Attach_1_QASP_022217.doc

DOC document 114 KB Posted

Attached to
4. 11. 5 (ETMS) ENGINEERING, TECHNICAL, AND MANAGEMENT SERVICES
Solicitation number
N00421-16-R-0021
Issued by

About this file

QASP

View the file

Other files

File Type Posted
Question_&_Answers.docx DOCX document
Question.docx DOCX document
N00421-16-R-0021_Amendment_5.docx DOCX document
N00421-16-R-0021_Amendment_5.docx DOCX document
Attach_P2.xlsx XLSX spreadsheet
N00421-16-R-0021_Amendment_4.docx DOCX document
Questions_and_Answers.docx DOCX document
Amendment_3_N00421-16-R-0021.docx DOCX document
Questions_and_Answers-032817.docx DOCX document
N00421-16-R-0021_Amendment2.docx DOCX document
P5_Past_Performance_Information_Form_Mar_2017.pdf PDF
Attach_5.xlsx XLSX spreadsheet
Attach_P1.xlsx XLSX spreadsheet
Attach_3.docx DOCX document
Attach_P2.xlsx XLSX spreadsheet
QuestionsAnswers__N00421-16-R-0021_031617_(2).docx DOCX document
Attach_P3.pdf PDF
Attach_P4.pdf.docx DOCX document
Attach_3.docx DOCX document
Attachment_2_DD254.pdf PDF
Attach_4.docx DOCX document
Exhibit_A_DD1423_(CDRLS)_2-16-17.xlsx XLSX spreadsheet
Attach_5.xlsx XLSX spreadsheet
Attach_6.xlsx XLSX spreadsheet
RFP_N00421-16-R-0021.docx DOCX document
Attach_P1.xlsx XLSX spreadsheet
Attach_P2.xlsx XLSX spreadsheet
ETMS_Questions&Answers.docx DOCX document
Past_Performance_Information_Form.pdf PDF
Attachment_P3_Past_Performance_Questionnaire.docx DOCX document
Attachment_5_SGFE_(Excel).xlsx XLSX spreadsheet
Attachment_1_QASP.docx DOCX document
ETMS_Solitication.docx DOCX document
Exhibit_A_CDRLs.xlsx XLSX spreadsheet
Instructions_for_CPAQ.docx DOCX document
Attachment_2_DD_Form_254.pdf PDF
Attachment_6_RGFE_(Excel).xlsx XLSX spreadsheet
Attachment_4_Data_Item_Xmittal_Form.docx DOCX document
Attachment_P2_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Contractor_Performance_Assessment_Questionnaire_(CPAQ).pdf PDF
Attachment_P1_Cost_Summary_Spreadsheet.xlsx XLSX spreadsheet
Attachment_3_OCI_List.docx DOCX document
N00421-16-R-0021_ETMS_Questions.docx DOCX document
LCATs_Min_Quals.docx DOCX document
ETMS_IGE_DRAFT.xlsx XLSX spreadsheet
DRAFT_ETMS_SOW.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP) for Engineering, Prototyping and Business Operations Support

1.

Purpose

This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure the systematic quality assurance methods are used in the administration of the performance based service contract. The intent is to ensure that the contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract.

This task order is for engineering, technical, management and professional support services to support the Engineering, Prototyping and Business Operations (EPBO), NAWCAD, St. Inigoes, MD. Specifically, the contractor shall support full spectrum research and development, systems engineering, systems integration, software support and life cycle support for various communications, electronic, information technology, and command and control systems. This performance based task order will consist of a combination of Cost-Plus-Fixed-Fee (CPFF)/Firm-Fixed-Price (FFP) CLIN’s for labor and Cost CLIN’s for Other Direct Costs (ODC). The anticipated period of performance includes a 12 month base period with four, one year option periods commencing on 2 November 2017. A properly executed QASP will assist the Government in achieving the objectives of this procurement.

2.

Authority

Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services and documentation called for in service contracts, to be executed by the Contracting Officer or a duly authorized representative.

3.

Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the Quality Assurance Surveillance Plan. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth in the contract.

The QASP on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract.

4.

Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer – A person duly appointed with the authority to enter into (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is Mr. Frank Douglass, 2.5.1. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Contracting Officer Representative (COR) – An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting service contract. The limitations of authority are contained in a written letter of appointment.

Alternate Contracting Officer Representative (ACOR) – An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting task order. The limitations of authority are contained in a written letter of appointment.

Government Project Leads - The COR designates an individual Government Project Lead to assist in administering of specific efforts under the contract.

5.

Responsibilities

The following Government resources shall have responsibility for the implementation of this QASP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer Representative – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

Alternate Contracting Officer Representative (ACOR) – The ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

Government Project Leads – The Government Project Lead is responsible for assisting in administering of specific efforts under the contract. A Government Project lead cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.

6.

Methods of QA Surveillance a.

Contractor Performance Assessment Reporting System (CPARS) – The market place for information technology, engineering, and management support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. This evaluation will be one determinant in performance of each sequential period. The Government for this procurement will address the quality of product or service, schedule, cost control, management responsiveness, management of key personnel, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the order, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.

b.

QASP - The below listed methods of surveillance shall be used by the COR and the Government Project Leads in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist provided herein.

7.

Surveillance

Enclosure (1) provides performance standards and surveillance methods for the contractor and Government Project Leads, enclosure (2) provides data performance standards and surveillance methods for the contractor and Government Project Leads, enclosure (3) provides incentives while enclosure (4) provides the checklist and means for the COR to document on a quarterly basis the results of the surveillance and shall be provided to the Contracting Officer on a quarterly basis.

8.

Documentation

In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.

9.

Enclosures

Enclosure (1) - Performance Standards

Enclosure (2) - Data Performance Standards

Enclosure (3) - Incentives

Enclosure (4) - Surveillance Activity Checklist

PERFORMANCE STANDARDS

Required Service (Performance Requirements)

Standard (Performance Standards)/ Maximum Allowable Degree of Deviation Requirement (AQL)
Method of Surveillance

(Quality Assurance) Incentives

Provide antenna range/instrumentation facility support IAW PWS Para 3.1.
The Contractor shall provide antenna range/instrumentation facility support IAW paragraph 3.1 of the PWS. The Contractor shall complete testing activities of Antenna systems within the timeframes specified in the PWS (or in accordance with customer schedules for new systems) 95% of the time. The contractor shall maintain a rating of “Good” or better for 95% of customer feedback surveys
Government Project Leads input; Quarterly feedback.
See enclosure 3.
Provide environmental simulation and test laboratory support IAW PWS Para 3.2.
The Contractor shall provide environmental laboratory support IAW paragraph 3.2 of the PWS. The Contractor shall complete work assignments in accordance with government provided schedules 95% of the time. The contractor shall maintain a rating of “Good” or better for 95% of customer feedback surveys.
Government Project Leads input; Quarterly feedback.
See enclosure 3.
Provide engineering and prototyping support IAW PWS Para 3.3.
The Contractor shall provide engineering and prototyping support IAW paragraph 3.3 of the PWS. The Contractor shall complete engineering work assignments in accordance with government provided schedules 95% of the time. The contractor shall complete work within government cost estimate, with no more than a 10% overrun, 95% of the time. The contractor shall maintain a rating of “Good” or better for 95% of customer feedback surveys.
Government Project Leads input; Quarterly feedback.
See enclosure 3.
Provide IT management and administration support IAW PWS Para 3.4.
The Contractor shall provide IT management and administration support IAW paragraph 3.4 of the PWS. The Contractor shall complete work assignments in accordance with government provided schedules 95% of the time. The contractor shall log all requests as stated in PWS paragraph 3.4 and also acknowledge receipt of request to the requestor within 2 hours of receiving the request 95% of the time. The contractor shall provide status updates on requests to requestor every 3 business days until request is resolved. The contractor shall not mark request complete until requestor concurrence of resolution is received. The contractor shall capture actions taken on requests in government tracking system within 8 hours of action being taken. The contractor shall maintain a rating of “Good” or better for 95% of customer feedback surveys.
Government Project Leads input; Quarterly feedback.
See enclosure 3.
Provide graphics/reports processing support IAW PWS Para 3.5.
The Contractor shall provide graphics/reports processing support IAW paragraph 3.5 of the PWS. The Contractor shall complete work assignments in accordance with government provided schedules 95% of the time. The contractor shall log and acknowledge receipt of request to the requestor within 2 hours of receiving the request 95% of the time. The contractor shall provide status updates on requests to requestor every 3 business days until request is resolved. The contractor shall capture actions taken on requests in government tracking system within 1 business day of action being taken. The contractor shall maintain a rating of “Good” or better for 95% of customer feedback surveys.
Government Project Leads input; Quarterly feedback.
See enclosure 3.

Provide facility coordination support IAW PWS Para 3.6

The Contractor shall provide facility coordination support IAW paragraph 3.6 of the PWS. The Contractor shall complete work assignments in accordance with government provided schedules 95% of the time. The contractor shall log all facilities requests as stated in PWS Section 3.6.2 and also acknowledge receipt of request to the requestor within 30 minutes of receiving the request 95% of the time. The contractor shall provide status updates on requests to requestor every 3 business days until request is resolved. The contractor shall provide a requestor with details of actions taken to complete request within 2 business days of request completion. The contractor shall maintain a rating of “Good” or better for 95% of customer feedback surveys.
Government Project Leads input; Quarterly feedback.
See enclosure 3.
Provide Systems Engineering and System Acquisition Support IAW PWS Para 3.7.
The Contractor shall provide Systems Engineering and System Acquisition Support IAW paragraph 3.7 of PWS. The Contractor shall provide engineering documentation in accordance with government provided schedules 95% of the time. The contractor shall complete work within government cost estimate, with no more than a 10% overrun, 95% of the time. The contractor shall maintain a rating of “Good” or better for 95% of customer feedback surveys.
Government Project Leads Input; Quarterly feedback.
See enclosure 3.

Provide project management support IAW PWS Para 3.8

The Contractor shall provide project management support IAW paragraph 3.8 of the PWS. The Contractor shall complete all managed projects in accordance with government provided schedules 95% of the time. The contractor shall manage projects ensuring that costs are within government cost estimate +/- 10%, 95% of the time. The contractor shall maintain a rating of “Good” or better for 95% of customer feedback surveys.
Government Project Leads input; Quarterly feedback.
See enclosure 3.

Provide contracts support IAW PWS Para 3.9

The Contractor shall provide contracts support IAW paragraph 3.9 of the PWS. The Contractor shall provide support and documentation in accordance with government provided schedules 95% of the time. The contractor shall maintain a rating of “Good” or better for 95% of customer feedback surveys.
Government Project Leads input; Quarterly feedback.
See enclosure 3.
Provide Telecommunications and Visitor Control IAW PWS Para. 3.10
The Contractor shall provide telecommunications and visitor control IAW paragraph 3.10 of the PWS The Contractor shall complete work assignments in accordance with government provided schedules 95% of the time. The contractor shall process the requests in PWS paragraphs 3.10 - 3.10.2.1 and acknowledge receipt of requests to the requestor within 1-2 hours of receiving the request 95% of the time. The contractor shall provide status updates on requests to requestor every 3 business days, at a minimum, until request is resolved. The contractor shall maintain a rating of The contractor shall maintain a rating of “Good” or better for 95% of customer feedback surveys.
Government Project Leads input; Quarterly feedback.
See enclosure 3.

DATA PERFORMANCE STANDARDS

Description
Performance Standard and Acceptable Quality Level

(AQL)

Surveillance

Method/Measure Incentives

Reports associated with Technical PWS Paragraphs 3.0 thru 3.10.
Unless a due date is specified, the deliverable completed 30 days after completion of tasking in accordance with CDRL requirements. 95% Acceptable on first submission to Government; 100% acceptable on subsequent submissions
Government Project Leads 100% Inspection; quarterly feedback

See enclosure 3.

Reports associated with Administrative PWS Paragraphs 5.0 through 9.0.
The deliverable is completed in accordance with the requirements cited in the CDRL. 95% Acceptable on first submission to Government; 100% acceptable on subsequent submissions
Government Project Leads 100% Inspection; quarterly feedback

See enclosure 3.

Reports associated with Financial PWS Paragraphs 4.0.
The deliverable is completed in accordance with the requirements cited in the CDRL. 95% Acceptable on first submission to Government; 100% acceptable on subsequent submissions
Government Project Leads 100% Inspection; quarterly feedback

See enclosure 3.

INCENTIVES

The following incentives shall apply to performance under this contract.

Assessment Period Acceptable Performance Definition

How Measured

Incentives

Year I:

None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (6 month) evaluation using the CPARS format covering the previous 6 months.
(+) Meet the acceptable performance definition as a condition for awarding additional task orders.*

(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders.*

Year II:

2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (Month 18) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for awarding additional task orders.*

(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders.*

Year III:
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (Month 30) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for awarding additional task orders.*

(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders.*

Year IV:
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (Month 42) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for awarding additional task orders.*

(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders.*

Year V:
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (Month 54) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for awarding additional task orders.*

(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders.*

Year VI:
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (Month 66) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for awarding additional task orders.*

(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders.*

Year VII:
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (Month 78) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory Final CPARS rating.

Annually thereafter until completion
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Annual evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory Final CPARS rating.

* The Government will not issue additional task orders unless all regulatory requirements are met and the contractor meets the acceptable performance definition.

All PWS/CDRL efforts will be assessed focusing on the following:

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program efforts, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or underrun? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract, identifies and applies resources required to meet schedule requirements, assigns responsibility for tasks/actions required the by contract, and communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract and issued task orders.

Utilization of Small Business – Assess the contractor’s success in utilizing and meeting small business goals.

Regulatory Compliance – Assess compliance with all terms and conditions in the contract relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (i.e. Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.

Other areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Performance Based Evaluation: The Government will evaluate contractor performance based on their ability to complete work specified in the scope and PWS paragraphs 3.1 through 3.4. The contractor shall be evaluated using the following ratings:

Exceptional Performance: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant, tangible or intangible, benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). The few areas for improvement are all minor. There are no recurring problems. Contractor’s management initiates effective corrective action whenever needed.

Very Good Performance: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted, and the contractor takes satisfactory corrective action.

Satisfactory Performance: Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although there are some areas of very good or excellent performance, these are more or less offset by unsatisfactory performance in other areas.

Marginal: Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were no fully implemented.

Unsatisfactory Performance: Contractor’s performance of most contract requirements is inconsistent and frequently does not always meet acceptable standards. Quality, responsiveness, and timeliness in many areas require attention and action. Corrective actions have not been taken or are ineffective.

SURVEILLANCE ACTIVITY CHECKLIST

Quarterly Surveillance:

The COR will perform a quarterly assessment of Technical Performance Cost and Schedule Performance, Management and Quality of Work utilizing the CPARS evaluation rating definitions listed in Enclosure 3.

Description
Surveillance Method/

Measure

Date Planned
Date

Comp

Quality
Sched.
Cost Control
Business Relations
Mgmt
Util. of Small Bus.
Other Areas
Provide antenna range - instrumentation facility support IAW PWS Para 3.1
Government Project lead input, quarterly feedback
TBD
Provide Environmental Simulation and Test Laboratory Support IAW PWS Para 3.2
Government Project lead input, quarterly feedback
TBD
Provide Engineering and Prototyping Facilities Support IAW PWS Para 3.3
Government Project lead input, quarterly feedback
TBD
Provide IT Management and Administration Support IAW PWS Para 3.4
Government Project lead input, quarterly feedback
TBD
Provide graphics/reports operations support IAW PWS Para 3.5
Government Project lead input, quarterly feedback
TBD

Provide Facility Coordination Support IAW PWS Para 3.6.

Government Project lead input, quarterly feedback
TBD

Provide Systems Engineering and System Acquisition Support IAW PWS Para 3.7.

Government Project lead input, quarterly feedback
TBD

Provide Project Management Support IAW PWS Para 3.8.

Government Project lead input, quarterly feedback
TBD

Provide Contracts Support IAW PWS Para 3.9.

Government Project lead input, quarterly feedback
TBD
Provide Telecommunications and Visitor Control IAW PWS Para. 3.10
Government Project lead input, quarterly feedback
TBD
Description
Surveillance Method/

Measure

Date Planned
Date

Comp

Quality
Sched
Cost Control
Business Relations
Mgmt
Util. of Small Bus.
Reports associated with Technical PWS Paragraphs 3.0 thru 3.10
Government Project lead input, quarterly feedback
TBD
Reports associated with Administrative PWS Paragraphs 5.0 through 9.0
Government Project lead input, quarterly feedback
TBD
Reports associated with Financial PWS Paragraphs 4.0
Government Project lead input, quarterly feedback
TBD

Quarterly Summary of Ratings:

Quality of Product

Schedule

Number of Exceptional Number of Exceptional

Number of Very Good Number of Very Good

Number of Satisfactory

Number of Satisfactory

Number of Marginal Number of Marginal

Number of Unsatisfactory Number of Unsatisfactory

Cost Control

Management

Number of Exceptional Number of Exceptional

Number of Very Good

Number of Satisfactory

Number of Marginal Number of Marginal

Number of Unsatisfactory Number of Unsatisfactory

Utilization of Small Business

Regulatory Compliance

Number of Exceptional

Number of Exceptional ____

Number of Satisfactory

Number of Marginal Number of Marginal

Number of Unsatisfactory

Other Areas

Number of Exceptional

Number of Marginal

Checklist Completed By: ____________________________

Date Completed: ____________________________ Annual Surveillance:

The COR will perform an annual assessment of overall contract performance utilizing the evaluation rating definitions listed in Enclosure 3. This annual assessment will occur at the midpoint of each year following the award of the contract and cover the previous 12 months, except for the first year of the contract which will cover only the previous 6 months.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Summary Rating/Results
Quality of Product or Service
Review of Quarterly Ratings.
TBD
Schedule
Review of Quarterly Ratings.
TBD
Cost Control
Review of Quarterly Ratings.
TBD
Business Relations
Review of Quarterly Ratings.
TBD
Management
Review of Quarterly Ratings.
TBD
Utilization of Small Business
Review of Quarterly Ratings.
TBD
Other Areas
Review of Quarterly Ratings.
TBD

File details come from the government source that posted it. Updated .