Attachment 6 Program Cost Report Format
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task 1
| PROPRIETARY INFORMATION - FUNDS EXPENDITURE REPORT | ||||||||||||||||||||||||||||||||
| Prepared: | ||||||||||||||||||||||||||||||||
| Contract No.: | Task 1 | |||||||||||||||||||||||||||||||
| Period of Performance: | ||||||||||||||||||||||||||||||||
| ESTIMATE | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | Cumulative Expenditures | |||||||
| JUL | JUL | May | May | June | June | July | July | August | August | September | September | October | October | November | November | December | December | January | January | February | February | March | March | |||||||||
| LATEST | 2013 | 2013 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2013 | 2013 | 2013 | 2013 | 2013 | 2013 | TOTAL | PERCENT | ||||||
| REVISED | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | DOLLAR | DOLLAR | |||||
| HOURS | TOTAL | ESTIMATE | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | VALUE | VALUE | |||
| LABOR | 4,024 | $ 144,254.29 | $ - 0 | 6.7% | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | 0.0 | $0.00 | 00.0% | P00018 |
| FEE | $ 7,212.71 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $ 100,000.00 | ||||||||||||||||
| $ 93,632.96 | ||||||||||||||||||||||||||||||||
| TOTAL LABOR PLUS FEE | $ 151,467.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 00.0% | $ 6,367.04 | |||||||||||||||
| TRAVEL | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||
| MATERIAL | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||
| NMCI MATERIAL | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||
| TOTAL CONTRACT PRICE | $ 151,467.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 00.0% | ||||||||||||||||
| TOTAL COMMITMENTS | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||
| AND EXPENDITURES |
Task 1 PERSONNEL
| PERSONNEL | |||||||||||||||
| Task 1 | |||||||||||||||
| Period of Performance: | |||||||||||||||
| 2013 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2013 | 2013 | 2013 | HOURS | |||
| CATEGORY | NAME | JUL | MAY | JUNE | JULY | AUGUST | SEPTEMBER | OCTOBER | NOVEMBER | DECEMBER | JANUARY | FEBRUARY | MARCH | Cumulative | |
| Aircraft/Aircrew Sched. Coord. | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| TOTAL | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Program Manager | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| TOTAL | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Sr. Management Analyst | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| TOTAL | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Administrative Assistant | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| TOTAL | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Clerk Typist | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| TOTAL | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| TOTAL TASK 1 HOURS: | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
Task 2
| PROPRIETARY INFORMATION - FUNDS EXPENDITURE REPORT | ||||||||||||||||||||||||||||||||
| Prepared: | ||||||||||||||||||||||||||||||||
| Contract No.: | Task 2 | |||||||||||||||||||||||||||||||
| Period of Performance: | ||||||||||||||||||||||||||||||||
| ESTIMATE | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | Cumulative Expenditures | |||||||
| JUL | JUL | May | May | June | June | July | July | August | August | September | September | October | October | November | November | December | December | January | January | February | February | March | March | |||||||||
| LATEST | 2013 | 2013 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2013 | 2013 | 2013 | 2013 | 2013 | 2013 | TOTAL | PERCENT | ||||||
| REVISED | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | DOLLAR | DOLLAR | |||||
| HOURS | TOTAL | ESTIMATE | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | VALUE | VALUE | |||
| LABOR | 26,756 | $ 2,385,110.38 | $ - 0 | 6.7% | 1,463.0 | $131,341.54 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | 1,463.0 | $131,341.54 | 05.5% | P00018 |
| FEE | $ 143,106.62 | $ - 0 | $8,799.88 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $8,799.88 | $ 100,000.00 | ||||||||||||||||
| $ 93,632.96 | ||||||||||||||||||||||||||||||||
| TOTAL LABOR PLUS FEE | $ 2,528,217.00 | $ - 0 | $140,141.42 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $140,141.42 | 05.5% | $ 6,367.04 | |||||||||||||||
| TRAVEL | $ 75,000.00 | $ - 0 | $2,202.86 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $2,202.86 | |||||||||||||||||
| MATERIAL | $ 15,000.00 | $ - 0 | $2,515.32 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $2,515.32 | |||||||||||||||||
| NMCI MATERIAL | $ 35,997.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||
| TOTAL CONTRACT PRICE | $ 2,654,214.00 | $ - 0 | $144,859.60 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $144,859.60 | 05.5% | ||||||||||||||||
| TOTAL COMMITMENTS | $144,859.60 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $144,859.60 | |||||||||||||||||||
| AND EXPENDITURES |
Task 2 Detail (IF REQUIRED)
| PROPRIETARY INFORMATION - FUNDS EXPENDITURE REPORT | |||||||||||||||||||||||||||||
| Prepared: | |||||||||||||||||||||||||||||
| Contract No.: | Task 2 | ||||||||||||||||||||||||||||
| 27 February -31 March 2012 | |||||||||||||||||||||||||||||
| TDL 2 DETAILED PROJECT EXPENDITURES | |||||||||||||||||||||||||||||
| Cumulative Expenditures | |||||||||||||||||||||||||||||
| 2011 | 2011 | 2011 | 2011 | 2011 | 2011 | 2011 | 2011 | 2011 | 2012 | 2012 | 2012 | ||||||||||||||||||
| 2011 | APRIL | 2011 | MAY | 2011 | JUNE | 2,011.0 | JULY | 2011 | AUGUST | 2011 | SEPTEMBER | 2011 | OCTOBER | 2011 | NOVEMBER | 2011 | DECEMBER | 2012 | JANUARY | 2012 | FEBRUARY | 2012 | MARCH | TOTAL | FUNDED | ||||
| APRIL | EXPEND- | MAY | EXPEND- | JUNE | EXPEND- | JULY | EXPEND- | AUGUST | EXPEND- | September | EXPEND- | OCTOBER | EXPEND- | NOVEMBER | EXPEND- | DECEMBER | EXPEND- | January | EXPEND- | FEBRUARY | EXPEND- | March | EXPEND- | MAN | DOLLAR | TO DATE | |||
| HRS | ITURES | HRS | ITURES | Hours | ITURES | Hours | ITURES | Hours | ITURES | Hours | ITURES | Hours | ITURES | Hours | ITURES | Hours | ITURES | Hours | ITURES | Hrs | ITURES | HRS | ITURES | HOURS | VALUE | thru P00063 | |||
| Project Title | Company Project Number | ||||||||||||||||||||||||||||
| 491.5 | 35,140.9 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 491.5 | 35,140.9 | ||||
| 25.5 | 2,722.6 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 25.5 | 2,722.6 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| 310.5 | 34,950.5 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 310.5 | 34,950.5 | ||||
| 22.0 | 2,813.9 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 22.0 | 2,813.9 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| 11.0 | 1,341.1 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 11.0 | 1,341.1 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| 69.5 | 8,237.2 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 69.5 | 8,237.2 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| 218.0 | 22,960.2 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 218.0 | 22,960.2 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| 75.5 | 6,845.8 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 75.5 | 6,845.8 | ||||
| - 0 | - 0 | ||||||||||||||||||||||||||||
| - 0 | - 0 | ||||||||||||||||||||||||||||
| - 0 | - 0 | ||||||||||||||||||||||||||||
| - 0 | - 0 | ||||||||||||||||||||||||||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | ||||||||||||||||||||||||||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | ||||||||||||||||||||||||||||
| 7.0 | 649.2 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 7.0 | 649.2 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| 100.0 | 10,716.1 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 100.0 | 10,716.1 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| 85.5 | 7,752.5 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 85.5 | 7,752.5 | ||||
| 47.0 | 6,011.4 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 47.0 | 6,011.4 | ||||
| TOTAL HOURS AND COST | 1,463.0 | 140,141.4 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | 1,463.0 | 140,141.4 |
Task 2 PERSONNEL
| PERSONNEL | |||||||||||||||
| Task 2 | |||||||||||||||
| Period of Performance: | |||||||||||||||
| 2013 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2013 | 2013 | 2013 | HOURS | |||
| CATEGORY | NAME | JUL | MAY | JUNE | JULY | AUGUST | SEPTEMBER | OCTOBER | NOVEMBER | DECEMBER | JANUARY | FEBRUARY | MARCH | Cumulative | |
| P-3 Pilot (CAT C) | 172.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 172.0 | ||
| 145.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 145.0 | |||
| TOTAL | 317.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 317.0 | ||
| P-3 Flight Pilot (A/B) | 129.5 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 129.5 | ||
| 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |||
| TOTAL | 129.5 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 129.5 | ||
| P-3 Weapons System Operator | 149.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 149.0 | ||
| 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |||
| 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |||
| TOTAL | 149.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 149.0 | ||
| P-3 Flight Tech | 127.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 127.0 | ||
| 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |||
| 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |||
| TOTAL | 127.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 127.0 | ||
| ASW Operator | 150.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 150.0 | ||
| 161.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 161.0 | |||
| TOTAL | 311.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 311.0 | ||
| Aircraft/Aircrew Sched. Coord. | 88.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 88.0 | ||
| 158.5 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 158.5 | |||
| TOTAL | 246.5 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 246.5 | ||
| Program Manager | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| TOTAL | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| Clerk Typist | 20.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 20.0 | ||
| 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |||
| TOTAL | 20.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 20.0 | ||
| Administrative Assistant | 1.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.0 | ||
| 160.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 160.0 | |||
| TOTAL | 161.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 161.0 | ||
| Sr. Management Analyst | 2.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 2.0 | ||
| TOTAL | 2.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 2.0 | ||
| TOTAL TASK #2 HOURS: | 1463.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1463.0 |
CUM ALL TASKS
| PROPRIETARY INFORMATION - FUNDS EXPENDITURE REPORT | ||||||||||||||||||||||||||||||||
| Prepared: | ||||||||||||||||||||||||||||||||
| Contract No.: | CUMULATIVE ALL TASKS | |||||||||||||||||||||||||||||||
| Period of Performance: | ||||||||||||||||||||||||||||||||
| ESTIMATE | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | ACTUAL | Cumulative Expenditures | |||||||
| JUL | JUL | May | May | June | June | July | July | August | August | September | September | October | October | November | November | December | December | January | January | February | February | March | March | |||||||||
| LATEST | 2013 | 2013 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2012 | 2013 | 2013 | 2013 | 2013 | 2013 | 2013 | TOTAL | PERCENT | ||||||
| REVISED | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | EXPEND- | MONTHLY | DOLLAR | DOLLAR | |||||
| HOURS | TOTAL | ESTIMATE | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | ITURES | HOURS | VALUE | VALUE | |||
| LABOR | 0 | 0 | $ - 0 | 6.7% | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | 00.0% | P00018 |
| FEE | 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $ 100,000.00 | ||||||||||||||||
| $ 93,632.96 | ||||||||||||||||||||||||||||||||
| TOTAL LABOR PLUS FEE | 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 00.0% | $ 6,367.04 | |||||||||||||||
| TRAVEL | 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||
| MATERIAL | 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||
| NMCI MATERIAL | 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||
| TOTAL CONTRACT PRICE | 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 00.0% | ||||||||||||||||
| TOTAL COMMITMENTS | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||
| AND EXPENDITURES |
File details come from the government source that posted it. Updated .