OPSEC CDRL REV.doc

DOC document 179 KB Posted

Attached to
Financial, Program, and Business Analysis Support Services Federal contract opportunity
Solicitation number
N00421-09-R-0014
Issued by
Department of the Navy Naval Air Systems Command

About this file

CDRL A006

View the file

Other files for this federal contract opportunity

Other files attached to Financial, Program, and Business Analysis Support Services, newest first.
File Type Posted
N00421-04-R-0014-00002.doc DOC document
7-Past Performance Matrix.doc DOC document
8-Past Performance Questionaire.doc DOC document
CDRL SAAR A005.doc DOC document
9 -Attachment 9 Revised 9-1-09.xls XLS spreadsheet
N00421-04-R-0014-00001.doc DOC document
CDRL page 1.rtf RTF text file
N00421-04-R-0014 Solicitation.doc DOC document
8-Past Performance Questionaire.doc DOC document
2- DD 254 N00421-09-R-0014 Scanned.pdf PDF
Copy of Attachment_9_CLIN_Breakout_spreadsheetrev6-15-09.xls XLS spreadsheet
3-OCI Interest List.xls XLS spreadsheet
5- Workforce Hour Matrix.xls XLS spreadsheet
1-QASP AD MOBIS 18May09.doc DOC document
4-FOUO A005 - IT Personnel Security Report for NAVAIR - GAIN LOSS update template rev SAARN(8May09).xls XLS spreadsheet
CDRL page 2.rtf RTF text file
6-Corp Experience.doc DOC document
7-Past Performance Matix.doc DOC document
PERFORMANCE BASED WORK STATEMENT.doc DOC document
Source Sought Questions Posted 022109.doc DOC document
Source Sought Questions Posted.doc DOC document
PBSW Comptroller.doc DOC document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

TDP (SECURITY)

OTHER FORMTEXT

TM

D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Business Financial Mgmt Comm.
N00421-09-R-0014
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A006
OPERATIONS SECURITY (OPSEC) PLAN
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-80934A See Blk 16
5.6
NAWCAD 7.4.3
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
Blk 16
Blk 16

b. COPIES

8. APP CODE
Blk 16
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Final

Blk 16
Blk 16
Draft
Reg
Repro

16. REMARKS

Block 4: Delete references in DI-MGMT-80934A. Instead use the definition of sensitive
AD 7.4.3
1
1
0

the definition of sensitive information given in Public Law 100-235 use National Security Decision Directive (NSDD) 298 for the concept of Operations Security.

Block9: Distribution Statement B: Distribution authorized to U.S.

Government agencies only. Propriatery Information, 21 Feb 2003.

Blocks 11, 12, & 13: Preliminary draft plan due 90 DAC. Final required after approval of final plan only to comply with

Other requests for this document shall be referred to Naval Air

Warfare Center Aircraft Division, 7.4.3, 22514 McCoy Road, UNIT 10

Patuxent River, MD 20670-1457

Block 10, 11, 12, 13:Preliminary draft OPSEC Plan due 90 days after award in MS Word 6.0 (or later) on Compact Disc and hard copy to:

Commander, Attn: 7.4.3, B463 UNIT 10, 22514 McCoy Road, Patuxent River, MD 20670-1457. Final plan due 45 days after

Government approval (NAWCAD 7.4.3) of draft. (Revisions as required after approval of final plan only to comply with Government

Data Protection Policy Documents revision.

15. TOTAL
(
1
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD Form 1423-1, Jun 90 Previous editions are obsolete Page 1 of 1Pages

1007/183

FOR GOVERNMENT PERSONNEL

Item A..

Self-explanatory.

Item B.

Self-explanatory.

Item C.

Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as “Provisioning,” “Configuration Management,” etc.

Item D:

Enter name of system/item being acquired that data will support.

Item E..

Self-explanatory (to be filled in after contract award).

Item F.

Self-explanatory (to be filled in after contract award).

Item G.

Signature of preparer of CDRL.

Item H.

Date CDRL was prepared.

Item I.

Signature of CDRL approval authority.

Item J.

Date CDRL was approved.

Item 1.

See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2.

Enter title as it appears on data acquisition document cited in Item 4.

Item 3.

Enter subtitle of data item for further definition of data item (optional entry).

Item 4.

Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5.

Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6.

Enter technical office responsible for ensuring adequacy of the data item.

Item 7.

Specify requirement for inspection/acceptance of the data item by the Government.

Item 8.

Specify requirement for approval of a draft before preparation of the final data item.

Item 9.

For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10.

Specify number of times data items are to be delivered.

Item 11.

Specify as-of-date of data item, when applicable.

Item 12.

Specify when first submittal is required.

Item 13.

Specify when subsequent submittals are required, when applicable.

Item 14.

Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15.

Enter total number of draft/final copies to be delivered.

Item 16.

Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17.

Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a.

Group I. Definition - Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b.

Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c.

Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirement with regard to the depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d.

Group IV. Definition - Data which is developed by the contractor as part of the normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost..

Item 18.

For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by the pertinent provisions of the contract.

DD Form 1423-1 Reverse, JUN 90

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)�

File details come from the government source that posted it. Updated .