Block14_attachement_to_amend_0001.pdf
PDF 165 KB Posted
- Attached to
- Blossom Point Award Notice Correction Federal contract opportunity
- Solicitation number
- N00173-13-R-JF01
About this file
Block 14 of the SF 30
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_AMENDMENT_0009v2.pdf | ||
| 13_JF01_AMEND0008_POSTED_COPY.pdf | ||
| 13-R-JF01_Pricing_Format.xlsx | XLSX spreadsheet | |
| N0017313RJF01_Amendment_0007_pdf_-_Adobe_Acrobat.pdf | ||
| 13-R-jf01_0004.pdf | ||
| 13-R-JF01_NRL_Past_Performance_Questioneer.pdf | ||
| http //heron.nrl.navy.mil/contracts/4335_1.pdf | ||
| 13-r-jfo1_0003.pdf | ||
| 13-R-jf01_0002.pdf | ||
| 13-R-JF01_ATTACH_L1.xlsx | XLSX spreadsheet | |
| RFP_BPTFv8_7May13_amendv1.pdf | ||
| SF_33_amend0001-p.pdf | ||
| PWS_CDRL_AMEND.pdf | ||
| SF30_AMENDMENT_OF_SOLIC_MODIFICATION_OF_CONTR.pdf | ||
| 13jf01rfp_Sect_B.pdf | ||
| 13jf01pws.pdf | ||
| DD254_PR81_4031_13_UPDATED.pdf | ||
| 13jf01packet.pdf | ||
| http //heron.nrl.navy.mil/contracts/13JF01.HTM | HTM file | |
| 13jf01wage.pdf | ||
| 13jf01costsummary.xlsx | XLSX spreadsheet | |
| BPTF_GFE_List_4-12-2013.pdf | ||
| BPTF_QAP_v5_final.pdf | ||
| SF_33.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.: N00173‐13‐R‐JFO1
AMENDMENT NO.: 0001
P a g e | 2 The purpose of this amendment is to:
A. Provide responses to questions received from potential offers.
B. Provide amended SF 33, copy attached C. Provide amended Request for Proposal, conformed copy attached, see below for specific changes/corrections.
D. Provide amended Performance Work statement, conformed copy attached, see below for specific changes/corrections.
A. Responses to questions received from potential offers:
1. We request the Government remove the requirement for submission of Key Personnel resumes since it generally favors the incumbent contractor team who would use incumbent personnel resumes with the most directly relevant experience and level of security clearance. In other NRL solicitations, the following language was used for assessing the qualifications of project personnel which provides an option for an Offeror to capture desired incumbent key personnel.
“The offeror shall provide convincing proof that he has, or, has the ability to obtain key personnel with relevant experience in the scientific and technical areas described in the
Statement of Work. These are highly specialized fields and personnel without actual experience in these areas are not acceptable. The Personnel Qualifications provided in the Solicitation sets forth the desired qualifications.
It is necessary for the offeror to demonstrate that personnel possess a final favorable
DoD adjudicated clearance.”
Government Response: The clearance requirement has been amended to: “demonstrate ability to achieve a TOP SECRET/SCI clearance prior to award.”
2. Question: There is a conflict with respect to the number of Key Personnel and security clearance requirements in the referenced sections of the solicitation. We recommend limiting Key Personnel to the three positions marked as (Key Personnel) in Appendix A ‐ Personnel Qualifications and using Appendix A Clearance descriptions for security clearance requirements, as this approach allows for fair and open competition. Please clarify.
Government Response: Key personnel has been amended in the PWS to three positions.
3. Question: Since this is a small business set aside, FAR 52.219‐9 Small Business Subcontracting Plan (Jan 2011) (a) states the clause does not apply to small business concerns. If FAR 52.219‐9 does not apply to small business concerns then does DFAR
215.304 apply to contracts that are small business set asides?
Government Response: Instructions for Small business are highlighted in paragraph 8 of this amendment.
P a g e | 3
4. Please clarify what we need to submit under Non‐Technical factor 1 and Non‐Technical factor 2. The requirements to provide a completed Section B , signed SF33, and Representation and Certifications are listed under both Non‐Technical Factor 1 and 2.
Was this information meant to be provided twice?
Government Response: The information was inadvertently duplicated, it has been removed from Factor 2. See amended RFP.
5. Some of the key personnel categories are missing from Section H‐8 (k) and the Labor Breakdown (Sr. Tech Engineer, Network Engineer, IT Specialist, Performance Analyst, Project Support/Jr. Project Support). Are these categories going to be added to Section H‐8 (k) and the Labor Breakdown and will hours be provided?
Government Response: Labor categories, pg 37, 38 have been revised to include key personnel. See amended/conformed RFP.
6. In Section L, “Provide a completed summary Attachment J‐3, provided under the base Period and first Option Period only.” Do you mean Attachment L‐3?
Government Response: Pg 58, section J, attachment 3 should be fully completed.
7. Attachment J‐3 has 2 formats, one for FFP and one for CPFF. The attachments contain all years (Base through Option 4). Are we to price all years, not just Base and Option 1?
Government Response: All years, in Section J, attachment 3, base and option one thru four are to be priced.
8. In H.8 The Labor Breakdown spreadsheet shows a total of 72,135 hours to be bid per year. Section H.8.(b) states "The level of effort for this contract shall be expended at an average rate of 150,281 hours per month." and Section B‐2 shows a maximum quantity of direct labor hours ordered over the life of the contract to be 153,604. Please clarify the number of hours to be bid.
Government Response: The labor hours per year are estimated at 72,135. The labor hours over the life of the contract have been revised to 360,675.
9. The submittal requirement for Factor 2 is missing. Will the detailed project information listed under Corporate Experience be moved to Factor 2?
Government Response: Factor 2 has been updated in the revised RFP
10. Does the Government want multiple organizational charts or just one for the BPTF requirement?
Government Response: One organizational chart
P a g e | 4
11. Ref: In FACTOR 3: MANAGEMENT, there is the following requirement:(d) Scheduling.
Provide methodology used (i.e. management indicators) to determine if/when there is a need to adjust recurring work schedule. Describe scheduling procedures that will minimize interference with the normal occurrence of Government business and the flexibility to adjust schedules to allow for access outside regular working hours and the flexibility to adjust to workload fluctuations.
In FACTOR 4: TECHNICAL APPROACH/METHOD, there is the following requirement: 3.)
Describe scheduling procedures that will minimize interference with normal occurrence of Government business and the flexibility to adjust schedules to allow for access outside regular working hours and the flexibility to adjust to workload.
Question: Is it the Government's intention for this information to be provided twice or included in one area and referenced from the other?
Government Response: Please provide the information for each area.
12. Is there more than one site supported than the Blossom Point facility?
Government Response: No Blossom Point facility is the only site.
13. Will the Government consider extending the proposal response time from 30 days to 45 days to accommodate changes resulting from the clarifications?
Government Response: At this time the government is not considering extending the proposal response time.
B. SF 33 CHANGES
1. Closing date updated in block 9.
C. Provide amended Request for Proposal, conformed copy attached, see below for specific changes/corrections. All page references are to the CONFORMED COPY OF THE RFP
1. Section B, added CLINs for CDRL items: 0009, 1008, 2008, 3008, 4008.
2. Section B‐2, Changed Labor Hours from 153,604 to 360,675 contract maximum.
3. Pg 22 Section F‐2, Added: “With respect to base CLIN 0001, 0002 and 0003, at its discretion, the government intends to exercise Option period 1 and 2 and it is unlikely to exercise future options.”
4. Pg 31 Sec H‐2, ONR 5252.237‐9705 ‐ KEY PERSONNEL (DEC 88). Edited listing of personnel to show only key personnel
Labor Categories: Senior Tech Engineer (key Personnel), Digital Tech (key personnel, Performance Analyst (key personnel), Project Support/Junior Project
Support, Facilities (Custodial, Electrical, HVAC, Power, Carpenter)
To:
Labor Categories: Senior Tech Engineer (key Personnel), Digital Tech (key personnel), Performance Analyst (key personnel)
P a g e | 5
5. Pg 37 and 38, the anticipated labor category breakdown was updated. These changes were made to align the PWS to the RFP labor categories.
The following changes were made:.
Associate Engineer ‐2 was changed to Performance Analyst Information systems – Security analyst was changed to IT Specialist Network Administrator was changed to network engineer Spacecraft Engineer was changed to Senior Technical engineer Technical Manager was changed to Project Support
6. Pg 66, Added closing date
7. Pg 66, Sect L: Added the closing date and cutoff date for questions
8. Pg 72, Added Page size and format requirements and proposal submission requirements.
9. Pg 79 Section L, vol 1, Factor 1, removed Senior Proj Mgr as a key personnel, this position was not mentioned elsewhere.
10. Pg 79, Revised Resume Submittal requirements: Removed requirement for “Name” and
“Signed Resume” requirement.
11. Pg 83, 52.219‐9, sentence 3 states: “Small business concerns that are not required by
FAR 52.219‐9 to submit a subcontracting plan must indicate the extent to which proposed joint ventures, teaming arrangements, or subcontracts are with historically black colleges or universities and minority institutions.” Therefore, a Small Business Plan, please indicate the extent of small business involvement besides the prime.
12. Pg 86, Sect M ‐ Reorganized Technical Evaluation Factors: New Technical Factors are:
Technical Factors
Technical Approach
Corporate Experience/Capability of Key Personnel
Management
Non Technical Factors
Cost
Past Performance
Small Business Utilization
13. PG 89, Factor 2, changed from: ”possession of a TOP SECRET/SCI clearance.”
To: “demonstrate ability to achieve a TOP SECRET/SCI clearance prior to award.”
D. Provide amended Performance Work statement, conformed copy attached; see below for specific changes/corrections. CONFORMED COPY OF THE PWS
1. Pg 13, 14, updated numbering to CDRLs
Former New A002 B006
P a g e | 6 A003 B002 A004 B003 A005 C001 A006 C002
A007 BOO4
A008 B005 A009 B001 A010 A002
File details come from the government source that posted it. Updated .