ATT_2_QASP.doc

DOC document 73 KB Posted

Attached to
UAV Aircrew
Solicitation number
N00421-17-R-0047
Issued by

About this file

QASP

View the file

Other files

File Type Posted
Att_1_SOW.docx DOCX document
UASTD_Aircrew_RFP_questions_2.xlsx XLSX spreadsheet
UASTD_Aircrew_RFP_questions_2.xlsx XLSX spreadsheet
N00421-17-R-0047_RFP2.docx DOCX document
Att_1_SOW.docx DOCX document
ATT_17_N00421-17-R-0047DD254.pdf PDF
Attachment_P-6B_Cost_Summary_Spreadsheet.xls XLS spreadsheet
ATT_16_Estimated_hours.xls XLS spreadsheet
N00421-17-R-0047.docx DOCX document
UASTD_Aircrew_RFP_questions.xlsx XLSX spreadsheet
ATT_P-3_Past_Performance.xlsx XLSX spreadsheet
Attachment_P6-A_-_Cost_Summary_Spreadsheet.xls XLS spreadsheet
ATT_P-5_PPQ.doc DOC document
ATT_8_SAAR-N_Instructions.pdf PDF
ATT_6_SECNAV_BaseVisitReq.pdf PDF
ATT_P-2_Workforce_Hour_Matrix.xls XLS spreadsheet
ATT_9_SAAR-N_Guidance_2016Oct19.docx DOCX document
ATT_3_Funding_Document.xlsx XLSX spreadsheet
ATT_13_CDRL_PG1.pdf PDF
ATT_5_Base_Acc_Req.doc DOC document
Attachment_P-6B_Cost_Summary_Spreadsheet.xls XLS spreadsheet
ATT_7-TASS-Reg_Req.pdf PDF
N00421-17-R-0047.docx DOCX document
ATT_14_CDRL_PG2.pdf PDF
ATT_15_Reports_Chart.docx DOCX document
Attachment_P6-A_-_Cost_Summary_Spreadsheet.xls XLS spreadsheet
ATT_16_Estimated_hours.xls XLS spreadsheet
ATT_P-1_Manning_Approach.xls XLS spreadsheet
ATT_11_Travel_Req.xls XLS spreadsheet
ATT_P-3_Past_Performance.xlsx XLSX spreadsheet
Att_1_SOW.docx DOCX document
ATT_12_CLIN_Structure.xlsx XLSX spreadsheet
ATT_4_Funds_Expenditure_Report.xlsx XLSX spreadsheet
ATT_10_SAAR-N_Form_Rev_9_11.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00421-17-R-0047 N00421-17-R-0047

Quality Assurance Surveillance Plan (QASP)

NAVAL TEST WING ATLANTIC (NTWL)

UASTD Aircrew Support Services 1.

Purpose

The purpose of this Government developed and applied Quality Assurance Surveillance Plan (QASP) is to ensure that systematic quality assurance methods are used in the administration of the performance based contract. The intent is to ensure that the Contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract.

This QASP describes how the Government will observe, evaluate and document the Contractor’s performance in meeting the critical performance standards identified in the contract. Specifically, the QASP will identify the Government resources responsible for monitoring performance and surveillance methods that will be utilized in determining the quality level of services and products delivered under the contract. A properly executed QASP will assist the Government in achieving the objectives of this procurement.

The contract requirement to provide aircrew support services to include, but not be limited to piloting, mission planning, training , scheduling, administrative assistance, and report facilitating. Services shall include the application of knowledge and expertise in the fields of scheduling events and logging or recording aviation data, weapon systems, subsystems and components, maintaining and tracking flight crew qualifications, and other concurrent tasks such as area frequency management. Support shall be provided to the NAVAIRSYSCOM’s Test Wing, Test Squadrons, and to the Test Pilot School and AIR-5.1.6.

2.

Authority

Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections, acceptance of the services and documentation called for in the contract, to be executed by the Contracting Officer or a duly authorized representative.

3.

Scope

This QASP provides Government surveillance oversight of the Contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract.

4.

Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer) (PCO) or administer (Administrative Contracting Officer) (ACO) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is AIR 2.5.1.12. The ACO will be designated in the resulting order. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed for the resulting contract. The limitations of authority are contained in a written letter of appointment.

5.

Responsibilities

The following Government resources shall have responsibility for the implementation of this QASP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance

Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. In addition to the continuous monitoring of performance, the COR will also submit an annual assessment in the Navy’s Contractor Performance Assessment Reporting System (CPARS). For CPARS, the COR assesses general quality of the product or service, schedule, cost control, business relations, management, small business compliance, and other important areas. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.

Technical Point of Contact (TPOC) – The TPOC is responsible for technical administration of the contract and the tasks addressed throughout the PWS and QASP. The TPOC is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf 6.

Methods of QA Surveillance a.

Contractor Performance Assessment Report System (CPARS) – The market place for research, development test and evaluation (RDT&E) flight services is very competitive. As such, the Contractor has a vested interest in the Government generated CPARS rating under this contract. The Government for this procurement will address the quality of product or service, schedule, cost control, business relations, management responsiveness, and other areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool in addition to the QASP.

b.

QASP - The below listed methods of surveillance shall be used by the TPOC and/or COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist (enclosure 5) provided herein.

7. Surveillance

Enclosures (1) thru (3) sets forth the performance standards, incentives, and surveillance methods for the contractor, TPOC, and COR while enclosure (4) provides the checklist and means for the COR to document on a monthly basis the results of the surveillance and shall be provided to the Contracting Officer on a monthly basis.

8. Documentation

In addition to providing monthly reports to the Contracting Officer, the COR will maintain a repository of reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.

9. Enclosures

Enclosure (1) –Support Performance Standards

Enclosure (2) – Data Performance Standards

Enclosure (3) - Incentives

Enclosure (3) – Surveillance Method and Rating Definitions

Enclosure (4) – Surveillance Activity Checklist SUPPORT Performance STANDARDS (Enclosure 1)

PWS Para.
PWS Task Description
Performance Standard and Acceptable Quality Level (AQL)
Incentives
Provide Test Flight Aircrew and Administrative support for each requirement addressed in the SOW
Respond to request for assistance within 3 working days.
100% Inspection by COR and customer feedback.
See enclosure (2)

Data Performance Standards (Enclosure 2)

Description
Standard
Acceptable Quality Level (AQL)
Surveillance

Method/

Measure Incentives

Monthly reports.
Submission is in accordance with the instructions cited in the CDRL.
95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government
100% Inspection by COR.

* See Enclosure 3.

INCENTIVES (Enclosure 3) The following incentives shall apply to performance under this contract.

Assessment Period
Acceptable Performance Definition
How Measured

Incentives

Base:

Not more than 2 of the measurement areas rated below “Satisfactory”.
At the end of the assessment period (12 month) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for exercise of option 1.*

(-) Does not meet the acceptable performance definition as a condition for exercise of option 1.*

Option 1:

Not more than 2 of the measurement areas rated below “Satisfactory”.
At the end of the assessment period (12 month) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for exercise of option 2.*

(-) Does not meet the acceptable performance definition as a condition for exercise of option 2.*

Option 2:
Not more than 2 of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
At the end of the assessment period (12 month) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for exercise of option 3.*

(-) Does not meet the acceptable performance definition as a condition for exercise of option 3.*

Option 3:
Not more than 2 of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
At the end of the assessment period (12 month) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for exercise of option 4.*

(-) Does not meet the acceptable performance definition as a condition for exercise of option 4.*

Option 4:
Not more than 1 of the measurement areas rated below “Very Good”. Not more than 2 of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
At the end of the assessment period (12 month) evaluation using the CPARS format covering the previous 12 months.
(+) Receive a positive final assessment (CPAR), appropriate for the quality of services provided.

(-) Receive a negative final assessment (CPAR), appropriate for the quality of services provided.

Surveillance Method and Rating Definitions (Enclosure 4) The Government may not choose to exercise an option unless all regulatory requirements are met and the contractor meets the acceptable performance definition.

All SOW/CDRL tasks, including SOW/CDRL sub-tasks, will be assessed focusing on the following:

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or underrun? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Business Relations – Assess the timelines, completeness, and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, Engineering Change Proposals (ECPs) or other Undefinitized Contract Actions (UCAs), the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management Responsiveness – Assess the contractor’s success with timely award and management of subcontracts. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. Consider the contractor’s responsiveness to the program as it relates to meeting contract requirements during the period covered by the report. If applicable, identify any other management areas that are unique to the contract.

Other areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.

SURVEILLANCE ACTIVITY CHECKLIST (Enclosure 5)

Quarterly Surveillance:

The COR/TPOC will perform a Quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure 4.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt.

Other

100% Inspection by TPOC
TBD

Monthly Summary of Ratings:

Quality

Schedule

Number of Exceptional

Number of Very Good

Number of Satisfactory

Number of Marginal

Number of Unsatisfactory

Cost Control

Business Relations

Management Responsiveness Other Areas

Number of Unsatisfactory

Annual Surveillance:

The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in enclosure 3 and the monthly summary of ratings. This annual assessment will occur at the midpoint of each period and cover the previous 12 months, except for the base period which will cover only the previous 6 months.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Summary Rating/Results
Quality of Product or Service
Review of Monthly Ratings.
TBD
Schedule
Review of Monthly Ratings.
TBD
Cost Control
Review of Monthly Ratings
TBD
Business Relations
Review of Monthly Ratings
TBD
Management
Review of Monthly Ratings
TBD
Other Areas
Review of Monthly Ratings
TBD