Clarification 005.doc
DOC document 38 KB Posted
- Attached to
- LEWIS AND CLARK T-AKE 1 ROH/DD
- Solicitation number
- N32205-15-R-3001
About this file
Clarification 005
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR:
SPECIFICATION ITEM NO.: 0109
PARAGRAPH / SECTION NO:____________________
TITLE: Sheathing Repair in way of LCCC and Fuel Receiving Stations
QUESTION:
What is the thickness expectation of the insulation material? What square footage of ¼” steel plates is expected? Are the beams existing? Please clarify the installation of the ¼” plate and foam insulation.
ANSWER:
This work item has been revised. The revised work item DOES NOT install plate to replace the sheathing. References 2.1 through 2.3 of the work item (same for both original work item and revised) provide all details for the insulation material.
ATTACHMENT J - 8
File details come from the government source that posted it. Updated .