Attachment_01_-_PAP...doc
DOC document 33 KB Posted
- Attached to
- Security Maintenance and Sustainment Federal contract opportunity
- Solicitation number
- M67854-16-R-0505
- Issued by
- United States Marine Corps
About this file
Attachment 01
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 01
MARINE CORPS SYSTEMS COMMAND,
SECURITY OFFICE
PERFORMANCE ASSESMENT PLAN (PAP)
MCSC Security Systems Technician Services 1.0
INTRODUCTION
This Performance Assessment Plan (PAP) has been developed to comply with the Federal Acquisition Regulation (FAR) Subpart 37.6 – Performance Based Contracting. FAR 37.602 states that agencies shall develop surveillance plans that recognize the responsibility of the contractor to carry out its quality obligations and shall contain measurable performance standards so that the Government receives the quality of the services called for in the contract.
This PAP is designed to define the performance management approach, define roles and responsibilities, define methodologies used to monitor and evaluate contractor’s performance and define the performance standards from which the contractor will be measured.
2.0
IDENTIFICATION OF WORK TO BE PERFORMED:
The contractor shall provide Marine Corps Systems Command with security systems labor and alarm monitoring services, which directly support the Command Security Office’s physical security efforts of providing supplemental security controls to assist in the overall protection strategy of workforce personnel, information, and assets. The major categories of the labor services are: equipment installation, maintenance/testing, technical security systems administration support, and lock/safe support.
3.0
PERFORMANCE MANAGEMENT APPROACH:
The contractor’s internal quality control system shall set forth the staffing and procedures for self inspecting the quality, timeliness, customer satisfaction and other performance requirements in the PWS.
The purpose of the PAP is to provide guidelines and procedures by which the Contractor’s performance will be evaluated and assessed. The PAP is intended to be a “living” document that will be revised or modified as circumstances warrant, and is therefore provided for information only. The PAP is based on the premise that the Contractor is responsible for quality assurance in the performance of their work, but it is the Government’s responsibility to periodically ensure it is receiving the work that was contracted for.
4.0
ROLES AND RESPONSIBILITIES:
Contracting Officer - A person duly appointed with the authority to enter into contracts and make related determination and findings on behalf of the Government. Contracting Officers are designated via a written warrant which sets forth limitations of authority. The Contracting Officer is responsible for monitoring contract compliance, performing contract administration and resolving any differences between the observations documented by the Contracting Officer’s Representative (COR) and the contractor’s performance.
Contracting Officer Representative (COR) –The COR will be the Contracting Officer’s authorized representative to assist in administering the contract. The COR will be designated in the resulting contract and/or individual task orders as needed. The limitations of authority are contained in a written letter of designation. The COR is the primary technically oriented representative assigned to monitor contract performance. The COR is responsible for providing technical direction to the contractor and will perform the final inspection and acceptance of all deliverables under the contract. The COR will also have the responsibility of performing periodic sampling and documenting customer feedback.
Alternate Contracting Officer’s Representative (ACOR) - An individual designated in writing by the PCO to act as their authorized representative to assist in administering the contract. The ACOR will be designated in the resulting contract. The limitations of authority are contained in a written letter of designation. The ACOR is the secondary technically oriented representative assigned to monitor contract performance. The ACOR’s responsibilities may mirror those of the COR in the COR’s absence.
Technical Point of Contact (TPOC) – An individual designated in writing by the COR authorized to monitor and review contractor compliance with individual task order requirements. The limitations of authority are contained in a written letter of designation. The TPOC is also assigned to monitor contract performance and provide feedback and input to the ACOR/COR.
5.0
METHODOLOGIES TO MONITOR PERFORMANCE:
In an effort to minimize the contract administration burden, simplified methods of surveillance techniques will be used by the Government to evaluate contractor performance. The primary methods of surveillance are Customer Input / Feedback. Customer feedback may be obtained either from the results of the formal customer satisfaction surveys (included in this PAP) or from random customer complaints.
Customer complaints, to be considered valid, must set forth in writing the detailed nature of the complaint, and must be certified by the COR. The complaint will then be forwarded to the Contracting Officer for review. If the Contracting Officer determines that the complaint is valid, the Contractor will be formally notified in writing. The Contractor will have 5 business days to formulate a response detailing the actions taken to remedy the complaint filed.
The Government will utilize the Contractor Performance Assessment Report System (CPARS) to address contractor performance related to the Quality of Service; Schedule; Business relations, Management of Key Personnel, and other important areas.
6.0
DOCUMENTATION
The COR must maintain copies of all reports, evaluations, recommendations and any actions related to the Contractor’s performance in the COR file for this contract. All records must be maintained for the life of this contract.
File details come from the government source that posted it. Updated .