About this file
Attachment VII Cost Worksheet Template
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M00264-16-R-0001-0005_PA E_Deadline_Extension.docx | DOCX document | |
| Amendment_4_M00264-16-R-0001-0004.pdf | ||
| Attachment_IV.pdf | ||
| Attachment_I.pdf | ||
| Attachment_VI.pdf | ||
| Attachment_VII_-_Cost_Price_Worksheet_Template.xlsx | XLSX spreadsheet | |
| Attachment_III.pdf | ||
| Attachment_II.pdf | ||
| Attachment_V.pdf | ||
| Amendment_3_M00264-16-R-0001-0003.pdf | ||
| Amendment_2_M00264-16-R-0001-0002.docx | DOCX document | |
| Amendment_1_M00264-16-R-0001-0001.docx | DOCX document | |
| DD254_revised.pdf | ||
| 16-R-0001_PA E_Support.doc | DOC document | |
| PERFORMANCE_WORK_STATEMENT_-_Draft_for_Synopsis.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost-Summary
CONTRACT SUMMARY
| Base Year | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | 6 mth option to extend | Total | ||||||||
| Cost Elements | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount |
| Direct Labor | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 |
| Fringe | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| OH | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Subcontractor Costs | ||||||||||||||
| 0 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 |
| Total Subcontractors Costs | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 |
| Travel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| ODCs (Prime and all Subs) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Prime's M&H | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Prime's G&A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Prime's Fee | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Grand Total | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 | 0.0 | $0.00 |
| **Notes** |
| 1. Please ensure all prime and subcontractors total labor hours and amounts are reflected in this summary. |
| 2. Please include all formulas and links to other spreadsheets. |
CONSOLIDATED
ALL YEARS - CONSOLIDATED
Cat # Labor Categories Location Rate Hours Amount
| Direct Labor | ||||
| Sample Labor Category 1 | Con Site | - 0 | $0.00 | |
| Sample Labor Category 2 | Con Site | - 0 | $0.00 | |
| Sample Labor Category 3 | Con Site | - 0 | $0.00 | |
| Sample Labor Category 4 | Con Site | - 0 | $0.00 | |
| Sample Labor Category 5 | Con Site | - 0 | $0.00 |
Total Prime Direct Labor - 0 $0.00
| Indirects | ||
| Fringe | $0.00 | |
| Overhead | $0.00 |
TOTAL PRIME LABOR - 0 $0.00
SUBCONTRACTOR COSTS (Proprietary data shall be submitted directly to the RCO-NCR)
| Total SUB AAA Direct Labor | 0.0 | $0.00 |
| Total SUB BBB Direct Labor | 0.0 | $0.00 |
| Total SUB CCC Direct Labor | 0.0 | $0.00 |
| Total SUB DDD Direct Labor | 0.0 | $0.00 |
TOTAL ALL SUBCONTRACTORS' COSTS $0.00
| OTHER DIRECT COSTS (Travel, Materials, etc.) | |
| Travel | $0.00 |
| ODC | $0.00 |
| PRIME's M&H | $0.00 |
| PRIME's G&A | $0.00 |
PRIME's FEE $0.00
Grand Total - 0 $0.00
| ** Notes ** |
| 1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions.. |
| 2. Please include all formulas and links to other spreadsheets. |
| 3. Please provide detailed costs (examples above) for each subcontractor proposed. |
| 4. Please provide detailed backup sheets as applicable to fully support above amounts. |
| 5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB. |
| 6, Please insert additional lines and update formulas if more than one Subcontractor is proposed |
| 7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions. |
| 8. Proprietary subcontracting data shall be submitted directly to the RCO-NCR in CD-ROM format to 2010 Henderson Rd., Quantico, VA 22134, |
| ATTN: Curtis Harris no later than then the solicitation closing date and time. |
Cost-Base
BASE YEAR
Cat # Labor Categories Location Rate Hours Amount
| Direct Labor | ||||
| Sample Labor Category 1 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 2 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 3 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 4 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 5 | Con Site | $ - 0 | $0.00 |
Total Prime Direct Labor 0.0 $0.00
| Indirects | |||
| Fringe | 0.00% | $0.00 | |
| Overhead | 0.00% | $0.00 |
TOTAL PRIME LABOR 0 $0.00
SUBCONTRACTOR COSTS (Proprietary data shall be submitted directly to the RCO-NCR)
| Total SUB AAA Direct Labor | 0.0 | $0.00 |
| Total SUB BBB Direct Labor | 0.0 | $0.00 |
| Total SUB CCC Direct Labor | 0.0 | $0.00 |
| Total SUB DDD Direct Labor | 0.0 | $0.00 |
TOTAL ALL SUBCONTRACTORS' COSTS $0.00
| OTHER DIRECT COSTS (Travel, Materials, etc.) | |
| Travel | $0.00 |
| ODC | $0.00 |
| PRIME's M&H | 0.00% | $0.00 |
| PRIME's G&A | 0.00% | $0.00 |
PRIME's FEE 0.00% $0.00
Grand Total 0.0 $0.00
| ** Notes ** |
| 1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions.. |
| 2. Please include all formulas and links to other spreadsheets. |
| 3. Please provide detailed costs (examples above) for each subcontractor proposed. |
| 4. Please provide detailed backup sheets and Basis of Estimate as applicable to fully support above amounts. |
| 5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB. |
| 6, Please insert additional lines and update formulas if more than one Subcontractor is proposed |
| 7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions. |
| 8. Proprietary subcontracting data shall be submitted directly to the RCO-NCR in CD-ROM format to 2010 Henderson Rd., Quantico, VA 22134, |
| ATTN: Curtis Harris no later than then the solicitation closing date and time. |
Cost - OY 1 Option Period 1
Cat # Labor Categories Location Rate Hours Amount
| Direct Labor | ||||
| Sample Labor Category 1 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 2 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 3 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 4 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 5 | Con Site | $ - 0 | $0.00 |
Total Prime Direct Labor 0.0 $0.00
| Indirects | |||
| Fringe | 0.00% | $0.00 | |
| Overhead | 0.00% | $0.00 |
TOTAL PRIME LABOR 0 $0.00
SUBCONTRACTOR COSTS (Proprietary data shall be submitted directly to the RCO-NCR)
| Total SUB AAA Direct Labor | 0.0 | $0.00 |
| Total SUB BBB Direct Labor | 0.0 | $0.00 |
| Total SUB CCC Direct Labor | 0.0 | $0.00 |
| Total SUB DDD Direct Labor | 0.0 | $0.00 |
TOTAL ALL SUBCONTRACTORS' COSTS $0.00
| OTHER DIRECT COSTS (Travel, Materials, etc.) | |
| Travel | $0.00 |
| ODC | $0.00 |
| PRIME's M&H | 0.00% | $0.00 |
| PRIME's G&A | 0.00% | $0.00 |
PRIME's FEE 0.00% $0.00
Grand Total 0.0 $0.00
| ** Notes ** |
| 1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions.. |
| 2. Please include all formulas and links to other spreadsheets. |
| 3. Please provide detailed costs (examples above) for each subcontractor proposed. |
| 4. Please provide detailed backup sheets as applicable to fully support above amounts. |
| 5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB. |
| 6, Please insert additional lines and update formulas if more than one Subcontractor is proposed |
| 7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions. |
| 8. Proprietary subcontracting data shall be submitted directly to the RCO-NCR in CD-ROM format to 2010 Henderson Rd., Quantico, VA 22134, |
| ATTN: Curtis Harris no later than then the solicitation closing date and time. |
Cost - OY 2 Option Period 2
Cat # Labor Categories Location Rate Hours Amount
| Direct Labor | ||||
| Sample Labor Category 1 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 2 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 3 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 4 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 5 | Con Site | $ - 0 | $0.00 |
Total Prime Direct Labor 0.0 $0.00
| Indirects | |||
| Fringe | 0.00% | $0.00 | |
| Overhead | 0.00% | $0.00 |
TOTAL PRIME LABOR 0 $0.00
SUBCONTRACTOR COSTS (Proprietary data shall be submitted directly to the RCO-NCR)
| Total SUB AAA Direct Labor | 0.0 | $0.00 |
| Total SUB BBB Direct Labor | 0.0 | $0.00 |
| Total SUB CCC Direct Labor | 0.0 | $0.00 |
| Total SUB DDD Direct Labor | 0.0 | $0.00 |
TOTAL ALL SUBCONTRACTORS' COSTS $0.00
| OTHER DIRECT COSTS (Travel, Materials, etc.) | |
| Travel | $0.00 |
| ODC | $0.00 |
| PRIME's M&H | 0.00% | $0.00 |
| PRIME's G&A | 0.00% | $0.00 |
PRIME's FEE 0.00% $0.00
Grand Total 0.0 $0.00
| ** Notes ** |
| 1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions.. |
| 2. Please include all formulas and links to other spreadsheets. |
| 3. Please provide detailed costs (examples above) for each subcontractor proposed. |
| 4. Please provide detailed backup sheets as applicable to fully support above amounts. |
| 5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB. |
| 6, Please insert additional lines and update formulas if more than one Subcontractor is proposed |
| 7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions. |
| 8. Proprietary subcontracting data shall be submitted directly to the RCO-NCR in CD-ROM format to 2010 Henderson Rd., Quantico, VA 22134, |
| ATTN: Curtis Harris no later than then the solicitation closing date and time. |
Cost - OY 3 Option Period 3
Cat # Labor Categories Location Rate Hours Amount
| Direct Labor | ||||
| Sample Labor Category 1 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 2 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 3 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 4 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 5 | Con Site | $ - 0 | $0.00 |
Total Prime Direct Labor 0.0 $0.00
| Indirects | |||
| Fringe | 0.00% | $0.00 | |
| Overhead | 0.00% | $0.00 |
TOTAL PRIME LABOR 0 $0.00
SUBCONTRACTOR COSTS (Proprietary data shall be submitted directly to the RCO-NCR)
| Total SUB AAA Direct Labor | 0.0 | $0.00 |
| Total SUB BBB Direct Labor | 0.0 | $0.00 |
| Total SUB CCC Direct Labor | 0.0 | $0.00 |
| Total SUB DDD Direct Labor | 0.0 | $0.00 |
TOTAL ALL SUBCONTRACTORS' COSTS $0.00
| OTHER DIRECT COSTS (Travel, Materials, etc.) | |
| Travel | $0.00 |
| ODC | $0.00 |
| PRIME's M&H | 0.00% | $0.00 |
| PRIME's G&A | 0.00% | $0.00 |
PRIME's FEE 0.00% $0.00
Grand Total 0.0 $0.00
| ** Notes ** |
| 1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions.. |
| 2. Please include all formulas and links to other spreadsheets. |
| 3. Please provide detailed costs (examples above) for each subcontractor proposed. |
| 4. Please provide detailed backup sheets as applicable to fully support above amounts. |
| 5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB. |
| 6, Please insert additional lines and update formulas if more than one Subcontractor is proposed |
| 7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions. |
| 8. Proprietary subcontracting data shall be submitted directly to the RCO-NCR in CD-ROM format to 2010 Henderson Rd., Quantico, VA 22134, |
| ATTN: Curtis Harris no later than then the solicitation closing date and time. |
Cost - OY 4 Option Period 4
Cat # Encore II Labor Categories Location Rate Hours Amount
| Direct Labor | ||||
| Sample Labor Category 1 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 2 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 3 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 4 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 5 | Con Site | $ - 0 | $0.00 |
Total Prime Direct Labor 0.0 $0.00
| Indirects | |||
| Fringe | 0.00% | $0.00 | |
| Overhead | 0.00% | $0.00 |
TOTAL PRIME LABOR 0 $0.00
SUBCONTRACTOR COSTS (Proprietary data shall be submitted directly to the RCO-NCR)
| Total SUB AAA Direct Labor | 0.0 | $0.00 |
| Total SUB BBB Direct Labor | 0.0 | $0.00 |
| Total SUB CCC Direct Labor | 0.0 | $0.00 |
| Total SUB DDD Direct Labor | 0.0 | $0.00 |
TOTAL ALL SUBCONTRACTORS' COSTS $0.00
| OTHER DIRECT COSTS (Travel, Materials, etc.) | |
| Travel | $0.00 |
| ODC | $0.00 |
| PRIME's M&H | 0.00% | $0.00 |
| PRIME's G&A | 0.00% | $0.00 |
PRIME's FEE 0.00% $0.00
Grand Total 0.0 $0.00
| ** Notes ** |
| 1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions.. |
| 2. Please include all formulas and links to other spreadsheets. |
| 3. Please provide detailed costs (examples above) for each subcontractor proposed. |
| 4. Please provide detailed backup sheets as applicable to fully support above amounts. |
| 5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB. |
| 6, Please insert additional lines and update formulas if more than one Subcontractor is proposed |
| 7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions. |
| 8. Proprietary subcontracting data shall be submitted directly to the RCO-NCR in CD-ROM format to 2010 Henderson Rd., Quantico, VA 22134, |
| ATTN: Curtis Harris no later than then the solicitation closing date and time. |
Cost 6mth Opt Option Period 4
Cat # Labor Categories Location Rate Hours Amount
| Direct Labor | ||||
| Sample Labor Category 1 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 2 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 3 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 4 | Con Site | $ - 0 | $0.00 | |
| Sample Labor Category 5 | Con Site | $ - 0 | $0.00 |
Total Prime Direct Labor 0.0 $0.00
| Indirects | |||
| Fringe | 0.00% | $0.00 | |
| Overhead | 0.00% | $0.00 |
TOTAL PRIME LABOR 0 $0.00
SUBCONTRACTOR COSTS (Proprietary data shall be submitted directly to the RCO-NCR)
| Total SUB AAA Direct Labor | 0.0 | $0.00 |
| Total SUB BBB Direct Labor | 0.0 | $0.00 |
| Total SUB CCC Direct Labor | 0.0 | $0.00 |
| Total SUB DDD Direct Labor | 0.0 | $0.00 |
TOTAL ALL SUBCONTRACTORS' COSTS $0.00
| OTHER DIRECT COSTS (Travel, Materials, etc.) | |
| Travel | $0.00 |
| ODC | $0.00 |
| PRIME's M&H | 0.00% | $0.00 |
| PRIME's G&A | 0.00% | $0.00 |
PRIME's FEE 0.00% $0.00
Grand Total 0.0 $0.00
| ** Notes ** |
| 1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions.. |
| 2. Please include all formulas and links to other spreadsheets. |
| 3. Please provide detailed costs (examples above) for each subcontractor proposed. |
| 4. Please provide detailed backup sheets as applicable to fully support above amounts. |
| 5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB. |
| 6, Please insert additional lines and update formulas if more than one Subcontractor is proposed |
| 7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions. |
| 8. Proprietary subcontracting data shall be submitted directly to the RCO-NCR in CD-ROM format to 2010 Henderson Rd., Quantico, VA 22134, |
| ATTN: Curtis Harris no later than then the solicitation closing date and time. |
RATE SHEET
RATE SHEET
| Escalation | 2.0% | 2.0% | 2.0% | 2.0% | |||
| Direct Rate | Base Year | OY1 | OY2 | OY3 | OY4 | Option to Extend | |
| Sample Labor Category 1 | |||||||
| Sample Labor Category 2 | |||||||
| Sample Labor Category 3 | |||||||
| Sample Labor Category 4 | |||||||
| Sample Labor Category 5 |
| Fringe Rate |
| Overhead |
| G&A |
| M/H |
Fee