J_-_11_Dry_Dock_Evaluation_Form.docx

DOCX document 143 KB Posted

Attached to
USNS ROBERT E. PEARY ROH/DD Federal contract opportunity
Solicitation number
N32205-15-R-3003
Issued by
Department of the Navy Military Sealift Command

About this file

J-11 attachement

View the file

Other files for this federal contract opportunity

Other files attached to USNS ROBERT E. PEARY ROH/DD, newest first.
File Type Posted
N32205-15-R-3003_Amendment_0004.doc DOC document
N32205-15-R-3003_Amendment_0003.doc DOC document
N32205-15-R-3003_Amendment_00002.doc DOC document
J_-_2_Category_A_Items-FPR's.xls XLS spreadsheet
J-A_-_ROH-DD_USNS_ROBERT_PEARY_T-AKE_5_(2).pdf PDF
RFP-RFQ_QandA_PEARY_No._2.docx DOCX document
J_-_2_Category_A_Items.xls XLS spreadsheet
pN32205-15-R-3003_Amendment_1.doc DOC document
WI_Index_REP_JUL_2015_ROH_DD2.doc DOC document
RFP-RFQ_QandA_PEARY_No._1.docx DOCX document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_3_Category_B_Items.xls XLS spreadsheet
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_12_Past_Performance_Data.doc DOC document
J-4_GFM_List.pdf PDF
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_6_WI_015_CDRL.pdf PDF
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
J_-_10_Interport_Differential.doc DOC document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MSC DRYDOCK EVALUATION FORM

Ship name: USNS ROBERT E. PEARY

Hull No: T-AKE 5

PART A (to be completed by MSC)

PART B (to be completed by ALL shipyards)

Drydock Certification / Classification Info

Certified? Yes |_| No |_|

Certifying / Classifying Agency

Certificate No.

Date of expiration

Ship Characteristics
English measure
Metric measure

Provide date in English and Metric Units:

Length, overall
689
ft -
0
in
210.0 m

Drydock Characteristics

Breadth, molded
105
ft -
7
in
32.2 m

Length, overall ft-in m

Draft, light load line
23
ft -
4
in
7.2 m

Breadth ft-in m

Gross Tonnage (U. S.)
43758
Tons

MT

Displacement, Full Load
44071
LT

44778 MT

Maximum dry-dock lift capability

LT

MT

Minimum Displacement/Draft

Displacement
24831
LT

25230 MT

Draft - forward
20
ft -
4
in
6.2 m

Maximum entry draft rating:

LT

MT

Draft – aft
20
ft -
4
in
6.2 m

Max stern trim for graving dock ft -

in
m

Water depths around dock ft-in m area and approaches, tidal conditions, Anticipated Arrival Draft and any unusual conditions for entering/

Draft - forward
24
ft -
2
in
7.3 m

Leaving the dry-dock

Draft - aft
26
ft -
2
in
8.1m

Depth Over Floor ft-in m

Positioning Clearances

Depth Over Blocks ft-in m

Bottom: keel to dry-dock floor
5
ft -
0
in
1.5 m

Depth Over Sill ft-in m

Side: hull to dry-dock wall
5
ft -
0
in
1.5m

Depth Over KEEL ft-in m

Loading Pressures

Max block loading
17.65
Tons Per square ft.
193.0 per sq meter

Note: All blocks to be positioned under longitudinal strength members and transverse bulkheads.

Max Block Loading Capability

Blocking Requirements

Block Capability

LT/ft2

LT/m2

Construction
Hardwood

Keel & Side Block Information

Cap material
Soft Wood

Construction

Cap thickness (min)
2

Cap Material

Side blocks (e.g., shaped, wedged, etc.)
Shaped

Cap Thickness in cm

Block Age

Hardwood: White Oak, California Laurel, Oregon Myrtle, Iron bark, Height ft-in m

Blue Gum, American Rock Elm or Preserved Red Oak.

Width ft-in m

Softwood: Douglas Fir, Tamarack, Long Leaf Pine or Hemlock

Length ft-in m

MSC DRYDOCK EVALUATION FORM (cont’d)

PART A (to be completed by MSC)

PART B (to be completed by ALL shipyards)

Provide data in English and Metric units

Minimum Required Services

Electrical power

Minimum Available Services

AC volts
505
VAC

Electrical power

number of phases
3

AC volts

VAC

amperage (total)
5600
Amps

number of phases

frequency
60
Hz

amperage (total) amps

number of lines
14

frequency

Hz number of lines

Ground connections

number
2

Ground connections

cable size, each
500,000
cir mils

number cable size, each cir mils

Sewage connections

number
1

Sewage connections

pipe size
2 1/2
inch ips

number

capacity
1,000
gals per day
3,785 liters per day

pipe size inch ips cm capacity gal/day ltr/day

Fire Main

number of connections
2

Fire Main

connection size
2 1/2
inch ips

number of connections

pressure
125
Psig
8.8kg per sq cm

connection size inch ips cm

capacity
1,000
gals per min
3,785 liters per min

pressure psig kg/m2 capacity gpm ltr/min

Aux Seawater

pressure
100
Psig
7.0kg per sq cm

Aux Seawater

capacity
600
gals per min
2,271 liters per min

pressure psig kg/m2 capacity gpm ltr/min

Fresh Water

pressure
60
Psig
4.2kg per sq cm

Fresh Water

capacity
100
gals per min
378liters per min

pressure psig kg/m2 capacity gpm ltr/min

Compressed Air

pressure
125
Psig
8.8kg per sq cm

Compressed Air

capacity
200
cu ft per min
5664 liters per min

pressure psig kg/m2 capacity cfm ltr/min

Shore Steam

pressure
100
psig
7.0kg per sq cm

Shore Steam

capacity
6,000
lbs per hour
2,722 kg per hour

pressure psig kg/m2 capacity lb/hr kg/hr

High Pressure Water Wash pressure
3,000
psig
211kg per sq cm

High Pressure Water Wash pressure psig kg per sq cm

Safety Response Plans Required

Safety Response Plans Available (circle correct answer)

Firefighting
YesX
No|_|
Firefighting
Yes
No
Flooding (accidental)
YesX
No|_|
Flooding (accidental)
Yes
No
Earthquake
Yes|_|
NoX
Earthquake
Yes
No
Typhoon
Yes|_|
NoX
Typhoon
Yes
No

MSC DRYDOCK EVALUATION FORM (cont’d)

PART C (to be completed by Shipyard if dry-dock is not certified by IACS or under MIL STD 1625C)

Dock master info

Contractor name

Dock master name

Certifying Agency

Certificate No.

Years experience

Drydock Insurance Info

Is Drydock insured?
Yes |_|No |_|

Insurer

Policy No.

Amount Insured

Date of expiration

IS SNUBBING NECESSARY?

YES NO

IS FIRE PROTECTION AVAILABLE

ON BUILDING WAY?

YES NO

TIDAL RANGE (DIFF. OF M.L. M.H)

CERTIFICATION DATE &

CERTIFIED BY WHOM

LIFT CAPACITY

(std. tons)

TYPE

CRANES SERVING WAY

NO.

AT DROP

OFF

OVER

WAY END

DEPTH OF WATER

LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE

OF (check one) (ton 2,240 lbs)

WAY

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

BUILDING WAYS (M. I. W.)

SHIPYARD DATA

Telephone No:

Telex No:

Date Found:

SHIPYARD AND ADDRESS

Commander (Code M-4E3) Military Sealift Command Washington, DC 20390 NOTE: If survey form has been previously submitted, then enter changes only.

MSC SHIP REPAIR FACILITY SURVEY

LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions) DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT RAILROAD CONNECTION (identify)

MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

DOCK

NO.

DRY DOCKS (continued) LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO

DATE CERTIFIED, CERTIFIED BY WHOM, &

DATE CERTIFICATION EXPIRES

LIFTING CAPACITY

(ton 2,240)

DEPTH/DRAFT

OVER OVER OVER

SILL FLOOR KEEL

(GD) BLOCKS

CLEAR WIDTH

at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height

LENGTH

at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON

(FD)

MATERIAL TYPE

Floating--(FD) Graving--(GD) Marine Railway (MR)

DOCK

SERVICES AVAILABLE

(Use abbreviation of service below)

USE

REPAIR/

OUTFIT-

ING

HEIGHT

OF

DOCK

(M.L.W.)

OUT-

BOARD

IN-

BOARD

WATER DEPTH

(M. L. W.)

LENGTH

(actual & usable)

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

TYPE

BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.)DRY DOCKS (means high water)
MSC SHIP REPAIR FACILITY SURVEY (continued)SHIPYARD:

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)

MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

MAX REACH HEIGHT OF HOOK

NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM & (STD TONS) (BRIDGE) AT REACH LENGT HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES

ACREAGE LEGALLY CONTROLLED

IN USE DEVELOPED TOTAL

EXISTING LOCAL ORDINANCES LIMITING PRODUCTIVE USE

LIMITATION IMPOSED BY PROPERTY ZONING CLASSIFICATION

LIST TYPES OF WORK NORMALLY SUBCONTRACTED

RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________

WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________

ALL OTHER SHOPS

(LIST NAMES AND DIMENSIONS)

LARGEST EXIT

WIDTH HEIGHT

DIMENSIONS OF

SHOP OR BUILDING

NAME OF SHOP

OR BUILDING

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY

RIGGER

STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)

PRINCIPAL SHOPS AND BUILDINGS

SHIPYARD:
MSC SHIP FACILITY SURVEY (continued)

NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED

ARE YOU CERTIFIED AS A SMALL BUSINESS? YES NO

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT

3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND

EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND

DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN

ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP

REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN

LIST EACH FACILITY AND ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM

(NAME/TITLE/PHONE NUMBER).

NORMAL

SHIFTS

NORMAL

MAXIMUM

POTENTIAL MAXIMUM

CURRENT

CURRENT

EMPLOYMENT

MANAGEMENT, ADMINISTRATION

PROFESSIONAL ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM

SHIPYARD:

MSC SHIP REPAIR FACILITY SURVEY (continued)

PART D (to be completed by ALL Shipyards)

1. The Offeror shall provide a list of the vessels (and their principal characteristics) drydocked in this drydock over the past 2 years. (Attach a separate page)

2.The Offeror shall describe the nature and cause of accidents experienced by the shipyard in drydocking operations over the past 5 years. The Offeror shall
describe corrective action taken or practices implemented to prevent recurrence of accident. (Attach a separate page)

I hereby certify that the above information is true and accurate.

Name and Title of Shipyard Official

Signature of Shipyard Official

Date

Attachment J – 11

ATTACHMENT J - 11

File details come from the government source that posted it. Updated .