See Admendment 0001 for New Work Items Revised Work Items add clause 52.243-7 Revised Paperwork Due date for site visit and revised C-2.

View the file

Other files

File Type Posted
Clarification_119.doc DOC document
J_-_3_Category_B_Items.xls XLS spreadsheet
N32205-15-R-3001-0006.pdf PDF
J_-_2_Category_A_Items_Revised.xls XLS spreadsheet
J_-_2_Category_A_Items_Revised.xls XLS spreadsheet
Clarifications_117-118.zip ZIP file
N32205-15-R-3001-0005.pdf PDF
0503_A_Repair_Miscellaneous_Valves_(VR12-033_VR13-016_VR14-022).docx DOCX document
Clarifications_104-115_and_References.zip ZIP file
Revised_Work_Items-_0208 _0413 _0509 _0902 _0910 _0921.zip ZIP file
References.zip ZIP file
Clarifications_074 _084-103.zip ZIP file
N32205-15-R-3001-0004.pdf PDF
N32205-15-R-3001-0003.pdf PDF
Clarifications_051-083_and_Attachments.zip ZIP file
Clarifications_032-050_and_Attachments.zip ZIP file
J_-_2_Category_A_Items.xls XLS spreadsheet
Clarification 022.doc DOC document
Clarification 019.doc DOC document
Clarification 015.doc DOC document
Clarification 020.doc DOC document
Clarification 027.doc DOC document
Clarification 024.doc DOC document
Clarification 025.doc DOC document
Clarification 013.doc DOC document
Clarification 017.doc DOC document
Clarification 014.doc DOC document
Clarification 016.doc DOC document
Clarification 031.doc DOC document
Clarification 023.doc DOC document
Clarification 028.doc DOC document
Clarification 030.doc DOC document
Clarification 021.doc DOC document
Clarification 029.doc DOC document
N32205-15-R-3001-0002.pdf PDF
Clarification 026.doc DOC document
Clarification 018.doc DOC document
8194713_-.PDF PDF
Clarification 005.doc DOC document
471-331-4775_E_ABS_Stamped_Approved_Dwg.pdf PDF
Clarification 003.doc DOC document
Clarification 001.doc DOC document
Clarification 006.doc DOC document
Clarification 009.doc DOC document
Clarification 007.doc DOC document
LEWIS_ _CLARK_ROH-DD_J A_AMENDMENT_0001.pdf PDF
Clarification 011.doc DOC document
Clarification 012.doc DOC document
Clarification 002.doc DOC document
Clarification 008.doc DOC document
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This Amendment incorporates the follow ing changes:

1) Add Work Items: 0113, 0208, 0308, 0409, 0410, 0411, 0412, 0413, 0414, 0516, 0620, 0621, 0622 and 0807.

2) Revise Work Items: 0012, 0030, 0106, 0109, 0204, 0402, 0403, 0406, 0407, 0501, 0503, 0504, 0508, 0515, 0520, 0529, 0530, 0533, 0534, 0538, 0604, 0607, 0609, 0610, 0611, 0617, 0906, 0909, 0913, 0914, and 0920.

3) Add Clause 52.243-7.

4) Revise Section C-2 and Attachment J-2 to include new w ork items.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Oct-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N32205-15-R-3001

X 9B. DATED (SEE ITEM 11)

21-Oct-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Oct-2014

CODE

MILITARY SEALIFT COMMAND NORFOLK

471 EAST C STREET, BLDG SP64

NAVAL STATION NORFOLK

NORFOLK VA 23511-2419

N32205 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N32205-15-R-3001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard Work Items included for this solicitation:

Category “A” Items

001 INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

002 TECHNICAL AND MANUFACTURER’S REPRESENTATIVES

003 Approach, Berth, and Mooring Requirements 004 Testing and Quality Assurance 005 Electrical Safety Procedure Requirements 006 Heavy Weather Plan 007 Cold Weather Plan

0010 FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT)

0011 FURNISH GENERAL SERVICES (T-AKE)

0012 Telephone Services

0013 PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS

0014 PREPARATION OF WEIGHT AND MOMENT REPORT

0015 INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS

0016 Fire Protection and Ship's Safety Program 0017 Handling Ship's Stores 0018 Delivery and Redelivery of the Vessel 0019 Shipboard Access and Security 0020 Gas Free Certificates

0021 CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES

0022 Dock Trials and Sea Trials

0023 HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY

0024 PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY

101 IMPROVED POINT DETECTION SYSTEM – LIFECYCLE REPLACEMENT

MOUNTINGS (T-ALT 378)

102 Watertight door repair

103 OPEN, CLEAN AND INSPECT TANK VENT GOOSENECKS

104 Hull Survey Support (ABS) 106 Fabricate and install new Jettison Ready Service Lockers

107 STACK REPAIRS 08 LVL (T-ALT 400)

FALL PROTECTION ANCHORS ON KINGPOSTS INSTALLATION (T-ALT

350)

109 SHEATHING REPAIR IN WAY OF LCCC AND FUEL RECEIVING STATIONS

110 ANCHOR CHANGE (ABS) (T-ALT-326)

111 Correct Forward Towing Arrangement (TALT-307) 112 Tank Boundary Testing and Structural Survey (ABS) 113 Convert Ballast Tank to Waste Tank 201 Propulsion Motor and Cooler Cleaning 202 Inspection Of MDE/MDG Vulcan Couplings 203 MDG No. 2 and No. 4 6000 HR OVERHAUL

204 Splash Oil and Test Circuit Modification (T-ALT-381R) 205 Propulsion Shaft Turning Gear Switch Relocation (T-ALT 379) 206 Inspect And Repair NO 4 MDE Exhaust 207 Replace Main Engine Flexible Hoses 208 Inspect Propulsion Motor Power Cable Connections

301 HV-SS AND EMERGENCY SWITCHBOARD CLEANING

302 MAIN GENERATOR MAINTENANCE AND CLEANING

303 LIFE RAFT EMERGENCY LIGHTING MODS IAW SOLAS (T-ALT 311)

304 PLC SURVEY

305 REPLACE HIGH VOLTAGE JUMPER CABLES (TALT-428)

306 OP 4 STOREROOMS LIGHTING UPGRADE (T-ALT 374)

307 ELECTRICAL TEST BENCH INSULATION INSTALLATION (T-ALT 180)

308 Cargo Holds 1-6 Lighting Switch Installation (T-ALT 246) 309 Test and Evaluate Degaussing System (VR14-072)

401 BRIDGE EQUIPMENT ANNUAL SERVICE

402 SRD-500 Speed Log PMS

403 OE-570/WSC ANTENNA SYSTEM MAINTENANCE

404 Antenna Preventative Maintenance

405 GMDSS TECH REFRESH (T-ALT-10-337)

406 ELECTRONIC CHARTING SYSTEM REPLACEMENT (T-ALT-347)

407 REPLACE TILT PLATFORM AB-1298 AND ANTENNA (T-ALT 380)

408 PA/GA SYSTEM SPEAKERS FOR DC LOCKERS (T-ALT 174)

409 PUBLIC ADDRESS - GENERAL ALARM SYSTEM REPAIRS (VR14-061)

410 INSTALL NEW WEATHER STATION WINDBIRD (T-ALT 173)

411 ADNS-SFF SYSTEM SUPPORT

412 GROOM OF HYDRA COMMUNICATIONS SYSTEM (VR14-065)

413 REPAIR THE INTRUSION DETECTION SYSTEM (VR14-067)

414 TV-DTS System Groom

501 REPLACE SALTWATER PIPE

502 Replace Inlet And Outlet Valves To FW Coolers 503 Repair Miscellaneous Valves

504 FIREFIGHTING SYSTEM ANNUAL INSPECTION

505 SCBA ANNUAL INSPECTION

506 Relief Valve Testing 507 Repair Pressure Regulating Valves

508 5 YR CRANE RETESTING SURVEY (ABS) AND HOSE REPLACEMENT

509 AIR CONDITIONING PLANT REPAIRS (VR14-009)

510 Clean High and Low Temp Coolers 511 Sewage System Piping Flush

AFFF PIPING REPAIRS – FLIGHT DECK SPRINKLING SYSTEM (T-ALT-

279)

AFFF PIPING REPAIRS – HELO HANGER SPRINKLING SYSTEM (T-ALT-

514 AFFF PIPING REPAIRS – FLIGHT DECK/HANGER HOSE REEL SYSTEMS

(T-ALT-279)

515 Oil Content Meter Calibration

516 REPLACE ELEVATOR 1 AND 3 HOIST ROPES

OPEN AND INSPECT AIR COMPRESSOR RECEIVERS AND HYDRO HP AIR

FLASK

519 HIGH TEMP AND LOW TEMP FRESH AND CHILL WATER SYSTEM FLUSH

520 Overhaul No. 1 and No. 2 Cargo Reefer Compressors

521 REPAIR VCHT CLEAN OUT PIPING

522 Replace Threaded Couplings at HP Air Valve AH-V-24

523 FLUSH MAGAZINE SPRINKLER DRAIN LINES

524 BRINE OVERBOARD PIPING REPAIR

525 CHLOROPAC INSTALLATION (T-ALT 170)

MAG SPRINKLING SYS CHECK VALVE INTERNALS REMOVAL (T-ALT

161)

527 Repair Sounding Tube Caps (VR14-053)

528 BOW THRUSTER LUBE OIL PIPING MODIFICATION (T-ALT 291)

529 LT FW COOLERS SALTWATER PIPING MODIFICATIONS (T-ALT 238)

530 14 INCH BUTTERFLY MOTOR-OPERATED ISOLATION VALVE

INSTALLATION FOR FIREMAIN (T-ALT 344)

531 No1 and No2 Distilling Plant Repairs

532 CARGO BRINE SYSTEM VALVE AND PIPING MOD (T-ALT 349)

533 ADD FIRE EXTINGUISHERS (T-ALT 232 AND 382)

534 MSD CHECK VALVE REPLACEMENT (T-ALT 362)

535 TEMPORARY CHILLER PIPING MODS (T-ALT 342R)

High Temperature Fresh Water Cooling System Modifications

(TALT-103)

537 Install Fuel Oil Drip Sampler (T-ALT 377) 538 Cargo Crane Lighting (T-ALT 172) 539 AFFF Bilge Sprinkling PIPING REPLACEMENT 540 No1 and No2 Steering Gear HPU repairs 541 Annual Personnel Elevator Inspection 542 Reserved 543 CMWD removal and hose and clip installation

545 HTFW Pump Seal Replacement And Bearing Isolator Installation (TALT-329)

546 LTFW Pump Seal Replacement And Bearing Isolator Installation (TALT-329)

547 Central Seawater Pump Seal Replacement And Bearing Isolator Installation (TALT-329)

548 Inert Gas Vapor Flange Modification (VR14-047)

549 Replace Rubber Expansion Joints On Piping Systems (VR14- 058)

550 Incinerator Repairs (VR14-071)

601 INSTALLATION FOR STERN BOARDING LADDER (T-ALT-390)

602 Lagging and Insulation Repair 603 Install Electrical Matting 604 Accommodation Ladder Inspection and Load testing

605 LIFERAFT ANNUAL CERTIFICATION

606 FASSMER Lifeboat, RHIB, and Davits Annual Inspections 607 Renew Nonskid Other Than Flight Deck 608 Flight Deck Safety Net Repair

609 REPLACE DECK COVERING IN INCINERATOR ROOM

610 Replace Deck Covering in Waste Processing Room 611 Replace Deck Covering in Fast Food Serving Line Annex 612 Steam Clean Bilges

613 CLEAN THE DECKS OF THE PORT AND STBD DISTRIBUTED SYSTEMS

COMPARTMENTS

614 LIFEBOAT AND RESCUE BOAT RELEASE HOOKS UPGRADE (T-ALT 376)

615 ROLLER CURTAIN CARGO DOOR MODIFICATIONS (T-ALT 361)

616 MEDICAL HOIST HAND RAILS (T-ALT 316)

617 Deckhouse Preservation 618 Replace Deck Covering in Galley

619 PRESERVATION OF MACHINERY SPACE FAN ROOMS

620 Preservation of Cargo Cranes (VR14-060)

621 Immersion Suit Testing 622 Replace Deck Covering in Various spaces 623 Kingpost Preservation (VR14-075) 624 Door Lock Repairs (VR14-076)

801 GALLEY EXHAUST DUCT CLEANING

802 Laundry EXHAUST DUCT CLEANING 803 Adjust vent dampers (VR14-054) 804 Replace heaters

805 GALLEY HVAC MODIFICATIONS (T-ALT 330)

806 OVERHAUL VENTILATION FANS AND MOTORS (VR14-052)

807 Vent Duct Alterations(TALT-315, VR14-025, VR14-064) 901 Dry-Docking And Undocking Ship 902 Propeller Shaft And Stern Tube Inspection 903 Polish Bow Thruster Propeller 905 Underwater Hull Cleaning and Painting 906 Freeboard Cleaning and Painting 907 Renew Seachest, Rope Guard, and Bow thruster Zincs 909 Inspect and Repair Cathodic Protection 910 Overhaul Sea Valves 911 Anchor and Anchor Chain Ranging 912 Blast And Coat Tanks 913 Bow Thruster 5 year Maintenance 914 Renew Waster Pieces

915 RUDDER STOCK VENT PIPING MODIFICATION (T-ALT 368)

920 STERN TUBE FLUSHING CORRECTIONS (TALT-321)

921 Propeller Shaft Proximity Probe Installation

922 REMOVABLE ROPE GUARD INSTALLATION (T-ALT 321)

924 Jacking Bolt Hole Repair 1001 Renew Flight Deck Non-skid

Category “B” Items

PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY IN FORCE

PROTECTION CONDITIONS BRAVO - DELTA

0030 Continuation of Services 105 Ballast Tank Zinc Renewal 517 Renew 50 feet of AFFF pipe 544 Assist Ship's Force 908 Steel Renewal

SECTION I - CONTRACT CLAUSES

The following have been added by full text:

52.243-7 NOTIFICATION OF CHANGES (APR 1984)

(a) Definitions.

"Contracting Officer," as used in this clause, does not include any representative of the Contracting Officer.

"Specifically authorized representative (SAR)," as used in this clause, means any person the Contracting Officer has so designated by written notice (a copy of which shall be provided to the Contractor) which shall refer to this subparagraph and shall be issued to the designated representative before the SAR exercises such authority.

(b) Notice. The primary purpose of this clause is to obtain prompt reporting of Government conduct that the Contractor considers to constitute a change to this contract. Except for changes identified as such in writing and signed by the Contracting Officer, the Contractor shall notify the Administrative Contracting Officer in writing, within 20 calendar days from the date that the Contractor identifies any Government conduct (including actions, inactions, and written or oral communications) that the Contractor regards as a change to the contract terms and conditions. On the basis of the most accurate information available to the Contractor, the notice shall state--

(1) The date, nature, and circumstances of the conduct regarded as a change;

(2) The name, function, and activity of each Government individual and Contractor official or employee involved in or knowledgeable about such conduct;

(3) The identification of any documents and the substance of any oral communication involved in such conduct;

(4) In the instance of alleged acceleration of scheduled performance or delivery, the basis upon which it arose;

(5) The particular elements of contract performance for which the Contractor may seek an equitable adjustment under this clause, including--

(i) What contract line items have been or may be affected by the alleged change;

(ii) What labor or materials or both have been or may be added, deleted, or wasted by the alleged change;

(iii) To the extent practicable, what delay and disruption in the manner and sequence of performance and effect on continued performance have been or may be caused by the alleged change;

(iv) What adjustments to contract price, delivery schedule, and other provisions affected by the alleged change are estimated; and

(6) The Contractor's estimate of the time by which the Government must respond to the Contractor's notice to minimize cost, delay or disruption of performance.

(c) Continued performance. Following submission of the notice required by (b) above, the Contractor shall diligently continue performance of this contract to the maximum extent possible in accordance with its terms and conditions as construed by the Contractor, unless the notice reports a direction of the Contracting Officer or a communication from a SAR of the Contracting Officer, in either of which events the Contractor shall continue performance; provided, however, that if the Contractor regards the direction or communication as a change as described in (b) above, notice shall be given in the manner provided. All directions, communications, interpretations, orders and similar actions of the SAR shall be reduced to writing and copies furnished to the Contractor and to the Contracting Officer. The Contracting Officer shall countermand any action which exceeds the authority of the SAR.

(d) Government response. The Contracting Officer shall promptly, within 5 calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer shall either--

(1) Confirm that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance;

(2) Countermand any communication regarded as a change;

(3) Deny that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance; or

(4) In the event the Contractor's notice information is inadequate to make a decision under (1), (2), or (3) above, advise the Contractor what additional information is required, and establish the date by which it should be furnished and the date thereafter by which the Government will respond.

(e) Equitable adjustments.

(1) If the Contracting Officer confirms that Government conduct effected a change as alleged by the Contractor, and the conduct causes an increase or decrease in the Contractor's cost of, or the time required for, performance of any part of the work under this contract, whether changed or not changed by such conduct, an equitable adjustment shall be made--

(i) In the contract price or delivery schedule or both; and

(ii) In such other provisions of the contract as may be affected.

(2) The contract shall be modified in writing accordingly. In the case of drawings, designs or specifications which are defective and for which the Government is responsible, the equitable adjustment shall include the cost and time extension for delay reasonably incurred by the Contractor in attempting to comply with the defective drawings, designs or specifications before the Contractor identified, or reasonably should have identified, such defect. When the cost of property made obsolete or excess as a result of a change confirmed by the Contracting Officer under this clause is included in the equitable adjustment, the Contracting Officer shall have the right to prescribe the manner of disposition of the property. The equitable adjustment shall not include increased costs or time extensions for delay resulting from the Contractor's failure to provide notice or to continue performance as provided, respectively, in (b) and (c) above.

Note: The phrases “contract price” and “cost” wherever they appear in the clause, may be appropriately modified to apply to cost-reimbursement or incentive contracts, or to combinations thereof.

(End of clause)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

L-4 NOTICE TO OFFERORS (FEB 2000)

(a) Sealed proposals will be received at the Contracting Office and will be opened at the hour and at the date specified in the solicitation for the performance of the work specified in the solicitation and in accordance with the terms of the Master Agreement for Repair and Alteration of Vessels, as amended through the date of this Solicitation.

(b) Any drawings and specifications referenced in this solicitation are an integral part of the solicitation.

(c) The work shall be completed on or before close of business on the completion date of the period indicated in Section F.

(d) Liquidated damages as specified in Section F shall be payable by the Contractor to the Government in accordance with FAR Clause 52.211-11.

(e) In submitting a solicitation response for Ship Repair, a vendor must cite the above solicitation number and each amendment thereto, if any, and must respond to each certification in this solicitation.

(f) The Government cannot guarantee that an application for a security clearance (if required) can be processed in the time between the closing and the time of award.

L-5 INSPECTION OF VESSEL / PRE-PROPOSAL CONFERENCE -

Inspection for the USNS LEWIS AND CLARK work items will take place on the USNS WILLIAM MCLEAN at Norfolk, on or about 1000 on 12 November 2014. Inspection is not mandatory and shall be at the offeror’s expense.

All offerors who plan to inspect the vessel must be registered with MSC Norfolk NLT 6 November 2014.

Participants shall be required to fax the following information on company letterhead prior to the deadline: Name of each individual who will be attending, Social Security Number, Date of Birth, Place of Birth, Citizenship and clearance level (if any) showing the granting agency and date of clearance. Offerors must provide a list of specific attendees only. DO NOT SUBMIT “BLANKET” LISTS. The request should state that the individual will be attending a shipcheck for USNS LEWIS AND CLARK. The information must be provided to Mike Rossik (757) 443-5873 or via E-mail Michael.rossik@navy.mil. Personnel who fail to pre-register will, at best, experience protracted delays in accessing the vessel. A second inspection will NOT be scheduled.

L-6 SHIP & BASE ACCESS (APR 2013)

Vendors are responsible for correctly submitting forms/applications. Vendors are encouraged to monitor email using “Request a Read Receipt” function and to confirm receipt of facsimile transmissions.

Due to enhanced security measures, ship and base access is required for pre-award ship visits (e.g. ship-check) and for contract performance. Specifically the following permissions are required:

1. El Paso Intelligence Center (EPIC) personnel screening requirement

2. Base/Repair Facility Access Request

3. Vehicle Access Request

4. Ship Access List (vendor-provided)

All forms are available for download on the MSC contracts webpage at http://www.msc.navy.mil. Click on “Contracts” in the upper right corner. Click on “Online Library of Common Documents” for all forms.

EPIC: Required for access to MSC vessels. Complete EPIC form strictly adhering to format requirements. For CONUS East and Gulf Coast repairs, forward request to msc.norfolk.epic@navy.mil and for CONUS West Coast and HI repairs, forward to MSC.SSUSD.EPIC@navy.mil EPIC personnel screening requests are desired seven calendar days prior to performance start date. Requests will be managed as expeditiously as circumstances permit.

Vendor will be notified by MSC of personnel who are denied access to the vessel.

Base/Repair Facility Access: Permit is required to access Navy facilities. Base/Repair Facility Access Request is desired seven days prior to ship check or performance start date. Submit forms per the document instruction and to the Port Engineer. A courtesy copy (CONUS West Coast performance locations only) to Ermanno Magliulo, Engineering Director, at ermanno.magliulo@navy.mil will be appreciated.

RAPIDGate® is being implemented for access to DoD facilities in CONUS, HI, Guam and Puerto Rico. Vendor is responsible to acquire RAPIDGate® status and destination base individual access badge(s) activation prior to performance start date. Delays that may result from inadequate planning are contractor responsibility. Vendor instructions and program information is available at http://www.RAPIDGate.com or tel. 877.727.4342.

RAPIDGate® access requires (in succession) (1) Individual Base Commander approval for vendor to access base, (2) Successful vendor RAPIDGate® company annual enrollment, (3) Company employee individual enrollment and possession of RAPIDGate® identification badge for single base or multiple base (enterprise) access. Vendor is responsible to confirm that each employee held annual RAPIDGate® badge is active for the specific facility and performance period in accordance with RAPIDGate® User Agreement (http://www.RAPIDGate.com).

Enclave Access request may be selected on the “Naval Base Point Loma (NBPL) Access Request Form.”

Vehicle Access: Required for vehicle access to Navy facilities. Follow supplemental instructions on Base Access forms or base-specific vehicle access forms.

Ship Access List (Vendor-Provided): On company letterhead attachment via email, the vendor is required to provide the ship master (courtesy copy the Port Engineer) with an accurate, current list of performing personnel prior to being admitted aboard the vessel. Under no circumstances will a hand-delivered list be accepted.

T-AKE email address: MASTER@AKE#.NAVY.MIL (example: master@ake8.navy.mil, where “8” is the hull number).

All other hulls address: MASTER.SHIPNAME@MSC.NAVY.MIL (example: master.sioux@msc.navy.mil).

(End of Text)

L-7 CONTRACTOR ACCESS TO MSC SHIPS

1. El Paso Intelligence Center (EPIC) clearance is required to gain gangway access to all USNS vessels. EPIC clearance is separate from base access.

2. If required for a ship check, or upon receipt of a contract award, the contractor must request an EPIC form from James Phillips via email at: james.b.phillips2@navy.mil. The completed form shall be returned via email.

3. When the EPIC clearance is received, MSC Norfolk Command Security will promulgate a letter for base access for cleared personnel and forward it to base security.

4. EPIC requests typically require five business days for clearance.

(End of Summary of Changes)