Q A_165_thru_211.docx
DOCX document 38 KB Posted
- Attached to
- P-8A Airframe and Engine Depot Maintenance Competition Federal contract opportunity
- Solicitation number
- N00019-15-R-2004
About this file
Q A 165 thru 211
View the file
Other files for this federal contract opportunity
Show all 50
P-8A Airframe and Engine Depot Maintenance Competition has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question
| Government Response |
| Reference |
| 165 |
| Will the Government provide the quantity and locations of auxiliary fuel tanks? |
Yes. The this information is in the P8 maintenance manuals and will be provided with the Technical Data CD referenced in the RFP
P-8A Integrated Maintenance Program Depot Specification
| 166 | |
| Will the Government provide the P-8 Layout of Passenger or Equipment Accommodation diagram? |
Yes. The this information is in the P8 maintenance manuals and will be provided with the Technical Data CD referenced in the RFP
None
| 167 |
| a) Will the Government provide the AMM to support proposal development? |
b) Are the instructions for mission system removal/reinstallation included in the AMM?
a) Yes will be provided with the Technical Data CD referenced in the RFP
b) Yes SOW paragraphs 1.2 System Descriptions and 2.0 References and Government Furnished Information
| 168 |
| a) Will the technical Directives, Service Bulletins, and Service Letters be accomplished as part of PMI 1 or PMI 2? |
b) Should the Contractor price the technical Directives, Service Bulletins, and Service Letters separately or priced as part of PMI 1 or 2.
a) Yes the intent is to accomplish concurrent with the PMI 1 and PMI 2 as applicable.
b) Contractor should price the TD’s SB and SL in accordance with Attachment L-9 of the RFP.
Attachment 8 Technical Directives
| 169 |
| Will the Government provide CNAFINST 4790.2 to support proposal development? |
The CNAFINST 4790.2 can be downloaded at the following site https://logistics.navair.navy.mil/
SOW 2.0, 4.1.5.3, 5.3.3.4, 6.0, 6.1, 7.1, 7.2, 8.2, 8.3, 8.14, 8.20
| 170 |
| Is liquid oxygen used on the aircraft? |
No
None
| 171 |
| Will the Government provide NAVAIR Risk Management Policy 5000.21B to support proposal development? |
NAVAIR Risk management Guide can be found on the Internet www.mctechsystems.com/resources/navairinst_5000.21b.pdf
7.11 Risk Management Plans
| 172 |
| Will the Government revise SOW paragraph 4.1.4 to include a CDRL number for the Discrepancy Record submittal? |
| There is no CDRL required for a discrepancy report. Attachment 2 should be provided per SOW paragraph 4.1.4. |
| SOW 4.1.4 Discrepancy Record(s) |
| 173 |
| Will the Government revise SOW paragraph 4.1.4 to include a CDRL number for the Discrepancy Record submittal? |
| Same as Question #172 (above) |
| SOW 4.3 Flap Track Attach Fitting Concurrent with AEPD |
| 174 |
| Data essential for proposal development was not included as part of the final RFP release, e.g., Section K, Clause 252.204-7007, titled Annual Representations and Certifications (Dec 2014) – Alternate A (Jan 2015). Will the Government amend the solicitation to include all essential data? |
| Information is contained within 52.204-7. |
| FAR 52.204-7 |
| 175 |
| Will the Government clarify the requirement for a “bonded” storeroom (versus “secured” storeroom)? “Bonded” as defined by the DoD Guidebook on Property Administration, page 23, does not appear to match what is intended here. As noted in the aforementioned reference, “unless there is a need to defer payment of duties on Government property until it is sold, bonded storage is generally inappropriate”. |
| The Govt will change the wording to reflect the intent of the DoD Guidebook on Property Administration. |
| SOW 3.2 Equipment Removal |
| 176 |
| Will the Government confirm that the referenced requirement applies to airframe depot maintenance? |
| No, there is no planned back shop requirement. See update in amendment 0001 |
| Section L 2.1.1 Facilities/Equipment – “Specifically, the Offeror shall provide the total monthly capacity of items processed for each shop in support of this solicitation.” |
| 177 |
| Will the Government clarify the scope or work for depot maintenance? |
| The scope of work for Depot maintenance is any airframe or engine maintenance that is beyond the “O” level maintenance capability. The P-8A program does not currently have a requirement for the repair of mission avionics components or any “O” level line replaceable units. However, there are requirements to install mission avionics system modifications IAW approved Technical Directives at the system level not at the component level. The SOW has been updated. |
1.0 Scope
1.3 Depot Maintenance Concept
5.1 Requirements
Integrated Maintenance Age Exploration Plan Depot Specification Attachment 5 NAVAIR P-8A AEPD Specification
| 178 |
| Will the Government provide additional details regarding the scope of integrated logistics support required? |
| The intent of the statement is for logistics support to support the requirements of the solicitation. There is not a CLS component of the P-8A Airframe and Engine Depot maintenance requirement. The SOW has been updated accordingly. |
| 7.0 Program Management |
| 179 |
| Will the Government confirm the applicability of a CWBS to a FFP depot maintenance program? |
| This contract meets the dollar threshold requirement; the contractors are required to report cost data on CSDR Forms 1921 & 1921-5 which require a CWBS dictionary to document what is being reported under each WBS element. |
| 7.0 Program Management |
| 180 |
| Please clarify Max Quantity for CLIN 6029. SF33 states “2”, Attachment L-5 Price Matrix states “1”. |
| Max Quantity for CLIN 6029 is correct 2; one stand down for each contractor. The quantity is correct in the SF33 and Attachment L-5, as L-5 is per Offeror. |
| SF33 Page 162, CLIN 6029 and Attachment L-5 Price Matrix, Option Period 6 tab, CLIN 6029 (row 21) |
| 181 |
| Will the Government include Description and Specifications for the rest of the Base Period CLINs? Only Item 0001 is included on page 184 of the SF33. |
| Section C of the RFP has been updated to include Base Period CLINs. See amendment 0001. |
| SF33, Section C, Description and Specifications. |
| 182 |
| The following task cards, which are listed as PMI 1 only tasks in P-8A AEPD Specification Attachment (5) Appendix E, are listed as both PMI 1 and PMI 2 in column 4 (Performed at Depot) of the A1-P8AAA-PMIC-000: 53-816-00-01, 53-824-01-01, 53-826-00-01, 53-830-00-01, 53-832-00-01, 53-834-00-01, 53-839-00-01, 53-858-01-01, 53-862-00-01, 53-868-00-01, 53-880-00-01, 53-886-00-01, 57-826-01-01, and 57-896-02-01 |
Will the Government remove these tasks from the PMIC prior to the first AEPD 2? Is it the Government's intent for contractors to omit these tasks from AEPD 2 bids?
| These are Zonal / Age Exploration tasks. The data obtained from findings associated with these tasks will be used to develop inspections for specific failure modes which will replace the Zonal / AE general inspections prior to the second depot event. |
| P-8A AEPD Specification Attachment (5) Appendix E |
and
A1-P8AAA-PMIC-000
| 183 |
| "The following tasks, which are listed as PMI 1&2 (fuel system check) requirements in column 4 (Performed at Depot) of the A1-P8AAA-PMIC-000, are not listed in P-8A AEPD Specification Attachment (5): 28-282-00-01, 28-284-00-01, 28-286-00-01, 28-288-00-01, 28-290-00-01, 28-292-00-01, 28-294-00-01, 28-296-00-01, 28-298-00-01, 28-300-00-01, 28-302-00-01, 28-304-00-01, 28-306-00-01, 28-308-00-01, 28-310-00-01, 28-320-00-01, 28-330-00-01, 28-340-00-01, 28-360-00-01, 28-390-00-01, 28-400-00-01. |
Is it the Government's intent to omit these tasks from the AEPD, even though they would be best performed during AEPD due to access to the fuel tanks? Should contractors include these tasks in the AEPD 1 and AEPD 2?"
| These functional checks are part of the AMM procedure for installation of the Auxiliary Fuel Tanks and therefore inherent in the process. |
| P-8A AEPD Specification Attachment (5) Appendix E |
and
A1-P8AAA-PMIC-000
| 184 |
| "The following tasks, which are listed as PMI 2 only tasks (landing gear task) requirements in column 4 (Performed at Depot) of the A1-P8AAA-PMIC-000, are not listed in P-8A AEPD Specification Attachment (5): 32-040-01-01, 32-040-02-01, 32-090-00-01, 32-720-01-01, 32-720-02-01, 32-750-00-01. |
Is it the Government's intent for the landing gear removal and replacement to be part of the contractor’s workscope for AEPD 2?
Is it the Government's intent for the landing gear overhaul to be part of the contractors' workscope for AEPD 2? "
| Landing gear replacement and overhaul should not be considered as part of the workscope for AEPD 2. |
| "P-8A AEPD Specification Attachment (5) Appendix E |
and
A1-P8AAA-PMIC-000"
| 185 |
| Attachment L-8 does not have CLIN X012 included in the T&M CLINs, however Attachment L-5 and Section B both have CLIN X012. |
Is it the Government's intent to leave CLIN X012 off of Attachment L-8 but have it included on Attachment L-5 and Section B?"
CLIN X012 is now included in Attachment L-8.
Att_L-8_Prime_Coontractor_Cost_Summary_TandM
| 186 |
| "When testing the referenced spreadsheet, contractor found that the ""SUMIF"" function was doubling some of the items as well as populating cells where it should be a $0 value. This calculation is due to the some of the same Service Letters and Work Locations being in both CLIN X013 and X035. |
Is it the Government's intent that these items be doubled in the Summary tab?"
| "Reference should be Att_L-9_Prime_Contractor_Tech_Directives_FFP. The formulas on L-9 have been modified to accurately reflect the unit price on the Summary tab. TDs that are applicable to both X013 and X035 are listed multiple times." |
| Att_L-8_Prime_Contractor_Tech_Directives_FFP |
| 187 |
| "Table G-2 Proposal Structure on pg. 248 states that the Copies Required for Volume 5 – CONTRACT ADMINISTRATION are as follows: ""1 Original / 5 Copy / 1 CD-ROM Master and 1 CD_ROM Back-up."" |
However, Section L., Part B, 5.0.e on pg., 275 states, ""Provide a separately bound hard-copy Model Contract and a digital version on a separate disk from the proposal volumes in both PDF and MS file formats.""
Will the Government please clarify the number of hard and soft copies required for submission of The Model Contract?"
| The Government has updated Table G-2 for Volume 5- CONTRACT ADMINISTRATION. The Government requires 1 hard copy of the Model Contract and a digital version in both PDF and MS file format, on a separate disk from the proposal volumes. |
| Formal Solicitation Section L |
| 188 |
| "On pg. 197 under Section G - Contract Administration Data, the solicitation states ""Offerors shall insert in Section B of the Schedule unit prices and total amount at the line item level only (e.g., Item 0001, 0002, etc.). Offerors shall break-out prices into subline items in Section B of the Schedule, to reflect unit prices and total amount at the task order level by aircraft/engine number."" |
Does the Government intend for contractors to insert SLINs for the price of each TD, or will the TD costs roll up to the CLINs 0012, 0013, 1012, 1013, 2012, 2013, 3012, 3013, 4012, 4013, 5012, 5013, 5034, 5035, 6012, 6013, 6034, or 6035, respectively, and each TD price should only be reflected in Att_L9? Pricing each TD as a SLIN will add 29 SLINs per CLIN for the Engine TDs and 61 SLINs per CLIN for the Airframe TDs. "
| No, the Government does not intend for the Offerors to insert SLINs for the price of each TD. The Offerors should price at the CLIN level on the IDIQ. The Contractors shall break out pricing into subline items at the task order level. |
| "Formal Solicitation Section G |
and Att_L-9_Prime_Contractor_Tech_Directives_FFP"
| 189 |
| "Document L-9 requires individual pricing for each Technical Directive. Pricing each Technical Directive to be awarded separately causes induction and delivery to be priced in each TD and duplicated when awarding concurrent TDs. Drop in flap track events appear to address this issue by use of T&M pricing. |
Would the Government consider separately pricing induction and delivery events? " SOW and Section L have been revised to clarify this. Technical Directive SLINs (CLINs X013 and X035) that are Concurrent with AEPD should have the Induction and Delivery costs included in the AEPD events (CLINs X002, X003, X007, X008, and X030). Technical Directive SLINS that are Drop-In will have the associated Induction and Delivery costs covered under CLINs X020, X021, or X033 as appropriate to the aircraft. Technical Directive SLINs that are In-Field Shall have no Induction or Delivery costs associated with them.
L-9 TD pricing
| 190 |
| "SOW paragraph 8.18 states ""Gov't aircrew will perform operational checks of mission systems prior to FCF and inform the contractor of any discrepancies. The contractor shall be responsible for the correction of aircraft systems discrepancies not identified during the pre-operational checks."" |
Will the Government please clarify the following:
1. Is the contractor's responsibility limited to items the contractor can test on the incoming configuration?
2. Will the Gov't aircrew perform operational checks prior to AEPD induction?
3. Will these pre-induction checks be performed at the contractor's facility or at a Gov't facility prior to the ferry flight?
4. Will the contractor be able to participate in the pre-induction operational checks? and
5. Will the same test procedure be used pre-induction and before the FCF by the Gov't aircrew?"
1) There is no requirement for the contractor to test incoming configurations. The USG will perform an ASW preflight to verify system operation and the contractor may witness the event.
2) Yes.
3) ASW preflight can be performed at either facility.
4) The contractor may witness the ASW preflight.
5) Yes the same ASW preflight will be performed prior to the FCF."
SOW 8.18
| 191 |
| When the Government references "Wrap Rates," is it the Government's intent that the rate should include all labor categories including base and support effort, with the contractor utilizing the wrap rate as a price per base hours worked? |
For example, if an effort/CLIN is comprised of 50% hands on labor ($10/hr.), 25% program management ($20/hr.) and 25% planning ($12/hr.); should the “Wrap Rate” be $13/hr. (weighted average of all rates) or $26/hr. (only hands on labor hours are “billable”).
| The wrap rate shall be inclusive of all labor to be charged to the applicable CLIN, including both base and support efforts. See updated Section L Price Proposal Instructions Section 2. Program management may only be included in the wrap rates for the CLINs listed in Section L 4.2.1 Price Proposal Instructions Section 2-Contractor Rates. |
| Formal Solicitation Section L 4.2.1 Price Proposal Instructions Section 1-Proposed Price (Page 273) |
| 192 |
| Do the evaluated hours for T&M include the base Hands on Labor hours (or Engineering hours) and Support hours, or are the evaluated hours only the base (HOL or Engineering)? |
| Hours in Attachment L-8 include only the base hours. |
| Attachment L-8 Prime_Contractor_Cost_Summary_TandM |
| 193 |
| The referenced solicitation paragraph states; “Attachment L-10 sets forth the requirements for Sample Tasks and is for evaluation purposes only. The Sample Tasks are for the incorporation of all three Technical Directives into a single aircraft concurrent with an AEPD”. However, Attachment L-10 lists seven Technical Directives. Please clarify the specific Technical Directives to be incorporated in the sample task. |
| AFC-46, 47, and 48 and AVC-5848 and 5849 are installed concurrently into a single aircraft. |
| Section L PART B SPECIFIC INSTRUCTIONS 2.1.9 Sample Task for incorporation of a Technical Directive |
| 194 |
| "252.216-7006 ORDERING (MAY 2011) |
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from [________] through [________][insert dates].
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c)(1) If issued electronically, the order is considered “issued” when a copy has been posted to the Electronic Document Access system, and notice has been sent to the Contractor.
(2) If mailed or transmitted by facsimile, a delivery order or task order is considered “issued” when the Government deposits the order in the mail or transmits by facsimile. Mailing includes transmittal by U.S. mail or private delivery services.
(3) Orders may be issued orally only if authorized in the schedule"
Please provide the dates to be inserted in referenced clause.
Time of award; End of POP Solicitation Section I
| 195 |
| "52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) N00019-15-R-2004 Page 224 of 286 |
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within _____ [insert the period of time within which the Contracting Officer may exercise the option].
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) N00019-15-R-2004 Page 224 of 286
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within _____ [insert the period of time within which the Contracting Officer may exercise the option].
Please provide the dates to be inserted in referenced clause.
| The Period of Performance. |
| Solicitation Section I FAR 52.217-8 Option to Extend Services (NOV 1999) |
| 196 |
| Request Paragraph reference states CLINS X062, X063, X075, X090 are FFP CLINS. |
However, X062, X075, & X089 are listed as T&M CLINS under Para 3.5.5 Life Limited Parts (LLP Replacement).
Since the purchase of the LLP have moved to T&M shouldn’t these CLINs be removed from this paragraph?
Same question under the solicitation section L.
SOW paragraph 3.5.3 have been corrected.
Section L Paragraph 4.2.1, Section 3 (FFP CLINs) have also been corrected.
Contract Line Item Numbers (CLINs) X062, X075 and X090 have been removed from the FFP paragraph.
The Offeror's question mis-stated the CLIN X089. It should've stated CLIN X090.
Attachment 1 part B, Para 3.5.3 Core Performance Restoration (with or without Life Limited Parts Replacement – FFP CLINS. Solicitation (N0019-15-R-2004) Section L, Para 4.2.1, Section 3 Firm Fixed Price CLINS, subparagraph a. contract prices for FFP CLINS – FFP Engine CLINS
| 197 |
| From our review of the SOW, it appears it is the Navy’s intent to authorize the appropriated core performance restoration FFP CLIN for LLP replacement and only the replacement cost of the LLPs are to be charged to the T&M LLP CLIN. |
For example if an engine requires a core performance restoration and replacement of the Fan Disk and Booster Spool as LLP, will the Navy exercise the following FFP CLINS, X080 Engine Induction, X060 Core Performance Restoration, & CLIN C064 Fan & Booster Refurbishment and the Replacement LLP would be charged T&M Under CLIN X062. Is our interpretation correct?
| The engine repair/necessary work scope required to return the engine to an RFI status will be done under various FFP CLINs. Any LLP hardware that is replaced during shop visit will be covered under T&M CLIN(s). |
| Attachment 1 part B, Para 3.5.3 Core Performance Restoration (with or without Life Limited Parts Replacement) |
| 198 |
| Is it the Navy’s intent to order a core restoration (CLIN X060) for all incoming engines, and other module refurbishment CLINS be considered additive work to the core restoration? |
If so, should the contractor charge engine disassembly/assembly (separation and reattachment of the major engine modules), engine test cell, and preservation to be covered under CLIN X 060?
Under this scenario only the disassembly/repair/reassembly of a specific module would be covered under the module refurbishment. If the Navy wants the option to bring an engine in for a single module (such as CLIN X066 HPC Stator Module refurbishment) where is the contractor to price engine disassembly/assembly, test, preservation & delivery? If those costs were added to each module, there would be times when the navy was paying for the effort under multiple CLINS (example if X065 HPC Rotor, X066 – HPC stator).
If the Navy wants flexibility to order module refurbishment without a core restore, will the navy consider adding an “Engine restoration” (major engine disassembly/assembly, test, preservation & delivery) to the Engine induction CLIN?
The work scope strategy for engine repairs is to begin with a core restoration (CLIN X060) and adjust the work scope using additional module specific CLINs.
The cost of disassembling, repairing, and assembling a specific module should be included in the proposed price for that specific module refurbishment CLIN.
There would be rare exceptions when an engine would be brought in for a repair of only one or two modules, likely a component failure or mishap. In that event, the repair of a few specific modules would be covered under the Special Test and Engineering Investigation (EI) Workscope CLIN (X083) Attachment 1 part B, Para 3.5.3 Core Performance Restoration (with or without Life Limited Parts Replacement)
| 199 |
| Replacement of the Fan Shaft (an LLP part) requires disassembly of the No.1 & No 2 bearing support module. This module is not covered under any of the module refurbishment CLINs. Will the USN consider adding an additional FFP CLIN for the No.1 & No 2 bearing support module? |
| No. Fan Shaft LLP module refurbishment should include all work/parts/material necessary including any bearing disassembly and re-assembly. |
| Attachment 1 part B, Para 3.5.3 Core Performance Restoration (with or without Life Limited Parts Replacement) |
| 200 |
| Per para 3.5.5 – LLP parts shall be invoiced at OEM catalog price plus applicable burden. Per para 5.1 only OEM (or OEM approved parts) are to be used unless approved by NAVAIR. Since the Navy requires OEM parts, and the OEM publishes an annual catalog with all of their parts priced, would the Navy consider adding a similar statement in Para 3.6.4 such as: “The contractor shall invoice all OEM parts at OEM catalog price plus any applicable burdens”? |
| Government concurs and Para 3.6.4 is to be updated to add the following statement: "The contractor shall invoice LLP parts at OEM catalog price plus any applicable burden. |
| Attachment 1 part B, Para 5.1 Part Utilization. Para 3.5.5 Life Limited Part Replacement & Para 3.6.4 Over & above procedures – OEM Engine material |
| 201 |
| Per referenced paragraph, states the following: “For FFP Engine CLINS (X060, X062-X071, X074-X076, X078, X080, X082, X088, X090-X098, X101, X103), the following table with projected scrap rates for Engine components [airfoils], based on actuals, is provided for reference purposes for price consideration.” |
Our interpretation is the Navy expects the replacement cost for any of the parts listed in the scrap rate projects would be part of the FFP for restoration of the appropriate module. Since the fleet is fairly new, the sample size for determining the referenced scrap rates must be fairly small.
Would the Navy consider revising their position and make refurbishment of the material to be covered as part of the FFP, but replacement of any parts beyond repair (aka scrapped) be covered as part of over & above under CLIN X073, X077, X100.
| Your interpretation is correct. The paragraph will remain as written. |
| Solicitation (N0019-15-R-2004) Section L, para 4.2.1, Section 3 Firm Fixed Price (FFP) CLINS), subparagraph a. Contractor Prices for Firm Fixed Price CLINs |
| 202 |
| For Tech directives under Attachment L-9, is the contractor to price installation only or is the contractor to include the cost of kits (or other parts) as part of the price? |
| The labor for installation and kit costs should be included as part of the price. |
| Attachment L-9 Prime contractor Tech Directives FFP |
| 203 |
| "Per the Notes tab in the attachment, For the Technical Directive CLINs (X013, X035, X082), the ""Total Unit Price"" represents the sum of all TDs for the specified Option period from Attachment L-9 [Prime Tech Directives-FFP]. |
There appears to be a math error on the L-7 Attachment in how the TD values are calculated. As an example if the value for the Base year TDs in L-9 that were to be concurrent to AEPD (see summary tab, cells G15 to G63) is $100,000 the contractor would place that value in Att L-7 for CLIN X013 Base year. Based on the formulas, the value in L-7 would be multiplied by the quantity identified in the summary sheet (see summary tab Cell J8) which is 385 – this would make the value for Base year of X013 = $38,500,000 which significantly overstates the value of TDs.
| Formulas on Attachment L-7 for X013, X035, and X082 have been modified on the Summary Tab. Notes are correct in directing that the "Total Unit Price" shall be the sum of all TDs for the specified option period. The modified formulas for those three CLINs will not multiply by the quantity and will reflect the total price on the summary tab. Formulas for those three CLINs also updated on Attachment L-5 due to same issue. |
| Attachment L-7 Prime Contract Cost Summary FFP |
| 204 |
| Per reference, all JV team members and principal subcontractors proposed shall provide the same information that is required for the Prime contractor. The proposed JV team members and principal subcontractors shall submit their sealed price proposals under the Prime contractor. The draft solicitation had subcontractor attachments L-7, L09, L-11, and L-14, these have been removed in the final RFP. Is the Navy wanting the JV team members and principal contractors to fill out forms Attachment L-5 through L-9 or is the requirement for JV and subcontractors to provide “sealed price proposals” no longer required? Please clarify. |
| Section L, para 4.1 c has been removed. Subcontractors are no longer required to fill out their own set of Attachments. Notes language on Attachments L-7 and L-9 has been updated to direct the addition of columns for "Principal Subcontractors/JV team members" as opposed to "Subcontractor." |
| Solicitation (N0019-15-R-2004) Section L, para 4.1 c) Price Proposal guidelines |
| 205 |
| These CDRLs call for the Contractor WBS to be submitted monthly. Is this necessary, or is a onetime submittal sufficient with further submittals only as updates are made? |
| CDRL blocks 9 (Dist Statement Required), 10 (Frequency), 12 (Date of First Submission), 11 (As of Date), and 13 (Date of Submission) should all say “See Block 16”. That’s how it’s listed in the DCARC examples. |
| Airframe CDRL X00T and Engine CDRL X00T |
| 206 |
| The Government will notify the Contractor prior to an unscheduled maintenance event to review the required scope of work. The contractor shall perform induction activities to include: The Government will remove sensitive/controlled flight essential equipment that was installed for ferry purpose prior to induction. The Government will provide Engine, Auxiliary Power Unit, and Aircraft Logs. |
What is considered sensitive/controlled flight essential equipment? Will this be classified, and do we need to provide storage for that equipment, or will the owning Org return it to home station?
The ARC-210 and the APX-123 are considered sensitive/controlled flight essential equipment. These are required for the flight to the contractor’s facility. The Government/owning organization will remove these two components and return them to the home station.
The SOW has been updated to define the classified storage requirements.
| 207 |
| The Contractor shall have the capability to store classified material to support pre- and post- disturbed systems operational check-out. The Contractor shall comply with the security requirements listed in the Industrial Security Program DoDD 5220.22 Series. |
Requirements (dimensions, weights, or other info) for storing classified materials would be helpful in establishing container/room requirements.
Govt estimate is a room 8X10 with the appropriate containers to store up to a classification of Secret.
| 208 |
| The Government will provide the Contractor a Transportation Account Code (TAC) for shipping material, unless the material is being transferred from the prime contractor to its sub-contractor for the performance of this contract. |
Will the Government ship directly to where it is requested, and not just to the Prime Contractor’s address?
If it is the Govt responsibility for shipping material, the Govt will ship to the location the material is required in CONUS.
| 209 |
| The Contractor shall develop air and ground procedures that are subject to Government approval that will ensure the following: that a Flight Operations Program is in effect to prevent injury to personnel and damage to aircraft IAW DFARS clause 252.228-7001 "Ground and Flight Risk," and NAVAIRINST 3710.1. |
Does the Contractor need to comply with the Flight Operations Procedures in Chapter 4 since the Navy will be performing all flying operations of the aircraft? Will complying with the Ground Operating Procedures in Chapter 5 be sufficient?
The Contractor shall comply with the Flight Operations Procedures, however, the contractor may request waivers from the GFR in accordance with NAVAIRINST 3710.1
| 210 |
| We have several approved FAA DER repairs that if implemented could provide a cost savings on several of the FFP CLINs. Per reference, these repairs require NAVAIR Engineering approval, would the Navy evaluate these repairs as part of our proposal if we submitted the required documentation? |
| Yes. NAVAIR Engineering will review the repair procedures if appropriate documentation is included in proposal. |
| Attachment (1), Part B Page 63 |
Part Repair Procedures
| For CLIN0064-0071 should the FFP be considered to cover ONLY the specific module listed in the description for the purposes of understanding individual module repair cost or should the FFP cover the removal and installation of the module from the engine assembly and all subsequent maintenance / inspection required for modules not listed in the description up to and including engine test cell operations, preservation and engine return to customer? |
| The cost of disassembling, inspecting, repairing, and assembling a specific module should be included in the proposed price for that specific module refurbishment FFP CLIN. |