N00421-23-R-0051 APSD CSS Draft RFP SAM.pdf

PDF 1 MB Posted

Attached to
DRAFT Request for Proposal- Aircraft Prototype System Division Federal contract opportunity
Solicitation number
N00421-23-R-0051-Draft-RFP-APSD-CSS
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This is a draft Request for Proposal (RFP) for contractor support services for the Naval Air Systems Command (NAVAIR) Aircraft Prototype System Division (APSD). The RFP seeks proposals for a single-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract to provide technical services and deliverables in support of APSD's prototyping, engineering, manufacturing, and installation requirements. Key requirements include project management, engineering, research and analysis, documentation, drafting, fabrication, configuration management, logistics, and administrative support. The contract would have a single five-year ordering period with two additional one-year optional ordering periods. Task orders would be issued on both a cost-plus-fixed-fee and firm-fixed-price basis. The RFP specifies labor categories, fully burdened rates, and details for cost reimbursement, travel, materials, and completion-based work. The NAICS code is 336413 and size standard is 1,250 employees. The period of performance for individual task orders would be determined at the time of award.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT Request for Proposal- Aircraft Prototype System Division, newest first.
File Type Posted
Draft RFP Questions_Answers - NAWCAD Response.xlsx XLSX spreadsheet
APSD Industry Day Brief_PublicRelease2023-698_FINAL.pdf PDF
APSD Industry Day Attendance.xlsx XLSX spreadsheet
Attachment L-3_Labor Hours Table.xlsx XLSX spreadsheet
N00421-23-R-0051 RFP DD-254_STILO Signed.pdf PDF
CDRL A003_Ground Operating Procedures.pdf PDF
CDRL A004_Contractor Training Plan.pdf PDF
Attachment L-2_APSD CSS Document Verification and Self-Scoring Worksheet.xlsx XLSX spreadsheet
WageDetermination 15-4279.pdf PDF
CDRL A005_Personnel Locator Report.pdf PDF
Attachment P-1_Minimum Rates Table.xlsx XLSX spreadsheet
Attachment L-1_Staffing Matrix.xlsx XLSX spreadsheet
CDRL A006_Transition Out Strategy.pdf PDF
CDRL A002_OPSEC Plan.pdf PDF
CDRL A001_Contracts Progress and Status Report.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local t ime

X

A X B X C X D

EX

X

G F 98 - 109

110 - 130 X H 131 - 138

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 138

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00421 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 12

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

13 - 66

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

68 - 69

70 - 72 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 73 - 79 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 80 - 85 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

86 - 96

PART II - CO NTRACT CLAUSES

PROCUREMENT GROUP

21983 BUNDY RD, BLDG 441

PATUXENT RIVER MD 20670

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0042123R0051

Section A - Solicitation/Contract Form

SECTION A

GOVERNMENT POINT OF CONTACT:

Contract Specialist Greg Tollefsen Email: gregory.e.tollefsen.civ@us.navy.mil

Procuring Contracting Officer Travora (Torri) Levasseur Email: Travora.r.levasseur.civ@us.navy.mil

General Information:

(1) The Government expects to award a Single Award (SA) Indefinite Delivery / Indefinite Quantity (IDIQ) contract to support the mission of the Naval Air Warfare Center Aircraft Division (NAWCAD,) and the Aircraft Prototype System Division (APSD) as a total Small Business Set Aside. Specific requirements will be derived from the scope of the SOW set forth below and documented through the issuance of individual Task Orders (TO) or Delivery Orders (DO).

(2) The NAICS code for this effort is 336413 – Other Aircraft Parts and Auxiliary Equipment Manufacturing with a size standard of 1,250 employees. The Product/Service Code (PSC) for this procurement is K015 – Modification of Equipment: Aircraft and Airframe Structural Components.

(3) Level of Effort (LOE) Task Orders (TOs) will be issued under this single award Indefinite Delivery Indefinite Quantity (IDIQ) contract. NAVAIR clause 5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR) (DEC 2012) will be included in applicable task orders.

(4) Performance-based Completion TOs and Delivery Orders (DOs) will be issued under this single award IDIQ contract, separate from LOE tasking and LOE labor hours.

(5) This contract includes Cost-Plus-Fixed-Fee (CPFF) contract line item numbers (CLINs) for labor, cost reimbursable (no fee) CLINs for Other Direct Costs (travel and material), and Firm Fixed Price (FFP) and CPFF Completion CLINs.

(6) This contract will have a single five (5) year ordering period with two additional one (1) year optional ordering periods. TOs and DOs will be issued as required, and the Period of Performance will be determined upon award of each individual task order.

(7) The Contractor will not be permitted access to classified information until a final DD254 is incorporated.

Section B - Supplies or Services and Prices

B-TXT-1

B-1 Streamlined Ordering Procedures Task Orders (TOs) that include CPFF Labor Term CLINs may be issued under this contract using the following streamlined ordering procedures:

(1) For each proposed order that includes CPFF Labor Term CLINs, the contracting officer will provide the Contractor a TO and an Independent Government Cost Estimate (IGCE). The IGCE is an estimate of labor hours by labor category utilizing the Hourly Burdened Composite Labor Rates provided in table(s) below, to calculate the total estimated cost for the proposed CLINs and/or TO.

i. The TO fixed fee is calculated using Section G Clause 5252.232-9510 PAYMENT OF FIXED FEE (NAVAIR).

ii. Ceiling for ODCs will be priced in accordance with the Government estimate.

iii. TOs crossing multiple years will be estimated by the Government using the Hourly Burdened Composite Labor Rates for each year in proportion to the Period of Performance (PoP) of the TO.

(2) Within three (3) working days of receipt of the TO and IGCE, the Contractor shall respond:

i. If the Contractor agrees that it can perform the TO within the parameters of the IGCE, they will sign and return the DD 1155 to the contracting officer. If the requirement remains valid, a priced order will be issued to the Contractor;

or

ii. If the Contractor does not agree with the TO and/or IGCE, the Contractor shall acknowledge its disagreement within three (3) working days. Additionally, a proposal shall be submitted to the contracting officer within five (5) working days of receipt of the TO and IGCE, addressing only the specific areas of difference in labor categories and/or hours in the IGCE. Once the differences are resolved between the contracting officer and the Contractor, and the requirement remains valid, a priced order will be issued to the Contractor.

iii. Contractor may not request deviation from the awarded streamlined rates in the B-1 table (below), either for the issuance of a task order OR the issuance of a task order modification when a level of effort increase is required.

(3) Rate Tables

(a) Hourly Burdened Composite Labor Rates To be completed within Attachment P-3, Fully Burdened Rates. Upon contract award, the completed B-1 table will be updated within this section.

B-TXT-2

B-TXT-2 ISSUANCE OF COMPLETION BASED WORK ORDERS

(a) The information contained in each completion based work delivery order / task order shall be the result of a negotiated agreement reached by the parties in advance of issuance of the order.

(1) The Contracting Officer shall furnish the contractor with a written request for proposal. The request shall include:

(i) a description of the work required,

(ii) the contract type,

(iii) the desired delivery schedule and location, and

(iv) the place and manner of inspection and acceptance.

(2) The contractor shall, within the time specified by the written notice, provide the Contracting Officer with a proposal, which shall include:

(i) the required number of labor hours by labor classification and scheduled billing rates, for each end product or task,

(ii) detailed material costs, as applicable,

(iii) proposed delivery dates,

(iv) other direct costs (i.e., direct material, travel subsistence, and similar costs)

(v) dollar amount and type of any proposed subcontracts (proprietary data of subcontractors may be submitted directly to the Contracting Officer),

(vi) breakdown of all Facilities Capital Cost of Money (FCCOM) costs, as applicable,

(vii) profit rate and associated justification, and

(viii) total proposed price.

(3) Upon receipt of the proposal, the Contracting Officer shall review the estimates therein to ensure acceptability to the Government, enter into such negotiations with the contractor as may be necessary to ensure mutual agreement of the parties, and effect whatever internal review procedures are required. This may include the submission of certified cost or pricing data, as required by FAR 15.403-4.

(4) The maximum profit rate, defined in the below table, for completion based work shall not exceed (percentage to be incorporated at time of award based on successful offeror’s proposal) under any circumstances.

Completion Based Work Maximum Profit/ Fee Rate CLINs X005, Firm-Fixed Price Proposed- To be added at award CLINs X006, Cost-Plus Fixed-Fee Proposed- To be added at award

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot Labor

CPFF

SERVICES IN ACCORDANCE WITH SECTION C STATEMENT OF WORK

(SOW)

FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0002 1 Lot Material

COST

OTHER DIRECT COSTS (ODC) MATERIAL AND EQUIPMENT IN

SUPPORT OF CLIN 0001 IAW SECTION C, SOW AND NAVAIR CLAUSE

CTXT.242-9520 PROCEDURES AND APPROVALS REQUIRED PRIOR TO

INCURRING DIRECT MATERIAL COSTS (APR 2022)

0003 1 Lot Travel

COST

OTHER DIRECT COSTS (ODC) TRAVEL IN SUPPORT OF CLIN 0001 IAW

SECTION C, SOW 3.1.5 AND 5252.232-9509 TRAVEL APPROVAL AND

REIMBURSEMENT PROCEDURES.

0004 1 Lot Completion Based Work Ceiling

FFP

Ceiling only for completion base work FOB: Origin (Shipping Point)

NET AMT

0005 1 Lot Completion Based Work

FFP

COMPLETION BASED TASKING IN ACCORDANCE WITH SECTION C

STATEMENT OF WORK (SOW)

NSP, included in CLIN 0004 ceiling Fixed Price contract type; Fixed Price and Profit will be negotiated at the DO/TO level

0006 1 Lot Completion Based Work

CPFF

COMPLETION BASED TASKING IN ACCORDANCE WITH SECTION C

STATEMENT OF WORK (SOW)

NSP, included in CLIN 0004 ceiling Cost contract type; Cost and Fixed Fee will be negotiated at the DO/TO level

DATA

Not Separately Priced (NSP) TECHNICAL, FINANCIAL AND

ADMINISTRATIVE DATA

1001 1 Lot OPTION Labor

CPFF

SERVICES IN ACCORDANCE WITH SECTION C STATEMENT OF WORK

1002 1 Lot

OPTION MATERIAL

COST

OTHER DIRECT COSTS (ODC) MATERIAL AND EQUIPMENT IN

SUPPORT OF CLIN 0001 IAW SECTION C, SOW AND NAVAIR CLAUSE

CTXT.242-9520 PROCEDURES AND APPROVALS REQUIRED PRIOR TO

1003 1 Lot

OPTION TRAVEL

COST

OTHER DIRECT COSTS (ODC) TRAVEL IN SUPPORT OF CLIN 0001 IAW

SECTION C, SOW 3.1.5 AND 5252.232-9509 TRAVEL APPROVAL AND

1004 1 Lot OPTION Completion Base Work Ceiling

FFP

1005 1 Lot OPTION Completion Based Work

FFP

COMPLETION BASED TASKING IN ACCORDANCE WITH SECTION C

STATEMENT OF WORK (SOW)

NSP, included in CLIN 1004 ceiling Fixed Price contract type; Fixed Price and Profit will be negotiated at the DO/TO

1006 1 Lot OPTION Completion Based Work

CPFF

COMPLETION BASED TASKING IN ACCORDANCE WITH SECTION C

STATEMENT OF WORK (SOW)

NSP, included in CLIN 0004 ceiling

OPTION DATA

2001 1 Lot OPTION Labor

CPFF

SERVICES IN ACCORDANCE WITH SECTION C STATEMENT OF WORK

2002 1 Lot

OPTION MATERIAL

COST

OTHER DIRECT COSTS (ODC) MATERIAL AND EQUIPMENT IN

SUPPORT OF CLIN 0001 IAW SECTION C, SOW AND NAVAIR CLAUSE

CTXT.242-9520 PROCEDURES AND APPROVALS REQUIRED PRIOR TO

2003 1 Lot

OPTION TRAVEL

COST

OTHER DIRECT COSTS (ODC) TRAVEL IN SUPPORT OF CLIN 0001 IAW

SECTION C, SOW 3.1.5 AND 5252.232-9509 TRAVEL APPROVAL AND

2004 1 Lot OPTION Completion Base Work Ceiling

FFP

2005 1 Lot OPTION Completion Based Work

FFP

COMPLETION BASED TASKING IN ACCORDANCE WITH SECTION C

STATEMENT OF WORK (SOW)

NSP, included in CLIN 1004 ceiling Fixed Price contract type; Fixed Price and Profit will be negotiated at the DO/TO

2006 1 Lot OPTION Completion Based Work

CPFF

COMPLETION BASED TASKING IN ACCORDANCE WITH SECTION C

STATEMENT OF WORK (SOW)

NSP, included in CLIN 0004 ceiling

OPTION DATA

CLAUSES INCORPORATED BY FULL TEXT

5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012)

(a) The level of effort estimated to be ordered during the term of this contract is 1,791,280 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor by classification is as follows:

Period of Performance Total Labor Hours CLIN 0001 Base 1,231,600 CLIN 1001 Option 278,680 CLIN 2001 Option 281,000

• The composition of direct labor by labor category to be provided at task order level

(b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.

(c) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of:

(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or 52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort; or

(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.

(d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.

(e) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order.

5252.216-9506 MINIMUM AND MAXIMUM QUANTITIES (NAVAIR)(MAR 1999)

As referred to in paragraph (b) of FAR 52.216-22 " Indefinite Quantity" of this contract, the contract minimum quantity is $10,000; the maximum quantity is total contract value.

Section C - Descriptions and Specifications

STATEMENT OF WORK

1 Scope

1.1 APSD Contract Support

The Prototyping, Instrumentation, & Experimentation (PIE) Department’s Aircraft Prototype Systems Division (APSD) has a requirement for Contractor technical support for efforts described in this Statement of Work (SOW). The PIE Department provides integrated airworthy prototypes, flight test instrumentation, and system experimentation capabilities for Navy and Marine Corps aircraft programs. The primary focus of this SOW is to provide technical services and deliverables to meet prototyping requirements of the APSD infrastructure, engineering, technical shops, and aircraft modification/installation teams in support of manufacturing, airworthiness, rapid reaction and transition, experimentation, concept demonstration, research, spiral development, prototyping, and test and evaluation programs.

The APSD requires a standing support team of project managers, analysts, engineers, technicians, artisans, and other incidental supporting roles in order to meet critical schedule and test milestones for the Naval Air Systems Command Program Executive Offices (PEOs) that make up the core of the workload demand. For the purpose of this SOW, all activities leading up to Initial Operation Capability (IOC) are considered part of the prototype maturation process. The Contractor support predominantly covers the following activities as part of the non-recurring engineering, manufacturing, and installation requirement:

• Provide support to the APSD AS9100D Quality Management System

• Perform engineering and manufacturing research, design, analysis, airworthiness, and documentation for air vehicle and aircraft mission system development, system definition and architecture development, modification programs, and support to providing alternative solutions to technology and aircraft component obsolescence

• Provide support to the development of aircraft parts, assemblies, and modifications as part of technical data packages and manufacturing documentation

• Provide technical support services to the APSD manufacturing shops for aircraft electrical and mechanical component manufacturing, modification, and installation activities

• Perform project and financial management, analysis, and reporting

• Provide facility and access control support

• Provide organizational operations and administrative support

1.2 APSD Division Overview

The APSD, located at Patuxent River, Maryland, is a principal center of expertise in the design, development, manufacturing, and installation of aircraft modification and mission systems for rapid response and quick reaction requirements, spiral development, concept demonstrations, prototype integration, aircraft test and evaluation, and fleet capability introduction. The APSD primarily supports U.S Navy and Marine Corps platforms, but also supports other DoD, Government Agencies and Foreign Military Sales programs. APSD performs systems research and analysis, electrical/electronic engineering, mechanical/structural engineering, reverse engineering, airworthiness analysis, documentation, manufacturing, fabrication, and flight certification coordination all in support of the installation of these systems and capabilities into military and commercial/commercial derivative aircrafts. Additionally, APSD provides and supports infrastructure and facility requirements for these programs across APSD and the PIE Department as part of the Naval Air Warfare Center Aircraft Division (NAWCAD) Digital, Analytics, Infrastructure and Technology Advancement (DAiTA) Group.

Requirements executed by APSD will require collection and delivery of required material and resources, flexibility in approach to projects, and collaborating with other Commercial, National, and private sector operations.

The priority of projects ranges from traditional acquisition timelines to urgent operational response programs with National priority and immediate operational deployment requirements. The scale of these projects will range from non-complex build to print fabrication or installation efforts lasting several weeks to highly complex complete systems of systems integration and mission systems development efforts lasting several years.

1.2.1 APSD Branch Descriptions

APSD’s project and support staff, and design/manufacturing equipment, are within approximately 60,000 square feet of engineering and manufacturing shop facilities.

APSD is composed of the following branches with corresponding branch code:

Branch Title Code Description

Manufacturing and Integration Support

Branch

AD4310M

Performs the shop planning, manufacturing, assembly, modification, and installation of aircraft hardware and related items; fabricates and repairs composite and additive manufacturing materials; and responsible for tool control and inventory management inclusive of shipping and receiving.

Operations and Project Management

AD43200

Performs major project management, project analysis, project scheduling, technical writing, resource planning, budget development, financial management, coordination of workload acceptance, and responsible for the creation, interpretation, and enforcement of policies and procedures associated with APSD project management.

Quality Assurance

AD4330M

Oversees APSD’s Society of Automotive Engineers (SAE) Aerospace Standard AS9100 certified Quality Management Systems (QMS) by controlling, maintaining, monitoring, and tracking all of APSD’s QMS processes and documentation. The Quality Assurance (QA) Branch provides Quality Control (QC) inspection, calibration monitoring and control, configuration management (CM), process management, technical writing, training coordination, and personnel safety. APSD QC serves to ensure that all manufactured, fabricated, assembled, and installed items conform to all applicable technical drawings, specifications, and customer requirements.

Mechanical

Engineering Branch

AD4350M

/AD43500

Performs mechanical engineering and component design, Computer Aided Design (CAD), drafting, model-based definition, model-based systems engineering, airworthiness analysis, reverse engineering, additive manufacturing expertise, and project management of lower complexity efforts.

Supply Procurement Support Branch

AD4420M

/AD44200

Performs the purchase of supplies, equipment, and services in accordance with Government and contracting procurement methods. Additionally, provides project support functions and supplements activities related to the research of industry, laboratory, and aerospace tooling, material, and parts.

Electrical Engineering Branch AD43700 Performs electrical engineering and system power design, aircraft power and signal analysis, CAD and drafting, electrical reverse engineering, avionics and mission systems engineering, and project management of lower complexity efforts.

Division Management and

Infrastructure Support

AD4300/

AD4300M

The Division Management and Infrastructure Support branch provides a broad array of services supporting the total operational capability of the Division. This includes administrative functional support, facility maintenance, upkeep, reconfiguration and upgrades, secure facility access control and janitorial services for secure facilities.

2 Applicable Documents

The following documents are applicable to the SOW as specified herein. This list is not all-inclusive. This list is for reference only and defines the most common documents, policies, and specifications that may be applicable in the performance of the duties defined within this SOW.

The Contractor shall comply with the most current version of all applicable standards and procedures. In the case of an inconsistency between the industry standards referenced herein and the Government documents referenced below, the Navy/DoD standard shall take precedence.

2.1 Department of Defense Specifications

• Joint Travel Regulation (JTR)

• DODM 5200.01 – DoD Information Security Program: Controlled Unclassified

Information (CUI)

• DODM 5220.22-M – National Industrial Security Program Operating Manual (NISPOM)

• DODI 5230.24 – Distribution Statements on Technical Documents

• MIL-STD-31000 Technical Data Packages

• MIL-A-8625F (1) Anodic Coatings for Aluminum and Aluminum Alloys

• MIL-DTL-5541F Chemical Conversion Coatings on Aluminum and Aluminum Alloy

• MIL-STD-1504C Abrasive Blasting

• MIL-STD-810 Environmental Engineering Standards and Laboratory Tests

• MIL-STD-704 Aircraft Electrical Power Characteristics

• MIL-W-5088 Wiring, Aerospace Vehicle

2.2 Department of Defense Standards

• OPNAVINST 3440.17A – Navy Installation Emergency Management Program

• OPNAV 5239/14 SAAR-N – System Authorization Access Request Navy (SAAR-N)

• OPNAVINST 5239.1D – US Navy Cybersecurity Program

• SECNAVINST 5100.13F – Navy Tobacco Policy

• SECNAV M-5510.30 – Personnel Security Program

• SECNAV M-5510.36 – Information Security Program

• SECNAVINST 5510.36 – DoN Information Security Program (ISP) Regulation

• OPNAVINST 5530.14E Navy Physical Security and Law Enforcement Program

• DODD 4715-1E Environment, Safety, and Occupational Health (ESOH)

2.3 Other Government Documents (e.g. NAVAIR Documents)

• FAA JO 7360.1H Aircraft Type Designators

• COMNAVAIRFORINST 4790.2C – Naval Aviation Maintenance Program

• EKMS-1b - Electronic Key Management System (EKMS) Policy and Procedures For

Navy EKMS Tiers 2 & 3

• NASPAXRIVINST 5100.12C Traffic Safety Program

• NASPAXRIVINST 5100.35D – Safety and Occupational Health Manual

• NASPAXRIVINST 12610.7H – Employee Reporting Procedures During Emergencies

• DCMA INST 8210-1D – Contractors Flight and Ground Operations

• NAVAIR Technical Manual 01-1A-505, Installation Practices, Aircraft Electric and

Electronic Wiring

• NAVAIRINST 13034.1F, Airworthiness and Cybersecurity Safety Policies for Air

Vehicles and Aircraft Systems

• NAVSUPINST 4200.98A – DON Policies and Procedures for the Operation and

Management of the Fleet Card

• NAWCADINST 13050.1D – Aircraft Mod and CM Policy

• NASPAXRIV 5510.15R- Regulations Governing Admission to the NAS Patuxent River

(August 2018)

• NASPAXRIVINST 3440.17A- Installation Emergency Management Program

• NASPAXRIVINST 4010.5B Hazardous Material Control and Management Plan

• NASPAXRIVINST 11320.1N Fire Bill

• NASPAXRIVINST 11240.20 Licensing of Motor Vehicle and Equipment Operators

• NAWCADINST 3432.1B Operations Security (OPSEC)

• National Security Decision Directive (NSDD) 298

2.4 Industry Documents

• AWS D17.1 – Specification for Fusion Welding for Aerospace Applications

• IPC-J-STD-001H – Requirements for Soldered Electrical and Electronic Assemblies

• IPC-A-610H – Acceptability of Electronic Assemblies

• IPC-7111/7721C – Rework, Modification, and Repair of Electronic Assemblies

• SAE AS9100D – Quality Management Systems - Requirements for Aviation, Space and

Defense Organizations

• ANSI Y14.24, 34M, ASMEY14.35M Engineering Drawing Practices

• NFPA 409 Standards on Aircraft Hangars

• NFPA 410 Standards for Aircraft Maintenance

2.5 Other Documents (APSD)

• APSD SWP5400-019, Standard Work Package (SWP) for Aircraft Prototype

Modifications

• APSD-D-0021 APSD Quality Management System (QMS) Manual

• APSD-D-0001 APSD Configuration Management Plan

3 Requirements

3.1 General Requirements

3.1.1 Compatibility

The Contractor shall maintain the capability to prepare documents and software packages compatible with the Government Information Technology (IT) environment through the security classification of TOP SECRET. The current operating environment required for this contract includes:

• Microsoft Windows (Latest Version)

• Microsoft Project 2021

• Microsoft Office Professional Plus 2021

• Microsoft SharePoint

• Microsoft Teams

• Adobe Acrobat Pro

• Internet access

The Contractor shall maintain the ability to interface with and transfer data to and from the requiring office software applications and their upgraded versions. The Contractor shall maintain state-of-the-art anti-virus software and ensure that all media are virus free when delivered. The Contractor shall be capable of Internet and Local Area Network (LAN) communications with APSD. Contractor personnel shall be capable of maintaining real-time communications, both voice and data transfer capabilities, with APSD during normal working hours whether at Contractor work site or on travel.

3.1.2 Work Location, Facilities, and Telework

3.1.2.1 Work Location and Facilities

Approximately 80 percent of the work will be performed at Government site NAS Patuxent River and 20 percent of work to be performed at Contractor site. The location of the work will be identified at the task order level. Contractors performing on-site support will be provided access to workspaces, telephones, printers, facsimile machines, copy machines, shredders, computers, and network access including web servers and applicable databases or other applications necessary to carry out assigned tasks.

3.1.2.2 Meeting Support

In support of the tasking outlined in this SOW, the Contractor shall have the ability to host and conduct nonrecurring meetings with a maximum of 25 attendees, at the classification levels up to TOP SECRET. The conference room shall have telephone and Video Teleconference (VTC) capability (Non- GFE) and shall contain sufficient equipment to conduct meetings with presentations including compatible software as required in Paragraph 3.1.1. This support shall be provided at the contractor facilities.

3.1.2.3 Telework

The Contractor, upon notification to, and concurrence from, the Contracting Officer's Representative (COR) that the employees' work tasking is eligible for telework, may utilize alternate worksites/locations and telework to support continued performance of its contract in accordance with company policy. Contractor discretion is required when making alternate worksite and telework decisions based upon the nature of support provided by the employees. In the event telework is utilized, the Contractor remains responsible for performance and compliance with any applicable cost accounting standards and contract cost principles/procedures.

3.1.3 Contract Deliverable Requirements List (CDRLs)

The Contractor shall, provide the following data outlined below. To enable electronic data analysis and cross-checking, personnel names and labor categories shall be EXACTLY the same across all CDRLs.

CDRL TITLE REQUIREMENT

A001 Contract Progress and Status Report The Contractor shall provide a Contract Progress and Status Report bi-weekly IAW CDRL A001.

A002

Operational Security

(OPSEC)

The Contractor shall develop, implement, and maintain an OPSEC plan to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract. The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. This program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Decision Directive (NSDD) 298 and CDRL A002.

A003

Ground Operating Procedures

(GOPs)

The Contractor is responsible for writing, implementing, and enforcing their procedures and identifying and correcting deficiencies. Work on aircraft shall not begin until GOPs are approved by the Government IAW CDRL A003.

A004 Contractor Training

Plan

The Contractor shall provide a comprehensive training plan showing how all of the training requirements are being met IAW

CDRL A004.

A005 Personnel Locator Report

The Contractor shall provide a Personnel Locator Report that identifies all Contractor and Subcontractor personnel working under this contract as of the date of the CDRL, and identifies those that have been added or removed since the previous submission

IAW CDRL A005.

A006 Transition Out Strategy

The Contractor shall provide a Transition-Out Strategy in accordance with CDRL A006. The transition-out strategy shall be created around maintaining the mission of APSD with minimal impact, not only in terms of timeliness of performance but also to ensure that all critical data and knowledge transfer occurs.

A00X Additional Reporting

As requisites to the various task activities of the contract, the Contractor shall provide additional reporting, documentation, schedules, illustrations, analysis, and technical drawings. CDRL deliverable requirements will be determined at the TO level.

3.1.4 Work Schedule to include Compressed Work Schedule (CWS), holidays, and installation closure.

3.1.4.1 Work Schedule

The Contractor shall provide the required services and staffing coverage during normal working hours. Normal working hours are usually 8.5 hours (including a 30-minute lunch break), from 0700 to 1530 each Monday through Friday (except as specified in paragraph 3.1.4.1.2). Some supported Government offices have flexibility to start as early as 0600/0630 and end as late as 1800, Monday – Friday.

Alternate Work Hours There may be occasions – short term or long term – when a project and overall workload requires the use of an alternate work schedule. The alternate work schedule may include a split shift, second shift, irregular and extended work hours. Alternate work hour requirements will be determined at the TO level.

3.1.4.1.1 Compressed Work Schedule (CWS)

CWS is an alternative work schedule to the traditional five 8.5-hour workdays (which includes a 30-minute lunch) worked per week. Under a CWS schedule, an employee completes the following schedule within a two-week period: eight weekdays are worked at 9.5 hours each (which includes a 30-minute lunch), one Friday is alternately worked as 8.5 hours (which includes a 30-minute lunch) and one Friday is not worked by the employee. The result is 80 hours worked every two weeks, with 44 work hours one week and 36 work hours the other.

The Contractor may allow its employees to work a CWS schedule provided the requirements of this SOW are met. If the contractor chooses to allow its employees to work a CWS schedule in support of this contract, any additional costs associated with the implementation of the CWS schedule vice the standard schedule are unallowable costs under this contract and will not be reimbursed by the Government. Additionally, the CWS schedule shall not prevent Contractor employees from providing necessary staffing and services coverage as required by the Government to the ACOR/COR.

3.1.4.1.2 Holidays

The Government observes the following Holidays:

• New Year’s Day, January 1

• Martin Luther King’s Birthday, the third Monday in January

• President’s Birthday, the third Monday in February

• Memorial Day, the last Monday in May

• Juneteenth, June 19

• Independence Day, July 4

• Labor Day, the first Monday in September

• Columbus Day, the second Monday in October

• Veteran’s Day, November 11

• Thanksgiving Day, the fourth Thursday in November

• Christmas Day, December 25

With the exception of the events in section 3.1.4.1.3 below, the contractor is permitted to observe the above Holidays in accordance with its corporate policy.

3.1.4.1.3 Installation Closure

When Federal facilities are closed by the Government, or when Federal employees are officially excused from work due to a holiday or a special event, severe weather, a security threat, or other Government facility related problem that prevents Federal personnel from working at the Government facility, contractor personnel assigned to work at that facility in support of such Federal employees shall follow their parent company’s policies.

While generally, contractor personnel may not perform work on-site at a Government facility without oversight from Federal personnel, in very limited circumstances, work being performed by contractor personnel may be deemed mission essential and performance of such mission essential work may be authorized to continue at the Government facility despite the facility being otherwise closed for normal operations. The circumstances permitting work being performed by contractor personnel to be deemed mission essential are extremely limited and generally only apply to performance of efforts related to public health, safety, or matters related to national security. The cognizant Contracting Officer must concur with any determination that work being performed by contractor personnel is mission essential.

3.1.4.2 Overtime (OT)

Overtime is authorized under this contract when support requirements beyond normal working hours occur, to the extent specified in individual task orders, provided COR approval is obtained in advance of each occurrence.

3.1.5 Other Direct Costs

The Contractor shall obtain COR/ACOR approval IAW with the Naval Air Systems Command

(NAVAIR) C-TXT.242-9520 PROCEDURES AND APPROVALS REQUIRED PRIOR TO

INCURRING DIRECT MATERIAL COSTS (APR 2022).

3.1.5.1 Travel

Travel will be allowable only when it is essential to the performance of the tasks detailed in Section 3.3. The Contractor shall comply with NAVAIR Travel Clause 5252.232-9509 (Section H) Travel Approval and Reimbursement Procedures (NAVAIR)(OCT 2013). Reimbursement for travel performed shall be in accordance with the Department of Defense Joint Travel Regulation (http://www.defensetravel.dod.mil/site/travelreg.cfm). Travel may include general and administrative expenses, but shall not include profit. All travel expenses shall be reimbursed to the Contractor as ODCs. The Contractor shall obtain COR/ACOR approval for all travel performed in support of this contract prior to the commencement of the travel. Travel authorization requests shall be submitted no less than 15 business days prior to travel for COR/ACOR approval.

3.1.5.2 Material

The Contractor shall obtain prior written approval by the COR /PCO. If the Contractor’s proposal includes a list of materials with associated prices, then the PCO acceptance of the Contractor’s proposal shall constitute written approval of those purchases. Any material provided by the Contractor is subject to the requirements of the FAR, the Defense Federal Acquisition Regulation Supplement (DFARS), and applicable Department of the Navy regulations and instructions including NAVAIR Clause CTXT.242-9520 Procedures and Approvals Required Prior to Incurring Direct Material Costs (APR 2022). All materials not depleted during the performance of this contract shall become Government property upon completion of this contract. The contractor shall transfer all materials not depleted to the COR by way of Material Inspection and Receiving Report (DD Form 250). Material costs may include general and administrative expenses but shall not include profit/fee.

3.1.6 Subcontractors and Consultants

Provisions stated herein shall be clearly and effectively communicated to all subcontractors providing support under this contract. All provisions of this SOW shall flow down to subcontractors providing support under this contract.

3.1.7 Management of Contractor Personnel

The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances will the Government assign tasks to, or prepare work schedules for, individual contractor employees. The contractor shall manage its employees and guard against any actions that are of the nature of personal services, or give the perception of personal services.

3.1.8 Transition Out Strategy

The Contractor shall submit a Transition Out Strategy IAW CDRL A006.

3.1.9 Program Unique Requirements

3.1.9.1 Mandated Training

The Government may mandate training for all personnel. This training may be computer or instructor based. Contractor personnel shall participate in these training requirements.

Participation may be at live training events, computer-based training, or via review of a provided set of PowerPoint slides. This training shall be provided by the Government or be an allowable http://www.defensetravel.dod.mil/site/travelreg.cfm) http://www.defensetravel.dod.mil/site/travelreg.cfm) cost. The Contractor Program Manager shall ensure all Contractors on the contract are trained and shall report all training compliance IAW Contractor Training Plan (CDRL A004).

3.1.9.2 Safe Working Environment

The Contractor shall ensure Occupational Safety and Health (OSH) requirements as well as specific site requirements are followed. Safety requirements include ensuring all contractor personnel are wearing required safety equipment while performing applicable tasking within the

SOW.

3.1.9.3 Hazardous Material (HAZMAT)

No HAZMAT shall be brought onto Government property that does not directly relate to the performance of this contract. The Government is not responsible for disposal of Contractor material brought onto the job site that is not required in the performance of this contract. The Contractor shall obtain and maintain HAZMAT Coordinator Certification for employees designated to perform these tasks. The Contractor shall be responsible for meeting training requirements and costs associated with obtaining and maintaining HAZMAT Coordinator certifications throughout the PoP of this contract.

3.1.9.4 Incident Reporting

Much of the work performed by APSD personnel is hazardous. While performing this work, mishaps or incidents occasionally occur to equipment and personnel. The Contractor shall ensure personnel are proactive in identifying and mitigating potential and realized incidents.

Each person shall report incidences they observe (whether they are involved or not) to ensure proper procedures are followed to minimize the risk of further injury or property damage. The Contractor shall establish a log of recordable incidences, injuries, and illness, and present this information to the COR after each incident. CDRL requirement(s) will be defined at the DO/TO level.

3.1.9.5 Vehicles

The Contractor shall be required to operate Government-owned or leased vehicles in performance of tasking in the SOW. Government-owned or leased vehicles that the Contractor may use include general purpose passenger carrying vehicles, special-purpose vehicles, tractor trailer, and range authorized vehicles. All vehicles shall be operated IAW NASPAXRIVINST

11240.20 Licensing of Motor Vehicle and Equipment Operators and the NASPAXRIVINST 5100.12C Traffic Safety Program. Vehicle status reporting, operator maintenance, vehicle damage reporting, and Government Fleet Card utilization requirements will be specified at the order level.

3.1.9.6 Aircraft Related Activities

In the performance of the contract, the Contractor may have access to aircraft hangars, flight lines, maintenance areas, mobile and fixed ground control stations, and aircraft. Contractor shall ensure personnel follow GOPs and additional local instructions, policies, and procedures regarding security, physical access, foreign object damage, tool control, and reporting requirements.

3.1.9.7 Communication Security (COMSEC)

The Contractor shall be required to access COMSEC material. The Contractor shall follow the guidance for handling COMSEC material as identified in EKMS-1b - Electronic Key Management System (EKMS) Policy and Procedures For Navy EKMS Tiers 2 & 3 and applicable local instructions. COMSEC storage requirements shall be identified at the DO/TO Level.

3.1.9.8 Data Handling

The Contractor shall perform in accordance with OCI Clause 5252.209-9510(e)(5).

3.1.9.9 Physical Security

Secure Buildings - The Government has materials, equipment, vehicles, and buildings located at government sites that the contractor may be required to access and operate in support of the tasking in this SOW. When the contractor accesses these areas, the contractor shall be responsible for performing necessary physical security duties at the sites, including situations where the contractor is the last person leaving joint facilities at the end of each workday.

3.2 Security

3.2.1 Citizenship Requirements

Only United States (U.S.) citizens may perform under this contract. If the Contractor cannot find qualified U.S. citizens to perform the work, the Contractor shall submit a citizenship waiver request with justification to the Government Security Office. The waiver request shall include:

a) The individual's name, date and place of birth, position title, and current citizenship.

b) A statement that a qualified U.S. citizen cannot be hired in sufficient time to meet the contractual requirements.

c) A statement of the unusual expertise possessed by the applicant.

d) A statement that access will be limited to a specific Government contract (specify contract number).

e) A statement that the Contractor has obtained an export license for the information required to perform the contract.

3.2.2 Investigative Requirements

Unclassified: All Contractor personnel must be eligible to perform Non-Critical Sensitive work as defined by SECNAV M-5510.30C. All Contractor personnel are required to have a favorably adjudicated Tier-3 investigation from the Office of Personnel Management. The Contractor shall submit a request for personnel security investigation to the Government Security Office. The Government Security Office shall initiate the Contractor's Electronic Questionnaire for Investigations Processing (eQIP), shall do a preliminary screening of the Contractor's eQIP for suitability and derogatory information. The Contractor employee shall provide all requested information pursuant to the Privacy Act of 1974. The Government Security Office may deny the Contractor access to Government facilities and information and may prohibit the Contractor from performance of sensitive duties for failure to provide requested information or when derogatory or adverse information is present on the Contractor's eQIP, in such cases, the Contractor employee may not perform on the Contract.

The Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of controlled unclassified information and to control distribution of controlled unclassified information in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), and SECNAV M-5510.36B. All Contractor facilities shall provide an appropriate means of storage for controlled unclassified information and materials. All controlled unclassified information shall be appropriately identified and marked as For Official Use Only in accordance with DoD Instruction 5200.48, Controlled Unclassified Information (CUI).

Controlled Unclassified Information including Covered Defense Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoD Instruction 5200.48, Controlled Unclassified Information (CUI) available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) using the criteria set forth in DoDI 5230.24 (Distribution Statements on Technical Documents); and have this statement displayed per DoDI 5230.24, Enclosure 3.

All controlled unclassified technical information shall be appropriately identified and marked with the following distribution statement(s):

Distribution Statement (Insert Appropriate Letter and Authorization Title), (Insert Appropriate Reason Category) (dated – (Date of Distribution Authorization). Other requests shall be referred to: Commander, Naval Air Systems Command, Attn: (Program/User Agency mailing address).

Classified: All Contractor personnel shall maintain security clearance eligibility commensurate with the level of classification of the work performed as annotated in the Contract's DD-254, Contract Security Classification Specification Form.

Contractor personnel shall require access to classified information in performance of this contract up to and including TOP SECRET, with a safeguarding level of SECRET. The Contractor is responsible for ensuring that all personnel receive the requisite investigation and are favorably adjudicated IAW DODM 5220.22, National Industrial Security Program Operating Manual (NISPOM). Contractor employees who fail to meet security clearance requirements may not access classified information or perform sensitive duties. In such cases, the Contractor employee may not perform on the contract.

The contractor shall comply with security requirements specified in the DD-254 attached to this contract. Information or data that the contractor accesses shall be handled at the appropriate classification level. Unclassified information shall be handled in accordance with the appropriate designation (Controlled Unclassified Information; Covered Defense Information). Distribution is authorized to the Requiring Office's Organization and supported Activity only. Other requests for deliverables under this contract shall be referred to the TPOC/COR of this contract for approval.

All personnel supporting the tasks under this contract must be eligible for a SECRET security clearance.

3.2.3 Common Access Card (CAC)/Public Key Infrastructure (PKI), System Authorization

Access Request (SAAR-N)

3.2.3.1 SAAR-N

All contractor personnel requiring access to Government Information Technology (IT) systems shall have an approved System Authorization Access Request (SAAR-N) Form OPNAV 5239/14 (Rev Sep 2011) on file, and complete required Annual Information Awareness Training.

New employees must submit their SAAR forms within thirty (30) calendar days of their first day of work. Instructions for processing the SAAR-N forms are available at:

http://www.cnrc.navy.mil/publications/Forms/OPNAV_5239_14_SAAR_N.pdf.

SAAR-N forms shall be submitted to the Contracting Officer’s Representative (COR), Government Technical Point of Contact (TPOC), or to the assigned government Trusted Associate Sponsorship System (TASS) Trusted Associate.

3.2.3.2 Common Access Cards (CAC)/Local Badges

Contractor CACs and facility specific identification badges will be issued by the Government to on-site Contractor personnel and shall be visible at all times while personnel are at the Government site. The Contractor shall furnish all requested information required to facilitate http://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF http://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF http://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF http://www.cnrc.navy.mil/publications/Forms/OPNAV_5239_14_SAAR_N.pdf issuance of identification badges and shall conform to NASPAXRIV Instruction 5510.15Q.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .