J_-_2_Category_A_Items-FPR's.xls
XLS spreadsheet 63 KB Posted
- Attached to
- USNS ROBERT E. PEARY ROH/DD Federal contract opportunity
- Solicitation number
- N32205-15-R-3003
About this file
Revised/corrected J-2
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | Intent, Scope, General Requirements and | - 0 | $ - 0 | $0 | ||||||||
| Definitions | - 0 | $ - 0 | $0 | |||||||||
| 002 | Technical and Manufacturer’s Representatives | - 0 | $ - 0 | $0 | ||||||||
| 003 | Approach, Berth, and Mooring Requirements | - 0 | $ - 0 | $0 | ||||||||
| 004 | Testing and Quality Assurance | - 0 | $ - 0 | $0 | ||||||||
| 005 | Electrical Safety Procedure Requirements | - 0 | $ - 0 | $0 | ||||||||
| 006 | Heavy Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 007 | Cold Weather Plan | $0 | ||||||||||
| 010 | Furnish Office for Overhaul Management Team (OMT) | - 0 | $ - 0 | $0 | ||||||||
| 011 | Furnish General Services | - 0 | $ - 0 | $0 | ||||||||
| 012 | Telephone Services | - 0 | $ - 0 | $0 | ||||||||
| 013 | Project Planning and Production Status | - 0 | $ - 0 | $0 | ||||||||
| Monitoring Reports | - 0 | $ - 0 | $0 | |||||||||
| 014 | Preparation of Weight and Moment Report | - 0 | $ - 0 | $0 | ||||||||
| 015 | Integrated Logistics and GFM Support Requirements | - 0 | $ - 0 | $0 | ||||||||
| 016 | Fire Protection and Ship’s Safety Program | - 0 | $ - 0 | $0 | ||||||||
| 017 | Handling Ship’s Stores | - 0 | $ - 0 | $0 | ||||||||
| 018 | Delivery and Redelivery of the Vessel | - 0 | $ - 0 | $0 | ||||||||
| 019 | Shipboard Access and Security | - 0 | $ - 0 | $0 | ||||||||
| 020 | Gas Free Certificates | - 0 | $ - 0 | $0 | ||||||||
| 021 | Clean and Gas Free Tanks, Voids, | - 0 | $ - 0 | $0 | ||||||||
| Cofferdams and Spaces | - 0 | $ - 0 | $0 | |||||||||
| 022 | Dock Trials and Sea Trial | - 0 | $ - 0 | $0 | ||||||||
| 023 | Hazardous Waste Disposal | - 0 | $ - 0 | $0 | ||||||||
| 100 | HULL STRUCTURE | |||||||||||
| 100 | Port and Stbd Fwd Crane Boom Rest Mod | - 0 | $ - 0 | $0 | ||||||||
| 101 | Roller Chock Replacement | - 0 | $ - 0 | $0 | ||||||||
| 107 | Bridge Wing Canopy Install | - 0 | $ - 0 | $0 | ||||||||
| 110 | Preservation of House | - 0 | $ - 0 | $0 | ||||||||
| 111 | Replace Chain Fairlead TALT 307 | - 0 | $ - 0 | $0 | ||||||||
| 112 | Preservation of RAS Station King Posts | - 0 | $ - 0 | $0 | ||||||||
| 113 | Preservation of Lifeboat and Rescue Boat Davtis | - 0 | $ - 0 | $0 | ||||||||
| 114 | Preservation of Cargo Cranes | - 0 | $ - 0 | $0 | ||||||||
| 115 | Install Deck Drain 02 Level | - 0 | $ - 0 | $0 | ||||||||
| 116 | Modify Exterior Deck Grating and Ladder Preservation | - 0 | $ - 0 | $0 | ||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 202 | MDG Splash Oil and Test Circuit Mod TALT 381 | - 0 | $ - 0 | $0 | ||||||||
| 203 | SACOS UPS Upgrade Mod | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | HV-SS Emergency Switchboard Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 302 | Install Hour Meters on Cargo Cranes | - 0 | $ - 0 | $0 | ||||||||
| 303 | PLC Survey | - 0 | $ - 0 | $0 | ||||||||
| 304 | HV Jumper Cable Replacement | - 0 | $ - 0 | $0 | ||||||||
| 305 | IMECO HVAC SHIPYARD SUPPORT | - 0 | $ - 0 | $0 | ||||||||
| 306 | Accomodation Ladder Winch Upgrade | - 0 | $ - 0 | $0 | ||||||||
| 307 | IMECO Chillers SY Support | - 0 | $ - 0 | $0 | ||||||||
| 375 | Cargo Hold 1-6 Lighting Switch Install | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAVIGATIONAL AIDS | |||||||||||
| 401 | AIS-DGPS Renewal | - 0 | $ - 0 | $0 | ||||||||
| 402 | 3 cm and 10 cm Radar Monitoring System | $0 | ||||||||||
| 405 | Antenna Preventative Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 407 | Searchlight Installation | - 0 | $ - 0 | $0 | ||||||||
| 408 | SRD-500 Doppler Speed Log Replacement | - 0 | $ - 0 | $0 | ||||||||
| 409 | Communication Suite Groom- Limited | - 0 | $ - 0 | $0 | ||||||||
| 415 | Upgrade of CCTV System of Flight Deck to DVR | - 0 | $ - 0 | $0 | ||||||||
| 416 | Electronic Charting System Replacement | - 0 | $ - 0 | $0 | ||||||||
| 440 | AWS Speaker Upgrade | - 0 | $ - 0 | $0 | ||||||||
| 500 | MACHINERY, AUXILIARY SYSTEMS | |||||||||||
| 507 | Deckhouse Weather Deck Drain Piping Replacement | - 0 | $ - 0 | $0 | ||||||||
| 508 | Distiller Plate Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 509 | LTFW Cooler Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 510 | Mag Sprinkler Sys Check Valve Internals Removal | - 0 | $ - 0 | $0 | ||||||||
| 512 | Fire Extinguisher in Galley | - 0 | $ - 0 | $0 | ||||||||
| 513 | CMWD System Piping Replacement | - 0 | $ - 0 | $0 | ||||||||
| 514 | Bow Thruster Lube Oil Piping Modification | - 0 | $ - 0 | $0 | ||||||||
| 515 | Sewage Piping Repair | - 0 | $ - 0 | $0 | ||||||||
| 518 | HP Air Union Nut Replacement | - 0 | $ - 0 | $0 | ||||||||
| 519 | Open/Inspect Air Comp. Receivers & Hydro HP Air Flask | - 0 | $ - 0 | $0 | ||||||||
| 521 | Firemain Isolation Valve Installation | - 0 | $ - 0 | $0 | ||||||||
| 524 | Install MARPOL Fuel Samplers | - 0 | $ - 0 | $0 | ||||||||
| 530 | Ballast Tank TLI's | - 0 | $ - 0 | $0 | ||||||||
| 600 | OUTFIT, FURNISHINGS AND HABITABILITY | |||||||||||
| 602 | Galley Equipment Calibration | - 0 | $ - 0 | $0 | ||||||||
| 603 | Replace Mess Passageway Decking with PRC | - 0 | $ - 0 | $0 | ||||||||
| 604 | Chief Mate Office Modifications | - 0 | $ - 0 | $0 | ||||||||
| 605 | MILDET Office Modifications | - 0 | $ - 0 | $0 | ||||||||
| 606 | Lifeboat and Rescue Boat Release Hook Upgrade | - 0 | $ - 0 | $0 | ||||||||
| 626 | Deck Tile Replace and PRC Install | - 0 | $ - 0 | $0 | ||||||||
| 628 | Misc. Lagging | - 0 | $ - 0 | $0 | ||||||||
| 673 | Second Deck Cargo Hold No. 6 Modification | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | Galley Exhaust Duct Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 802 | Laundry Exhaust Duct Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRY-DOCKING | |||||||||||
| 901 | Dry-Docking and Undocking Vessel | - 0 | $ - 0 | $0 | ||||||||
| 902 | Polish Bow Thruster Propeller | - 0 | $ - 0 | $0 | ||||||||
| 903 | Propeller Shaft and Stern Tube Inspection | - 0 | $ - 0 | $0 | ||||||||
| 904 | Stern Tube Seal Inspection | - 0 | $ - 0 | $0 | ||||||||
| 905 | Underwater Hull Cleaning and Painting | - 0 | $ - 0 | $0 | ||||||||
| 906 | Freeboard Cleaning and Painting | - 0 | $ - 0 | $0 | ||||||||
| 907 | Zinc Renewal Seachests Rope Guard BT | - 0 | $ - 0 | $0 | ||||||||
| 909 | Inspect and Repair Cathodic Protection | - 0 | $ - 0 | $0 | ||||||||
| 910 | Overhaul Sea Valves | - 0 | $ - 0 | $0 | ||||||||
| 911 | Anchor and Anchor Chain Ranging | - 0 | $ - 0 | $0 | ||||||||
| 913 | Bilge Keel Repairs | - 0 | $ - 0 | $0 | ||||||||
| 914 | Waster Pieces Renewal | - 0 | $ - 0 | $0 | ||||||||
| 916 | Cetral Seawater 30" Waster Piece Mod | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNREP GEAR | |||||||||||
| 1001 | ASD Fan Motor Overhaul | - 0 | $ - 0 | $0 | ||||||||
| 1002 | UNREP Hauling Winch Repairs | - 0 | $ - 0 | $0 | ||||||||
| 1003 | Sliding Block Rubber Bumpers | - 0 | $ - 0 | $0 | ||||||||
| 1004 | HP Air Relief Valve Calibration | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $0.00 |
&LUSNS LEWIS AND CLARK (T-AKE 1)&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-15-R-3001
&CATTACHMENT J-2
File details come from the government source that posted it. Updated .