURV APPROVAL:
PERSONNEL REQUIRED:
A. ONE ENGINEERING SURVEYOR
B. LICENSED SHIP'S ENGINEER
C. SHIP'S ELECTRICIAN
D. THERMOGRAPHIC INSPECTOR
REFERENCES:
ABS 5.15.14
ABS 5.15.1
INSTRUMENTATION/EQUIPMENT REQUIRED:
A. STOP WATCH
B. AMP PROBE
INSPECTOR:
PRE-UNDERWAY REQUIREMENTS:
GENERAL - THERE MUST BE NO CONDITIONS PRESENT WHICH, IN THE DISCRETION OF THE SENIOR INSPECTOR, PRESENT SIGNIFICANT FIRE OR PERSONNEL HAZARDS. THE SHIP SHALL BE FREE FROM FUEL LEAKS AND PROPERLY SECURED FOR SEA. THERE MUST BE NO CONDITION WHICH WOULD RESULT IN THE USCG ISSUING A "NO-SAIL" FORM 835. THERE MUST BE NO C-4 CASREPS. THERE MUST NOT BE AN ACCUMULATION OF C-3 CASREPS WHICH WOULD RENDER THE SHIP UNRELIABLE OR UNSAFE.
INSPECTION/TEST PROCEDURES:
IN PORT / PRE-UNDERWAY CHECKS:
1. TEST ALL INSTALLED INSTRUMENTATION AND ALARMS: (REF. ABS 5.15.14)
2. TEST THE INTERNAL RELIEF VALVE FOR EACH UNIT.
3. TEST HAND PUMP AND/OR NFU OPERATION OF THE HYDRAULIC SYSTEM, AS APPLICABLE.
4. PERFORM A TIMED SWING RATE TEST OF EACH UNIT (SIMILAR TO TM 56100 "AT SEA", ITEM #2).
5. VERIFY THAT THE UNIT CAN ACHIEVE THE MAXIMUM STATED RUDDER TRAVEL.
6. CHECK FOR RUDDER FOLLOW-UP ERROR.
COMMENTS: ________________________________________________________________________________________________________________________________________________________________________________
SHIP MATERIAL ASSESSMENT & READINESS TESTING
STEERING SYSTEM
56110
INSPECTION/TEST PROCEDURES (CONT)
AT SEA:
1. AT THE COMPLETION OF THE FULL POWER TRIAL. PERFORM AHEAD STEERING GEAR OPERATIONAL TESTS AS FOLLOWS: (REF. ABS 5.15.1)
A. THE VESSEL MUST BE RUNNING AHEAD AT THE MAXIMUM CONTINUOUS RATED SHAFT RPM (AT THE SUMMER LOAD WATERLINE BUT NOT LESS THAN 11 KNOTS).
B. STEERING GEAR MOTOR CONTROLLERS SHALL BE OPENED PRIOR TO THE TEST TO FACILITATE MOTOR AMPERAGE READINGS AND THERMOGRAPHIC INSPECTION.
C. ESTABLISH COMMUNICATION BETWEEN THE BRIDGE AND THE LOCAL STEERING GEAR CONTROL PLATFORM.
2. WHEN THE BRIDGE DETERMINES IT IS CLEAR FOR MANEUVERS THE FOLLOWING RUDDER ORDERS SHALL BE CARRIED OUT AND RESPONSE TIMES RECORDED:
- MIDSHIP TO 35o RIGHT RUDDER
- 35o RIGHT RUDDER TO 35o LEFT RUDDER (TIME FROM 30oR TO 30oL)
- 35o LEFT RUDDER TO 35o RIGHT RUDDER (TIME FROM 30oL TO 30oR)
- 35o RIGHT RUDDER TO MIDSHIPS
3. PERFORM AHEAD BLOCKING VALVE / BLOCKING VALVE FUNCTION TESTS:
A. SECURE POWER TO THE STANDBY STEERING UNIT.
B. ORDER 20o RIGHT RUDDER.
C. WHEN THE RUDDER REACHES 20o RIGHT AND THE STEERING SYSTEM PRESSURE IS STEADY, SECURE POWER TO THE ONLINE STEERING UNIT BY PLACING THE REMOTE/ LOCAL SELECTOR SWITCH IN THE "OFF" POSITION. LEAVE THE POWER OFF FOR 10 SECONDS AND OBSERVE THE RUDDER FOR MOVEMENT.
D. RE-ENERGIZE THE STEERING UNIT AND ORDER 20o LEFT RUDDER.
E. WHEN THE RUDDER REACHES 20o LEFT AND THE STEERING SYSTEM PRESSURE IS STEADY, SECURE POWER TO THE ONLINE STEERING UNIT BY PLACING THE REMOTE/ LOCAL SELECTOR SWITCH IN THE "OFF" POSITION. LEAVE THE POWER OFF FOR 10 SECONDS AND OBSERVE THE RUDDER FOR MOVEMENT.
F. RE-ENERGIZE THE STEERING UNIT AND ORDER RUDDER AMIDSHIP.
4. UPON TEST COMPLETION OF THE ON-LINE STEERING GEAR UNIT, THE BRIDGE SHALL CHANGE OVER TO THE OTHER STEERING GEAR UNIT AND REPEAT STEPS 2 AND 3.
5. DURING THIS TEST ALL PERTINENT DATA ON THE ENCLOSED "STEERING GEAR TEST DATA SHEET" SHALL BE RECORDED.
SHIP MATERIAL ASSESSMENT & READINESS TESTING
STEERING SYSTEM
56110
INSPECTION/TEST PROCEDURES (CONT)
6. THE STEERING GEAR MUST BE CAPABLE OF PUTTING THE RUDDER FROM 30o ON EITHER SIDE TO 30o ON THE OTHER SIDE IN NOT MORE THAN 26 SECONDS - EQUAL TO A RUDDER TRAVEL RATE NOT LESS THAN 2.3 DEGREES/SECOND.
7. AFTER THE SHIP HAS CONDUCTED THE QUICK REVERSAL DEMONSTRATION, PERFORM ASTERN STEERING GEAR OPERATIONAL TEST AS FOLLOWS:
A. THE VESSEL MUST BE OPERATING ASTERN AT FULL POWER SHAFT RPM WITH STERN WAY ON THE SHIP.
B. ESTABLISH COMMUNICATION BETWEEN THE BRIDGE AND THE LOCAL STEERING GEAR CONTROL PLATFORM.
8. WHEN THE BRIDGE DETERMINES IT IS CLEAR FOR MANEUVERS THE FOLLOWING RUDDER ORDERS SHALL BE CARRIED OUT:
- MIDSHIPS TO 35o RIGHT RUDDER
- 35o RIGHT RUDDER TO 35o LEFT RUDDER
- 35o LEFT RUDDER TO 35o RIGHT RUDDER
- 35o RIGHT RUDDER TO MIDSHIPS
9. OBSERVE PROPER OPERATION OF STEERING GEAR UNIT AND NOTE ANY UNUSUAL NOISES OR LIFTING RELIEF VALVES. IF THE RUDDER GOES OVER AND FAILS TO RESPOND TO RUDDER COMMANDS, DETERMINE THE MAXIMUM ASTERN RPM AT WHICH THE STEERING GEAR MAINTAINS CONTROL OF THE RUDDER.
10. CONDUCT VISUAL INSPECTION OF RUDDERSTOCK AND CROSSHEAD FOR CRACKING, DAMAGE AND DETERIORATION. INSPECT PACKING GLAND FOR INTACTNESS AND EXCESSIVE LEAKAGE.
N00033-13-R-8035 Shipboard Inspection Program Attachment A-2: SMART TEST PLAN
Attachment A-2
ATTACHMENT A3
SAMPLE TASK 1: SMART inspection of the USNS OVERTHEHORIZON (T-EST 001)
The purpose of this task is to plan, prepare, provide resources and test equipment and conduct the SMART inspection for the vessel, and prepare the report.
Specific Tasks:
1) Organize the ship’s test plan index
2) Review all test plans. Spot check test plan evaluation criteria against technical manuals, regulatory requirements and other applicable references for validity. Incorporate lessons learned and inspector’s notes into test plan requirements as authorized by the MSC POC.
3) Provide all test plans to the MSC POC in electronic format.
4) Assist the SMART Coordinator in planning and preparations for the SMART inspection
5) Notify MSC POC of assigned resources to support Main Propulsion, Auxiliaries and Thermographic Survey tests and inspections. Identify required test equipment and validate that all required equipment is available, calibrated as required and in good working order.
6) Coordinate travel requirements with the MSC POC.
7) Accomplish SMART tests and inspections for Main Propulsion, Auxiliaries and Thermography with shipboard personnel, collect operating data for major pieces of propulsion and auxiliary machinery. Provide preliminary results and findings to the SMART Coordinator.
8) In conjunction with SMART Coordinator, collect inspector notes and lessons learned from all SMART inspectors.
9) Accomplish data analysis for main propulsion and auxiliary machinery and provide a report of machinery operating conditions and efficiency. Make recommendations to increase performance and efficiency.
10) Provide administrative assistance to assemble/publish the final SMART report.
SAMPLE TASK 2: Root Cause Analysis on the USNS OVERTHEHORIZON (T-EST 001)
The purpose of the task is to accomplish a root cause failure investigation and analysis of a connecting rod bolt failure on SSDG #1, using industry RCA practices such as the “5 Whys”, and provide a report detailing findings and recommendations.
SAMPLE TASK 3: SMART/SIP test plan development for a new ship class
USNS OVERTHEHORIZON (T-EST 001) is set to deliver to MSC in 60 days. The ship will accomplish Operational Test and Evaluation over the next 6 months, followed by Final Contract Trials. Task will require the Contractor to develop comprehensive shipboard equipment and system test and evaluation plans to be utilized to demonstrate the capabilities of the ship for Final Contract Trials.
Specific Tasks:
1) Review fleet introduction manuals, technical documentation and other Government Furnished Information and develop a draft index of shipboard test and evaluation plans.
2) Develop a POAM to research, establish test and evaluation criteria, and write test and evaluation plans for the ship.
a. Discuss resource requirements
b. Discuss significant milestones
3) Determine evaluation criteria.
4) Discuss methods to validate test and evaluation plans
5) Provide project management, coordination and administration support for the Final Contract Trial event.
6) Support post-FCT event to identify issues and update test and evaluation plans for future SMART or SIP inspections.
SAMPLE TASK 4: Re-engine study onboard the USNS OVERTHEHORIZON (T-EST 001)
Task will require the Contractor to accomplish a study for re-engineing the main propulsion engines.
Specific Tasks:
1) Develop a POAM for the task. Highlight key milestones.
2) Review operation, maintenance and repair history for the engines. Identify specific issues necessitating engine replacement. Discuss upgrade/modification options in lieu of replacement.
3) Discuss latest technologies, regulatory requirements and other factors influencing options.
4) Discuss full spectrum of options and identify ROM lead time and machinery acquisition costs for each option.
5) Provide recommendations, cost/benefit analysis and publish the report.
N00033-13-R-8035 Shipboard Inspection Program
Attachment A-3: SAMPLE TASKS
6) Prepare presentations as directed by the MSC POC to disseminate the main points from the study.
Attachment A-3
File details come from the government source that posted it. Updated .