Attachment_7_-_Funding_Types_-_Supply.docx
DOCX document 50 KB Posted
- Attached to
- 5. 4. 3 Supply Support
- Solicitation number
- N00421-15-R-0013
About this file
Attachment 7 posted on 9 Dec 2016 should be replaced with Attachment 7 posted on 29 Dec 2106.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_&_As_20_Jan_2017.xlsx | XLSX spreadsheet | |
| 15-R-0013_Amendment_0002.docx | DOCX document | |
| Q_&_As_29_Dec_2016.xlsx | XLSX spreadsheet | |
| 15-R-0013_Amendment_0001.docx | DOCX document | |
| Attachment_P5_Past_Performance_Questionnaire.doc | DOC document | |
| Attachment_2_-_Personnel_Qualifications.docx | DOCX document | |
| Attachment_P4_Past_Performance_Matrix.doc | DOC document | |
| Q_&_As_29_Dec_2016.xlsx | XLSX spreadsheet | |
| Attachment_6_-_Approved_Material_List_-.docx | DOCX document | |
| wgl_15-2013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| 5.4.3 Supply Contract | Attachment 7 | 2015-08-19 |
| N00421-15-R-0013 | Funding Types |
The information in this attachment is intended to assist Government Comptrollers in determining the appropriateness of using Appropriated funding on this contract, and is provided for reference only. Provided below are definitions of the use of appropriated funding on this contract, which can be compared with the Task Order (TO) work statement and appropriation type.
A map between appropriation types and the functional performance requirements in the Performance Work Statement (PWS) is also provided.
Use of Appropriated and Non-Appropriated Funds
Listed below are the approved uses of appropriated and non-appropriated funds on this contract.
1. Research, Design, Test and Evaluation (RDT&E) Appropriations. (RDT&EN, RDT&EA, RDT&EAF)
a. Manufacture and procure supplies to support research, design, test and evaluation of air vehicles, air-vehicle systems, and supporting equipment and systems. Typical end uses include, but are not limited to:
i. Air vehicle and air-vehicle systems simulators and simulator sub-systems in support of flight and ground test activities.
ii. RDT&E laboratory infrastructure, systems, spaces, and networks.
iii. Simulation operator stations,
iv. RDT&E software development.
v. Hardware-in-the-loop test racks.
vi. Mock-ups of pre-production or developmental air-vehicle structures and systems.
b. Provide supplies and supply related services for the operation, maintenance, repair, and upgrade of infrastructure (laboratories, equipment, networks, systems, spaces and software) supporting basic and applied research efforts and test and evaluation.
c. Provide supplies and supply related services for the direct support of developmental and operational flight and ground test of air-vehicles, air-vehicle systems and supporting equipment.
d. Provide supplies and support for the development and testing of air-vehicle systems and software.
e. Provide supplies required for manufacturing RDT&E system (tools, equipment, etc).
2. Aircraft Procurement (AP) Appropriations. (APN, APA, APAF)
a. Manufacture and procure supplies to develop simulation-based training systems for production air-vehicles and air-vehicle systems. Typical end uses include, but are not limited to:
i. Prototype Operational Flight Trainers (OFT)
ii. Prototype Cockpit Procedure Trainers (CPT)
iii. UAV Ground control simulation stations
iv. Maintenance training devices
v. Simulation instructor and operator stations
b. Manufacture and procure supplies required for capability upgrades of simulation-based training systems.
c. Procure and manufacture supplies required for air-vehicle support systems and software, and software support activities.
d. Procure material in support of verification, validation and accreditation (VV&A) of training products.
3. Operations and Maintenance (O&M) Appropriations. (O&MN, O&MA, O&MAF)
a. Manufacture and procure materials required for the maintenance and repair of deployed out-of-production simulation training systems.
b. Procure supplies required for operational support of deployed out-of-production simulation training systems.
c. Note: O&M funding shall not be used for operation and maintenance of RDT&E infrastructure and systems.
4. Foreign Military Sales (FMS) Funding.
a. Manufacture and procure supplies to support research, design, test and evaluation of air vehicles, air-vehicle systems, and supporting equipment and systems for foreign military sales.
b. Manufacture and procure supplies required for capability upgrades of simulation-based training systems for foreign military sales.
c. Procure and manufacture supplies required for air-vehicle support systems and software, and software support activities for foreign military sales.
Funding of Manufacturing Functional Performance Requirements
Functional performance requirements – the functions required to execute TO requirements – are outlined in Section 4.0. The applicability of each functional performance requirement to funding types is indicated in the table below.
image1.emf
Microsoft_Excel_Worksheet1.xlsx Sheet1
SOW # Description RDT&E AP O&M FMS
4.2 Program and Project Management and Support - - - -
4.2.1 Program Support X X X X
4.2.2 Program Support X X X X
4.2.3 Production Planning X X X X
4.2.4 Meetings X X X X
4.3 Operations Support (all paragraphs) X X X X
4.4 Supply Acquisition and Acceptance - - - -
4.4.1 Supply Procurement X X X X
4.4.2 Quality Assurance X X X X
4.4.3 Shipping, Receiving, and Inventory X X X X
4.5 Supply Manufacture, Installation and Deployment - - - -
4.5.1 Fabrication X X X X
4.5.2 Wiring X X X X
4.5.3 Deployment X X X X
4.5.4 Supply Manufacture Technical Support X X X X
Sheet2
Sheet3
File details come from the government source that posted it. Updated .