About this file
Solicitation Package
View the file
Other files
| File | Type | Posted |
|---|---|---|
| M67001-15-Q-0048-00005.pdf | ||
| M67001-15-Q-0048-0004.pdf | ||
| M67001-15-Q-0048-00003.doc | DOC document | |
| Additional_Questions_11_May_2015.docx | DOCX document | |
| Gov_Site_Visit_Attendees.pdf | ||
| M67001-15-Q-0048-0002.pdf | ||
| Questions_and_Responses_April_15_2015.pdf | ||
| M67001-15-Q-0048-0001.pdf | ||
| Past_Performane_Questionnaire.pdf | ||
| Approved_Shelter_Locations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTING DEPARTMENT
P O BOX 8368 (BLDG 1116)
CAMP LEJEUNE NC 28547-8368
910-451-2331
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
M67001-15-Q-0048 26-Feb-2015
b. TELEPHONE NUMBER
910-451-3096
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 27 Mar 2015
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
M67001
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ROBERT EDWARDS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
332311
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: 100 % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
M0105315SU00008
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
M67001-15-Q-0048
Section A - Solicitation/Contract Form
INTENTION
The Regional Contracting Department, Marine Corps Installations East - Marine Corps Base, Camp Lejeune, NC has a requirement for Aircraft Protective Equipment (Sunshades) for Marine Corps Air Station Cherry Point, NC.
This solicitation is issued as a Request for Quote accordance with FAR Part 12 and Subpart 13.5, and as supplemented with additional information included in this RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-78, effective 26 December 2014 and DPN 20150115 effective 15 January 2015.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 63 Each Aircraft Protective Equipment Shelter
FFP
Aircraft Protective Equipment Shelter - Harrier
Length: Minimum of 53’ to Maximum of 55’
Width: Minimum of 42’4” to Maximum of 48'
Sidewall Height: Minimum 10' to Maximum of 23'
Overall Height: of 19’ to Maximum of 23'
SEE STATEMENT OF WORK AT SECTION C FOR ADDITIONAL
INFORMATION
FOB: Destination
MILSTRIP: M0105315SU00008
PURCHASE REQUEST NUMBER: M0105315SU00008
NET AMT
0002 63 Each Installation
FFP
Includes All Labor, Equipment, Materials, Etc. to Erect the above shelters. Vendor will install shelters on site. The vendor is responsible for all Foreign Object Debris
(FOD) mitigation and removal from the worksite.
FOB: Destination
0003 15 Each Aircraft Protective Equipment Shelter
FFP
Aircraft Protective Equipment Shelter - Prowler
Length: Minimum of 60’ to Maximum of 61’
Width: Minimum of 63’ to Maximum of 70'
Center Line Height: Minimum of 26’7” to Maximum of 35'
26’7” From the center line to 17’ left and right of shelter center line (gives 5’ clearance above wingtips during folding operations and allows for aircraft jacking)
Sidewall Height: Minimum of 19’7” to Maximum 35’
FOB: Destination
0004 15 Each Installation
FFP
Includes All Labor, Equipment, Materials, Etc. to Erect the above shelters. Vendor will install shelters on site. The vendor is responsible for all Foreign Object Debris
(FOD) mitigation and removal from the worksite.
FOB: Destination
Section C - Descriptions and Specifications
STATEMENT OF WORK
C1. Specifications
C1.1 Aircraft Protective Equipment Shelter - Harrier
Length: Minimum of 53’ to Maximum of 55’
Width: Minimum of 42’4” to Maximum of 48'
Sidewall Height: Minimum 10’ to Maximum of 23’
Overall Height: Minimum of 19’ to Maximum of 23'
Shelter shall be constructed with galvanized steel that is treated for corrosion prevention. Shelter will be covered by a uniform white or beige-colored opaque cover material that is flame retardant and waterproof. Material must be able to maintain its flame retardant and waterproof qualities under long term UV exposure and varying humidity conditions. Material will cover the entire shelter length and width, ending at 8' above ground level. Material will be secured to the shelter with sufficient tension that water does not collect on the shelter's top surface.
Shelters columns and any lateral bracing, side cables, or X braces shall be wrapped with 1 band of 2- or
3-inch wide reflective tape that meets Federal Specification L-S-300C. Self-adhesive, self-illuminating tape, which stores energy, or “recharges” with exposed UV-illuminated visible light may be used.
Reflective tape must be a solid band, on all columns; exact height of band shall be determined by customer during installation.
Shelter must withstand wind loads of at least 130 MPH per UFC3-300-10N Structural Engineering -
Table C-1 and ANSI/SPRI Wind Load Design Manual.
Shelters shall be free standing and anchored to the existing concrete parking apron. Concrete anchors shall be designed and installed according to the provisions found in American Concrete Institute (ACI)
318-14. Anchors shall maintain a minimum of 6 inches from any expansion joint to ensure pavement integrity. Column support placement must meet the minimum edge spacing requirements in ACI 318-14.
Anchoring method shall be in such a manner that the shelter can be removed and reinstalled in another location without irreparable damage to the existing concrete surface.
All fasteners shall be corrosion resistant and of a type and size to meet the performance requirements and design loads. Fasteners, washers and nuts shall be corrosion resistant, as well as have locking features.
Mitigation of bird roosting and nesting shall be incorporated into the design and installation of the sun shade.
The vendor is responsible for grounding each shelter with a static ground that does not exceed 10,000 ohms per shelter in normal dry conditions. The grounding method used must be approved by MCAS
Cherry Point and be located inside, or in close proximity, to the shelter wall and not interfere with aircraft taxiing or cause a trip hazard. Based on final dimensions and layout of the shelters, tie-downs and existing grounds that meet the above requirements may be used as static grounds.
The vendor will provide engineering drawings and specifications with their quote for evaluation and confirmation that all specifications meet all site approval requirements.
The vendor will provide all transportation for shelters from the vendor site to the installation site. The vendor will install shelters on site. The vendor is responsible for all Foreign Object Debris (FOD) mitigation and removal.
C1.2 Aircraft Protective Equipment Shelter - Prowler
Length: Minimum of 60’ to Maximum of 61’
Width: Minimum of 63’ to Maximum of 70'
Center Line Height: Minimum of 26’7” to Maximum of 35'
26’7” From the center line to 17’ left and right of shelter center line (gives 5’ clearance above wingtips during folding operations and allows for aircraft jacking)
Sidewall Height: Minimum of 19’7” to Maximum 35’
Shelter shall be constructed with galvanized steel that is treated for corrosion prevention. Shelter will be covered by a uniform white or beige-colored opaque cover material that is flame retardant and waterproof. Material must be able to maintain its flame retardant and waterproof qualities under long term UV exposure and varying humidity conditions. Material will cover the entire shelter length and width, ending at 8' above ground level. Material will be secured to the shelter with sufficient tension that water does not collect on the shelter's top surface.
Shelters columns and any lateral bracing, side cables, or X braces shall be wrapped with 1 band of 2- or
3-inch wide reflective tape that meets Federal Specification L-S-300C. Self-adhesive, self-illuminating tape, which stores energy, or “recharges” with exposed UV-illuminated visible light may be used.
Reflective tape must be a solid band, on all columns; exact height of band shall be determined by customer during installation.
Shelter must withstand wind loads of at least 130 MPH per UFC3-300-10N Structural Engineering -
Table C-1 and ANSI/SPRI Wind Load Design Manual.
Shelters shall be free standing and anchored to the existing concrete parking apron. Concrete anchors shall be designed and installed according to the provisions found in American Concrete Institute (ACI)
318-14. Anchors shall maintain a minimum of 6 inches from any expansion joint to ensure pavement integrity. Column support placement must meet the minimum edge spacing requirements in ACI 318-14.
Anchoring method shall be in such a manner that the shelter can be removed and reinstalled in another location without irreparable damage to the existing concrete surface.
All fasteners shall be corrosion resistant and of a type and size to meet the performance requirements and design loads. Fasteners, washers and nuts shall be corrosion resistant, as well as have locking features.
Mitigation of bird roosting and nesting shall be incorporated into the design and installation of the sun shade.
The vendor is responsible for grounding each shelter with a static ground that does not exceed 10,000 ohms per shelter in normal dry conditions. The grounding method used must be approved by MCAS
Cherry Point and be located inside, or in close proximity, to the shelter wall and not interfere with aircraft taxiing or cause a trip hazard. Based on final dimensions and layout of the shelters, tie-downs and existing grounds that meet the above requirements may be used as static grounds.
The vendor will provide engineering drawings and specifications with their quote for evaluation to confirmation that all specifications meet all site approval requirements.
The vendor will provide all transportation for shelters from the vendor site to the installation site. The vendor will install shelters on site. The vendor is responsible for all Foreign Object Debris (FOD) mitigation and removal.
C2 Management and Administrative
C2.1 Government Regular Working Hours
The Government's regular working hours are from, 0700-1630, five days per week, Monday through
Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this SOW. The performance of work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any work outside Government regular working hours requires prior KO approval.
C2.1.1 Observed Federal Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
C2.1.2 Restriction to Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular
Working Hours to the KO for approval at least two (2) calendar days prior to requested day. Excludes work to be performed during specified hours.
C2.2 Permits and Licenses
The Contractor shall obtain all required Contractor permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations.
C2.2.1 Hot Work and/or Confined Space
Cherry Point Fire & Emergency Services shall be notified prior to any open flame (i.e. welding, torch cutting) and a burn permit shall be issued. In addition, CPFES shall be notified prior to entry into any confined space. Contact Number (252) 466-2241.
C2.3 Protection of Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
C2.4 Service Interruptions
If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures.
If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.
C2.5 Environmental Management System
The Contractor shall perform work under this contract consistent with the following EMS goals and policy.
C2.5.1 Goals
Reduce purchase and use of toxic and hazardous materials;
Expand purchase of green products and services; increase recycling;
Reduce energy and water use;
Increase use of alternative fuels and renewable energy;
Integrate green building concepts in major renovations and new construction;
C2.5.2 Policy
Point’s community;
ural, historic and cultural resources;
includes purchasing products made from recycled materials;
rations and business decisions; Integrate environmental protection requirements and pollution prevention initiatives into the early planning, design and procurement of facilities, equipment and material, as well as the planning and implementation of military training activities;
hazardous materials and generation of hazardous waste;
nd new environmental laws and regulations;
ensure that our entire community knows this is our policy by our actions as well as our words.
The Contractor shall maintain monitoring and measurement information to address the EMS goals and policy and provide the EMS Goals and Policy Measurement Information to the KO when requested. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, the Contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall assume legal and financial liability for the noncompliance and take corrective action immediately to remedy the noncompliance. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the KO.
The Contractor shall ensure that its employees are aware of their roles and responsibilities under the
EMS and how these EMS roles and responsibilities affect work performed under the contract.
C2.6 Personnel Requirements
The Contractor shall comply with the personnel requirements stated below.
C2.6.1 Key Personnel
Within 15 calendar days after award of the contract, the Contractor shall submit to the KO an
Organizational Chart showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, QCM, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.
C2.6.1.1 Project Manager (PM)
Insert information as appropriate relative to on-site Project Manager. Ensure consistency with Section L, Key Personnel. The Contractor shall provide a PM who has relevant experience at a comparable level of responsibility in projects of similar size, scope and complexity. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site within one hour during the Government's regular working hours and within two hours during other than normal working hours after the Government’s request. The PM may have to attend unscheduled meetings with the KO as deemed necessary by the Government.
C2.6.1.2 Quality Control Manager (QCM)
The Contractor shall provide a QCM who shall have full authority and responsibility for assuring performance objectives and standards identified in this contract are met. The QCM may be the same person as the project manager. The QCM or alternate shall be available on-site within one hour after the
Government's request.
C2.6.1.3 Site Safety and Health Officer (SSHO)
The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the
Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:
The SSHO shall have satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past, and have completed the OSHA 10-hour construction safety class or equivalent within the last three years. The SSHO may be the same person as the project manager but shall have fulfilled the pre-requisite qualification and experience.
C2.6.2 Employee Requirements
The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Competent personnel shall be provided as required. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.
C2.6.2.1 Employee Appearance
The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All
Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.
C2.6.2.2 Employee Conduct
Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.
C2.6.2.3 Employee Removal
The Contractor shall remove from the site any individual whose continued employment is deemed by the
KO to be contrary to the public interest or inconsistent with the best interests of National Security.
C2.6.2.4 Proof of Legal Residency
No employee or representative of the Contractor will be admitted to the site of work unless satisfactory
Proof of Legal Residency is furnished.
C2.7 Security Requirements
The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.
C2.7.1 Employee Listing
The Contractor shall maintain and provide upon request a current Employee List. shall include employee's name, current address and date of birth.
C2.7.2 Vehicles
The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle
Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.
C2.7.3 Passes and Badges
All Contractor employees shall obtain the required employee and vehicle passes. The Government will issue badges without charge. The Contractor employees must be able to obtain CAC in accordance with security requirements. Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within 10 calendar days.
C2.7.4 Contractor Access to Installation
See Section H for instructions for access to MCAS Cherry point
C2.7.5 Access Arrangements
The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.
C2.7.6 Security Clearance
The Contractor shall obtain all required corporate and personnel Security Clearances prior to commencement of work. The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending.
C2.8 Contractor Safety Program
The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM-385-1-1 and Public Law 91-596, Occupational Safety and Health Act. The Contractor shall ensure that all
Contractor personnel have received proper safety training, appropriate to their respective jobs. The
Contractor shall implement an ongoing training program that refreshes the safety skills, qualifications and awareness of the Contractor workforce on a regular, periodic basis. The details of the Contractor’s safety training program shall be included as part of the Contractor’s Accident Prevention Plan, as required in Paragraph C2.8.1.
C2.8.1 Accident Prevention Plan (APP)
To ensure that the Contractor has a well-organized and thorough Safety Program, the Contractor shall prepare an Accident Prevention Plan (APP). The APP shall be prepared by the Contractor’s SSHO and shall be followed by all Contractor employees, subcontractors, and vendors at each service site. The APP shall incorporate Activity Hazard Analyses (AHAs) and Situation Specific Safety Plans that are relevant to the site specific hazards and controls for each activity and type of work that may be encountered in the performance of this contract.
The Contractor shall submit an APP to the KO within 15 days following award for acceptance. The
Contractor shall review, update, and submit the revised APP to the KO annually and within 15 calendar days whenever a change in work conditions, hazards, or activities occur.
C2.8.2 Activity Hazard Analysis (AHA)
The Contractor shall prepare Activity Hazard Analyses (AHAs) for all common recurring work activities performed under this contract. AHAs shall be submitted with the APP and shall be updated as work activities or conditions change and additional AHAs prepared as new work activities are required.
Specifically:
For FFP contract modifications where changes are germane to the original contract, the Contractor shall revise applicable AHAs and submit to the KO within 15 calendar days after modification is signed.
The steps of the service process;
Identify potential hazards that exist as a result of the Contractor’s service process within the environment;
Measures or plans of actions to safely remove potential hazards away from people in and around the service process and environment;
Specific materials and equipment necessary to safely remove potential hazards away from people in and around the service process and environment;
Inspection requirements to assure service activity is safe; and
Training of service personnel to be aware of potential hazards and measures or plans of actions to be used to remove hazards from service environment. During performance of services, the SSHO shall periodically review the AHA at each service site and for each sub-annex to assess the effectiveness of the
Contractor’s overall APP. If changes to the AHAs are required, such changes shall be submitted to the
KO for review and acceptance.
C2.8.3 Hazard Specific Safety Plan
The Contractor shall develop and implement hazard specific safety plans, as listed below, as necessary for the situation or types of work to be performed under this contract. These Hazard Specific Safety Plans shall be submitted with the APP and shall be updated as situations change. Additional hazard specific safety plans developed as applicable when new types of work are required under this contract.
C2.8.3.1 Drug Abuse Prevention Plan
The Contractor shall develop a plan to explain how it will satisfy the drug-free work force requirement as stated in DFARS Clause 252.223-7004.
C2.8.3.2 Emergency Response Plan
The Contractor shall develop an emergency response plan to ensure safe evacuation of people during emergencies, before the hazard or natural disaster is imminent, and to minimize the consequences of accidents during evacuations.
C2.8.3.3 Emergency Rescue Plan
The Contractor shall develop a plan to rescue personnel who might become injured or incapacitated while performing services in an underground shaft/caisson or high angle situation.
C2.8.3.4 Fall Protection Plan
The Contractor shall develop a plan to explain how it will eliminate falls at the service site. The plan will explain how the Contractor will protect and prevent its service workers from falling from heights of 1.8m
(6 feet) or more. A competent person for fall protection shall prepare and sign the plan.
C2.8.3.5 Hazard Communication Plan
The Contractor shall develop a plan to explain how it will identify hazardous substances at the service site. This plan shall address: (1) training (to include potential safety and health effects from exposure);
(2) labeling of hazardous substances; (3) maintaining an inventory listing of hazardous chemicals at the service site; and (4) location of a library of Material Safety Data Sheets (MSDSs) in the office to satisfy
29 Code of Federal Regulations (CFR) 1910.1200 or 1926.59 requirements.
C2.8.3.6 Health Hazard Control Plan
The Contractor shall develop a plan to explain how it will determine the presence of hazardous or toxic agents at the service environment and explain what safety measures are to be taken.
C2.8.4 Accident and Damage Reporting
The Contractor shall notify the KO of all damages, accidents, mishaps, and near misses that occur on or related to Government property as soon as practical, but not later than four hours. For recordable injuries and illnesses, property damage accidents resulting in at least $2,000 in damages, and Weight Handling
Equipment (WHE) accidents, the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident.
(a) For recordable injuries and illnesses and property damage accidents resulting in at least $2,000 in damages complete the Navy Contractor Significant Incident Report (CSIR) form and provide the report to the KO within 1 calendar day of the accident. The KO will provide a blank copy of any required or special forms.
(1) Recordable Injuries or Illnesses. Any work-related injury or illness that results in:
(i) Death, regardless of the time between the injury and death, or the length of the illness;
(ii) Days away from work (any time lost after day of injury/illness onset);
(iii) Restricted work;
(iv) Transfer to another job;
(v) Medical treatment beyond first aid;
(vi) Loss of consciousness; or
(vii) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.
(b) For WHE accidents (including rigging gear accidents) complete the WHE Accident Report (Crane and Rigging Gear) form and provide the report to the KO within 30 calendar days of the accident. The
KO will provide a blank copy of the accident report form.
(1) WHE Accident. A WHE accident occurs when any one or more of the six elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load;
derailment; two-blocking; overload; and/or collision, including unplanned contact between the load, crane, and/or other objects. A dropped load, derailment, two-blocking, overload and collision are considered accidents even though no material damage or injury occur. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, roll over, etc.). Comply with current 29CFR1904 for OSHA/HIOSH record keeping and reporting requirements.
C2.8.4.1 Accident Reporting Notification
The Contractor shall report all accidents, mishaps, and near misses to the KO in a timely manner as described below:
An Initial Accident Reporting Notification Report shall be developed by the Contractor and provided to the KO immediately after that an accident, or near miss, has occurred. The Contractor may not have all the facts and information regarding the actual incident or near miss at the time of the initial report.
However, it is the Government’s desire to receive notification of all mishap situations as early as possible.
The Contractor shall develop a Follow-on Accident Reporting Notification Report and shall and provide a copy to the KO by close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning. Follow-on reports shall be required daily until the
Contractor can send a final, conclusive report of the nature, cause, and outcome of the accident.
The Contractor shall provide a Final Accident Reporting Notification Report of the accident to the KO within 24 hours after completing the investigation of the accident.
C2.8.5 Medical Treatment
No emergency medical care is available on Government facilities to Contractor employees who suffer on-the-job injury or disease. 911 is to be utilized for emergency transportation to one of the regional hospitals.
C2.8.6 Fire Protection
The Contractor shall know where fire alarms are located and how to activate them. The Contractor shall handle and store all combustible supplies, materials, waste and trash in a manner that prevents fire or hazards to persons, facilities, and materials.
C2.8.7 OSHA Citations and Violations
The Contractor shall correct violations and citations promptly and provide a copy of each OSHA citation and OSHA report with written OSHA Citations and Violations Corrective Action Report to the KO within 48 hours after receiving a citation.
C2.8.8 Safety Inspections and Monitoring
The Contractor shall be responsible for regularly inspecting its work areas, job sites, and work crews to ensure that all Contractor operations are being conducted safely. These inspections shall ensure:
The site is safe and free of job-site hazards
Proper PPE is being utilized and worn.
Safe work practices and processes are being followed.
Workers are familiar with the hazards covered in the respective AHA for that work activity.
All equipment and tools are in good condition and being used safely.
The Government reserves the right to inspect and monitor Contractor operations for safety compliance.
In general, the Government approach will be to conduct Performance Assessment on the quality and effectiveness of the Contractor’s safety program. The Government reserves the right to stop any work activity that it deems to be unsafe. Contractor personnel shall work in a safe manner and comply with all applicable safety regulations. The Contractor shall be subject to safety inspections of its work sites by the Government.
Contractor safety records shall be available to the KO upon request. Whenever the KO becomes aware of any safety noncompliance or any condition which poses a serious or imminent danger or hazard to the health or safety of the public or Government Personnel, the KO will notify the Contractor orally, with written confirmation, and request immediate corrective action. This notice, when delivered to the
Contractor’s representative or SSHO, shall be deemed sufficient notice of noncompliance and that corrective action is required. After receiving this notice, the Contractor shall immediately take corrective action. If the Contractor fails, delays, or refuses to promptly take corrective action, the KO may issue a stop work order for all or part of the services or work until satisfactory corrective action has been taken.
Whenever such a stop work order has been issued, the Contractor shall waive all equitable adjustments to the contract related to the stop work ordered issued. The Contractor shall include this requirement in all of its subcontracts and vendor contracts in support of contract safety.
C2.8.9 Safety Apparel
The Contractor personnel shall wear appropriate high-visibility safety apparel (garment, vest, or harness of retro-reflective and fluorescent material) meeting ANSI/ISEA 107-2004 requirements. Appropriate garment shall be based on the worker hazards and tasks, complexity of the work environment or background, and vehicular traffic and speed. As a minimum, the Contractor personnel shall wear
ANSI/ISEA 107-2004 Class I compliant apparel.
C2.9 Environmental Protection
The Contractor shall comply with all applicable Federal, state, and local laws, and with the regulations and standards listed in. All environmental protection matters shall be coordinated with the KO.
Inspection of any of the facilities operated by the Contractor may be accomplished by the Activity
Environmental Protection Coordinator, or authorized officials on a no-notice basis during Government regular working hours. In the event that a regulatory agency assesses a monetary fine against the
Government for violations caused by Contractor negligence, the Contractor shall reimburse the
Government for the amount of that fine, costs of defending against administrative or other legal action, remedial action, and other costs. The Contractor shall comply with the instructions of the cognizant
Navy Medical Department with respect to avoidance of conditions which create a nuisance or which may be hazardous to the health of military or civilian personnel. The Contractor is responsible for ensuring that its employees receive applicable environmental and occupational health and safety training, and are kept up to date on regulatory required specific training for the type of work to be conducted onsite. All on-site Contractor personnel, and their subcontractor personnel, performing tasks that have the potential to cause a significant environmental impact shall be competent on the basis of appropriate education, training or experience.
C2.9.1 Disposal
C2.9.1.1 Non-Hazardous Waste
The Contractor shall dispose of debris and rubbish resulting from the work under this contract after determined to be non-usable and non-recyclable, on-installation and off-installation. All on-installation disposal must be coordinated with the Government POC.
C2.9.1.2 Hazardous Waste
The Contractor shall dispose of all hazardous waste in accordance with the Resource Conservation and
Recovery Act and all other applicable Federal, state and local laws and regulations. No on-installation disposal of hazardous waste is allowed.
C2.9.2 Spill Prevention Containment and Clean up
The Contractor shall prevent, contain, clean up, and report all spills on Government property, caused by the Contractor, in a manner that complies with applicable Federal, state, and local laws and regulations or otherwise stated herein, and the installation spill control plan as specified in at no cost to the
Government.
C2.9.3 Hazardous Material Management
The Contractor shall support the Consolidated Hazardous Material Reutilization and Inventory
Management Program (CHRIMP). The Contractor shall ensure that procedures are in place to deal with hazardous materials, pursuant to the FAR Clause 52.223-3, HAZARDOUS MATERIAL
IDENTIFICATION AND MATERIAL SAFETY DATA.
C2.10 Disaster Preparedness
The Contractor shall comply with the activity's Contingency Instruction, contingency response plan The
Contractor shall support the installation contingency response plan as directed by the KO.
Section D - Packaging and Marking
THIS SECTION INTENTIONALY LEFT BLANK
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY FULL TEXT
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(a) Definition. "Supplies," as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.
(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the
Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the
Contractor's or subcontractor's premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.
(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting
Officer may charge to the Contractor the additional cost of inspection or test.
(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.
(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.
(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place,promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.
(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.
(i)(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time (i) when Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract and (ii) when the supplies will be ready for Government inspection.
(2) The Government's request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor's plant, nor more than 7 workdays in other instances.
(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the
Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.
(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.
(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor's plant at the Contracting Officer's election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor's plant and return to the original point when that point is not the Contractor's plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the
Government thereby.
(End of clause)
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
Section F - Deliveries or Performance
52.211-8 TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
Item No. Quantity Within Days After Date of Contract
Begin NLT
Within Days After Date of Contract
Complete NLT
0001 63 6 Weeks 55 Weeks
0002 63 6 Weeks 55 Weeks
0003 15 6 Weeks 55 Weeks
0004 15 6 Weeks 55 Weeks
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
Item No. Quantity Within Days After Date of Contract
Begin NLT
Within Days After Date of Contract
Complete NLT
0001 63
0002 63
0003 15
0004 15
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The
Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
DELIVERY/INSTALLATION
F.1 Delivery and Installation
The vendor will provide all transportation for shelters from the vendor site to the installation site. The vendor will install shelters on site.
A pre-installation meeting will be held within 10 Days After Receipt of Order. The purpose of this meeting will be to coordinate delivery and installation schedules. Vendor will be responsible for coordinating all deliveries with the
Government Representative (identified at time award)
As squadrons deploy and return frequently, material staging availability can be limited which makes this coordination essential.
Vendor will have 6 Weeks After Receipt of Order to make the initial delivery. Each subsequent delivery will be made as specified by the
Government Representative after award. All Delivery and Installation will be completed 55 weeks After Receipt of Order.
Installation shall be conducted in accordance with the Statement of Work
The vendor is responsible for all Foreign Object Debris (FOD) mitigation and removal from the worksite.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 6 wks. ADC 63 N/A
FOB: Destination
0002 55 wks. ADC 63 N/A
0003 6 wks. ADC 15 N/A
0004 55 wks. ADC 15 N/A
Section G - Contract Administration Data
CONTRACT ADMINISTRATION
G1. Contract Administration
Contract Administrator: Robert S. Edwards
Title: Contract Specialist
Office: MCIEAST Regional Contracting Office
Location: Bldg 1116 Birch Street, MCB Camp Lejeune, NC
Phone: (910) 451-3096 (Collect Calls Will Not Be Accepted)
Email: robert.edwards@usmc.mil mailto:robert.edwards@usmc.mil
Section H - Special Contract Requirements
SPECIAL CONTRACT REQUIREMENTS
H1. Special Contract Requirements
MCAS CHERRY POINT BASE ACCESS
Contract Title Aircraft Protective Equipment
Contract Number TBD
Contractor TBD
Award Date TBD
Completion Date 55 Weeks ARO
Flightline Access/Gate Numbers TBD
Contract Administrator Robert Edwards robert.edwards@usmc.mil
INSTRUCTIONS FOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .