Attachment_7_QA_for_Amendment_1.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Education and Training Support Federal contract opportunity
Solicitation number
M67854-16-R-7100
Issued by
United States Marine Corps

About this file

Attachment 7 Q A Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Education and Training Support, newest first.
File Type Posted
M67854-16-R-7100_Amendment_0002.pdf PDF
Attachment_7_QA_for_Amendment_2.xlsx XLSX spreadsheet
Att_3_DPME_QASP_DRAFT_for_amendment_1.docx DOCX document
Att__1_PWS_Final__2-17-16_for_amendment_1.docx DOCX document
M67854-16-R-7100_Amendment_0001_final.pdf PDF
Att_2_dd0254_DPME_05Jan2016.pdf PDF
Exb_T_CDET_ELINs_v1.xlsx XLSX spreadsheet
Exhibit_A_CDRLs.pdf PDF
M67854-16-R-7100.pdf PDF
Att_6_Average_Helpdesk_Stats_18Dec2015.xlsx XLSX spreadsheet
Att_5_Total_Evaluated_Price_v1.xlsx XLSX spreadsheet
Att__1_PWS_Final__2-2-16.docx DOCX document
Att_3_DPME_QASP_Final.docx DOCX document
Att_4_PPQ_1-21.doc DOC document
Exhibit_B_CDRLs.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Q #DocumentLocationQuestionAnswer
1RFPFactor 3, Page 131Will the Government accept a final CPARS report in place of PPQs?The Government already reserved the right to evaluate data obtained from sources such as PPIRS (CPARS reports), so a CPARS report would not be used as a substitute for a PPQ. However, the maximum number of PPQs to be provided is three. The offeror may choose to submit less than three.
2Performance Work StatementPerformance Work Statement footerThe Solicitation says it is a draft document. Will the Government please confirm that this is a FINAL document?It is the final document. The word "DRAFT" has been removed from the footer via amendment 0001.
3SolicitationSection B, Page 20Government is requesting a breakdown of trips and costs rather than providing a plug number. Would the Government consider removing this requirement and replacing with a plug number for all offerors, to which each offeror can then apply its G&A rate?CLINs 0042, 0142, 0242, 0342 and 0442 have been revised to clarify that the offerors shall not submit a price for those CLINs. Also, the third paragraph in Section L.4(B) has been revised to delete the following sentence: "The Offeror shall submit a breakout of the proposed travel locations for each trip and for the ODCs."
4Performance Work StatementSection 4.0Will the Government confirm that there are no support billets in any locations other than Quantico, VA?Support billets are located at locations other than Quantico, VA.
5General IssueAre Adjunct faculty considered independent workers, or are they guided by and fall under the direction of the Chief Instructors?Adjunct faculty are contractor employees that perform the requirements of the PWS.
6Performance Work Statement2.7.2Calls out Technology Service Locations; is the client asking to ensure the services and products are available at those locations, or is the client demanding that services must be performed at these locations? This is an important distinction as service and products can be produced more efficiently, more rapidly, under stricter quality control standards, for less money at centralized locations that are already fitted with the equipment and personnel.The Technology, Media, and Graphic Arts Services are required to be at the locations annotated in the PWS because the individuals providing these services will work on collaborative teams, supporting the DPME Programs listed in the PWS, who continually refine their products. In this environment, daily face to face contact with other team members (contractor and Government) is required.
7Performance Work Statement2.8.2Calls out Media Services; is the client asking to ensure the services and products are available at those locations, or is the client demanding that services must be performed at these locations? This is an important distinction as service and products can be produced more efficiently, more rapidly, under stricter quality control standards, for less money at centralized locations that are already fitted with the equipment and personnel.The Technology, Media, and Graphic Arts Services are required to be performed at the locations annotated in PWS 2.7.2 because the individuals providing these services will work on collaborative teams, supporting staff for the DPME Programs listed in the PWS, as the products for those programs are continually refined. In this environment, daily face to face contact with other team members (contractor and Government) is required.
8Performance Work Statement2.8.2Calls out Graphic Artists and ASS; is the client asking to ensure the services and products are available at those locations, or is the client demanding that services must be performed at these locations? This is an important distinction as service and products can be produced more efficiently, more rapidly, under stricter quality control standards, for less money at centralized locations that are already fitted with the equipment and personnel.The Technology, Media, and Graphic Arts Services are required to be performed at the locations annotated in PWS 2.7.2 because the individuals providing these services will work on collaborative teams, supporting staff for the DPME Programs listed in the PWS, as the products for those programs are continually refined. In this environment, daily face to face contact with other team members (contractor and Government) is required.
9Performance Work Statement1.2.2Can the Government please provide the Instructor Evaluation Standards (item 1.2.2 b) as GFI prior to award so that all bidders (not just the incumbent) can reference the standards when recruiting for staff to meet contract requirements?The Instructor Evaluation Standards are provided via amendment 0001.
10Performance Work Statement1.2.2Can the Government please provide access to the Blended Seminar program schedule (item 1.2.2 e) as GFI prior to award so that all bidders (not just the incumbent) can consider that schedule (and any others available) in our Transition Plan and Management Plan?The Blended Seminar program schedule is provided via amendment 0001.
11Performance Work Statement2.9 item hWhat is “the current CDET rapid development tool”? If there is more than one tool in use, please provide the full list of tools currently in use.Lectora is the rapid development tool with Adobe Creative Cloud as support software. Specific requirements are listed in Appendix D of the PWS.
12Performance Work Statement2.11What version of Action Script is currently being used at CDET to support Flash development?Action Script 3.0, Animate and HTML5.
13Performance Work Statement2.11Please provide a full summary of the technical specifications developers must be familiar with (for example, browsers and versions, operating systems, plugins permitted/not permitted; bandwidth; etc.). This will enable all bidders (not just the incumbent) to staff the production teams (graphics, programming, etc.) with people with appropriate skillsets).EPME courses need to conform with MarineNet Courseware Development Technical Standards found at: https://www.mcu.usmc.mil/cdet/SitePages/courseware.aspx

OPME courses are developed and loaded, so that all courseware is functional on the CDET LSS. The current CDET LSS is Blackboard LearnTM.

14 Performance Work Statement 2.0.7 (b) Is the Program Manager the only “key personnel” highlighted for this effort? Yes. The PM is the only position that will be designated in the contract as "key personnel".

Sheet2

Sheet3

File details come from the government source that posted it. Updated .