Attachment_VII_-_Cost_Price_Worksheet_Template.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
Technical, Analytical, and Managerial Support/Amendment 0005 Federal contract opportunity
Solicitation number
M00264-16-R-0001
Issued by
United States Marine Corps

About this file

Attachment VII

View the file

Other files for this federal contract opportunity

Other files attached to Technical, Analytical, and Managerial Support/Amendment 0005, newest first.
File Type Posted
M00264-16-R-0001-0005_PA E_Deadline_Extension.docx DOCX document
Attachment_VII_-_Cost_Price_Worksheet_Template_(Revised).xlsx XLSX spreadsheet
Amendment_4_M00264-16-R-0001-0004.pdf PDF
Attachment_IV.pdf PDF
Attachment_I.pdf PDF
Attachment_VI.pdf PDF
Amendment_3_M00264-16-R-0001-0003.pdf PDF
Attachment_II.pdf PDF
Attachment_V.pdf PDF
Attachment_III.pdf PDF
Amendment_2_M00264-16-R-0001-0002.docx DOCX document
Amendment_1_M00264-16-R-0001-0001.docx DOCX document
16-R-0001_PA E_Support.doc DOC document
DD254_revised.pdf PDF
PERFORMANCE_WORK_STATEMENT_-_Draft_for_Synopsis.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost-Summary

CONTRACT SUMMARY

Base YearOption Year 1Option Year 2Option Year 3Option Year 46 mth option to extendTotal
Cost ElementsHoursAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursAmount
Direct Labor0.0$0.000.0$0.000.0$0.000.0$0.000.0$0.000.0$0.000.0$0.00
Fringe$0.00$0.00$0.00$0.00$0.00$0.00$0.00
OH$0.00$0.00$0.00$0.00$0.00$0.00$0.00

Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Costs
SUBCONTRACTOR AAA0.0$0.000.0$0.000.0$0.000.0$0.000.0$0.000.0$0.000.0$0.00
Total Subcontractors Costs0.0$0.000.0$0.000.0$0.000.0$0.000.0$0.000.0$0.000.0$0.00
Travel$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ODCs (Prime and all Subs)$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Prime's M&H$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Prime's G&A$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Prime's Fee$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Grand Total0.0$0.000.0$0.000.0$0.000.0$0.000.0$0.000.0$0.000.0$0.00
**Notes**
1. Please ensure all prime and subcontractors total labor hours and amounts are reflected in this summary.
2. Please include all formulas and links to other spreadsheets.

CONSOLIDATED

ALL YEARS - CONSOLIDATED

Cat # Encore II Labor Categories Location Rate Hours Amount

Direct Labor
Sample Labor Category 1Con Site- 0$0.00
Sample Labor Category 2Con Site- 0$0.00
Sample Labor Category 3Con Site- 0$0.00
Sample Labor Category 4Con Site- 0$0.00
Sample Labor Category 5Con Site- 0$0.00

Total Prime Direct Labor - 0 $0.00

Indirects
Fringe$0.00
Overhead$0.00

TOTAL PRIME LABOR - 0 $0.00

SUBCONTRACTOR COSTS (provide details for EACH sub)

SUBCONTRACTOR AAA
Direct Labor
Subcontractor Sample Labor CategoryCon Site- 0$0.00
Fringe$0.00
Overhead$0.00
Fee$0.00

Total SUB AAA Direct Labor - 0 $0.00

TOTAL ALL SUBCONTRACTORS' COSTS $0.00

OTHER DIRECT COSTS (Travel, Materials, etc.)
Travel$0.00
ODC$0.00
PRIME's M&H$0.00
PRIME's G&A$0.00

PRIME's FEE $0.00

Grand Total - 0 $0.00

** Notes **
1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions..
2. Please include all formulas and links to other spreadsheets.
3. Please provide detailed costs (examples above) for each subcontractor proposed.
4. Please provide detailed backup sheets as applicable to fully support above amounts.
5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB.
6, Please insert additional lines and update formulas if more than one Subcontractor is proposed
7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions.

Cost-Base

BASE YEAR

Cat # Encore II Labor Categories Location Rate Hours Amount

Direct Labor
Sample Labor Category 1Con Site$ - 0$0.00
Sample Labor Category 2Con Site$ - 0$0.00
Sample Labor Category 3Con Site$ - 0$0.00
Sample Labor Category 4Con Site$ - 0$0.00
Sample Labor Category 5Con Site$ - 0$0.00

Total Prime Direct Labor 0.0 $0.00

Indirects
Fringe0.00%$0.00
Overhead0.00%$0.00

TOTAL PRIME LABOR 0 $0.00

SUBCONTRACTOR COSTS (provide details for EACH sub)

SUBCONTRACTOR AAA
Direct Labor
Subcontractor Sample Labor CategoryCon Site$0.00
Fringe$0.00
Overhead$0.00
Fee$0.00

Total SUB AAA Direct Labor 0.0 $0.00

TOTAL ALL SUBCONTRACTORS' COSTS $0.00

OTHER DIRECT COSTS (Travel, Materials, etc.)
Travel$0.00
ODC$0.00
PRIME's M&H0.00%$0.00
PRIME's G&A0.00%$0.00

PRIME's FEE 0.00% $0.00

Grand Total 0.0 $0.00

** Notes **
1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions..
2. Please include all formulas and links to other spreadsheets.
3. Please provide detailed costs (examples above) for each subcontractor proposed.
4. Please provide detailed backup sheets and Basis of Estimate as applicable to fully support above amounts.
5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB.
6, Please insert additional lines and update formulas if more than one Subcontractor is proposed
7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions.

Cost - OY 1 Option Period 1

Cat # Encore II Labor Categories Location Rate Hours Amount

Direct Labor
Sample Labor Category 1Con Site$ - 0$0.00
Sample Labor Category 2Con Site$ - 0$0.00
Sample Labor Category 3Con Site$ - 0$0.00
Sample Labor Category 4Con Site$ - 0$0.00
Sample Labor Category 5Con Site$ - 0$0.00

Total Prime Direct Labor 0.0 $0.00

Indirects
Fringe0.00%$0.00
Overhead0.00%$0.00

TOTAL PRIME LABOR 0 $0.00

SUBCONTRACTOR COSTS (provide details for EACH sub)

SUBCONTRACTOR AAA
Direct Labor
Subcontractor Sample Labor CategoryCon Site$0.00
Fringe0.00%$0.00
Overhead0.00%$0.00
Fee0.00%$0.00

Total SUB AAA Direct Labor 0.0 $0.00

TOTAL ALL SUBCONTRACTORS' COSTS $0.00

OTHER DIRECT COSTS (Travel, Materials, etc.)
Travel$0.00
ODC$0.00
PRIME's M&H0.00%$0.00
PRIME's G&A0.00%$0.00

PRIME's FEE 0.00% $0.00

Grand Total 0.0 $0.00

** Notes **
1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions..
2. Please include all formulas and links to other spreadsheets.
3. Please provide detailed costs (examples above) for each subcontractor proposed.
4. Please provide detailed backup sheets as applicable to fully support above amounts.
5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB.
6, Please insert additional lines and update formulas if more than one Subcontractor is proposed
7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions.

Cost - OY 2 Option Period 2

Cat # Encore II Labor Categories Location Rate Hours Amount

Direct Labor
Sample Labor Category 1Con Site$ - 0$0.00
Sample Labor Category 2Con Site$ - 0$0.00
Sample Labor Category 3Con Site$ - 0$0.00
Sample Labor Category 4Con Site$ - 0$0.00
Sample Labor Category 5Con Site$ - 0$0.00

Total Prime Direct Labor 0.0 $0.00

Indirects
Fringe0.00%$0.00
Overhead0.00%$0.00

TOTAL PRIME LABOR 0 $0.00

SUBCONTRACTOR COSTS (provide details for EACH sub)

SUBCONTRACTOR AAA
Direct Labor
Subcontractor Sample Labor CategoryCon Site$0.00
Fringe$0.00
Overhead$0.00
Fee$0.00

Total SUB AAA Direct Labor 0.0 $0.00

TOTAL ALL SUBCONTRACTORS' COSTS $0.00

OTHER DIRECT COSTS (Travel, Materials, etc.)
Travel$0.00
ODC$0.00
PRIME's M&H0.00%$0.00
PRIME's G&A0.00%$0.00

PRIME's FEE 0.00% $0.00

Grand Total 0.0 $0.00

** Notes **
1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions..
2. Please include all formulas and links to other spreadsheets.
3. Please provide detailed costs (examples above) for each subcontractor proposed.
4. Please provide detailed backup sheets as applicable to fully support above amounts.
5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB.
6, Please insert additional lines and update formulas if more than one Subcontractor is proposed
7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions.

Cost - OY 3 Option Period 3

Cat # Encore II Labor Categories Location Rate Hours Amount

Direct Labor
Sample Labor Category 1Con Site$ - 0$0.00
Sample Labor Category 2Con Site$ - 0$0.00
Sample Labor Category 3Con Site$ - 0$0.00
Sample Labor Category 4Con Site$ - 0$0.00
Sample Labor Category 5Con Site$ - 0$0.00

Total Prime Direct Labor 0.0 $0.00

Indirects
Fringe0.00%$0.00
Overhead0.00%$0.00

TOTAL PRIME LABOR 0 $0.00

SUBCONTRACTOR COSTS (provide details for EACH sub)

SUBCONTRACTOR AAA
Direct Labor
Subcontractor Sample Labor CategoryCon Site$0.00
Fringe$0.00
Overhead$0.00
Fee$0.00

Total SUB AAA Direct Labor 0.0 $0.00

TOTAL ALL SUBCONTRACTORS' COSTS $0.00

OTHER DIRECT COSTS (Travel, Materials, etc.)
Travel$0.00
ODC$0.00
PRIME's M&H0.00%$0.00
PRIME's G&A0.00%$0.00

PRIME's FEE 0.00% $0.00

Grand Total 0.0 $0.00

** Notes **
1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions..
2. Please include all formulas and links to other spreadsheets.
3. Please provide detailed costs (examples above) for each subcontractor proposed.
4. Please provide detailed backup sheets as applicable to fully support above amounts.
5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB.
6, Please insert additional lines and update formulas if more than one Subcontractor is proposed
7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions.

Cost - OY 4 Option Period 4

Cat # Encore II Labor Categories Location Rate Hours Amount

Direct Labor
Sample Labor Category 1Con Site$ - 0$0.00
Sample Labor Category 2Con Site$ - 0$0.00
Sample Labor Category 3Con Site$ - 0$0.00
Sample Labor Category 4Con Site$ - 0$0.00
Sample Labor Category 5Con Site$ - 0$0.00

Total Prime Direct Labor 0.0 $0.00

Indirects
Fringe0.00%$0.00
Overhead0.00%$0.00

TOTAL PRIME LABOR 0 $0.00

SUBCONTRACTOR COSTS (provide details for EACH sub)

SUBCONTRACTOR AAA
Direct Labor
Subcontractor Sample Labor CategoryCon Site$0.00
Fringe$0.00
Overhead$0.00
Fee$0.00

Total SUB AAA Direct Labor 0.0 $0.00

TOTAL ALL SUBCONTRACTORS' COSTS $0.00

OTHER DIRECT COSTS (Travel, Materials, etc.)
Travel$0.00
ODC$0.00
PRIME's M&H0.00%$0.00
PRIME's G&A0.00%$0.00

PRIME's FEE 0.00% $0.00

Grand Total 0.0 $0.00

** Notes **
1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions..
2. Please include all formulas and links to other spreadsheets.
3. Please provide detailed costs (examples above) for each subcontractor proposed.
4. Please provide detailed backup sheets as applicable to fully support above amounts.
5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB.
6, Please insert additional lines and update formulas if more than one Subcontractor is proposed
7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions.

Cost 6mth Opt Option Period 4

Cat # Encore II Labor Categories Location Rate Hours Amount

Direct Labor
Sample Labor Category 1Con Site$ - 0$0.00
Sample Labor Category 2Con Site$ - 0$0.00
Sample Labor Category 3Con Site$ - 0$0.00
Sample Labor Category 4Con Site$ - 0$0.00
Sample Labor Category 5Con Site$ - 0$0.00

Total Prime Direct Labor 0.0 $0.00

Indirects
Fringe0.00%$0.00
Overhead0.00%$0.00

TOTAL PRIME LABOR 0 $0.00

SUBCONTRACTOR COSTS (provide details for EACH sub)

SUBCONTRACTOR AAA
Direct Labor
Subcontractor Sample Labor CategoryCon Site$0.00
Fringe$0.00
Overhead$0.00
Fee$0.00

Total SUB AAA Direct Labor 0.0 $0.00

TOTAL ALL SUBCONTRACTORS' COSTS $0.00

OTHER DIRECT COSTS (Travel, Materials, etc.)
Travel$0.00
ODC$0.00
PRIME's M&H0.00%$0.00
PRIME's G&A0.00%$0.00

PRIME's FEE 0.00% $0.00

Grand Total 0.0 $0.00

** Notes **
1. Please provide in the supportting documentation Basis of Estimate for all labor and indirct rates, labor hours and subcontractor costs per instructions..
2. Please include all formulas and links to other spreadsheets.
3. Please provide detailed costs (examples above) for each subcontractor proposed.
4. Please provide detailed backup sheets as applicable to fully support above amounts.
5. ALL PRIME DIRECT AND INDIRECT RATES SHOULD BE ENTERED ON THE 'RATE SHEET" TAB.
6, Please insert additional lines and update formulas if more than one Subcontractor is proposed
7. Contractor should apply approved/disclosed accounting system practices into the spreadsheets including solicitation instructions.

RATE SHEET

RATE SHEET

Escalation2.0%2.0%2.0%2.0%
Direct RateBase YearOY1OY2OY3OY4Option to Extend
Sample Labor Category 1
Sample Labor Category 2
Sample Labor Category 3
Sample Labor Category 4
Sample Labor Category 5
Fringe Rate
Overhead
G&A
M/H

Fee

File details come from the government source that posted it. Updated .