REQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR:
SPECIFICATION ITEM NO.: N/A
PARAGRAPH / SECTION NO: N/A
TITLE:
N/A
QUESTION:
The disc provided containing technical data has 216 files, most of which do not identify the file with any particular work item. Ordinarily, we receive the references in folders specific to work items in the package, which makes it easy then to put together packages to be sent to sub-contractors, material suppliers, technical representatives, etc. for bidding purposes. Will MSC please organize the references by work item and redistribute them?
ANSWER:
The below table is provided to assist with matching references to Work Items.
LIST OF REFERENCES
USNS LEWIS AND CLARK (T-AKE 1)
| Work Item |
| Reference |
| Drawing/Reference Title |
| 001 |
| 2.1 |
| MSC 803-7081122, Military Sealift Command General Technical Requirements (GTR's) |
| 003 |
| 2.1 |
| MIL. STD. MIL-C-28628D, dtd. July 1991; Camels |
| 2.2 |
| MIL. STD. MIL-F-29248, dtd. 21 November 1986; Fenders, Marine, Foam Filled, Netless |
| 2.3 |
| MSC Drawing No. No. 802-7488866 Rev. S, General Arrangement Plan |
| 2.4 |
| NAVSEA Drawing No. 835-7489033 Rev. C, Mooring Analysis |
| 2.5 |
| MSC Quality Management System Procedures Manual; EPI N0721-001.00-AQ – UNDER KEEL CLEARANCE |
| 004 |
| 2.1 |
| MIL-I-45208 (series), Inspection Systems |
| 005 |
| 2.1 |
| High Voltage Awareness Instruction Guide Powerpoint Presentation |
| 2.2 |
| High Voltage Awareness Powerpoint Presentation |
| 2.3 |
| MSC Safety Management System Procedure 2.1-004-ALL, Lock-out/Tag-out |
| 2.4 |
| MSC Safety Management System Procedure 2.1-016-AKE, High Voltage Systems |
| 2.5 |
| 29CFR 1910.335 Electrical Safety Related Work Practices; Safeguards for Personnel Protection |
| 2.6 |
| NFPA 70E Standard for Electrical Safety Requirements for Employee Workplaces |
| 006 |
| 2.1.1 |
| MSC Drawing No. 801-7488869, USNS LEWIS AND CLARK TRIM AND STABILITY BOOKLET AND LOADING MANUAL |
| 007 |
| 2.1 |
| NAVSEA Drawing No. 801- 7488869; Trim and Stability Booklet and Loading Manual USNS LEWIS AND CLARK |
| 011 |
| 2.1.1 |
| MSC Drawing No. 802-8194711, General Arrangements |
| 2.1.2 |
| MSC Chemical Treatment Handbook |
| 015 |
| 2.1 |
| Department of Defense Security Manual for Safeguarding Classified Information, DOD Manual 5220.22-M |
| 016 |
| 2.1 |
| National Fire Protection Association 312, Standard for Fire Protection of Vessels During Construction, Repair and Lay-up |
| 2.2 |
| National Fire Protection Association 51B, Standard for Fire Prevention in Use of Cutting and Welding Processes |
| 018 |
| 2.1 |
| NAVMED P-5010-6, Manual of Naval Preventive Medicine, Chapter 6, Water Supply Afloat |
| 019 |
| 2.1 |
| COMSCINST 5530.3 Series, MILITARY SEALIFT COMMAND (MSC) SHIPBOARD FORCE PROTECTION (FP) PROGRAM |
| 2.2 |
| NAVSEA Standard Item 009-72, 09 May 2011 |
| 021 |
| 2.1.1 |
| MSC Dwg 801-7488865, Capacity Plan |
| 2.1.2 |
| MSC Dwg 801-7488869; Trim and Stability Booklet and Loading Manual USNS LEWIS AND CLARK |
| 023 |
| 2.1.1 |
| Resource Conservation and Recovery Act (RCRA) as amended |
| 2.1.3 |
| Applicable Uniform Hazardous Waste Manifest Form |
| 2.1.4 |
| Test Methods for Evaluating Solid Waste, Physical/Chemical Methods; EPA Document, SW-846; the official compendium of analytical and sampling methods that have been evaluated and approved for use in complying with the RCRA regulations. |
| 024 |
| 2.1 |
| COMSCINST 5530.3 Series, Military Sealift Command (MSC) Shipboard Antiterrorism (AT) Program |
| 2.2 |
| NAVSEA Standard Item 009-72 “CURRENT REVSION”, Physical Security at Private Contractor’s Facility |
| 025 |
| 2.1 |
| COMSCINST 5530.3 Series, MILITARY SEALIFT COMMAND (MSC) SHIPBOARD FORCE PROTECTION (FP) PROGRAM |
| 2.2 |
| NAVSEA Standard Item 009-72 “CURRENT REVSION”, Physical Security at Private Contractor’s Facility |
Improved Point Detection System – Lifecycle Replacement Drawings, NAVSEA #’s 5038593, Rev -;
Improved Point Detection System – Lifecycle Replacement Drawings, NAVSEA #’s 5038594, Rev -;
Improved Point Detection System – Lifecycle Replacement Drawings, NAVSEA #’s 5038595, Rev -;
Improved Point Detection System – Lifecycle Replacement Drawings, NAVSEA #’s 5038596, Rev -;
Improved Point Detection System – Lifecycle Replacement Drawings, NAVSEA #’s 5038597, Rev –;
Improved Point Detection System – Lifecycle Replacement Drawings, NAVSEA #’s 5038598, Rev -;
Improved Point Detection System – Lifecycle Replacement Drawings, NAVSEA #’s 5038599, Rev -
| 0103 |
| 2.1 |
| MSC DWG 506- 8194693 – Vents, Sounds and Overflows System Diagram |
| 0103 |
| 2.2 |
| WAGER Co. Install, Operation and Maintenance Guide // Models 1500/1500-MC // 1700/1750 |
| 0105 |
| 2.1 |
| NAVSEA Drawing 631-7489175, Corrosion Prevention of Ballast Tanks |
| 0106 |
| 2.1 |
| NAVSEA Drawing 804-6397302; Locker, Stowage AN-MI4 Hand Grenade |
| 2.2 |
| NAVSEA Drawing 804-1360106; Locker Details |
| 0107 |
| 2.1 |
| MSC DRAWING # 150-8494851 Rev A, Stack Repairs FR 68 & 08 Level |
| 0108 |
| 2.1 |
| Recommendations for TRANSALT Request Installation of Additional Fall Protection Anchors T-AKE Class 1 through 14 Vessels |
| 2.2 |
| NAVSEA Dwg No. 611- 8214756 – Fall Arrest Anchorage Assembly |
| 2.3 |
| IMECO INC Dwg No. 22024-570-0103-1 Rev B – Solid Cargo Delivery Kingposts Fabrication Details Station No. 1 |
| 0109 |
| 2.1 |
| NAVSEA Drawing 635-7489017; Insulation Details (Shipboard) |
| 2.2 |
| NAVSEA Drawing 635-7489023; Insulation Arrangement - 01 Level |
| 2.3 |
| NAVSEA Drawing 635-7489024; Insulation Arrangement - 02 Level |
| 0201 |
| 2.1 |
| T/M T9235-AG-MMC-010, Propulsion Motor, Synchronous, Motor Design M3HSX 305-126/16 |
| 0202 |
| 2.1 |
| Vulcan Coupling Drawing, DOKU1G531W00013E 4088324. |
| 2.2 |
| Tech Manual, Vulcan Coupling, Tech Doc DOKU1G531W0013E. |
| 2.3 |
| Tech Manual T9233-CF-1MC-070, Technical Manual, Diesel Engines, Main Power Generation, Model 9L 48/60 and 8L 48/60, Volume E1-E4 for Main Diesels |
| 0203 |
| 2.1 |
| T9233-CF-IMC-060; Diesel Engines, Main Power Generation Models 48/60 8L And 9L, Volumes C1, C2 & C3; For USNS LEWIS AND CLARK (T-AKE 1) Class Installation, Operation And Maintenance Manual |
| 2.2 |
| T9233-CF-IMC-020; Diesel Engines, Main Power Generation Models 48/60 8L And 9L, Volume B2; For USNS LEWIS AND CLARK (T-AKE 1) Class Installation, Operation And Maintenance Manual |
| 0204 |
| 2.1 |
| Engineering Report Test Junction Box Ship Check R-5.76-6020 68299625 |
| 2.2 |
| FME PROCEDURE M12702096 – INSTRUCTIONS, INSTALLATION, AND TAKE UPGRADE. |
| 2.3 |
| FME DWG M12702240 - TEST JUNCTION BOX, T-AKE UPGRADE |
| 2.4 |
| FME DWG M12702248 - TEST JUNCTION BOX |
| 2.5 |
| FME DWG M12702099 – ASSEMBLIES, EXTENSION SACOS CABLE, T-AKE UPGRADE |
| 2.6 |
| FME DWG M12702249 - CABLE, 12 METER |
| 2.7 |
| FME DWG M12702250 - CABLE 17 METER |
| 2.8 |
| FME DWG 10570989 - INTERCONNECT DIAGRAM, ENGINE CONTROL SYSTEM, T-AKE UPGRADE |
| 2.9 |
| FME DWG 10570990 - ELECTRICAL SCHEMATIC, ALARM PRE-PROCESSING SYSTEM, T-AKE UPGRADE |
| 2.10 |
| FME DWG 10570991 - ELECTRICAL SCHEMATIC, SAFETY SYSTEM, T-AKE UPGRADE |
| 2.11 |
| FME DWG 10570992 - CABLE LIST, T-AKE UPGRADE |
| 2.12 |
| FME DWG 10570993 - CABLING ELECTRICAL UNITS ON ENGINE, T-AKE UPGRADE |
| 2.13 |
| FME DWG 10570994 - ELECTRICAL SCHEMATIC, ENGINE CONTROL SYSTEM, T-AKE UPGRADE |
| 2.14 |
| FME PROCEDURE M12701960 - PROCEDURE, PRE & POST COMMISSIONING SAFETY CHECKS |
| 0205 |
| 2.1.1 |
| IEEE Std 45TM-2002 IEEE Recommended Practice for Electric Installations on Shipboard |
| 2.1.2 |
| Turning Gear Limit Switch Adjustment Instructions |
| 2.1.3 |
| Drawing 202-7488822: BWD, Propulsion Control System |
| 0206 |
| 2.1 |
| TAKE-Notice 16-MDG Exhaust Transition Piece Cracks |
| 0207 |
| 2.1 |
| T9233-CF-IMC-060; Diesel Engines, Main Power Generation Models 48/60 8L And 9L, Volumes C1, C2 & C3; For USNS LEWIS AND CLARK (T-AKE 1) Class Installation, Operation And Maintenance Manual |
| 2.2 |
| T9233-CF-IMC-020; Diesel Engines, Main Power Generation Models 48/60 8L And 9L, Volume B2; For USNS LEWIS AND CLARK (T-AKE 1) Class Installation, Operation And Maintenance Manual |
| 0301 |
| 2.1 |
| NAVSEA T/M T9235-AL-MMC-010, Main Power Switchboard, 6.6 KV, 2500A. |
| 2.2 |
| NAVSEA T/M T9324-BU-MMC-010, Switchboards Ships Service 480V. |
| 2.3 |
| NAVSEA T/M T9324-BT-MMC-010, Emergency Switchboard 480V. |
| 2.4 |
| Cutler Hammer, I.B. 32-255-1G, Instructions for Installation, Operation and Maintenance of Type VCP-W Vacuum Circuit Breakers. |
| 2.5 |
| Cutler Hammer, I.B. 48002, Instructions for 36" Wide Vacuum-Break Starters Rated 360 Amperes, 7200 Volts, Roll Out Type. |
| 0302 |
| 2.1 |
| T/M T9312-AM-MMC-010, Generator, AC Synchronous, 2200 KW, 480 Volt |
| 0303 |
| 2.1 |
| NAVSEA Drawing 331-7488806; Ltg System BWD Topside Ltg |
| 2.2 |
| NAVSEA Drawing 331-7489151; BWD Ras/Fas Ltg System |
| 2.3 |
| NAVSEA Drawing 331-7488809; BWD Cargo and Misc Space Ltg |
| 2.4 |
| 471-346-0105 E ECN-17 -- Hulls 480 & Follow |
| 2.5 |
| 471-346-0105 E ECN-18 -- Hulls 480 & Follow |
| 2.7 |
| Rescue boat lkr ECN E-57 |
| 2.8 |
| Life Boat and Life Raft Placard Relocation |
| 0305 |
| 2.1 |
| Technical Manual T9475-AA-MMC-010, “Degaussing System, Advanced Model for USNS Lewis and Clark (T-AKE 1) Class; Installation, Operation and Maintenance Instructions”. |
| 2.2 |
| NAVSEA Drawing No. 475-7489155, NASSCO Drawing No. 471-346-0562 LOC, Rev E, Dry Cargo/Ammunition Ship T-AKE 1 Class, “Degaussing System Block Wiring Diagram-List of Connections” |
| 0306 |
| 2.1 |
| MSC Drawing 331-7488807, SRD: LIGHTING SYSTEM BWD, ACCOMMODATIONS 01 AND 02 LEVELS (SRD REV B) |
| 2.2 |
| MSC Drawing 331-7488808, SRD: BWD, MACHINERY SPACE LIGHTING |
| 2.3 |
| MSC Drawing 331-7488809, SRD: BWD, CARGO AND MISCELLANEOUS SPACES LIGHTING |
| 2.4 |
| PC 1 - RIG-A-LITE Product Sheet SAFJ Series LED Fixtures and Certificates (9) Sheets, SAFJ06-1LMS Hazardous LED Fixture, 45Watt 120-277VAC, 5000k, Clear lens |
| 0307 |
| 2.1 |
| Naval Ships’ Technical Manual 300 (Electrical Plant – General) Section 300-H |
| 2.2 |
| Mil-I-24768/1 - Insulation, Plastic, Laminated, Thermosetting, Glass-Cloth, Melamine-Resin (GME) |
| 2.3 |
| ASTM D709 – Materials, Laminated, Thermosetting |
| 2.4 |
| L-P-513 – Plastic Sheet & Insulating Sheet, Electrical (Laminated, Thermosetting, Paper Base, Phenolic Resin) |
| 0308 |
| 2.1 |
| Naval Ships’ Technical Manual 300 (Electrical Plant – General) Section 300-H |
| 2.2 |
| Mil-I-24768/1 - Insulation, Plastic, Laminated, Thermosetting, Glass-Cloth, Melamine-Resin (GME) |
| 2.3 |
| ASTM D709 – Materials, Laminated, Thermosetting |
| 2.4 |
| L-P-513 – Plastic Sheet & Insulating Sheet, Electrical (Laminated, Thermosetting, Paper Base, Phenolic Resin) |
| 0401 |
| 2.1 |
| GMDSS Technical Manuals (located onboard vessel) |
| 2.2 |
| VDR Technical Manual MS0113-ET5-1441D (located onboard vessel) |
| 2.3 |
| Technical Manual VisionMaster FT (located onboard vessel. |
| 2.4 |
| SOLAS Chapter 1, Regulation 9, Survey of Radio Installations of Cargo Ships |
| 0402 |
| 2.1 |
| SRD-500 Sperry Marine Doppler Speed Log SERVICE MANUAL Booklet number JA-13-6505. (Manual is proprietary information and will only be made available to OEM Manufacturers REPS). |
| 2.2 |
| MSC Drawing No. T-AKE 1 CLASS SRD500 SEA CHEST AND TRANSDUCER MECHANICAL INSTALLATION DRAWING #1813692 REV |
| 0403 |
| 2.1 |
| Trivec Avant Technical Manual TMIN EE 134-AT-OMP-010 |
| 0404 |
| 2.1 |
| Antenna Legend sheet Dated 17 Jul 2008 |
| 2.2 |
| Whip Antenna Maintenance PMS 4411/023, U10 |
| 2.3 |
| Dipole Antenna Maintenance PMS |
| 0405 |
| 2.1 |
| FURUNO FS-2570 GMDSS MF/HF Radio Technical manual (Provided with Radio) |
| 2.2 |
| SPERRY/FURUNO FS-5000 GMDSS TERMINAL Technical manual (Onboard ship) |
| 0406 |
| 2.1 |
| MSC Drawing No. 423-7488815, Block Wiring Diagram, Integrated Bridge and Navigation System |
| 2.2 |
| Manuals: T9AKE-ABS2 - Navigational Integrated Bridge System (ABS stamped approved manual for each ship) |
| 0407 |
| 2.1 |
| AB-1298 foundation replacement sketch |
| 2.2 |
| SKSP 6390 antenna spec and installation sheet |
| 2.3 |
| 409R installation mounting kit spec sheet |
| 2.4 |
| NASSCO T-AKE CLASS GEN ARR Drawing # 802-7488866 |
| 0408 |
| 2.1 |
| NAVSEA Dwg. No. 432-7488812, Rev F, BWD, Interior Communication System |
| 2.2 |
| Technical Manual TE101-A5-MMC-010 Rev. 1, T-AKE Integrated Communication System, Model 2225-EPIC |
| 2.3 |
| NAVSEA Dwg. No. 631-7488891, Rev F, Paint Schedule |
| 2.4 |
| NAVSEA Dwg. No. 085-7488971, Rev C, Label Plates – Electrical. |
| 0501 |
| 2.1 |
| 521-8194715; Firefighting System Diagram |
| 2.2 |
| 523-8194717; Countermeasure Washdown System Diagram |
| 2.3 |
| 256-8194725; Auxiliary Seawater Services System Diagram |
| 2.1 |
| 532-7488722, Low Temperature Freshwater Cooling System Diagram |
| 2.2 |
| 532-7488723, Diesel Generator High Temperature Freshwater Cooling System Diagram |
| 2.1 |
| MSCLANT Standard Item No. 60, Revised 2 April 1993 Repairing Miscellaneous Valves |
| 0504 |
| 2.1 |
| Fire Control Plan - MSC Dwg 801-7488867 |
| 2.2 |
| Technical Manual T9555-CJ-MMC-010 – Fire Extinguishing System, Model FM-200 |
| 2.3 |
| MSCLANT Standard Item No. 77, Annual Inspection And Test Of Fixed Fire Fighting Systems And Extinguishers, issued 2 April 1993 (SI089); included in paragraph 8.0 |
| 0505 |
| 2.1 |
| Technical Manual T6220-CH-MMC-010 -- Compressor Unit, High Pressure Breathing Air, Verticus Model VT13 |
| 2.1 |
| MSCLANT Standard Item No. 60, Revised 2 April 1993 Repairing Miscellaneous Valves |
| 0508 |
| 2.1 |
| TG811-BL-MMC-01A, Technical Manual, Boom Crane, Electro Hydraulic Model EB270-87-47 for USNS LEWIS AND CLARK (T-AKE 1) CLASS, Installation, Operation and Maintenance Instructions. |
| 2.2 |
| Naval Sea Systems Command, Links Radio Frequency, High-Voltage Insulator Link, Cylinder Type, Drawing No. 6397427 Rev. A. |
| 2.3 |
| Appleton Marine, Inc., Memo FSR-16136-01, dated 06 June, 2011, Recommended Wire Rope Spelter Anchorage Inspection, Lubrication and Preservation Procedure |
| 0509 |
| 2.1 |
| T9516-BB-MMC-010; Technical Manual for Refrigeration Plant, Air Conditioning for USNS LEWIS AND CLARK (T-AKE 1) – USNS ROBERT E. PEARY (T-AKE 5) Class |
| 0510 |
| 2.1 |
| T9532-A2-MMC-010 Heat Exchanger, Plate, High Temp |
| 2.2 |
| T9532-AZ-MMC-010 Heat Exchangers, Plate, Low Temp |
| 0511 |
| 2.1.1 |
| NAVSEA Tech Manual T9593-AC-MMC-010, Marine Sanitation Device and Vacuum Collection, Holding and Transfer System for T-AKE |
2.1.2
NAVSEA Dwg No. 528-7488743, Vacuum Sewage and Plumbing Drains System Diagram
| 2.1 |
| MSC Dwg 555-8195582 Rev -, SRD Foam Firefighting System Diagram |
| 2.2 |
| MSC Dwg 800-8390862 Rev -, Aft AFFF Piping Replacement |
| 2.3 |
| MSC General Technical Requirements (GTRs) Dwg 803-7081122 |
| 2.4 |
| MSFSC SMS Procedure 2.1-004-all, Tagout/Lockout |
| 2.1 |
| MSC Dwg 555-8195582 Rev -, SRD Foam Firefighting System Diagram |
| 2.2 |
| MSC Dwg 800-8390862 Rev -, Aft AFFF Piping Replacement |
| 2.3 |
| MSC General Technical Requirements (GTRs) Dwg 803-7081122 |
| 2.4 |
| MSFSC SMS Procedure 2.1-004-all, Tagout/Lockout |
| 2.1 |
| MSC Dwg 555-8195582 Rev -, SRD Foam Firefighting System Diagram |
| 2.2 |
| MSC Dwg 800-8390862 Rev -, Aft AFFF Piping Replacement |
| 2.3 |
| MSC General Technical Requirements (GTRs) Dwg 803-7081122 |
| 2.4 |
| MSFSC SMS Procedure 2.1-004-all, Tagout/Lockout |
| 2.1 |
| 555-8195582; Foam Firefighting Systems Diagram |
| 2.1 |
| 555-8195582; Foam Firefighting Systems Diagram |
| 0518 |
| 2.1 |
| MSC Dwg 551-8194696 Rev -, Diesel Generator Starting Air System Diagram |
| 2.2 |
| MSC Dwg 551-8194726 Rev-, High Pressure Air System Diagram |
| 2.3 |
| MSC Dwg 551-8194707 Rev-, Ship Service and Control Air System Diagram |
| 0519 |
| 2.1 |
| NAVSEA DWG 514-8194713, A/C Chilled Water System Diagram |
| 2.2 |
| NAVSEA DWG 532- 8194695 Diesel Generator High Temperature Freshwater Cooling System Diagram |
| 2.3 |
| NAVSEA DWG 532- 8194719, Low Temperature Freshwater Cooling System Diagram |
| 0520 |
| 2.1 |
| T9516-A8-MMC-01C; Technical Manual for Refrigeration Plant, Cargo for USNS AKE 1 Class |
| 0521 |
| 2.1 |
| NAVSEA Drawing 528-8194705; Vacuum Sewage & Plumbing Drains System Diagram |
| 0522 |
| 2.1 |
| NAVSEA Drawing 551-8194726 |
High Pressure Air System Diagram
| 0523 |
| 2.1 |
| NAVSEA Drawing No. 581-7489016 Rev E, Anchor Handling Arrangement and Details |
| 2.2 |
| NAVSEA Drawing No. 582-7488906 Rev E, Mooring Arrangement and Detail Forward and Towing Package |
| 0524 |
| 2.1 |
| NAVSEA Drawing 531-7488738; Distilling Plant Systems Diagram |
| 0525 |
| 2.1.1 |
| MSC Drawing No. 800-8389569 Rev B, T-AKE 1 CLASS CHLOROPAC INSTALLATION (Mark Up for GFM) |
| 2.1.2 |
| NAVSEA Drawing No. 320-7488777 Rev L, Electrical System One Line Diagram |
| 2.1.3 |
| NAVSEA Drawing No. 521-7488717 Rev J, Fire Main System Diagram |
| 2.1.4 |
| NAVSEA DRAWING No. 551-7488733 Rev G, Ship Service & Control Air System Diagram |
| 2.1.5 |
| SIEMENS Drawing No. 68159, Copper Ion Protection System |
| 0526 |
| 2.1 |
| NAVSEA Drawing NO. 471-342-7104 REV D; “CARGO HOLD SPRINKLING SYSTEM DIAGRAM” |
| 2.2 |
| SRD Cargo Hold Sprinkling Sys Diag, 522-8195583 |
| 0527 |
| 2.1 |
| MSC Dwg 531-8391806 Distillate Dump to Sea Chest Mod |
| 2.2 |
| NAVSEA Dwg 256-7488724 Central Seawater Cooling System Diagram |
| 2.3 |
| NAVSEA Dwg 531-7488738 Distilling Plant Systems Diagram |
| 0528 |
| 2.1.1 |
| NAVSEA Dwg 556-7488740, Hydraulic Piping systems Diagram |
| 2.1.2 |
| MSC Dwg 556-8390670, Bow Thruster Lube Oil System Mod |
| 2.1.3 |
| T9568-A2-MMC-010, Bow Thruster Installation Manual, Type TT2200 |
| 2.1.4 |
| MSC General Technical Requirements (GTR) Dwg 803-7081122. |
| 2.1.5 |
| DWG 505-7488748, Flushing Criteria and Guidelines |
| 0529 |
| 2.1.1 |
| NAVSEA Dwg 256-8194714 Rev - Central Seawater Cooling System Diagram |
| 2.1.2 |
| Central Seawater Cooling System Mod DWG 256-8390463, Rev A |
| 2.1.3 |
| MSC General Technical Requirements (GTR) Dwg 803-7081122 |
| 0530 |
| 2.1 |
| MSC DWG. 521-8391776, Firemain Isolation COV Valve Installation |
| 2.2 |
| MSC DWG. 320-8391777, Firemain Isolation COV Valve Electrical Installation |
| 2.3 |
| SOLAS 14” Fire Main MOV Installation (COV 2-66-5). |
| 2.4 |
| MSC Dwg No. 320-194701, Rev K, Electrical System One Line Diagram |
| 0531 |
| 2.1 |
| NAVSEA Dwg. 531-7488738 SRD-Distilling Plant Sys Diagram |
| 0531 |
| 2.2 |
| NAVSEA T/M T9531-AU-MMC-010; Distilling Plant And Bromination Disinfection System, Model SPD35-53TPD |
| 0532 |
| 2.1 |
| NAVSEA Dwg No. 516-8194692, Cargo Refrigeration Secondary Coolant Circulation System Diagram |
| 0534 |
| 2.1 |
| 528-8392554; VCHT Check Valves Modifications |
| 0535 |
| 2.1 |
| 2.1. NAVSEA Drawing No. 505-7488767 Rev D: Booklet of System Diagrams |
| 2.2 |
| MSC Drawing No. 500-8194766 Rev D: LP Air and Chill Water Piping Mods |
| 2.3 |
| Navsea Drawing No. 541-7488755: A/C Chilled Water System Diagram |
| 2.4 |
| MSC Drawing No. 514-8391793 Rev A, Temp Chiller Piping Mods |
| 0536 |
| 2.1 |
| Military Sealift Command Legacy Standard Work Item - Item No. 54 “Recondition Squirrel Cage Motors (AC) Service” (included in paragraph 8) |
| 2.2 |
| Military Sealift Command Legacy Standard Work Item - Item No. 87 “Shop Overhaul of Centrifugal Pumps” (included in paragraph 8) |
| 2.3 |
| Manufacturer’s Technical Manual, Pumps, Centrifugal, Type VHSM, Size 5”, T6225-MW-MMC-010 |
| 0537 |
| 2.1 |
| MSC DWG No. 540-8393689–Install Fuel Oil Drip Sampler |
| 2.2 |
| MSC GTR DWG No. 803-7081122-General Technical Requirements(GTR) |
| 2.3 |
| MSC DWG No. 541-8194708-Fuel Fill, Transfer and Purification System Diagram |
| 2.4 |
| MSC DWG No. 541-8194709-Cargo Fuel Systems Diagram |
| 0538 |
| 2.1 |
| Appleton Marine Inc “Boom Mounted Floodlight Installation Guide”, dated 30 September 2009 |
| 0539 |
| 2.1 |
| MSC Drawing 555-8494855, Rev - Forward AFFF Piping Replacement Modification |
| 0539 |
| 2.2 |
| MSC Drawing 555-8494867, Rev A MMR AFFF Piping Replacement Modification |
| 0539 |
| 2.3 |
| NAVSEA Drawing No. 505-7488748 T-AKE 1 Class Flushing Procedures |
| 0539 |
| 2.4 |
| MSC Drawing 555-8195582, Selected Record Drawing, T-AKE Class, Foam Firefighting System Diagram |
| 0539 |
| 2.5 |
| MSC Standard Drawing 803-7081122, Military Sealift Command General Technical Requirements (GTRs) |
| 0539 |
| 2.6 |
| MSFSC SMS Procedure 2.1-004-All, Tagout/Lockout |
| 0539 |
| 2.7 |
| ASTM Standard F1166, Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities |
| 0539 |
| 2.8 |
| MSC Drawing 631-7488891, T-AKE Class, Paint Schedule |
| 0540 |
| 2.1 |
| NAVSEA Tech Manual T9561-BR-MMC-010; Operation, Maintenance, And Repair, Steering Gear, Rotary Vane And Shorthorn Rudder |
| 0540 |
| 2.2 |
| MSC Standard Work Item No. 19 Motor and Fan Repair |
| 0545 |
| 2.1.1 |
| MSC Technical Manual T6225-LL-MMC-010 Pumps, Centrifugal, Type VHSM Size 16”, Central Low Temperature Fresh Water Cooling Pump for USNS Lewis and Clark (T-AKE 1) Class |
| 2.1.2 |
| NAVSEA Drawing No. 505-7488748 T-AKE 1 Class Flushing Procedures |
| 0546 |
| 2.1.1 |
| MSC Technical Manual T6225-LL-MMC-010 Pumps, Centrifugal, Type VHSM Size 16”, Central Low Temperature Fresh Water Cooling Pump for USNS Lewis and Clark (T-AKE 1) Class |
| 2.1.2 |
| NAVSEA Drawing No. 505-7488748 T-AKE 1 Class Flushing Procedures |
| 0547 |
| 2.1.1 |
| MSC Technical Manual T6225-LL-MMC-010 Pumps, Centrifugal, Type VHSM Size 16”, Central Low Temperature Fresh Water Cooling Pump for USNS Lewis and Clark (T-AKE 1) Class |
| 2.1.2 |
| NAVSEA Drawing No. 505-7488748 T-AKE 1 Class Flushing Procedures |
| 0548 |
| 2.1 |
| NAVSEA Drawing 552-7488726; Inert Gas Diagram |
| 0549 |
| 2.1 |
| NAVSEA DRAWING 514-8194713, A/C Chilled Water System Diagram |
| 2.2 |
| NAVSEA DRAWING 532-8194695 Diesel Generator High Temperature Freshwater Cooling System Diagram |
| 2.3 |
| NAVSEA DRAWING 532-8194719, Low Temperature Freshwater Cooling System Diagram |
| 2.4 |
| NAVSEA DRAWING 516-8194692, Cargo Refrigeration Secondary Coolant Circulating System Diagram |
| 0601 |
| 2.1 |
| MSC Drawing No. 623-8494823, STERN BOARDING LADDER INSTALLATION. |
| 2.2 |
| MSC Drawing No. 803-7081122, MSC General Technical Requirements (GTR). |
| 0602 |
| 2.1 |
| NAVSEA Drawing 635- 7489072; Insulation Schedule Pipe And Vent |
| 2.2 |
| NAVSEA Drawing 635-7489017; Insulation Details (Shipboard) |
| 2.3 |
| NAVSEA Drawing 635-7489018; Insulation Arrangement - Tank Top |
| 2.4 |
| NAVSEA Drawing 635-7489019; Insulation Arrangement - 4th Deck |
| 2.5 |
| NAVSEA Drawing 635-7489020; Insulation Arrangement - 3rd Deck |
| 2.6 |
| NAVSEA Drawing 635-7489021; Insulation Arrangement - 2nd Deck |
| 2.7 |
| NAVSEA Drawing 635-7489022; Insulation Arrangement - Main Deck |
| 2.8 |
| NAVSEA Drawing 635-7489023; Insulation Arrangement - 01 Level |
| 2.9 |
| NAVSEA Drawing 635-7489024; Insulation Arrangement - 02 Level |
| 2.10 |
| NAVSEA Drawing 635-7489025; Insulation Arrangement - 03 Level & Above |
| 0604 |
| 2.1 |
| IMO MSC.1/Circ. 1331 dtd 11 June 2009, Guidelines for construction, Installation, Maintenance and Inspection/Survey of Means of Embarkation and Disembarkation. |
| 2.2 |
| Fassmer Dwg 12.1544-203.00.00C Accommodation Ladder 13.16 X 0.75M with Auto Turning Over Device |
| 2.3 |
| T9623-AM-MMC-010; Ladder, Accommodation, Model 12.1544-203 |
| 2.4 |
| MSC DWG# 600-8392567 (FASSMER DWG# 12.1566-279.00.00.0), Outrigger, Foldable |
| 2.5 |
| MSC DWG# 600-8392830 (FASSMER DWG# 12.1566-279.01.00.0), Outrigger Bracket, Screwable |
| 2.6 |
| MSC DWG# 600-8392831 (FASSMER DWG# 12.1566-279.02.00.0), Outrigger/Spreader Bar |
| 2.7 |
| MSC DWG# 600-8392832 (FASSMER DWG# 12.1566-279.03.00.0), Counterplate |
| 2.8 |
| MSC DWG# 600-8392833 (FASSMER DWG# 12.1566-279.04.00.0), Outrigger Adapter |
| 2.9 |
| MSC DWG# 600-8392834 (FASSMER DWG# 12.1566-279.00.99.0), Accommodation Ladder Retrofit w/ Outriggers & Safety Net |
| 0605 |
| 2.1 |
| 46 CFR 160.151-35, Servicing, Inflatable Life Rafts (SOLAS) |
| 2.2 |
| 46 CFR 160.151-57, Servicing Procedures, Inflatable Life Rafts (SOLAS) |
| 0606 |
| 2.1 |
| Tech Manual TS800-AE-MMC-010; Lifeboat w/Davit, FASSMER Type CL-C11.5 |
| 2.2 |
| Checklist for FASSMER Duplex Release Gear Annually |
| 2.3 |
| Checklist for FASSMER Lifeboats Annually |
| 2.4 |
| Checklist for FASSMER Fast Rescue Boats Annually |
| 2.5 |
| Technical Manual T9583-A8-MMC-020 |
| 0607 |
| 2.1 |
| Surface Preparation Standard No. 10 (SSPC-SP-10) of the steel structures painting council manual. |
| 2.2 |
| Surface Preparation Standard SSPC-SP11, Power Tool Cleaning To Bare Metal. |
| 2.3 |
| Surface Preparation Standard, SSPC-SP-12/NACE 5, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating |
| 0608 |
| 2.1 |
| NAVSEA Drawing 612-7489180; “Flight Deck Safety Nets Arrangement & Detail". |
| 2.2 |
| NAVSEA Drawing 803-5000902 (Rev.-B); "Safety Nets, Deck Edge, CRES Net, Stl/CRES Frame". |
| 2.3 |
| Systems and Specifications, Steel Structures Painting Manual, Vol.2, SSPC Steel Structures Painting Council (Latest Edition). |
| 2.4 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition. |
| 2.5 |
| Steel Structures Painting Council, Systems and Specifications, Volume 2, Eighth Edition. |
| 2.6 |
| SSPC-PA 2, Measurement of Dry Coating Thickness with Magnetic Gages. |
| 2.7 |
| SSPC-VIS-1 Visual Standard for Abrasive Blast Cleaned Steel. |
| 2.8 |
| SSPC-VIS-3 Visual Standard for Power and Hand Tool Cleaned Steel. |
| 2.9 |
| Surface Conductivity Testing Procedure “Cell Retrieval Method Bresle Patch ISO 8502-6 |
| 2.10 |
| SSPC-SP1, Solvent Cleaning |
| 0614 |
| 2.1 |
| Duplex E Upgrade Procedure |
| 2.2 |
| Modification checklist Fassmer Duplex system over 10 t |
| 2.3 |
| Modification checklist Fassmer Duplex system 2,5 t - 6,6 t |
| 0615 |
| 2.1 |
| Federal Equipment Co Drawing No. WD0181, REV -, Bottom Bar Weather Sealing Arrangement |
| 0616 |
| 2.1 |
| 4 Piece Hoist System Model # 8518501 (Included in Paragraph 8.0) |
| 0617 |
| 2.1 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition. |
| 2.2 |
| Steel Structures Painting Council, Systems and Specifications, Volume 2, Eighth Edition. |
| 2.3 |
| SSPC-PA 2, Measurement of Dry Coating Thickness with Magnetic Gages. |
| 2.4 |
| SSPC-VIS-3 Visual Standard for Power and Hand Tool Cleaned Steel. |
| 2.5 |
| Surface Conductivity Testing Procedure “Cell Retrieval Method Bresle Patch ISO 8502-6 |
| 2.2 |
| Steel Structures Painting Council, Systems and Specifications, Volume 2, Eighth Edition. |
| 2.6 |
| SSPC SP11, Power cleaning to Bare Metal |
| 2.7 |
| SSPC SP-10 Near white grit blasting |
| 0619 |
| 2.1 |
| Steel Structures Painting Council, Systems and Specifications, Volume 2, Eighth Edition. |
| 2.2 |
| NAVSEA Drawing 631-7488891; “Paint Schedule” |
| 0801 |
| 2.1.1 |
| MSCLANT Standard Item No. 14, “Cleaning Galley Range Exhaust Ducts” (Revised 2 April 1993). |
| 2.1.2 |
| NAVSEA Drawing 512-7488750, Rev F; HVAC Diagram Accommodation Spaces (Sheets 1, 12 and 17 only) |
| 2.1.3 |
| MSC Drawing 500-8194018, HVAC System Mods (sheet 3) |
| 2.1.4 |
| MSC Drawing 500-8194022, Scullery, Fast Serve Line, and Duty Mess HVAC Mods (Sheet 3) |
| 0802 |
| 2.1 |
| MSCLANT Standard Item No. 15, “Cleaning Ventilation Systems” (Revised 2 April 1993). |
| 2.2 |
| MSCLANT Standard Item No. 16, “Cleaning Ventilation Filter Screens” (Revised 2 April 1993). |
| 2.3 |
| NAVSEA Drawing 512-7488750, Rev D; HVAC Diagram Accommodation Spaces |
| 0803 |
| 2.1 |
| NAVSEA Drawing 512-7488751, Rev D; HVAC Diagram, Machinery Rooms & Ancillary Spaces |
| 0804 |
| 2.1 |
| NAVSEA Drawing 512-7488750, Rev D; HVAC Diagram Accommodation Spaces |
| 2.2 |
| NAVSEA Drawing 512-7488751, Rev E; HVAC Diagram, Machinery Rooms & Ancillary Spaces |
| 0805 |
| 2.1 |
| MSC DRAWING NO. 510-8391501 GALLEY HVAC MODIFICATIONS |
| 2.2 |
| MSC DRAWING NO. 300-8391502 GALLEY HVAC ELECTRICAL MODIFICATIONS |
| 2.3 |
| PPG Protective and Marine Coatings - MSC Paint Handbook |
| 0806 |
| 2.1 |
| MSC Standard Item No. 19, “Recondition Squirrel Cage Motors, AC Service Motor and Ventilation Fan Repairs” |
| 2.2 |
| NAVSEA Drawing 512-7488751, Rev D; HVAC Diagram, Machinery Rooms & Ancillary Spaces |
| 0901 |
| 2.1 |
| Trim & Stability Booklet, Dwg. 801-7488869 |
| 2.2 |
| Docking Plan, Dwg. 801-7488890 |
| 2.3 |
| Capacity Plan, Dwg 801-7488865 |
| 2.4 |
| Safety Certification Program for Dry-docking Facilities and Shipbuilding Ways for U.S. Navy Ships, MIL-STD 1625C(SH) |
| 2.5 |
| COMSC Instruction 9997.1A, Dry dock Standards for MSC Ship Availabilities |
| 2.2 |
| Docking Report, Forms NAVSEA 9997/1,2,3 and 4 |
| 0902 |
| 2.1.1 |
| NAVSEA Dwg 243-7488962 Rev F, Shaft Arrangement |
| 2.1.2 |
| T/M T9243-AZ-MMC-010 Fixed Pitch Propeller and Shafting with Bearings Model W084836780 |
| 2.1.3 |
| T/M T9561-BR-MMC-010 Steering Gear Rotary Vane, Model # RV 2150-3, and Shorthorn Rudder |
| 2.1.4 |
| Wartsila Dwg W084837233 Rev E, Assy Sterntube |
| 2.1.5 |
| Bot Groningen Dwg 1.1262/1/1 A1, Rudder Project Arrangement. |
| 2.1.6 |
| Bot Groningen Dwg 3.1265/1.1 A3, Rudder Trunk Summary |
| 2.1.7 |
| Bot Groningen Dwg 2.1263/1.1 A3, Rudder Cone Coupling |
| 2.1.8 |
| Bot Groningen Dwg 2.1264/1.1 A3, Rudder Hydraulic Nut Summary |
| 2.1.9 |
| Wartsila Dwg W084827066, Assy Propeller Cap |
| 2.1.10 |
| Wartsila Dwg W084836779, Propeller Boss |
| 2.1.11 |
| Wartsila Dwg W084838596, Assy Propeller Hydraulic Nut |
| 2.1.12 |
| NASSCO Dwg 471-351-4984, Rope Guard Installation |
| 2.1.13 |
| Wartsila Dwg W084837232, Arrangement Shafting |
| 2.1.14 |
| Wartsila Dwg W007420313, Round Nut Locking |
| 2.1.15 |
| Wartsila Dwg 9AK30410AS3, Shaft Flange-9FC6-58 AS3 |
| 2.1.16 |
| T-AKE 1 Class Tail Shaft Optical Alignment – In place Machining Support |
| 2.1.17 |
| T-AKE 1 Class Propeller Shafting – Static Bearing Reaction |
| 0904 |
| 2.1 |
| T/M T9243-AX-MMC-010, SHAFT SEAL, STERN TUBE, TYPE MD FOR USNS LEWIS AND CLARK (T-AKE 1) CLASS, INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS. |
| 2.2 |
| WARTSILA LIPS Drawing H74985-01 Rev(C), GA of 750 MOD 712 Type MD Seal, provided in Reference 2.1 |
| 0905 |
| 2.1 |
| MSC Standard Item 90, Underwater Hull Recoat 5 Year Ablative |
| 2.2 |
| NAVSEA Dwg. 603-7488868, Paint Lines and Draft Marks. |
| 2.3 |
| Surface Preparation Standard SSPC-SP-12/NACE 5, Surface Preparation and cleaning of Metals by Water Jetting Prior to Coating. |
| 0906 |
| 2.1 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition. |
| 2.2 |
| Steel Structures Painting Council, Systems and Specifications, Volume 2, Eighth Edition. |
| 2.3 |
| SSPC-PA 2, Measurement of Dry Coating Thickness with Magnetic Gages. |
| 2.4 |
| SSPC-VIS-3 Visual Standard for Power and Hand Tool Cleaned Steel. |
| 2.5 |
| Surface Conductivity Testing Procedure “Cell Retrieval Method Bresle Patch ISO 8502-6 |
| 2.6 |
| SSPC SP11, Power cleaning to Bare Metal. |
| 2.7 |
| Surface Preparation Standard SSPC-SP-12/NACE 5, Surface Preparation and cleaning of Metals by Water Jetting Prior to Coating. |
| 2.9 |
| NAVSEA Dwg. 603-7488868, Paint Lines and Draft Marks. |
| 0908 |
| 2.1 |
| NAVSEA Drawing 085-7488873; Shell Expansion |
| 2.2 |
| NAVSEA Drawing 085-7488874; MIDSHIP SECTION |
| 2.3 |
| NAVSEA Drawing 085-7488875; SCANTLING PLAN - DECKS AND PROFILES |
| 2.4 |
| NAVSEA Drawing 085-7488876; SCANTLING PLAN - SECTIONS |
| 2.5 |
| NAVSEA Drawing 085-7488877; SCANTLING PLAN - HOUSE |
| 0909 |
| 2.1 |
| T/M T9633-AS-MMC-010, Cathodic Protection System Impressed Current |
| 0910 |
| 2.1 |
| MSC Drawing 801-8388177 Rev - Docking Plan. |
| 2.2 |
| T/M T6435-CN-MMC-010, T-AKE Motor Operated Valves With Actuators. |
| 2.3 |
| Sea Valves Status Spreadsheet (provided in paragraph 8) |
| 0911 |
| 2.1.1 |
| Surface Preparation Specifications, Steel Structures Painting Council Volume 2. |
| 2.1.3 |
| NAVSEA Dwg. 631-7488891 Rev G, Paint Schedule |
| 2.1.4 |
| NAVSEA DWG. 581-7489016 Rev B, Anchor Handling Arrangement and Details |
| 0912 |
| 2.1 |
| Military Sealift Fleet Support Command (MSFSC) Standard Work Item for Repetitive Repair Requirements; Item No. 10 dated 22 March 2010; Tank, Void And Cofferdam Preservation |
| 2.2 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition. |
| 2.3 |
| Steel Structures Painting Council, Systems and Specifications, Volume 2, Eighth Edition. |
| 0913 |
| 2.1 |
| Technical Manual T9568-A2-MMC-010, Bow Thruster Installation Manual TYPE TT2200 |
| 0914 |
| 2.1 |
| MSC Drawing No. 256-7488724 Rev B, Central Seawater Cooling System Diagram. |
| 2.2 |
| MSC Drawing No. 256-7488735 Rev B, Auxiliary Seawater System Diagram. |
| 2.3 |
| MSC Drawing No. 521-7488717 Rev D, Firemain System Diagram. |
| 2.4 |
| MSC Drawing No. 529-7488731 Rev B, Ballast System Diagram. |
| 2.5 |
| MSC Drawing No. 531-7488738 Rev C, Distilling Plant System Diagram. |
| 2.6 |
| NASSCO Drawing No. 73-87-441. |
| 2.7 |
| MSC DWG 256-8390559, Rev -, Central Seawater 30 Inch Waster Piece Mod |
| 0915 |
| 2.1 |
| MSC DWG 506-8392852, Rudder Stock Vent Pipe Modification |
| 2.2 |
| MSC DWG 803-7081122, MSC General Technical Requirements |
| 2.3 |
| ASTM F708, Standard Practice for Design and Installation of Rigid Pipe Hangers |
| 2.4 |
| ASTM F994, Standard Specification for Design and Installation of Overboard Discharge Hull Penetration Connections |
| 2.5 |
| Code of Federal Regulations (CFR), Title 46-Shipping, Chapter 1 |
| 2.6 |
| ABS Guide for Nondestructive Inspection of Hull Welds |
| 0916 |
| 2.1 |
| MSC DWG 506-8392852, Rudder Stock Vent Pipe Modification |
| 2.2 |
| MSC DWG 803-7081122, MSC General Technical Requirements |
| 2.3 |
| ASTM F708, Standard Practice for Design and Installation of Rigid Pipe Hangers |
| 2.4 |
| ASTM F994, Standard Specification for Design and Installation of Overboard Discharge Hull Penetration Connections |
| 2.5 |
| Code of Federal Regulations (CFR), Title 46-Shipping, Chapter 1 |
| 2.6 |
| ABS Guide for Nondestructive Inspection of Hull Welds |
| 0917 |
| 2.1 |
| Technical Manual T9561-BR-MMC-010, Steering Gear, Rotary Vane, Model# 2150-3, and shorthorn Rudder |
| 2.2 |
| NASSCO Drawing 1.1262/1.1; Project Arrangement, Rudder |
| 2.3 |
| Rolls Royse Drawing 14948; Top End of Rudderstock |
| 0920 |
| 2.1 |
| MSC Drawing 256-8391508; T-AKE Class Stern Tube Cooling Modification, Mechanical |
| 0921 |
| 2.1.1 |
| DWG 243-7488962 Shaft Arrangement |
| 2.1.2 |
| WI 0918 Stern Tube Reference Cell Installation |
| 2.1.3 |
| WI 0920 Stern Tube Power Panel Installation 63532875 |
| 0924 |
| 2.1 |
| NASSCO Dwg. 471-351-4982 Rev-D, “Stern Tube Installation & Chocking |
| 1001 |
| 2.1 |
| Naval Ships’ Technical Manual (NSTM) Chapter 634 (“Deck Coverings”) |
| 2.2 |
| Aviation Support Facilities, NAVSEA Dwg 588-7488997 |
| 2.3 |
| T-AKE 1 Hanger Deck Markings, MSC Dwg 588-8195394 |
| 2.4 |
| Air Capable Ship Aviation Facilities Bulletin No. 1K |
| 2.5 |
| Surface Preparation Standard No. 10 (SSPC-SP-10) of the steel structures painting council manual. |
| 2.6 |
| Surface Preparation Standard SSPC-SP11, Power Tool Cleaning To Bare Metal. |
| 2.7 |
| Surface Preparation Standard, SSPC-SP-12/NACE 5, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating |