Lake_County_Schools_Division_27v4_5.20.2023__Exhibit_A.pdf

PDF 925 KB Posted

Attached to
Low Voltage and Communication Systems
Solicitation number
26-0807-B-KK945
Issued by
Florida

About this file

This is a Structured Cabling System Exhibit A specification document from Lake County Public Schools in Florida, detailing comprehensive requirements for the design, installation, and maintenance of a complete data and voice communications infrastructure. The specification covers the furnishing and installation of structured telecommunications cabling systems including fiber optic cable distribution, twisted pair copper cabling, work area outlets, patch panels, termination blocks, equipment racks, cable management systems, and associated hardware and labor. The scope of work requires contractors to provide all materials, labor, tools, equipment, and services necessary for installation in accordance with current Florida Building Code, including floor penetrations, conduit raceways, firestopping, grounding and bonding, wireless LAN access point installation, field testing of horizontal and backbone cabling, and complete as-built documentation. Approved contractors must have completed at least two similar projects within the preceding 24 months, maintain current manufacturer certifications for installation and testing of the specified systems, possess appropriate state contractor licensing, and ensure all personnel have cleared background clearances per Jessica Lunsford requirements before facility access.

The specification mandates that all materials be new and delivered in original packaging, with Category 6 and Category 6A copper cabling from General Cable Corporation and fiber optic products from General Cable Corporation or Hubbell Premise Wiring as the basis of design. Connectivity components must be Hubbell Premise Wiring products, with substitutions requiring approval from Lake County Public Schools IT and Shared Services at least 30 days prior to bid opening. The installation must comply with ANSI/TIA standards, National Electrical Code provisions, UL and ETL listings, and local Florida codes. Contractors are responsible for complete submittal packages including data sheets, drawings, bill of materials, technician certifications, labeling schemes, and show drawings prior to work commencement. The warranty requirement includes a minimum 25-year extended warranty covering all components and workmanship, with permanent link warranty for voice and data structured cabling and channel warranty for wireless applications, registered through the manufacturer. All moves, adds, and changes beyond the original contract scope require revised quotations, and the owner bears costs for substantial design changes while contractors fund changes executed without written approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lake County Public Schools Page 0 of 55

Requirements Structured Cabling System

Exhibit A

Lake County Schools 2023

Data/Communications Guidelines

Division 27 Specification

Lake County Public Schools Page 2 of 55

Contents

PART 1 GENERAL

1.1 SCOPE OF WORK

1.2 SUMMARY

1.3 DATA AND VOICE COMMUNICATIONS CONTRACT WORK

1.4 SUBMITTALS

1.5 APPROVED CONTRACTOR QUALIFICATIONS

1.6 APPROVED PRODUCT MANUFACTURERS

1.7 PRODUCT SUBSTITUTIONS

1.8 QUALITY ASSURANCE

1.9 DRAWINGS

1.10 APPLICABLE STANDARDS, CODES, AND REGULATIONS

1.11 MAINTENANCE

1.12 DOCUMENTATION

1.13 WARRANTY

1.14 MOVES, ADDS AND CHANGES

1.15 CLEANUP

PART 2 PRODUCTS

2.1 WORK AREA CONNECTORS

2.2 FACE PLATES

2.3 CABLE

2.4 CONNECTORS – FIBER OPTIC

2.5 PATCH CORDS

2.6 PATCH PANELS – FIELD CONFIGURABLE

2.7 TERMINATION BLOCKS – CATEGORY 6

2.8 RACKS – FREE STANDING – 2 POST

2.9 RACKS – FREE STANDING – 4 POST

2.10 CABLE MANAGEMENT – VM SERIES CABLE MANAGEMENT

2.11 CABLE MANAGEMENT – HORIZONTAL – HM SERIES

2.12 CABINETS, ENCLOSURE & ACCESSORIES

2.13 INNER-DUCT

Lake County Public Schools Page 3 of 55

2.14 PROTECTION UNITS – COPPER CABLE

PART 3 EXECUTION

3.1 APPROVED CONTRACTOR RESPONSIBILITIES

3.2 DELIVERY, STORAGE AND HANDLING LOGISTICS

3.3 PREPARATION

3.4 INSTALLATION

Lake County Public Schools Page 4 of 55

1.1 SCOPE OF WORK

THIS DOCUMENT SPECIFIES LAKE COUNTY PUBLIC SCHOOLS REQUIREMENTS FOR PRODUCT DESIGN, PERFORMANCE, QUALITY ASSURANCE, AND CONTRACTOR RESPONSIBILITIES. THIS DOCUMENT SPECIFIES THE EXECUTION OF WORK TO INSTALL A COMPLETE STRUCTURED CABLING SYSTEM. EXECUTION OF WORK INCLUDES DELIVERY AND STORAGE OF MATERIALS, PREPARATION, INSTALLATION, FIELD-TESTING, AND PROJECT COMPLETION TASKS. SYSTEM CERTIFICATION AND WARRANTY SUBMITTAL REQUIREMENTS FOR COMPLETED WORK AND FUTURE MOVES, ADDS, AND CHANGES (MAC’S) ARE ALSO SPECIFIED IN THIS DOCUMENT. COMPLIANCE TO APPLICABLE CODES, STANDARDS AND REGULATIONS IS

REQUIRED FOR ALL CONSTRUCTION WORK PERFORMED.

1.2 SUMMARY

A. THE APPROVED CONTRACTOR SHALL FURNISH, SUPPLY AND INSTALL A COMPLETE STRUCTURED CABLING

INFRASTRUCTURE. INITIAL INSTALLATION AND ALL ADDS- MOVES AND CHANGES OF THE DATA NETWORK

INFRASTRUCTURE SHALL INCLUDE IN THIS DOCUMENT.

B. PRODUCT SPECIFICATIONS, GENERAL DESIGN CONSIDERATIONS, AND INSTALLATION GUIDELINES ARE

PROVIDED IN THIS DOCUMENT. QUANTITIES FOR ALL CABLING PRODUCTS SHALL BE PROVIDED AS REQUIRED TO COMPLETE CABLING TO ALL WORK STATIONS AS SHOWN ON FLOOR PLANS OR AGREED

UPON PROJECT. CURRENT FLORIDA BUILDING CODE MUST BE ADHERED TO BE APPROVED

CONTRACTOR. ADHERENCE TO THAT CODE IS THE RESPONSIBILITY OF THE APPROVED CONTRACTOR

AND WILL NOT BE FULLY DETAILED OR OUTLINED IN THESE DOCUMENTS.

1.3 DATA AND VOICE COMMUNICATIONS CONTRACT WORK

A. GENERAL:

1. FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND SERVICES FOR THE INSTALLATION IN

ACCORDANCE WITH THE SCOPE OF WORK. THIS INCLUDES LIFTS OR OTHER EQUIPMENT THAT

MAY BE NEEDED TO COMPLETE THE JOB. IT IS THE RESPONSIBILITY OF THE APPROVED

CONTRACTOR TO PLAN FOR AND PROVIDE THOSE NEEDS.

2. COMPLETELY COORDINATE WITH WORK OF ALL OTHER TRADES.

3. PROVIDE ALL SUPPLEMENTARY OR MISCELLANEOUS ITEMS, APPURTENANCES AND DEVICES

INCIDENTAL TO OR NECESSARY FOR A SOUND, SECURE AND COMPLETE INSTALLATION,

WHETHER OR NOT SPECIFICALLY INDICATED IN THE CONTRACT DOCUMENTS.

4. PROVIDE ALL FLOOR PENETRATIONS, FLOOR SLEEVES, CONDUIT RACEWAYS, WALL

PENETRATIONS, ETC. NOT SHOWN ON THE ELECTRICAL PLANS BUT NEEDED FOR THE ROUTING

OF CABLING. MAKE SURE ALL FIRE RATING ARE CREATED AND OR RETURNED TO THE LEVELS

REQUIRED BY CODE OR BUILDING REQUIREMENTS

5. PROVIDE LABOR FOR TESTING HORIZONTAL AND BACKBONE CABLING.

6. PROVIDE FIRESTOPPING TO ALL PENETRATIONS AND ADJUSTMENTS TO ANY WALL.

7. PROVIDE LABOR FOR WIRELESS LAN ACCESS POINT, ANTENNAS AND POWER INJECTOR

INSTALLATION AND SYSTEM TESTING. INCLUDES THE MOUNTING OF WIRELESS ACCESS POINTS

IF REQUIRED BY THE DISTRICT.

8. PROVIDE TELECOMMUNICATIONS GROUNDING AND BONDING. PROVIDE GROUNDING AND

BONDING FOR ALL EXTERIOR CONNECTIONS AND CABLING AS WELL.

Lake County Public Schools Page 5 of 55

B. PROVIDE COMPLETE INSTALLATION FOR STRUCTURED TELECOMMUNICATIONS CABLING SYSTEM

INCLUDING BUT NOT LIMITED TO:

1. A CENTRAL DATA DISTRIBUTION POINT IN A DESIGNATED COMMUNICATIONS EQUIPMENT

ROOM AND REMOTE DATA DISTRIBUTION POINTS

2. EQUIPMENT RACKS AND/OR CABINETS

3. STRUCTURED CABLING, INCLUDING:

a FIBER OPTIC CABLE DISTRIBUTION b TWISTED PAIR COPPER CABLING DISTRIBUTION

4. WORK AREA TELECOMMUNICATION OUTLETS.

5. MODULAR PATCH PANELS AS SPECIFIED.

6. OPTICAL FIBER PATCH PANELS.

7. OPTICAL FIBER CONNECTORS.

8. HORIZONTAL AND VERTICAL WIRE MANAGEMENT.

9. NECESSARY PATHWAYS AND SPACES, INCLUDING:

a CONDUIT b RACEWAYS c CABLE SUPPORTS

10. NECESSARY POWER CIRCUITS, SURGE SUPPRESSION AND PROPER PLANNING REQUIRED FOR

ISSUES SUCH AS: SEGMENTATION AND GROUNDING TESTS.

11. FIRE STOPPING.

12. GROUNDING AND BONDING.

13. FIELD TESTING.

14. ADMINISTRATION.

15. AS BUILT DOCUMENTATION AND TESTING PROOFS AT END OF PROJECT.

1.4 SUBMITTALS

A. SUBMITTALS SHALL BE COMPLETE AND AT ONE TIME. PARTIAL SUBMITTALS WILL NOT BE CONSIDERED.

THE PACKAGE SHALL INCLUDE THE FOLLOWING: DATA SHEETS, DRAWINGS AND INSTRUCTIONS IF

AVAILABLE. WORK SHALL NOT PROCEED WITHOUT THE OWNER’S APPROVAL OF THE SUBMITTAL

PACKAGE ANY PRODUCTS INSTALLED WITHOUT OWNERS’ APPROVAL SHALL BE REMOVED AT

CONTRACTORS EXPENSE.

1. CABLE

Lake County Public Schools Page 6 of 55 a FIBER OPTIC b UTP AND/OR STP

2. CONNECTIVITY (PATCH PANEL & MODULAR JACK AND/OR CONNECTOR)

a FIBER OPTIC b UTP AND/OR STP

3. WORK AREA OUTLETS

4. CABINETS, RACKS AND ENCLOSURES

B. BILL OF MATERIAL LISTS

C. LISTS OF SUBCONTRACTORS AND PROOF OF CONTRACTOR QUALIFICATIONS SHALL BE PROVIDED TO LAKE COUNTY PUBLIC SCHOOLS REPRESENTATIVE UPON REQUEST. SUBMIT COPIES OF CERTIFICATIONS FOR ALL

TECHNICIANS AND THE PROJECT MANAGER WHO WILL SUPPORT THIS PROJECT.

1. STRUCTURED CABLING AND TERMINATION EQUIPMENT INSTALLATION CERTIFICATIONS FOR

COPPER AND OPTICAL FIBER CONNECTIVITY AND CABLING.

2. ALL CONTRACTOR EMPLOYEES MUST HAVE CLEARANCE TO FACILITIES PER THE JESSICA

LUNDSFORD REQUIREMENTS. NO EMPLOYEE WILL BE PERMITTED INTO ANY FACILITY

WITHOUT CLEARENCES. ALL EMPLOYEES MUST BE CLEARED.

3. APPROVED MANUFACTURER CLASSES OR CERTIFICAITONS SATISFACTORILY COMPLETED.

D. PROPOSED LABELING SCHEMES AND LABELING METHOD.

E. SHOW DRAWINGS SHALL BE SUBMITTED. ALL COMMUNICATION SYSTEM SHOP DRAWINGS SHALL

INCLUDE:

1. WIRING DIAGRAMS FOR ALL INSTALLED CABLING.

2. EQUIPMENT RACK/CABINET LAYOUTS.

3. LIST OF CABLING DISTANCES (TYPICAL AND MAXIMUM) FOR ALL STRUCTURED CABLING

F. CONTRACTOR INSPECTION OF SITE:

1. COMMUNICATIONS FLOOR PLAN DRAWINGS ARE TO SCALE AND TYPICALLY ARE NOT

DIMENSIONED. THE CONTRACTOR SHALL NOT SCALE DRAWINGS FOR EQUIPMENT PLACEMENT

AND CLEARANCES. DIMENSIONS GIVEN ON DRAWINGS SHALL ALWAYS TAKE PRECEDENCE OVER

SCALED DRAWINGS.

2. ANY EXISTING WIRES, UTILITIES, OR EQUIPMENT SHOWN ON THE DRAWINGS ARE SHOWN FOR

GENERAL INFORMATION AND TO THE BEST KNOWLEDGE OF THE ENGINEER. THE CONTRACTOR

SHALL FIELD VERIFY ALL EXISTING WIRES, UTILITIES, OR EQUIPMENT.

3. THE CONTRACTOR SHALL FIELD VERIFY DISTANCES AND EQUIPMENT PLACEMENTS

COORDINATING LOCATIONS WITH OTHER TRADES, CONSTRUCTION MANAGERS, AND GENERAL

CONTRACTOR PRIOR TO INSTALLATION.

Lake County Public Schools Page 7 of 55

4. THE CONTRACTOR SHALL REVIEW ALL SITE CONDITIONS PRIOR TO SUBMITTING A BID ON THIS

PROJECT. ANY OBVIOUS DISCREPANCIES BETWEEN THE SITE CONDITIONS AND BIDDING

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE LAKE COUNTY PUBLIC SCHOOLS

REPRESENTATIVE PRIOR TO THE TIME OF BIDDING SO CLARIFICATION CAN BE MADE

BY ADDENDUM.

5. CHANGE ORDER REQUESTS FOR ADDITIONAL COSTS RELATED TO THE CONTRACTORS

MISUNDERSTANDING RELATED TO THE AMOUNT OF WORK INVOLVED AND LACK OF

KNOWLEDGE RELATED TO THE SITE CONDITIONS WILL NOT BE ALLOWED.

G. TEST REPORTS: SUBMIT COPIES OF COMPLETE REPORTS OF ALL TESTING PERFORMED TO THE GENERAL

CONTRACTOR, WITH COPIES TO THE LAKE COUNTY PUBLIC SCHOOLS REPRESENTATIVE UPON

COMPLETION OF JOB.

1.5 APPROVED CONTRACTOR QUALIFICATIONS

A. THE CONTRACTOR SHALL HAVE EXPERIENCE IN THE INSTALLATION AND TESTING OF SIMILAR SYSTEMS AS

SPECIFIED HEREIN AND SHALL HAVE COMPLETED AT LEAST TWO PROJECTS OF SIMILAR SIZE AND SCOPE

WITHIN THE LAST 24 MONTHS. THE CONTRACTOR SHALL PROVIDE REFERENCES UPON REQUEST

(INCLUDING THE PROJECT NAME, ADDRESS, AND DATE OF IMPLEMENTATION, CLIENT NAME, TITLE, TELEPHONE NUMBER, AND PROJECT DESCRIPTION).

B. ALL MEMBERS OF THE INSTALLATION TEAM MUST BE CERTIFIED BY THE MANUFACTURER AS HAVING

COMPLETED THE NECESSARY TRAINING TO COMPLETE THEIR PART OF THE INSTALLATION. ALL

PERSONNEL SHALL BE ADEQUATELY TRAINED IN THE USED OF SUCH TOOLS AND EQUIPMENT AS

REQUIRED.

C. THE CONTRACTOR BIDDING ON COMMUNICATION SYSTEMS SPECIFIED HEREIN SHALL BE CERTIFIED BY

THE CONNECTIVITY MANUFACTURER TO INSTALL, SERVICE, AND WARRANTY THE SPECIFIED PRODUCT PRIOR TO THE TIME OF BID AND THROUGHOUT THE DURATION OF THE INSTALLATION. MANUFACTURER CERTIFICATIONS SHALL NOT BE PROJECT SPECIFIC AND SHOULD BE VALID FOR ANY AND ALL PROJECTS

COMPLETED BY CONTRACTOR.

D. THE CONTRACTOR SHALL OWN AND MAINTAIN TOOLS, INSTALLATION EQUIPMENT, AND TEST

EQUIPMENT NECESSARY FOR SUCCESSFUL INSTALLATION AND TESTING OF OPTICAL AND CATEGORY 6 &

6A PREMISE DISTRIBUTION SYSTEMS.

E. LAKE COUNTY PUBLIC SCHOOLS RESERVES THE RIGHT TO REQUIRE THE CONTRACTOR TO REMOVE FROM

THE PROJECT ANY SUCH EMPLOYEE THE OWNER DEEMS TO BE INCOMPETENT, CARELESS OR

INSUBORDINATE.

F. THE CONTRACTOR MUST MAINTAIN A STATE CONTRACTOR’S LICENSE AS REQUIRED BY THE STATE.

1.6 APPROVED PRODUCT MANUFACTURERS

A. THE MANUFACTURER OF THE CONNECTIVITY, THAT LAKE COUNTY PUBLIC SCHOOLS IS USING AS BASIS OF

DESIGN IN THIS DOCUMENT, AS REQUIRED FOR CONSTRUCTION OF THE CABLING INFRASTRUCTURE PER

CONTRACT DOCUMENTS SHALL BE:

1. HUBBELL PREMISE WIRING

B. THE MANUFACTURER OF THE CABLING PRODUCTS, THAT LAKE COUNTY PUBLIC SCHOOLS IS USING AS

BASIS OF DESIGN IN THIS DOCUMENT, AS REQUIRED FOR CONSTRUCTION OF THE COPPER CABLE

INFRASTRUCTURE PER CONTRACT DOCUMENTS SHALL BE:

Lake County Public Schools Page 8 of 55

1. GENERAL CABLE CORPORATION

C. THE MANUFACTURER OF THE FIBER OPTIC CABLING PRODUCTS, THAT LAKE COUNTY PUBLIC SCHOOLS IS USING AS BASIS OF DESIGN IN THIS DOCUMENT, AS REQUIRED FOR CONSTRUCTION OF THE FIBER OPTIC

CABLE PER CONTRACT DOCUMENTS SHALL BE:

1. GENERAL CABLE CORPORATION

D. PRODUCT SUBSTITUTIONS ARE PERMITTED UNDER THE CONDITIONS STATED BELOW. (1.7 A)

1.7 PRODUCT SUBSTITUTIONS

A. PRODUCT SUBSTITUTIONS FROM OTHER MANUFACTURERS SHALL REQUIRE THE APPROVAL OF LAKE

COUNTY PUBLIC SCHOOLS – IT AND SHARED SERVICES, 30 DAYS PRIOR TO BID OPENING.

1.8 QUALITY ASSURANCE

A. INSTALLED CATEGORY RATED UTP AND FIBER CABLING SYSTEMS, PATHWAYS AND DISTRIBUTION

FACILITIES SHALL ADHERE TO MANUFACTURER’S INSTRUCTIONS, SUBMITTED DRAWINGS AND

SPECIFICATIONS, AND APPLICABLE CODES, STANDARDS AND REGULATIONS.

B. INSTALLED CATEGORY RATED UTP CABLING SYSTEMS AND FIELD TEST RESULTS SHALL STRICTLY ADHERE

TO REQUIREMENTS OF ANSI/TIA-568.O-D AND ANSI/TIA-568.2-D.

C. INSTALLED OPTICAL FIBER CABLING SYSTEMS AND FIELD TEST RESULTS SHALL STRICTLY ADHERE TO

REQUIREMENTS OF ANSI/TIA-568.0-D AND ANSI/TIA-568.3-D.

D. WHERE APPLICABLE, ALL EQUIPMENT, COMPONENTS, ACCESSORIES AND HARDWARE SHALL BE NEW AND

UL LISTED FOR THE INTENDED PURPOSE OF THE INSTALLATION.

E. INSTALLED PRODUCTS SHALL BE MANUFACTURED BY AN ISO 9001 CERTIFIED FACILITY.

F. INSTALLED PRODUCTS SHALL BE FREE FROM DEFECTS IN MATERIAL OR WORKMANSHIP FROM THE

MANUFACTURER, AND SHALL BE OF THE QUALITY INDICATED.

G. ALL METHODS OF CONSTRUCTION THAT ARE NOT SPECIFIED IN THE CONTRACT DOCUMENTS SHALL BE

SUBJECT TO CONTROL AND APPROVAL BY LAKE COUNTY PUBLIC SCHOOLS REPRESENTATIVE.

H. INSTALLED PRODUCTS SHALL BE LOT-TRACEABLE BY DATE CODE.

I. ALL CRITICAL INTERNAL MANUFACTURING OPERATIONS FOR INSTALLED PRODUCTS SHALL HAVE

DOCUMENTED IN-PROCESS INSPECTION AND TESTING ACCORDING TO ISO9001.

1.9 DRAWINGS

A. FLOOR PLANS:

1. THE LOCATION OF THE MDF, ALL IDF’S AND ALL DATA OUTLET LOCATIONS, INCLUDING THE TYPE

AND LABELING OF THE OUTLET.

Lake County Public Schools Page 9 of 55

2. THE ROUTING AND DISTANCES OF ALL DATA AND FIBER OPTIC CABLES, AND ASSOCIATED

CONDUIT SIZES.

3. ALL FIRE RATED WALL OR STRUCTURAL PENETRATIONS AND SLEEVE REQUIREMENTS.

4. ROUTING OF ALL EXPOSED CONDUIT (EXPOSED CONDUIT IS TO BE PROVIDED ONLY WHERE

ALLOWED AT EXISTING FACILITIES.)

B. RISER DIAGRAMS:

1. MDF AND IDF’S SHOWING, IN ELEVATION, THE LOCATION OF THE RACK AND SPACES REQUIRED

FOR ALL FIBER TRAYS, NETWORK ELECTRONICS, COPPER PATCH PANELS AND WIRE MINDERS.

2. ALL CABLE ROUTING DETAILS AT THE RACKS.

3. THE NUMBER, TYPE AND CONDUIT SIZES OF ALL FIBER RUNS INTERCONNECTING THE MDF AND

THE IDF’S.

4. THE RACK ROOM NUMBER, BUILDING NUMBER AND SIZE.

5. THE TOTAL NUMBER AND TYPE OF DATA DROPS SERVED BY THE MDF OR IDF, SUCH AS WIRELESS –WL, COMPUTER – C, CLOCK – CLK, VIDEO PROJECTOR – VP, AIR CONDITIONING – A/C, CAMERA

– CAM.

C. DETAILS:

1. THE MDF AND IDF ENLARGED PLANS WITH ALL DIMENSIONED CLEARANCES, ADJACENT

SHELVING/CABINETS AND MISCELLANEOUS EQUIPMENT NECESSARY TO JUDGE THE SUITABILITY

OF THE ARRANGEMENT AND POSSIBILITIES FOR FUTURE EQUIPMENT AND RACK EXPANSION.

MDF AND IDF DETAILS SHALL SHOW CONDUIT ARRANGEMENTS.

2. CONDUIT DETAILS INCLUDING BUT NOT LIMITED TO SURFACE MOUNTED CONDUIT DATA DROP

DETAIL, CABLING SUPPORT DETAILS, FIRE RATED WALL/STRUCTURAL PENETRATION DETAILS AND

EXTERIOR EXPOSED CONDUIT DETAILS (ONLY WHERE ALLOWED).

3. A LEGEND OF CLEARLY DRAWN SYMBOLS WITH WRITTEN DEFINITIONS SHALL BE PROVIDED.

4. PROVIDE THE TOTAL NUMBER OF DROPS FOR EACH RACK EXTENDING TO ROOMS.

5. PROVIDE AND SHOW A SURGE SUPPRESSANT POWER STRIP AT EACH RACK WITH A MINIMUM OF

6 20-AMP OUTLETS AND A MINIMUM OF A 20-AMP CIRCUIT BREAKER MOUNTED IN THE RACK.

1.10 APPLICABLE STANDARDS, CODES, AND REGULATIONS

A. INSTALLATION STANDARDS: CABLE INSTALLATION SHALL COMPLY WITH THE FOLLOWING:

1. AMERICAN NATIONAL STANDARDS INSTITUTE, (ANSI)

a NSI/TIA-568.0-D, "GENERIC TELECOMMUNICATIONS CABLING FOR CUSTOMER

PREMISES", OR CURRENT UPDATED STANDARD.

b ANSI/TIA-568.1-D, "COMMERCIAL BUILDING TELECOMMUNICATIONS CABLING

STANDARD", OR CURRENT UPDATED STANDARD.

Lake County Public Schools Page 10 of 55 c ANSI/TIA-568.2-D, "BALANCED TWISTED-PAIR TELECOMMUNICATION CABLING AND

COMPONENTS STANDARD", OR CURRENT UPDATED STANDARD.

d ANSI/TIA-568.3-D, "OPTICAL FIBER CABLING COMPONENTS STANDARD", OR CURRENT

UPDATED STANDARD.

e ANSI/TIA-568.4-D, “COAXIAL CABLING COMPONENT STANDARD “, OR CURRENT

UPDATED STANDARD.

f ANSITIA/EIA-569-D, COMMERCIAL BUILDING STANDARDS FOR TELECOMMUNICATIONS

PATHWAYS AND SPACES, OR CURRENT UPDATED STANDARD.

g ANSI/TIA-607-D, COMMERCIAL BUILDING GROUNDING AND BONDING REQUIREMENTS

FOR TELECOMMUNICATIONS, OR CURRENT UPDATED STANDARD.

h ANSI/TIA/EIA-942-A, TELECOMMUNICATIONS INFRASTRUCTURE FOR DATA CENTERS, OR

CURRENT UPDATED STANDARD.

i ANSI/TIA-4966, TELECOMMUNICATIONS INFRASTRUCTURE STANDARD FOR

EDUCATIONAL FACILITIES

j ANSI/ICEA S-83-596, FIBER OPTIC PREMISES DISTRIBUTION CABLE, 2001.

k ANSI/TIA/EIA-598, COLOR CODING OF OPTICAL FIBER CABLES, 2001 l ANSI/ICEA S-87-640, FIBER OPTIC OUTSIDE PLANT DISTRIBUTION CABLE, 1999.

m ANSI/TIA/EIA-492AAAC, DETAIL SPECIFICATION FOR 850NM LASER-OPTIMIZED 50UM

CORE DIAMETER/125 UM CLADDING DIAMETER CLASS 1A GRADED INDEX MULTIMODE

OPTICAL FIBERS, 2003.

n ANSI/TIA/EIA-492CAAA, DETAIL SPECIFICATION FOR CLASS IVA DISPERSION-UNSHIFTED

SINGLEMODE OPTICAL FIBERS, 2002.

o ANSI/TIA/EIA-758: CUSTOMER-OWNED OUTSIDE PLANT TELECOMMUNICATIONS

CABLING STANDARD OR CURRENT UPDATED STANDARD.

p ANSI/TIA/EIA-526-7, OPTICAL POWER LOSS MEASUREMENTS OF INSTALLED

SINGLEMODE FIBER PLANT: OFSTP-7, 2002.

q ANSI/TIA/EIA-526-14-A, OPTICAL POWER LOSS MEASUREMENTS OF INSTALLED

MULTIMODE FIBER PLANT: OFSTP-14A, 2003.

r ANSI/TIA/EIA-TSB-125, GUIDELINES FOR MAINTAINING OPTICAL FIBER POLARITY

THROUGH REVERSE-PAIR POSITIONING, 2001.

s ANSI/TIA/EIA-TSB-140, ADDITIONAL GUIDELINES FOR FIELD TESTING LENGTH, LOSS, AND POLARITY OF OPTICAL FIBER CABLING SYSTEMS, 2004.

t ANSI/TIA/EIA-606-C, ADMINISTRATION STANDARD FOR COMMERCIAL

TELECOMMUNICATIONS INFRASTRUCTURE, OR CURRENT UPDATED STANDARD.

u ANSI/EIA-310-D, CABINETS, RACKS, PANELS, AND ASSOCIATED EQUIPMENT, 1992.

Lake County Public Schools Page 11 of 55 v ANSI/TIA/EIA-604 (SERIES), FOCIS FIBER OPTIC CONNECTOR INTERMATEABILITY

STANDARD, 2000-2003.

2. NATIONAL FIRE PROTECTION ASSOCIATION, INC., NFPA 70

a NATIONAL ELECTRIC CODE (NEC), 2014 OR CURRENT UPDATED STANDARD. .

b NEC ARTICLE 250: GROUNDING c NEC ARTICLE 386: SURFACE METAL RACEWAYS d NEC ARTICLE 388: SURFACE NON-METALLIC RACEWAYS e NEC ARTICLE 800: COMMUNICATIONS CIRCUITS f NEC ARTICLE 770: OPTICAL FIBER CABLES AND RACEWAY

3. UNDERWRITER’S LABORATORY, INC. (UL)

a UL-5A: STANDARD FOR NON-METALLIC RACEWAYS AND FITTINGS b UL-5: STANDARD FOR SURFACE METAL RACEWAYS AND FITTINGS c UL-5C: STANDARD FOR SURFACE RACEWAYS AND FITTINGS FOR USE WITH DATA, SIGNAL, AND CONTROL CIRCUITS d UL-50: STANDARD FOR ENCLOSURES FOR ELECTRICAL EQUIPMENT e UL-94-V0: TESTS FOR FLAMMABILITY OF PLASTIC MATERIALS f UL-498: ATTACHMENT PLUGS AND RECEPTACLES g UL-1479: FIRE TESTS OF THROUGH-PENETRATION FIRESTOPS (IN ACCORDANCE WITH

ASTM E814).

h UL-1863: STANDARD FOR SAFETY OF COMMUNICATIONS CIRCUIT ACCESSORIES

4. NATIONAL ELECTRICAL MANUFACTURER’S ASSOCIATION (NEMA)

a ANSI/NEMA WD-6-2002: WIRING DEVICES – DIMENSIONAL REQUIREMENTS b NEMA 250-2003: ENCLOSURES FOR ELECTRICAL EQUIPMENT

5. FEDERAL COMMUNICATIONS COMMISSION (FCC) TITLE 47, CODE OF FEDERAL REGULATIONS, PART 68: CONNECTION OF TERMINAL EQUIPMENT TO THE TELEPHONE NETWORK, 1998.

6. U.S. PUBLIC LAW 336. 101ST CONGRESS, ADA: AMERICANS WITH DISABILITIES ACT OF 1992.

7. IEEE 802.3AF, DATA TERMINAL EQUIPMENT (DTE) POWER OVER MEDIA DEPENDENT INTERFACE

(MDI). 15.4 WATTS

8. IEEE 802.3AT, DATA TERMINAL EQUIPMENT (DTE) ENHANCED POWER OVER MEDIA DEPENDENT

INTERFACE (MDI). 25 WATTS

Lake County Public Schools Page 12 of 55

9. IEEE 802.3BT, DATA TERMINAL EQUIPMENT (DTE) ENHANCED POWER OVER MEDIA DEPENDENT

INTERFACE (MDI). 100 WATTS

10. IEEE 802.3AE, SPECIFICATION FOR 10 GBIT/S ETHERNET OPERATION OVER OPTICAL FIBER.

11. TELECOMMUNICATIONS DISTRIBUTION METHODS MANUAL, 13TH ED., BUILDING INDUSTRY

CONSULTING SERVICES INTERNATIONAL (BICSI). OR CURRENT ADDITION.

B. THIS DOCUMENT IS NOT A SUBSTITUTE FOR ANY CODE, STANDARD OR REGULATION. THE APPROVED

CONTRACTOR MUST BE AWARE OF LOCAL CODES THAT MAY IMPACT THE SCOPE OR EXECUTION OF THE PROJECT. THE CURRENT REVISION OF ANY APPLICABLE CODE, STANDARD, OR REGULATION SHALL TAKE PRECEDENCE AT THE POINT OF PROJECT EXECUTION, UNLESS OTHERWISE RECOGNIZED BY LOCAL AUTHORITIES. APPLICABLE STANDARDS OR CODES THAT AFFECT CONSTRUCTION, WHICH ARE LISTED AS NORMATIVE REFERENCES WITHIN ANY GOVERNING DOCUMENT, ARE ALSO THE RESPONSIBILITY OF THE

APPROVED CONTRACTOR FOR COMPLIANCE. THE MOST STRINGENT RULE WILL APPLY IN ALL

SITUATIONS.

C. MATERIALS:

1. ALL MATERIALS SHALL BE UL OR ETL LISTED AND SHALL BE MARKED AS SUCH.

2. ALL COMMUNICATIONS CATEGORY RATED COMPONENTS SHALL BE ETL VERIFIED.

3. PRODUCTS SHALL BE REGULARLY CATALOGUED ITEMS OF THE MANUFACTURER AND SHALL BE

SUPPLIED AS A COMPLETE UNIT IN ACCORDANCE WITH THE MANUFACTURER'S STANDARD

SPECIFICATIONS WITH ANY OPTIONAL ITEMS REQUIRED FOR PROPER INSTALLATION UNLESS

OTHERWISE NOTED.

4. MATERIAL SHALL BE DELIVERED TO THE SITE IN THE ORIGINAL VIRGIN PACKING.

1.11 MAINTENANCE

A. ALL MATERIALS USED ON THIS PROJECT SHALL BE NEW. USED AND REFURBISHED EQUIPMENT IS NOT

PERMITTED UNLESS APPROVED BY LAKE COUNTY PUBLIC SCHOOLS IN ADVANCE. PROVIDE EQUIPMENT TO SITE IN ORIGINAL PACKAGING WHENEVER PRACTICAL UNLESS PRECONFIGURATION IS BEING

PERFORMED.

B. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING ALL DELIVERIES AND PROVIDING PROPER RECEIPT, HANDLING, AND STORAGE OF ALL MATERIALS. PROTECT ALL EQUIPMENT FROM PHYSICAL DAMAGES

(DENTS, SCRATCHES, DUST, WATER, PAINT, CHEMICALS, AND TEMPERATURE EXTREMES) AND

VANDALISM, OR THEFT. THE CONTRACTOR SHALL REPLACE ANY DAMAGED OR STOLEN EQUIPMENT. THE CONTRACTOR IS RESPONSIBLE FOR ALL EQUIPMENT UNTIL FINAL PROJECT ACCEPTANCE BY OWNER.

C. MAINTENANCE OF THE CABLING INFRASTRUCTURE IS TO BE DONE BY AUTHORIZED PERSONNEL ONLY, OR

VOID OF MANUFACTURER’S WARRANTY MAY RESULT. IT IS THE RESPONSIBILITY OF THE OWNER OR END USER TO UTILIZE A CERTIFIED INSTALLER TO MAINTAIN WARRANTY COVERAGE ON EXISTING OR NEW

CABLING INFRASTRUCTURE.

D. THE CONTRACTOR SHALL FURNISH A QUOTATION FOR TIME AND MATERIAL TO PERFORM MAINTENANCE

AND REPAIRS. THE OWNER HAS THE FIRST RIGHT OF REFUSAL OF SELECTING A SUITABLE CONTRACTOR

OR QUALIFIED INTERNAL PERSONNEL TO PERFORM MAINTENANCE AND REPAIRS ON STRUCTURED

CABLING.

Lake County Public Schools Page 13 of 55

E. ADDITIONS OF NEW CABLING, EITHER HORIZONTAL OR BACKBONE, SHALL BE COMPLETED, TESTED, AND DOCUMENTED INTO PERMANENT BUILDING RECORDS. NEW CABLING INSTALLATIONS INTENDED TO BE COVERED BY THE MANUFACTURER’S WARRANTY SHALL ADHERE TO THE DOCUMENTATION SUBMITTAL

AND SYSTEM CERTIFICATION PROVISIONS STATED ABOVE.

F. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING THE WORKSITE EVERY BUSINESS DAY AND REMOVE

DEBRIT FROM THE FACILITY.

1.12 DOCUMENTATION

A. TEST RESULTS

1. ALL TEST RESULTS ARE TO BE SAVED ELECTRONICALLY. TEST DOCUMENTATION SUBMITTED

ELECTRONICALLY VIA EMAIL AND SHALL BE CLEARLY MARKED WITH THE WORDS “PROJECT,

RELATED PROJECT OR JOB TEST DOCUMENTATION”, AND THE DATE OF COMPLETION (MONTH

AND YEAR). FOR MULTIPLE BUILDINGS, THE BUILDING NAME, INCLUDING FLOOR OR WING I.D.

SHOULD ALSO BE INCLUDED ON THE TEST RESULTS SUBMISSION.

2. FILE NAMES OF THE TEST RESULTS RECORDED FOR EACH LINK SHALL MATCH THE OFFICIAL

IDENTIFICATION. TEST RESULTS SHALL INCLUDE A COMPLETE RECORD FOR EACH LINK,

INCLUDING TYPE OF TEST, CABLE TYPE, CABLE/PORT I.D., MEASUREMENT DIRECTION,

REFERENCE SETUP, DATE AND TECHNICIAN’S NAME(S).

3. THE TEST EQUIPMENT NAME, MANUFACTURER, MODEL NUMBER, SERIAL NUMBER, SOFTWARE

VERSION AND LAST CALIBRATION DATE SHALL ALSO BE PROVIDED IN THE TEST RESULTS

DOCUMENTATION.

4. WHEN REPAIRS AND RE-TESTS ARE PERFORMED, THE PROBLEM CAUSE AND CORRECTIVE ACTION

TAKEN SHALL BE NOTED, AND BOTH THE FAILED AND PASSED TEST DATA SHALL BE

DOCUMENTED.

5. THE OWNER OR OWNER’S REPRESENTATIVE RESERVE THE RIGHT TO REQUEST VERIFICATION OF

TEST RESULTS WITH A RE-TEST OF INSTALLED CABLES, ON A SAMPLING BASIS. RE-TESTING SHALL

BE AT THE EXPENSE OF THE INSTALLER UNLESS OTHERWISE NOTED IN THE CONTRACT

DOCUMENTS.

B. AS BUILT DRAWINGS

1. DEVIATIONS FROM THE APPROVED DRAWINGS, WHETHER OR NOT A CHANGE ORDER IS

SUBMITTED, SHALL BE CLEARLY DENOTED AS BUILT ON THE WORKING HARD COPY DRAWING BY

THE CONTRACTOR. AS-BUILT DRAWINGS SHALL BE RETURNED PROMPTLY TO THE OWNER OR

DESIGN AGENT FOR COMPLETION OF DRAFTING REVISIONS TO THE ORIGINAL DESIGN. SEE

“DOCUMENTATION – CHANGE ORDERS” BELOW. MANUFACTURER’S WARRANTY

REGISTRATIONS MAY ALSO REQUIRE AS-BUILT DRAWINGS.

2. FLOOR PLAN DRAWINGS SHALL AT MINIMUM INCLUDE DETAILED CABLE AND PATHWAY

LAYOUTS, EXACT LOCATIONS OF WORKSTATION OUTLETS, AND CABLE DISTRIBUTION

HARDWARE LOCATIONS. WORKSTATION OUTLETS SHALL HAVE ALPHANUMERIC IDENTIFIERS ON

THE DRAWINGS AS SPECIFIED BY THE END USER OR OWNER.

C. CHANGE ORDERS

Lake County Public Schools Page 14 of 55

1. ANY DEVIATION FROM THE APPROVED CONTRACT DRAWINGS OR SPECIFICATIONS SHALL BE

SUBMITTED AS A WRITTEN CHANGE ORDER.

2. EXECUTION OF WORK, TO PERFORM CHANGES, SHALL NOT PROCEED WITHOUT PRIOR WRITTEN

APPROVAL. ANY CHANGES DONE WITHOUT WRITTEN APPROVEAL WILL BE AT NO COST TO LAKE

COUNTY PUBLIC SCHOOLS. IF THE WORK IS SHOWN TO BE INCORRECT THE CONTRACTOR WILL

HAVE TO CORRECT THE PROBLEM AT NO COST TO LAKE COUNTY PUBLIC SCHOOLS.

3. SIGNIFICANT CHANGES MAY REQUIRE A WRITTEN QUOTATION OF ADDITIONAL LABOR AND

MATERIALS FROM THE CONTRACTOR.

4. IT IS THE RESPONSIBILITY OF THE OWNER (LAKE COUNTY PUBLIC SCHOOLS) OR OWNER’S

REPRESENTATIVE TO BEAR THE ADDED COST OF ANY SUBSTANTIAL CABLING SYSTEM DESIGN

CHANGES. THE CONTRACTOR WILL NOT PROCEED WITH ANY CHANGE ORDERS WITHOUT

WRITTEN APPROVAL BY THE OWNER’S REPRESENTATIVE. ANY CHANGES NOT APPROVED BY THE

OWNER’S REPRESENTATIVE WILL BE RESPONSIBILITY OF THE CONTRACTOR AND AT NO COST TO

LAKE COUNTY PUBLIC SCHOOLS.

5. FIELD CHANGES THAT ARE COMPLETED WITHOUT ISSUANCE OF REVISED DRAWINGS SHALL BE

CLEARLY DENOTED ON THE WORKING AS-BUILT DRAWING. REFER TO “AS-BUILT DRAWINGS”

ABOVE.

D. PUNCH LISTS AND CORRECTIVE ACTION

1. AS REQUIRED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL CORRECT PUNCH-LISTS

ITEMS DETERMINED TO BE IN VIOLATION OF DRAWINGS, SPECIFICATIONS, CODES, STANDARDS

OR REGULATIONS.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TIMELY RE-WORK OF FAULTY CABLING OR

HARDWARE INSTALLATIONS.

3. LAKE COUNTY PUBLIC SCHOOLS RESERVES THE RIGHT TO WITHHOLD FINAL PAYMENT UNTIL

PUNCH LIST ITEMS ARE RESOLVED SATISFACTORILY AS DETERMINED BY THE PROJECT

SUPERVISOR.

1.13 WARRANTY

A. LAKE COUNTY PUBLIC SCHOOLS REQUIRES:

1. A PERMANENT LINK WARRANTY FOR THE VOICE AND DATA STRUCTURED CABLING ON THE

PROJECT. MANUFACTURER REQUIRES PERMANENT LINK TEST.

2. A CHANNEL WARRANTY FOR THE WIRELESS DATA STRUCTURED CABLING ON THE PROJECT.

MANUFACTURE REQUIRES CHANNEL TEST.

B. THE LENGTH OF THE EXTENDED WARRANTY SHALL BE A MINIMUM OF TWENTY-FIVE (25) YEARS.

C. WARRANTY COVERING ALL COMPONENTS, EQUIPMENT AND WORKMANSHIP SHALL BE SUBMITTED IN

WRITING WITH SYSTEM DOCUMENTATION.

D. THE WARRANTY PERIOD SHALL BEGIN ON THE SYSTEM'S FIRST USE BY THE OWNER.

Lake County Public Schools Page 15 of 55

E. SHOULD THE CABLING SYSTEM FAIL TO PERFORM ITS EXPECTED OPERATION WITHIN THIS WARRANTY PERIOD DUE TO INFERIOR OR FAULTY MATERIAL AND/OR WORKMANSHIP, THE CONTRACTOR SHALL

PROMPTLY MAKE ALL REQUIRED CORRECTIONS WITHOUT COST TO THE OWNER

F. UPON COMPLETION OF THE PROJECT THE TELECOMMUNICATION CONTRACTOR SHALL FORWARD THE

SIGNED WARRANTY REGISTRATION FORM AND WARRANTY CERTIFICATE TO THE OWNER.

G. THE MANUFACTURER WARRANTS CATEGORY RATED CABLING SYSTEMS, OPTICAL FIBER CABLING

AND CONNECTING COMPONENTS FREE OF DEFECTS IN MATERIAL OR WORKMANSHIP.

H. CATEGORY RATED SYTEMS AND OPTICAL FIBER CABLING AND COMPONENTS ARE WARRANTED TO

PERFORM THE INTENDED APPLICATION UPON COMPLETION OF PROPER INSTALLATION AND TESTING.

I. WARRANTY COVERAGE INCLUDES APPLICATION ASSURANCE AND COMPLIANCE TO APPLICABLE

PERFORMANCE SPECIFICATIONS.

J. INSTALLED CATEGORY RATED CABLING SYSTEMS MAY BE GRANTED A LINK OR CHANNEL WARRANTY

UNDER THE CONDITIONS STATED BELOW.

1. A CERTIFIED INSTALLER REGISTERED WHO HAS COMPLETED A MANUFACTURER’S TRAINING

PROGRAM PERFORMS THE CONSTRUCTION.

2. CONTRACTORS PERFORMING THE CERTIFIED INSTALLATION ARE PROPERLY REGISTERED IN THE

MANUFACTURER’S WARRANTY PROGRAM.

3. THE CHANNEL COMPONENTS ARE SUPPLIED ENTIRELY BY ONE MANUFACTURER, INCLUDING

PATCH CORDS.

4. CATEGORY RATED CABLE USED IN THE INSTALLATION IS QUALIFIED, RECOGNIZED AND

WARRANTED BY CONNECTIVITY MANUFACTURER.

5. FIELD TEST EQUIPMENT USED FOR CATEGORY RATED CABLING IS MINIMUM LEVEL III

CLASSIFICATION AND COMPLIES WITH TIA/EIA-568.0-D REQUIREMENTS.

6. REQUIRED TEST RESULTS, PROJECT DOCUMENTATION, INCLUDING AS-BUILT DRAWINGS ARE TO

BE STORED ON A STORAGE DEVICE AND SUBMITTED TO THE MANUFACTURER AND LAKE

COUNTY PUBLIC SCHOOLS – IT AND SHARED SERICES BY THE REGISTERED CONTRACTOR.

1.14 MOVES, ADDS AND CHANGES

A. MOVES, ADDS AND CHANGES INITIATED BY THE OWNER, END USER, PROJECT MANAGER OR DESIGN

AGENT WHICH ARE BEYOND THE SCOPE OF WORK IN THE ORIGINAL CONTRACT, SHALL REQUIRE A

REVISED QUOTATION BY THE CONTRACTOR.

B. IT IS THE RESPONSIBILITY OF THE OWNER OR OWNER’S REPRESENTATIVE TO BEAR THE ADDED COST OF

ANY SUBSTANTIAL CABLING SYSTEM DESIGN CHANGES.

C. MOVES, ADDS AND CHANGES SHALL EITHER BE ISSUED IN REVISED DRAWINGS, OR OTHERWISE SHALL BE

CLEARLY DENOTED ON AS-BUILT DRAWINGS.

Lake County Public Schools Page 16 of 55

D. MOVES, ADDS AND CHANGES THAT AFFECT INSTALLATIONS COVERED IN A MANUFACTURER’S WARRANTY

SHALL BE PERFORMED BY A CERTIFIED CONTRACTOR THAT IS PROPERLY REGISTERED IN THE

MANUFACTURER’S WARRANTY PROGRAM.

E. REQUIRED TEST RESULTS, ELECTRONICALLY DELIVERED, AND PROJECT DOCUMENTATION INCLUDING AS-

BUILT DRAWINGS, ARE SUBMITTED TO THE MANUFACTURER AND LAKE COUNTY PUBLIC SCHOOLS –

SAFETY AND SECURITY SERVICES AND SHARED SERVICES BY THE REGISTERED CONTRACTOR.

1.15 CLEANUP

A. THE CONTRACTOR SHALL CLEAN UP ALL DEBRIS RELATED TO THIS WORK ON A REGULAR BASIS LEAVING

THE JOB SITE IN A CLEAN, SAFE CONDITION.

B. PROTECT ALL EQUIPMENT FROM DAMAGE DURING CONSTRUCTION. EQUIPMENT NOT PROTECTED SHALL

BE REPLACED AT THE CONTRACTOR’S EXPENSE.

PART 2 PRODUCTS

2.1 WORK AREA CONNECTORS

A. CATEGORY 6 JACKS

1. DESIGN REQUIREMENTS

a) JACKS SHALL BE STANDARD 8-POSITION, RJ-45 STYLE, UN-KEYED, FCC COMPLIANT.

b) JACKS SHALL BE DESIGNED FOR 4-PAIR, 100 OHM BALANCED UNSHIELDED TWISTED

PAIR (UTP) CABLE.

c) EACH JACK SHALL BE SINGLE UNIT CONSTRUCTION, WITH SNAP – FIT TO INDUSTRY

STANDARD KEYSTONE OPENING (.760” X .580”).

d) JACK HOUSINGS SHALL BE HIGH IMPACT UL 94 V-0 RATED THERMOPLASTIC.

e) HOUSING SHALL BE ULTRASONICALLY WELDED FOR TAMPER RESISTANCE.

f) MODULAR JACK CONTACTS SHALL ACCEPT A MINIMUM OF 1500 MATING CYCLES

WITHOUT DEGRADATION OF ELECTRICAL OR MECHANICAL PERFORMANCE.

g) JACK CONTACTS SHALL MAINTAIN A MINIMUM DEFLECTION FORCE OF 100 GRAMS

WHILE MATED WITH AN FCC-STANDARD RJ-45 PLUG.

h) JACK CONTACTS SHALL BE ARRANGED ON THE PC BOARD IN 2 STAGGERED ARRAYS, ONE

ARRAY HAVING 6 CONTACTS AND THE OTHER ARRAY HAVING 2 CONTACTS.

i) IDC CONTACT TERMINATION TOWERS SHALL HAVE TAPERED PAIR-SPLITTING FEATURES

TO AID WIRE INSERTION AND MINIMIZE PAIR UN-TWIST.

j) IDC CONTACTS SHALL BE ARRANGED IN STAGGERED ARRAYS OF 4 SETS OF 2 CONTACTS.

k) JACKS SHALL ACCEPT FCC COMPLIANT 6 POSITION PLUGS.

Lake County Public Schools Page 17 of 55

l) ALL TRANSMISSION PERFORMANCE PARAMETERS SHALL BE INDEPENDENTLY VERIFIED

BY A UL OR ETL THIRD PARTY TESTING ORGANIZATION.

m) THE MANUFACTURER SHALL PROVIDE CATEGORY 6 COMPONENT COMPLIANCE

CERTIFICATES FROM THIRD PARTY TESTING ORGANIZATION UPON REQUEST.

n) JACKS SHALL EXCEED IEEE 802.3 DTE POWER SPECIFICATION TO 4 TIMES THE RATED

CURRENT LIMITS WITH NO DEGRADATION OF PERFORMANCE OR MATERIALS.

2. COLOR APPLICATION HUBBELL CATALOG NO.

a HJX6B(24) BLUE IT - DATA b HJX6P(24) PURPLE DOOR ACCESS/AV c HJX6O (24) ORANGE SEC CAM d HJX6Y(24) YELLOW BUILDING - FIRE

3. CATEGORY 6 MODULAR JACKS, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

a HUBBELL

i. HXJ6xx (xx SPECIFIES COLOR)

ii. ACCEPTABLE MANUFACTURERS: BASIS OF DESIGN OR EQUIVALENT AS

APPROVED BY LAKE COUNTY PUBLIC SCHOOLS - IT AND SHARED

SERVICES DEPARTMENT

2.2 FACE PLATES

A. REAR LOADING W/DESIGNATION WINDOW

a) FACEPLATES SHALL BE CONSTRUCTED OF HIGH IMPACT, UL94 V-0 RATED

THERMOPLASTIC.

b) FACEPLATES SHALL BE 2.75" W X 4.5" H (69.8 MM X 114.3 MM) FOR SINGLE GANG AND 4.5” X 4.5” (114.3 X 114.3 mm) for double gang.

c) FACEPLATES SHALL ACCEPT MODULES LOADED WITH SNAP-FIT FIBER OPTIC, AUDIO, AND

VIDEO CONNECTORS FOR MULTIMEDIA APPLICATIONS.

d) FACEPLATES SHALL BE PROVIDED WITH CLEAR PLASTIC AND COLOR-MATCHED LABEL

FIELD COVERS.

e) FACEPLATES SHALL BE COMPATIBLE WITH STANDARD NEMA OPENINGS AND BOXES.

f) FACEPLATES SHALL BE COMPATIBLE WITH RACEWAY FITTINGS, SURFACE MOUNT BOXES, SERVICE FITTINGS, SERVICE POLES, FLUSH MOUNT BOXES AND DRYWALL RINGS.

g) FACEPLATES SHALL BE UL LISTED 1863.

1. WORK AREA FACEPLATES, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE

Lake County Public Schools Page 18 of 55 a HUBBELL (IFP SERIES)

i. IFP1xOW (x DENOTES PORTS) b ACCEPTABLE MANUFACTURERS: BASIS OF DESIGN OR EQUIVALENT AS APPROVED BY

LAKE COUNTY PUBLIC SCHOOLS - IT AND SHARED SERVICES DEPARTMENT

2.3 CABLE

A. CATEGORY 6 UTP

1. PLENUM - CABLE CONSTRUCTION SHALL BE FOUR TWISTED PAIRS OF 23 AWG INSULATED SOLID

CONDUCTORS, WITH A RIPCORD, A FILLER, SURROUNDED BY A TIGHT OUTER JACKET.

2. NON-PLENUM - CABLE CONSTRUCTION SHALL BE FOUR TWISTED PAIRS OF 23 AWG INSULATED

SOLID CONDUCTORS, WITH A RIPCORD, A FILLER, SURROUNDED BY A TIGHT OUTER JACKET.

3. SHALL BE CATEGORY 6A COMPONENT COMPLIANT, VERIFIED BY UL OR ETL

4. NO MINIMUM COMPLIANT CABLE WILL BE ACCEPTED. LAKE COUNTY PUBLIC SCHOOLS

REQUIRES ADDITIONAL BANDWIDTH. MINIMUM ACCEPTABLE 550 MHz

5. CABLE SHALL BE MARKED WITH MANUFACTURER AND PERTINENT INFORMATION. UL, ETL, OR

CSA AGENCY CERTIFICATION OR VERIFICATION MARKINGS SHALL BE MARKED ON THE CABLE

JACKET ACCORDING TO THE CERTIFYING AGENCY’S REQUIREMENTS.

6. COLOR CODING OF THE PAIRS SHALL BE AS FOLLOWS:

a PAIR 1: WHITE/BLUE; BLUE b PAIR 2: WHITE/ORANGE; ORANGE c PAIR 3: WHITE/GREEN; GREEN d PAIR 4: WHITE/BROWN; BROWN

7. JACKET COLOR TO BE SPECIFIED BY USE.

a CATEGORY 6 JACKET COLOR SHALL BE:

i. SRR ATTACHED HUBBEL/GENERAL PRODUCT SPECIFICATION SHEET FOR

ITEM NUMBERS AND COLORS

b CATEGORY 6 OSP (OUTSIDE PLANT) – SHALL BE BLACK - BK

8. CABLE SHALL BE SUPPLIED IN 1000 FT SPOOLS OR 1000 FT BOXES.

9. CABLE SHALL EXCEED CATEGORY 6 TRANSMISSION REQUIREMENTS SPECIFIED IN ANSI/TIA/EIA- 568-D.2.

Lake County Public Schools Page 19 of 55

10. CABLE SHALL BE UL LISTED.

11. CATEGORY 6/6a UTP HORIZONTAL DISTRIBUTION CABLE, AS SPECIFIED IN THE

CONTRACT DOCUMENTS, SHALL BE

a GENERAL CABLE CORP

i. 7131900– Category 6, 550MHz Plenum, Blue (Network)

ii. 7131909– Category 6, 550MHz Plenum, Purple (Security/AV)

iii. 7131902– Category 6, 550MHz Plenum, Yellow (BAC)

iv. 7133900– Category 6, 550MHz Riser, Blue (Network)

v. 7133909– Category 6, 550MHz Riser, Purple (Security/AV)

vi. 7133902– Category 6, 550MHz Riser, Yellow (BAC)

vii. 7141839– Category 6a, 550MHz Riser, Blue (Network)

viii. 7141845– Category 6a, 550MHz Riser, Purple (Security/AV)

ix. 7141842– Category 6a, 550MHz Riser, Yellow (BAC) b HUBBELL PREMISE WIRING

B. HORIZONTAL DISTRIBUTION CABLE – FIBER OPTIC

1. 12-STRAND OR 24-STRAND MULTIMODE OPTICAL FIBER HORIZONTAL DISTRIBUTION CABLE FOR 10 GBIT/S APPLICATIONS SHALL BE CONSTRUCTED WITH GRADED INDEX 50/125 MICRON LASER

OPTIMIZED FIBERS OM4 SPECIFICATION.

2. CABLE CONSTRUCTION SHALL BE ALL-DIELECTRIC, SINGLE SHEATH WITH SINGLE OR MULTIPLE

FIBER PAIRS, AVAILABLE IN PLENUM (OFNP) OR RISER (OFNR) VERSIONS.

3. INSTALLED MULTIMODE FIBER CABLE, WHEN TERMINATED, SHALL EXCEED THE PERFORMANCE

REQUIREMENTS OF ANSI/TIA/EIA-568-C.3.

4. HORIZONTAL FIBER, 2 STRAND LOMMF, ZIP STYLE, 500M MAXIMUM LENGTH, EXTENDED

DISTANCES MAY REQUIRE ANOTHER CABLE OR SINGLE MODE

5. OPTICAL FIBER HORIZONTAL DISTRIBUTION CABLE, AS SPECIFIED IN THE CONTRACT

DOCUMENTS, SHALL BE

HUBBELL PREMISE WIRING

C. BACKBONE DISTRIBUTION CABLE – FIBER OPTIC

1. 12-STRAND OR 24-STRAND MULTIMODE AND SINGLEMODE FIBER BACKBONE DISTRIBUTION

CABLE SHALL BE AVAILABLE IN MULTI-STRAND CONSTRUCTIONS FOR INTRABUILDING

Lake County Public Schools Page 20 of 55

APPLICATIONS. MULTIMODE FIBER BACKBONE DISTRIBUTION CABLE FOR 10 GBIT/S

APPLICATIONS

2. SHALL BE CONSTRUCTED WITH 50/125 MICRON LASER-OPTIMIZED OPTICAL FIBER, OM4, 500M

MAXIMUM LENGTH, EXTENDED DISTANCES MAY REQUIRE ANOTHER CABLE OR SINGLE MODE

Lake County Public Schools Page 21 of 55

3. LASER-OPTIMIZED 50/125 MICRON FIBER SHALL BE CLASS 1A FIBER IN COMPLIANCE WITH

ANSI/TIA/EIA-492AAAC.

4. OFNR OR OFNP WILL BE DETERMINED AT EACH SITE. THE CONTRACTOR WILL BE RESPONSIBLE

TO ASSURE THAT THE PROPER TYPE OF JACKETING IS BEING USED. FAILURE TO MEET THE LOCAL

CODE WILL BE CAUSE FOR REPLACEMENT OF CABLE AT NO EXPENSE TO LAKE COUNTY PUBLIC

SCHOOLS.

5. OPTICAL FIBER BACKBONE FIBER DISTRIBUTION CABLE, AS SPECIFIED IN THE CONTRACT

D. BACKBONE DISTRIBUTION CABLE – OPTICAL FIBER, INDOOR/OUTDOOR

1. 12-STRAND OR 24-STRAND MULTIMODE AND SINGLEMODE FIBER BACKBONE CABLE SHALL BE

AVAILABLE IN MULTI-STRAND CONSTRUCTIONS. CABLE DESIGN SHALL BE SUITABLE FOR THE

ENVIRONMENTAL AND MECHANICAL CONDITIONS OF THE INSTALLATION.

2. RISER (OFNR) AND PLENUM (OFNP) FIBER OPTIC CABLES

3. THESE CABLES CAN BE INSTALLED IN CONDUITS OR INNER-DUCTS.

4. THE TIGHT BUFFER FEATURE OF THESE INDOOR/OUTDOOR CABLES ELIMINATES THE NEED FOR

BREAKOUT KITS AND OR OTHER SPECIAL TERMINATION EQUIPMENT.

5. THE OUTER JACKET IS COMPRISED OF A RUGGED UL LISTED SUNLIGHT RESISTANT POLYMER THAT ALLOWS FOR THE CABLE TO BE EXPOSED TO DIRECT SUNLIGHT WITHOUT THE CONCERN OF

MATERIAL DEGRADATION AND GREATLY REDUCES MOISTURE MIGRATION.

6. ALL FIBER 50/125 10G 500 METER, LOMMF OM43, 500M MAXIMUM LENGTH, EXTENDED

7. 12-STRAND OR 24-STRAND MULTIMODE INDOOR/OUTDOOR DISTRIBUTION CABLE FOR 10

GBIT/S APPLICATIONS SHALL BE CONSTRUCTED WITH 50/125 MICRON LASER-OPTIMIZED

OPTICAL FIBER. LASER-OPTIMIZED 50/125 MICRON FIBER SHALL BE CLASS 1A FIBER IN

COMPLIANCE WITH ANSI/TIA/EIA-492AAAC.

8. MULTIMODE AND SINGLEMODE BACKBONE INDOOR/OUTDOOR OSP FIBER DISTRIBUTION CABLE, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

E. BACKBONE DISTRIBUTION CABLE – OPTICAL FIBER, LOOSE-TUBE

1. MULTIMODE AND SINGLEMODE FIBER BACKBONE OSP CABLE SHALL BE AVAILABLE IN MULTI-

STRAND CONSTRUCTIONS FOR OUTSIDE PLANT (OSP) APPLICATIONS. CABLE DESIGN SHALL BE

SUITABLE FOR THE ENVIRONMENTAL AND MECHANICAL CONDITIONS OF THE INSTALLATION.

Lake County Public Schools Page 22 of 55

2. LOOSE TUBE OSP CABLE WILL BE USED IN AREAS THAT EXCESSIVE MOISTURE ARE PRESENT.

APPLICATIONS REQUIRING GOOD OZONE, MOISTURE, WEATHER RESISTANCE

3. BUILDING INTERCONNECTIONS AND DATA TRUNK

4. DUCTS BETWEEN BUILDINGS AND AERIAL LASHING, 300M MAXIMUM LENGTH, EXTENDED

5. DIELECTRIC CENTRAL STRENGTH MEMBER

6. DRY OR WATERBLOCK GEL BLOCKING FOR MOISTURE PROTECTION

7. POLYETHYLENE JACKET FOR WEATHER AND UV PROTECTION

8. BREAKOUT KITS WILL BE REQUIRED FOR TERMINATION

9. MULTIMODE AND SINGLEMODE BACKBONE LOOSE-TUBE OSP FIBER DISTRIBUTION CABLE, AS

SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

2.4 CONNECTORS – FIBER OPTIC

A. PRE-POLISHED FIBER CONNECTOR BASIC DESIGN SHALL BE A FACTORY PRE-POLISHED LC-STYLE OPTICAL

FIBER CONNECTOR WITH A ZIRCONIUM CERAMIC FERRULE.

B. INDEX-MATCHING GEL IS FACTORY-INJECTED INTO THE CLEAVED FIBER STUB SPLICE TO MINIMIZE

CONNECTOR INSERTION LOSS.

C. LC MULTIMODE FACTORY PRE-POLISHED CONNECTORS SHALL HAVE 50 MICRON PRE-INSTALLED FIBERS.

D. CONNECTOR MATERIALS SHALL BE DESIGNED WITH THERMAL STABILITY TO COMPLY WITH

ENVIRONMENTAL REQUIREMENTS OF ANSI/TIA/EIA-568.3-D AND TELCORDIA GR-1081-CORE.

E. PRE-POLISHED SC CONNECTORS SHALL REQUIRE NO FIELD POLISHING AND REQUIRE NO ADHESIVES FOR

TERMINATION.

F. AQUA HOUSING

G. PRE-POLISHED SC FIBER CONNECTORS, WHEN PROPERLY INSTALLED ONTO QUALIFIED CABLE, SHALL

MEET THE 10 GB/S ETHERNET PERFORMANCE REQUIREMENTS OF IEEE802.3.

H. LC FIBER CONNECTORS, PROPERLY INSTALLED ONTO QUALIFIED CABLE, SHALL EXCEED THE MECHANICAL

AND ENVIRONMENTAL PERFORMANCE REQUIREMENTS OF ANSI/TIA/EIA-568.3-D.

I. OPTICAL FIBER HORIZONTAL DISTRIBUTION CABLE, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL

BE:

1. HUBBELL (PROCLICK)

a LC - FCLC900KSM12 SINGLEMODE

Lake County Public Schools Page 23 of 55 b LC - FCLC900K50GM MULTIMODE

2. ACCEPTABLE MANUFACTURERS: BASIS OF DESIGN OR EQUIVALENT AS APPROVED BY LAKE

COUNTY PUBLIC SCHOOLS - IT AND SHARED SERVICES DEPARTMENT

2.5 PATCH CORDS

A. CATEGORY 6

1. CATEGORY 6 PATCH CORDS SHALL BE CONSTRUCTED WITH A POLYCARBONATE PLUG HAVING

VERTICALLY STAGGERED, TRIFURCATED CONTACTS, EACH HAVING 50 MICRO-INCHES OF GOLD

PLATING.

2. PATCH CORDS SHALL BE CONSTRUCTED WITH CATEGORY 6 PATCH CABLE, WITH 24 AWG 7/32

TINNED COPPER STRANDED CONDUCTORS, EACH INSULATED WITH POLYETHYLENE, AND

OVERALL JACKET WITH UL FLAME-RETARDANT PVC.

3. PATCH CORDS SHALL BE AVAILABLE IN THE FLLOWING COLORS:

4. PATCH CORDS SHALL BE OF THE SAME MANUFACTURER AS THE CATEGORY 6 WORK AREA

OUTLETS.

5. PATCH CORDS SHALL MEET OR EXCEED THE COMPONENT TRANSMISSION REQUIREMENTS FOR

CONNECTING HARDWARE, AS SPECIFIED IN ANSI/TIA/EIA-568.2-D STANDARD.

6. PATCH CORDS SHALL BE CUL AND UL LISTED.

7. PATCH CORDS AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

a HUBBELL HC6XXYY (XX DENOTES COLOR) (YY DENOTES LENGTH)

B. FIBER OPTIC

1. OPTICAL FIBER PATCH CORDS AND CROSS-CONNECT CORDS SHALL BE STANDARD SC AND SC-TO-

LC HYBRID CONSTRUCTIONS. PATCH CORDS FOR 10 GBIT/S APPLICATIONS SHALL BE

CONSTRUCTED WITH LASER OPTIMIZED 50/125 MICRON OPTICAL FIBER.

2. INSTALLED MULTIMODE FIBER PATCH CORDS, WHEN INSTALLED, SHALL EXCEED THE

PERFORMANCE REQUIREMENTS OF ANSI/TIA-568.3-D.

3. OPTICAL FIBER PATCH CORDS SHALL BE CONSTRUCTED WITH ARAMID-REINFORCED PVC LOOSE- JACKET DUPLEX OR SIMPLEX CABLE, WITH OPTICAL FIBER(S) HAVING A 900-MICRON PVC BUFFER

COATING DIAMETER.

4. CONNECTOR TERMINATIONS ON EACH END OF THE FIBER PATCH CORD SHALL BE HEAT-CURED

EPOXY TYPE WITH A MACHINE POLISH, INSPECTED 100% FOR POLISH QUALITY AND MATED-PAIR

INSERTION LOSS

5. DUPLEX FIBER PATCH CORDS SHALL HAVE REVERSE-PAIR POLARITY ACCORDING TO ANSI/TIA-

568.3-D AND TIA/EIA-TSB-125.

Lake County Public Schools Page 24 of 55

6. FIBER A-B POLARITY SHALL BE CLEARLY MARKED ON EACH END OF DUPLEX PATCH CORDS.

7. MULTIMODE AND SINGLEMODE FIBER PATCH CORDS SHALL EXCEED THE GIGABIT ETHERNET

PERFORMANCE REQUIREMENTS OF IEEE 802.3Z STANDARD.

8. OPTICAL FIBER PATCH CORDS, AS SPECIFIED IN THE CONTRACT DOCUMENTS SHALL BE

a HUBBELL (OPTICHANNEL)

i. LC – DFPCLCLCExxMM (xx DENOTES LENGTH)

2.6 PATCH PANELS – FIELD CONFIGURABLE

A. HPJ-SERIES MODULAR PATCH PANEL BASIC DESIGN SHALL BE A RIGID 19” RACK-MOUNTABLE CROSS

MEMBER WITH RECESSED KEYSTONE OPENINGS, IN 24 AND 48-PORT CONFIGURATIONS.

B. PANEL MATERIAL SHALL BE 14-GAGE COLD ROLLED STEEL.

C. FINISH SHALL BE BLACK DURABLE POLYURETHANE POWDER COAT ON ALL METAL URFACES.

D. KEYSTONE MODULES SHALL BE MOLDED IN A HIGH IMPACT UL TERMOPLASTIC IN A 6-PORT

CONFIGURATION.

E. PANELS SHALL BE AVAILABLE IN 1U (1.75”) AND 2U (3.5”) SIZES, UN-LOADED.

F. RECESSED KEYSTONE OPENINGS, WITH STANDARD DIMENSIONS OF .760” X .580”, SHALL ACCEPT HJ, HXJ-

SERIES JACKS AND SNAP-FIT FIBER OPTIC, AUDIO, VIDEO, AND MULTI-MEDIA CONNECTORS.

G. PANELS SHALL BE UL LISTED 1863.

H. PATCH PANELS, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

1. HUBBELL KEYSTONE STYLE

a 24 PORT – 1 RU – HPJ24 b 48 PORT - 2 RU – HPJ48 c 48 PORT – 1 RU - UDX48E1U d CABLE MANAGEMENT BAR - HPRCMB

2.7 TERMINATION BLOCKS – CATEGORY 6/6A

A. CONSTRUCTION SHALL BE A POLYCARBONATE BASE, EITHER WALL-MOUNT OR RACK-MOUNT STYLE, WITH INDIVIDUAL 4-PAIR CONNECTING BLOCKS.

Lake County Public Schools Page 25 of 55

B. CATEGORY 6-110 WIRING BLOCKS SHALL BE AVAILABLE IN 64-PAIR OR 192-PAIR CAPACITIES, WITH OR

WITHOUT DETACHABLE STANDOFF LEGS. \

C. WIRING BLOCKS SHALL BE AVAILABLE AS KITS THAT INCLUDE WIRING BLOCKS, LABEL STRIPS, AND THE

APPROPRIATE QUANTITY OF CONNECTING BLOCKS FOR TERMINATION TO FULL CAPACITY.

D. WIRING BLOCKS AND CONNECTING BLOCKS SHALL BE CONSTRUCTED OF UL94-V0 RATED HIGH-IMPACT

FLAME-RETARDANT POLYCARBONATE BLEND THERMOPLASTIC.

E. WIRING BLOCKS SHALL ACCEPT 26-22 AWG SOLID OR STRANDED CONDUCTORS. WIRING BLOCKS SHALL

ACCEPT CONDUCTOR INSULATION DIAMETERS OF .050 IN TO .070 IN MAXIMUM.

F. 6-110 TERMINATION BLOCKS SHALL BE UL LISTED.

G. CATEGORY 6-110 TERMINATION BLOCKS AND ACCESSORIES, EITHER RACK-MOUNTED OR WALL-

MOUNTED AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

1. HUBBELL (6-110 TERMINATION BLOCK SERIES)

2.8 RACKS – FREE STANDING – 2 POST

A. RACKS SHALL BE AVAILABLE IN.

B. RACKS SHALL BE AVAILABLE IN 19-INCH STANDARD RACK CONFIGURATIONS AND 3, 6, 10 AND 16 INCH WIDTH CONFIGURATIONS. RACK MATERIAL SHALL BE STRUCTURAL ALUMINUM WITH A DURABLE BLACK POLYURETHANE POWDER COAT FINISH. STANDARD RACK HEIGHTS OF 7 FT (84 IN), AND HAVE A

CAPACITY OF 45 RMU.

C. NOTE: EACH BASIC RACK DELIVERED SHALL CONSIST OF: EQUIMENT RACK, ISOLATION PADS, GROUND

BAR, AND A VERTICAL ELECTRICAL 20 AMP OUTLET STRIP (MINIMUM 6 RECEPTACALS) WITH MOUNTING

BRACKETS.

D. FREE STANDING RACKS AND ACCESSORIES, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

1. HUBBELL (NEXTFRAME SERIES)

a HPW84RR19 (3 INCH SERIES) b HPW84RR19D (6 INCH SERIES) c HHR45U10 (10 INCH SERIES) d HHR45U16 (16 INCH SERIES)

2.9 RACKS – FREE STANDING – 4 POST

Lake County Public Schools Page 26 of 55

A. RACK MATERIAL SHALL BE 12 GA COLD ROLL STEEL WITH A DURABLE BLACK POWDER COAT FINISH AND

HAVE A STATIC LOAD CAPACITY OF 2000 LBS. IF MOUNTED TO FLOOR.

B. STANDARD RACK HEIGHTS OF 7 FT (84 IN), HAVE A DEPTH OF 36 INCHES, AND HAVE A CAPACITY OF 45

RMU.

C. NOTE: EACH BASIC RACK DELIVERED SHALL CONSIST OF: EQUIMENT RACK, ISOLATION PADS,18” WIDE BLACK LADDER RACK & MOUNTS TO SECURE TO RACK, GROUND BAR, AND A VERTICAL ELECTRICAL 20

AMP OUTLET STRIP(MINIMUM 6 RECEPTACALS) WITH MOUNTING BRACKETS.

D. FOUR POST EQUIPMENT RACKS AND ACCESSORIES, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL

1. HUBBELL (NEXTFRAME SERIES)

a SF841936T

2.10 CABLE MANAGEMENT – VM SERIES CABLE MANAGEMENT

A. HORIZONTAL MANAGEMENT WILL BE CONSTRUCTED OF 16 GA COLD-ROLLED STEEL (CRS) DURABLE, BLACK POWDER COAT, 6 INCH WIDE WITH HINGED FRONT COVER

B. VERTICAL CABLE MANAGEMENT AND ACCESSORIES, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL

1. HUBBELL VM SERIES

a VM610

2.11 CABLE MANAGEMENT – HORIZONTAL – HM SERIES

A. HORIZONTAL MANAGEMENT WILL BE CONSTRUCTED OF 16 GA COLD-ROLLED STEEL (CRS) DURABLE, BLACK POWDER COAT, 2U WITH HINGED FRONT COVER.

B. HORIZONTAL CABLE MANAGEMENT AND ACCESSORIES, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

1. HUBBELL (HM SERIES)

a HM24C – 4- INCH HORIZONTAL MANAGER

2.12 CABINETS, ENCLOSURE & ACCESSORIES

A. CABINETS – FULL SIZE NETWORK AND SERVER

Lake County Public Schools Page 27 of 55

1. NETWORK AND SERVER CABINETS SHALL BE FREE STANDING, FULL-SIZE ENCLOSED CABINETS, WITH A FORMED, WELDED AND POWDER COATED CONSTRUCTION.

2. NETWORK AND SERVER CABINETS SHALL BE SUITABLE FOR EQUIPMENT ROOMS,

TELECOMMUNICATIONS ROOMS, ENTRANCE FACILITIES AND DATA CENTERS. HEAVY-DUTY,

WELDED FOUR-POST FRAME

3. NETWORK AND SERVER CABINETS, AND ACCESSORIES, AS SPECIFIED IN THE CONTRACT

a HUBBELL CABINETS – (H3 SERIES)

LAKE COUNTY PUBLIC SCHOOLS - IT AND SHARED SERVICES DEPARTMEN

B. CABINETS – WALL MOUNT

1. BASIC DESIGN SHALL BE A THREE PIECE MODULAR SWIVEL-TYPE, 14 GAGE STEEL, REINFORCED

WELDED ENCLOSURE WITH A REMOVABLE FRONT DOOR, AND REMOVABLE REAR SECTION.

2. SHALL BE CONSTRUCTED OF 14 GAGE COLD ROLLED STEEL (CRS), FINISH SHALL BE BLACK OR

OFFICE WHITE DURABLE POWDER COAT ON ALL SURFACES.

3. INSTALLED CABINETS SHALL HAVE A STATIC LOAD CAPACITY OF 400 LBS IN THE OPEN OR CLOSED

POSITION. FULL LOAD CAPACITY SHALL NOT CAUSE INTERFERENCE WITH OPENING OR CLOSURE

OF CENTER SECTION.

4. CABINETS SHALL BE UL LISTED.

5. WALL-MOUNT CABINETS AND ACCESSORIES, AS SPECIFIED IN THE CONTRACT DOCUMENTS,

SHALL BE:

i. HSQxxXX

ii. HLQxxXX

iii. HEQxxXX

C. FRAMES – WALL MOUNT - HINGED

1. FRAME WILL BE CONSTRUCTED OF 16 GA, ALL SURFACES WILL BE FINISHED WITH A DURABLE

BLACK POWDER COAT. QUICK RELEASE LATCHES – RAKE FRAME HINGES BOTH LEFT AND RIGHT

2. 70 LBS LOAD CAPACITY

3. WALL-MOUNT HINGED FRAMES AND ACCESSORIES, AS SPECIFIED IN THE CONTRACT

DOCUMENTS, SHALL BE:

Lake County Public Schools Page 28 of 55

i. HPWWMR24

ii. HPWWMR36

iii. HPWWMR48

D. ENCLOSURES – WALL MOUNT

1. REMOTE EQUIPMENT BOX BASIC DESIGN SHALL BE A ONE-PIECE, 16-GAGE STEEL, REINFORCED

WELDED ENCLOSURE WITH A PRE-CONFIGURED LEFT-HINGED DOOR.

2. BASIC UNIT DELIVERED SHALL INCLUDE: (1) WALL MOUNT ENCLOSURE BODY WITH VENTED

DOOR ASSEMBLED, WITH (2) SETS OF UNIVERSAL #12-24 TAPPED MOUNTING RAILS FOR

COMMUNICATIONS EQUIPMENT, (2) SETS OF HUB MOUNTING BRACKETS, (2) NSQ LOCKS, AND

(1) SET OF PANEL MOUNTING BRACKETS.

3. BODY INNER BACK WALL SHALL HAVE CLIP FEATURES TO ACCEPT OPTIONAL MOUNTING

BRACKETS FOR EQUIPMENT, SUCH AS PANELS, 110 BLOCKS, HUBS, SWITCHES, ROUTERS, UPS

UNITS, POWER SUPPLIES, AUDIO/VIDEO, COAX SPLITTERS, FIBER BRACKETS, AND OTHER

SUITABLE NETWORKING DEVICES.

4. WALL-MOUNT ENCLOSURES AND ACCESSORIES, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE a HUBBELL (REBOX ENCLOSURES)

E. ENCLOSURES – FIBER RACK MOUNT

1. RACK-MOUNTED, POWDER COATED FORMED COLD ROLLED STEEL ENCLOSURE.

2. SWING-OUT OR PULL-OUT INNER TRAY SHALL PROVIDE ACCESS TO INNER CABLES AND

CONNECTIONS, AND MAINTAIN PROPER CABLE BEND RADIUS THROUGHOUT THE RANGE OF

MOTION.

3. INNER TRAY SHALL HAVE A THREADED MOUNTING BOSS TO ACCEPT A MOUNTING STUD FOR

SPLICE TRAYS. SPLICE TRAY CAPACITY SHALL BE (2) 10” SPLICE TRAYS, EACH WITH 24-SPLICE CAPACITIES (48 SPLICES TOTAL). SPLICE TRAY MOUNTING BOSS SHALL ALSO ACCEPT A STUD FOR

MOUNTING 1-RMU BLOWN FIBER ADAPTER BRACKETS.

4. FIBER RACK-MOUNT ENCLOSURES AND ACCESSORIES, AS SPECIFIED IN THE CONTRACT

DOCUMENTS, SHALL BE:

Lake County Public Schools Page 29 of 55

i. 1RU - FCR1U3SP

ii. 2RU - FCR2U9SP

iii. 3RU - FCR3U12SP

iv. 4RU - FCR4U15SP

F. ENCLOSURES – FIBER WALL MOUNT

1. BASIC FIBER ENCLOSURE DESIGN SHALL BE A FORMED COLD ROLLED STEEL ENCLOSURE WITH A

HINGED COVER.

2. ENCLOSURE MATERIAL SHALL BE 16-GAGE COLD ROLLED STEEL (CRS).

3. FINISH SHALL BE DURABLE BLACK ELECTROSTATIC POWDER COAT ON ALL SURFACES.

4. FIBER WALL-MOUNT ENCLOSURES AND ACCESSORIES, AS SPECIFIED IN THE CONTRACT

i. 4 ADAPTER PANEL 12" X 14" X 3.25" - FCW4SP

ii. 12 ADAPTER PANEL 16" X 14" X 6.50” - FCW12SP

G. ADAPTER PANELS – OPTICAL FIBER

1. OPTICAL FIBER ADAPTER PANELS SHALL BE A MODULAR DESIGN POWDER COATED STAMPED

METAL CONSTRUCTION.

2. AVAILABLE IN LC ADAPTER CONFIGURATIONS

3. HIGH OR LOW-DENSITY VERSIONS.

4. ADAPTER PANELS SHALL HAVE QUICK-RELEASE SNAP FASTENERS TO FIT DIRECTLY INTO FIBER

ENCLOSURES.

5. FIBER PATCH PANELS, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

a HUBBELL (FSP SERIES PANELS)

Lake County Public Schools Page 30 of 55

2.13 INNER-DUCT

1. FIBER OPTIC CABLE SHALL BE INSTALLED WITH INNERDUCT FOR PROTECTION OF FIBER CABLES IN

A SHARED PATHWAY

2. THE INNER DUCT WILL BE RATED FOR THE ENVIRONMENT THAT IT IS BEING INSTALLED IN.

PLENUM AND RISER RATED

3. THREE INNER DUCTS WILL BE RUN BETWEEN CLOSETS. ONE FOR CURRENT INSTALLATION, TWO

SPARE FOR FUTURE APPLICATIONS.

4. SIZE: 1”

5. FLEXIBLE & LIGHTWEIGHT FOR EASE OF HANDLING

6. PLACE MULTI DUCT SYSTEM INSIDE INNERDUCT – 3 CELLS

7. PRE-THREADED WITH PULL LINE

8. INNER DUCT, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

a MAXCELL

2.14 PROTECTION UNITS – COPPER CABLE

1. UL LISTED PROTECTION FOR DATA COMMUNICATION CIRCUITS. THE 4 PAIR BLOCK PROTECTS

NETWORKS FROM TRANSIENTS THAT CAN HARM SENSITIVE ELECTRONIC EQUIPMENT.

2. ULTRA LOW CAPACITANCE SOLID STATE TECHNOLOGY ALLOWS FOR CAT 6 PERFORMANCE WHILE

PROVIDING QUICK REACTION TO

HAZARDOUS ELECTRICAL SURGES WITHOUT NETWORK DEGRADATION.

3. DESIGNED TO PROTECT DATA NETWORKS OPERATING BELOW 65 VOLTS.

4. THESE PROTECTORS PROVIDE OPTIMUM TRANSMISSION PERFORMANCE FOR PROTOCOLS

OPERATING AT TRANSMISSION SPEEDS UP TO 250 MHZ.

5. UL LISTED

6. 65V MODEL IS IDEAL FOR POWER OVER ETHERNET (POE) CIRCUIT PROTECTION

7. 110 TERMINATION

8. COVER INCLUDED

9. FACTORY LOADED WITH 65V SOLID STATE MODULES

10. INNER DUCT, AS SPECIFIED IN THE CONTRACT DOCUMENTS, SHALL BE:

a PORTA SYSTEMS (606)

Lake County Public Schools Page 31 of 55

PART 3 EXECUTION

3.1 APPROVED CONTRACTOR RESPONSIBILITIES

A. THE APPROVED CONTRACTOR SHALL ASSUME THE FOLLOWING RESPONSIBILITIES:

1. EXECUTE CONSTRUCTION IN ACCORDANCE WITH CONTRACT DRAWINGS AND SPECIFICATIONS.

2. ADHERE TO PROJECT SCHEDULES AND JOB SITE RULES.

3. ADHERE TO THE QUALITY, REGULATORY, LOGISTICS,…

This is the start of the file's text. The full file is on GovTribe.