L15PS00180_1098931-Combined_Fullsize.pdf

PDF 5 MB Posted

Attached to
Fairbanks District Office Storage Facility - Construction
Solicitation number
L15PS00180
Issued by

About this file

Drawings

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:3

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

T1.0

TITLE SHEET &

SHEET INDEX

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

T1.0

1 EXPLODED AXONOMETRIC

SHEET INDEX

Sheet Number Sheet Name

T1.0 TITLE SHEET & SHEET INDEX

T1.1 CODE ANALYSIS, GENERAL NOTES, AND ABBREVIATIONS

C1.0 SITE PLAN

C2.0 SECTIONS AND DETAILS

C3.0 FENCE DETAILS

S0.0 GENERAL NOTES & EXCAVATION SECTION

S1.0 FOUNDATION / SLAB PLAN & DETAILS

S2.0 ROOF FRAMING PLAN, WALL SCHEDULE & FRAMING DETAILS

S2.1 CANOPY FRAMING PLAN & DETAILS

A2.1 FIRST FLOOR PLAN

A2.2 REFLECTED CEILING PLAN

A2.3 ROOF PLAN

A3.1 ELEVATIONS

A3.2 ELEVATIONS

A3.3 SECTIONS

A4.1 WALL SECTIONS & DETAILS

A4.2 DETAILS

A8.1 ROOM FINISH SCHEDULES

M1.0 MECHANICAL LEGENDS, ABBREVIATION AND SCHEDULES

M2.0 HEATING PLAN

M2.1 HEATING DETAILS

M3.0 VENTILATING PLAN

E1.1 ELECTRICAL SITE PLAN

E1.2 DETAILS

E2.1 ELECTRICAL LIGHTING PLAN

E3.1 ELECTRICAL POWER PLAN

E4.1 ELECTRICAL SYSTEMS PLAN

BUREAU OF LAND MANAGEMENT

FAIRBANKS DISTRICT OFFICE

STORAGE FACILITY

PERSPECTIVE 1

PERSPECTIVE 2

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

T

L15PS00180 109831-COMBINED FULLSIZE

% OF ALLOWABLE TABULAR AREA

% REDUCTION FOR HEIGHT

% INCREASE FOR OPEN PERIMETER

% INCREASE FOR AUTOMATIC SPRINKLER

AREA AND HEIGHT MODIFICATIONS

ITEM (IBC SECTION 506)

NONE

2009 INTERNATIONAL BUILDING CODE (IBC)

2009 INTERNATIONAL MECHANICAL CODE (IMC)

2005 NATIONAL ELECTRICAL CODE

2009 UNIFORM PLUMBING CODE

2010 AMERICANS WITH DISABILITIES ACT

2006 INTERNATIONAL FIRE CODE

AUTHORITY HAVING JURISDICTION

OCCUPANCY CLASSIFICATION

(IBC CHAPTER 3)

SPECIAL DETAILED REQUIREMENT

BASED ON USE AND OCCUPANCY

FIRE RESISTANCE RATED

CONSTRUCTION (IBC TABLE 601)

FIRE PROTECTION SYSTEMS

STORAGE (S-2 LOW HAZARD)

CORRIDORS

ROOMS / ENCLOSED SPACES

B NONE THIS PROJECT

C

EXIT ENCLOSURE/EXIT PASSAGEWAY B NONE THIS PROJECT

BUREAU OF LAND MANAGEMENT

APPLICABLE BUILDING CODES

OCCUPANCY SEPARATION

(IBC CHAPTER 5)

ALLOWABLE BUILDING HEIGHTS

& AREAS - BASE (IBC TABLE 503)

FACTORY (S-2) TYPE V-B

ALLOWABLE HEIGHT: 2 / 40 FT.

INCREASE FOR AUTOMATIC SPRINKLERS (504.2):

ADJUSTED ALLOWABLE HEIGHT:

ACTUAL BUILDING HEIGHT:

2 / 40 FT.

1 / 18' -0"

TYPE OF CONSTRUCTION

(IBC TABLE 601) TYPE V-B - NON-FIRERATED, COMBUSTIBLE

STORIES / HEIGHT

0 / 0 FT.

% OPEN PERIMETER

TOTAL PERIMETER

OPEN PERIMETER

TOTAL PERCENTAGE FACTOR

CONVERSION FACTOR (TOTAL PERCENTAGE FACTOR/100%)

% TABULAR AREA INCREASE

196'-0"

1.75 175% 0% 75%

100 %

196'-0"

NON-SPRINKLERED

ALLOWABLE AREA CALCULATIONS (SEC. 506 IBC)

Aa (S-2) = 13,500 + [ 13,500 x 0.75] + [ 13,500 x 0] Aa (S-2) = 23,625 SF / FLOOR (2 FLOORS)

ALLOWABLE AREA = 23,625 SF X 2 = 47,250 SF

If = [196ft / 196ft - 0.25] 30/30 = 75%

FIRST FLOOR ACTUAL AREA: 2,400 SF (GROSS BUILDING)

SECOND FLOOR ACTUAL AREA: 0 SF (GROSS BUILDING)

TOTAL ACTUAL AREA: 2,400 SF (GROSS BUILDING)

STRUCTURAL FRAME: 0 HR.

BEARING WALLS: INTERIOR 0 HR. EXTERIOR 0 HR.

NON-BEARING WALLS: INTERIOR 0 HR. EXTERIOR 0 HR.

FLOOR CONSTRUCTION: 0 HR.

ROOF CONSTRUCTION: 0 HR.

SHAFTS: 0 HR.

CORRIDORS: 0 HR.

INTERIOR FINISHES

(IBC TABLE 803.9)

SECTION 508.2.5 A FURNACE ROOM WHERE ANY PIECE OF EQUIPMENT IS OVER 400,000 BTU PER HOUR INPUT SHALL BE 1

HOUR RATED OR PROVIDE AN AUTOMATIC FIRE-EXTINGUISHING SYSTEM.

SYMBOL DEFINITION SYMBOL DEFINITION SYMBOL DEFINITION SYMBOL DEFINITION

AB ANCHOR BOLT EA EACH LAV LAVATORY R RADIUS

ACT ACOUSTICAL TILE EL ELEVATION RD ROOF DRAIN

ADD ADDITIVE ELEC ELECTRICAL MAX MAXIMUM REQ REQUIRED

ADD'L ADDITIONAL EQUIP EQUIPMENT MECH MECHANICAL RM ROOM

ADH ADHEASIVE EXT EXTERIOR MFD MANUFACTURED RO ROUGH OPENING

ADJ ADJUSTABLE EXIST EXISTING MFR MANUFACTURER

AFF ABOVE FINISHED FLOOR m METER SCW SOLID CORE WOOD AP ACCESS PANEL FA FIRE ALARM mm MILLIMETER SD SOAP DISPENSER

APPROX APPROXIMATE FD FLOOR DRAIN MIN MINIMUM SECT SECTION

ARCH ARCHITECTURAL FDN FOUNDATION MISC MISCELLANEOUS SIM SIMILAR

FE FIRE EXTINGUISHER MTD MOUNTED SND SANITARY NAPKIN DISPENSER

BD BOARD FEC FIRE EXTINGUISHER CABINET SPEC SPECIFICATION

BLDG BUILDING FEX EXISTING FIRE EXTINGUISHER NFS NON-FROST SUSCEPTIBLE SQ SQUARE

BLK BLOCKING FIN FINISH NIC NOT IN CONRACT STOR STORAGE

FL FLOOR NO NUMBER STRUC STRUCTURE

CAB CABINET FRP FIBERGLASS REINFORCED PANEL NOM NOMINAL SV SHEET VINYL

CLG CEILING FT FEET NTS NOT TO SCALE

CONST CONSTRUCTION GA GAUGE TB TOWEL BAR

CONT CONTINUOUS GALV GALVANIZED OC ON CENTER TEL TELEPHONE

CMU CONCRETE MASONRY UNIT GB GRAB BAR OD OVERFLOW DRAIN TP TOILET PAPER DISPENSER

CPT CARPET GWB GYPSUM WALL BOARD OSB ORIENTED STRAND BOARD TS TUBE STEEL

CT CERAMIC TILE TYP TYPICAL

HDWR HARDWARE PL PLASTIC LAMINATE

DEMO DEMOLITION HM HOLLOW METAL PLWD PLYWOOD UNO UNLESS OTHERWISE NOTED

DET DETAIL HMI HOLLOW METAL INSULATED PT PRESSURE TREATED VB VAPOR BARRIER

DF DRINKING FOUNTAIN HORIZ HORIZONTAL PTDR PAPER TOWEL DISPENSER VT VINYL COMPOSITION TILE DIA DIAMETER HVAC HEATING, VENTILATING, AIR COND. PVC POLYVINYL CHLORIDE VERT VERTICAL

DIM DIMENSION VTR VENT THROUGH ROOF

DISP DISPENSER INSUL INSULATION QT QUARRY TILE VWC VINYL WALL COVERING

DN DOWN INT INTERIOR

DWG DRAWING JAN JANITOR W/ WITH

WWF WELDED WIRE FABRIC

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:3

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

T1.1

CODE ANALYSIS,

GENERAL NOTES,

AND ABBREVIATIONS

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

CODE DATA

ARCHITECTURE ABBREVIATIONS

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

S0.0

R ev is io n

Date Stamped:

D at e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway Suite 200 Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

FACILITY

S1.0

R ev is io n

Date Stamped:

D at e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway Suite 200 Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

GARAGE BAYS

MECHANICAL

EVIDENCE

LAW

ENFORCEMENT

S2.0

By R ev is io n

Date Stamped:

D at e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway Suite 200 Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

MECHANICAL

S2.1

By R ev is io n

Date Stamped:

D at e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway Suite 200 Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

'-0

48'-0"

2'-4" 3'-4" 5'-4" 12'-0" 2'-0" 12'-0" 5'-4" 3'-4" 2'-4"

A3.3

A3.3

CONCRETE APRON,

SEE CIVIL POINT TABLE

FOR SLOPE

8" STEEL BOLLARD,

TYP

'-4

3'

-4

'-4

103B

101D

101C103A

101B101A

A

A

B

B

A

GARAGE BAYS

MECHANICAL

EVIDENCE

LAW

ENFORCEMENT

SECURITY CAGES,

BY OTHERS

8' -2

'-6

8'-4"

9' -2

10'-0"

10# 4A: 60BC

MULTI-PURPOSE

DRY CHEMICAL F.E.

1' -0

6' CONCRETE

SIDEWALK,

SEE CIVIL

TRENCH GRATE,

SEE S1.0

CANOPY ABOVE, TYP.

SEE 4/C2.0

434'-0"435'-0"

LOFT ABOVE,

SEE 2/A2.1

INTERIOR WALL SYSTEM

5/8" GWB

2X4 WOOD STUD WALL

ACOUSTIC BATT INSULATION

5/8" GWB

A

INTERIOR WALL SYSTEM

5/8" GWB

7/16" PLYWOOD SHEATHING

2X4 WOOD STUD WALL

ACOUSTIC BATT INSULATION

5/8" GWB

B

3/4" PLYWOOD

W/ FLOOR ENAMEL

FINISH

434'-0"443'-0"

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:1

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

A2.1

FIRST FLOOR PLAN

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

1/4" = 1'-0"A2.1

1 FIRST FLOOR PLAN

WALL TYPES

1/4" = 1'-0"A2.1

2 MECHANICAL PLATFORM

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

A3.3

A3.3

446'-0"

446'-0"

446'-0"

442'-0"

SOLARTUBE LIGHT, TYP

12'-0" AFF

12'-0" AFF

8'-0" AFF

12'-0" AFF

CENTER MDO PLYWOOD

JOINT ON CANOPY, TYP.

DUCTWORK, SEE MECH

NOTE: MECH PLATFORM

ABOVE MECH ROOM

SURFACE MTD. LIGHTING,

TYP, SEE ELEC.

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:1

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

A2.2

REFLECTED CEILING

PLAN

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

1/4" = 1'-0"A2.2

1 REFLECTED CEILING PLAN

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

A3.3

1/4" / 1'-0" 1/4" / 1'-0"

ENTRY CANOPY TYP,

SEE DETAIL 7/A4.2

R

ID

G

E VA

LL

EY

A4.1

DRAINAGE SCUPPER,

TYP. SEE DETAIL 4/A4.2

GRAVITY VENT, TYP.

SEE DETAIL 4/A4.2

FALL PROTECTION

ANCHOR POINT, TYP.

SEE DETAIL 10/A4.2

CANOPY SCUPPER TYP,

SEE DETAIL 8/A4.2

1/4" / 1'-0"1/4" / 1'-0"

1/ 4"

/1 '-0

HATCHED AREA INDICATES TAPERED

INSULATION CRICKET, TYP.

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:1

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

A2.3

ROOF PLAN

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

1/4" = 1'-0"A2.3

1 ROOF PLAN

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

1 1 1

'-0

PARAPET ELEVATION

TO MATCH METAL PANEL

COURSING, TYP.

STEEL BOLLARD,

SEE 4/C2.0

12" X 12" LOUVER

FIXED FIBERGLASS

WINDOW, TYP. (ALT #3)

TYP.

VERTICAL DOWNSPOUT,

SEE DETAIL 5/A4.2

VERTICAL DOWNSPOUT

AT PARPAPET, SEE

DETAIL 5/A4.2

TYP.

TYP.

TYP.

CANOPY SCUPPER, TYP.

SEE DETAIL 8/A4.2

'-0

4" CORNER FLASHING, TYP.

TYP.

CANOPY SUPPORTS,

SEE SHEET S2.1

TYP.

ENTRY CANOPY,TYP.

SEE DETAIL 7/A4.2

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:1

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

A3.1

ELEVATIONS

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

1/4" = 1'-0"A3.1

1 EAST ELEVATION

1/4" = 1'-0"A3.1

2 NORTH ELEVATION

EXERIOR WALL FINISHES

METAL WALL PANELS: AEPSPAN "METALLIC CHAMPAGNE"

PAINT FINISH ON HM DOORS & FRAMES, CANOPY SUPPORTS AND FLASHINGS:

VERYIFY AND MATCH EXISTING DEEP COLONIAL RED FINISH ON MAIN FDO

BUILDING

HM DOORS & FRAMES, GARAGE DOORS, WINDOW FRAMES: WHITE

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

1 1 1

'-0

CANOPY SCUPPER, TYP.

SEE DETAIL 8/A4.2

FIXED FIBERGLASS

WINDOW, TYP. (ALT#3)

VERTICAL DOWNSPOUT,

SEE DETAIL 5/A4.2

VERTICAL DOWNSPOUT

AT PARPAPET, SEE

DETAIL 5/A4.2

'-0

12" X 12" LOUVER,

SEE MECH

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:2

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

A3.2

ELEVATIONS

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

1/4" = 1'-0"A3.2

1 WEST ELEVATION

1/4" = 1'-0"A3.2

2 SOUTH ELEVATION

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

GARAGE BAYS

4' -0

'-0

'-0

A3.3

MECHANICAL

LOFT

A3.3

A4.1

EVIDENCE

GARAGE BAYS

GARAGE BAYS

2' -0

4'

-0

'-0

'-0

SEE CIVIL FOR FINISHED

FLOOR ELEVATION

8' PLYWOOD

WAINSCOT

WOOD FRAMING,

SEE STRUCTURAL

3/4" PLYWOOD

PLYWOOD

SHEATHING

5/8" GWB

PAINTED 2X4

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:2

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

A3.3

SECTIONS

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

1/4" = 1'-0"A3.3

1 LONGITUDINAL SECTION

1/4" = 1'-0"A3.3

2 TRANSVERSE SECTION

1 1/2" = 1'-0"A3.3

3 MECHANICAL LOFT DETAIL

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

T

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

EXTERIOR WALL SYSTEM:

METAL PANEL

WOOD FURRING

6" RIGID INSULATION

AIR BARRIER

7/16" APA SHEATHING

2X8 WOOD STUD WALL @ 24" O.C

R-22 BATT INSULATION

5/8" GYPSUM BOARD

ROOF SYSTEM:

FULLY ADHEARED .060 EPDM

CRICKETS WHERE OCCUR

SHEATHING, SEE STRUC

WOOD TRUSS, SEE STRUC

24" MIN BLOWN-IN INSULATION

VAPOR RETARDER

3/4" GYPSUM BOARD

A4.1

A4.1

A4.1

A4.2

ROOF SYSTEM:

FULLY ADHEARED .060 EPDM

CRICKETS WHERE OCCUR

SHEATHING, SEE STRUC

WOOD TRUSS, SEE STRUC

24" MIN BLOWN-IN INSULATION

VAPOR RETARDER

3/4" GYPSUM BOARD

PARAPET CAP FLASHING

W/ CONTINUOUS CLEAT

ROOF PARAPET SYSTEM

METAL PANEL

2X4 FURRING STRIPS

PLYWOOD SHEATHING

2X8 WOOD STUD WALL

1/2" PLYWOOD SHEATHING

FULLY ADHEARED EPDM

2X6 WOOD BLOCKING

2" DIA AIR VENT HOLE

EA. TRUSS SPACE. W/

SCREEN

PREFORMED METAL

FLASHING

WALL SYSTEM

SEE 1/A4.1

2X6 WOOD BLOCKING

WOOD BLOCKING

METAL TRIM

EXTERIOR WALL SYSTEM:

METAL PANEL

WOOD FURRING

6" RIGID INSULATION

WEATHER BARRIER

7/16" APA SHEATHING

2X8 WOOD STUD WALL @ 24" O.C

R-22 BATT INSULATION

5/8" GYPSUM BOARD

WINDOW UNIT

CAULK WITH BACKER ROD

2X FRAMING SILL

EXTENSION

5/8" GYPSUM BOARD SILL

METAL TRIM &

FLASHING

CAULK WITH BACKER ROD

2 4 2 4

2 4 2 4

PREMANUFACTURED 21" TUBE

SKYLIGHT ASSEMBLY

CURB MOUNTED SKYLIGHT FLASHING

CEDAR BEVEL SIDING FOR SLOPE

NEW CURB CONSTRUCTION

EPDM ROOF MEMBRANE

1/2" PLYWOOD SHEATHING

2X4 WOOD STUD

FULL BATT INSULATION

10 MIL POLY VAPOR RETARDER

SKYLIGHT TUBE

24 GA. PREFINISHED METAL FLASHING

OVER TOP OF CURB & UNDER CURB

MOUNTED FLASHING

2' -0

N

TS

2'-0"

WOOD TRUSS @ 24" O.C.

LIGHT DIFFUSER

BASE METAL FLASHING

SEALANT WITH BACKER ROD

EXTERIOR WALL SYSTEM:

METAL PANEL

WOOD FURRING

6" RIGID INSULATION

AIR BARRIER

SHEATHING

2X8 WOOD STUD WALL @ 24" O.C.

R-22 BATT INSULATION

5/8" GYPSUM BOARD

8" RIGID INSULATION

POLYETHYLENE SHEETING

2 8

4" RUBBER BASE

FOUNDATION

INSULATION

PT 2X8 BASE PLATE

4"

2'-0"

1' -0

FINISHED FLOOR

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:2

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

A4.1

WALL SECTIONS &

DETAILS

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

3/4" = 1'-0"A4.1

1 WALL SECTION

1 1/2" = 1'-0"A4.1

2 ROOF PARAPET DETAIL

1 1/2" = 1'-0"A4.1

5 WINDOW DETAIL ALTERNATE #3

1 1/2" = 1'-0"A4.1

4 SOLARTUBE CURB

1 1/2" = 1'-0"A4.1

3 FOUNDATION DETAIL

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

EXTERIOR WALL SYSTEM

SEE 1/A4.1

2X6 MOUNTING FRAME

DOOR BLOCKING PER

OVERHEAD DOOR MANUFACTURER

THERMAL BRUSH WEATHERSTRIP

OVERHEAD DOOR

FILL WITH INSULATION

METAL J-TRIM

DRIP FLASHING

(2) LAYERS 3/4" PLYWOOD

INSULATED METAL FRAME

TYPICAL WALL SYSTEM

SEE1/A4.1

DOOR

2X WOOD BUCK

METAL J-CHANNEL

FILL CAVITY WITH INSULATION

BACKER ROD WITH CAULK

WOOD BLOCKING ABOVE DOOR,

SEE STRUCTURAL

PREFINISHED METAL FLASHING

2 4 2 4

2 4 2 4

GRAVITY VENT ON CURB

CURB MOUNTED VENT FLASHING

CEDAR BEVEL SIDING FOR SLOPE

NEW CURB CONSTRUCTION

EPDM ROOF MEMBRANE

1/2" PLYWOOD SHEATHING

2X4 WOOD STUD

FULL BATT INSULATION

10 MIL POLY VAPOR RETARDER

12" PLYWOOD SHEATHING

24 GA. PREFINISHED METAL FLASHING

OVER TOP OF CURB & UNDER CURB

MOUNTED FLASHING

2' -0

N

TS

ROOF SYSTEM:

FULLY ADHEARED .060 EPDM

CRICKETS WHERE OCCUR

SHEATHING, SEE STRUC

WOOD TRUSS, SEE STRUC

24" MIN BLOWN-IN INSULATION

VAPOR RETARDER

3/4" GYPSUM BOARD

PARAPET CAP FLASHING

W/ CONTINUOUS CLEAT

ROOF PARAPET SYSTEM

METAL PANEL

2X4 FURRING STRIPS

PLYWOOD SHEATHING

2X8 WOOD STUD WALL

1/2" PLYWOOD SHEATHING

FULLY ADHEARED EPDM

METAL SCUPPER

2" DIA AIR VENT HOLE

EA. TRUSS SPACE. W/

SCREEN

WALL SYSTEM

SEE 1/A4.1

2X6 WOOD BLOCKING

WOOD BLOCKING

2X WOOD OPEN VERTICAL GUTTER

WITH METAL FLASHING, SEE DETAIL

5/A4.2 AND 6/A4.2

METAL PANEL

EXTERIOR WALL INSULATION

WOOD FURRING

METAL

FLASHING

2X WOOD

STUD UP TO

SCUPPER

2X8 WOOD STRUCTURE

2X BLOCKING FASTENED TO

2X8 WOOD STRUCTURE

2 10

METAL PANEL

EXTERIOR WALL INSULATION

WOOD FURRING

METAL

FLASHING

2X WOOD

STUD UP TO

SCUPPER METAL FLASHING

7/16 APA SHEATHING

2X8 WOOD STRUCTURE

2 10

PREFINISHED METAL

FLASHING

LAP EPDM ROOF

MEMBRANE

UNDER FLASHING

PREFINISHED

METAL FLASHING

EXTERIOR WALL SYSTEM,

SEE1/A4.1

BEVELED CEDAR FOR SLOPE

SEALANT W/ BACKER ROD

2 8 2 8

BATT INSULATION

CONTINUOUS CLEAT

2" STD PIPE,

SEE STRUCTURAL

1/2" SEALANT

NOTE: COORDINATE & SET CANOPY ELEVATION TO

INTERFACE INTO METAL WALL PANEL

COURSING

PREFINISHED METAL

FLASHING BEYOND

EPDM ROOF MEMBRANE

NOTCHED GLB

PREFINISHED METAL

FLASHING W/ DRIP EDGE

1/2" MDO PLYWOOD

EXTERIOR WALL SYSTEM,

SEE1/A4.1

METAL J TRIM

TYPICAL EXTERIOR

ELECTRICAL BOX

WATERPROOF CAULKING

AROUND BOX, TYP.

COORDCINATE W/ ELECTRICAL

CONTRACTOR FOR SIZES AND HEIGHT,

PROVIDE APPROPRIATE 2X BACKING

TO SPAN BETWEEN STUDS

PREFORMED EPDM PIPE BOOT.

FILL W/ POURABLE SEALER

(INSTALL SEALER PER MRFS

INSTRUCTIONS)

FALL ANCHOR, BOLT

TO BLOCKING PER MFR

RECOMMENCATIONS

4X12 FLAT W/ SIMPSON

A35 EA. SIDE,

FASTEN TO SHEATHING

W/ (2) 16D @ 4" O.C.

EPDM

ROOF

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:2

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

A4.2

DETAILS

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

1 1/2" = 1'-0"A4.2

1 OVERHEAD DOOR HEADER (JAMB SIM.)

1 1/2" = 1'-0"A4.2

2 DOOR HEAD DETAIL

1 1/2" = 1'-0"A4.2

3 GRAVITY VENT DETAIL

1 1/2" = 1'-0"A4.2

4 SCUPPER DETAIL

1 1/2" = 1'-0"A4.2

5 DOWNSPOUT DETAIL

1 1/2" = 1'-0"A4.2

6 DOWNSPOUT DETAIL AT PARAPET

1 1/2" = 1'-0"A4.2

7 CANOPY SECTION

1 1/2" = 1'-0"A4.2

8 CANOPY SCUPPER

1 1/2" = 1'-0"A4.2

9 ELECTRICAL BOX DETAIL

1 1/2" = 1'-0"A4.2

10 FALL ANCHOR DETAIL

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645

B C

2" 7'

-0

2" 3'-0" 2"

6"6"

6" 3'

-0

'-0

12'-0"

7' -0

2"

2" 3'-0" 2"

A

4'-1"

2' -1

GWB

INTERIOR FINISH SCHEDULE

MAT. # DESCRIPTION MANUFACTURER MFG. REF. # COLOR FINISH NOTES

PT01 SHERWIN WILLIAMS SW 6133 MUSLIN - -

WAINSCOT PT02 SHERWIN WILLIAMS SW 6134 NETSUKE -

HM

DOORS PT03 SHERWIN WILLIAMS - - -

RB RB ROPPE 182 TOFFEE -

MATCH FDO MAIN BUILDING TRIM

By R ev is io n

Date Stamped:

D at e

PlanningLand Surveying EngineeringArchitecture

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

USKH W.O.

Environmental Services

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive, Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway, Suite 200 Wasilla, Alaska 99654

(907) 376-7815 www.USKH.com

4/ 1/

1:

:2

P M

C :\U se rs

\e du ke s\

D es kt op

\1

-B

LM

FD

O

S to ra ge

_e du ke s.

rv t

A8.1

ROOM FINISH

SCHEDULES

04/01/2014

GHP

EJD

1098931

BLM/FDO

STORAGE

FACILITY

Client: Bureau of Land Management Project Location: Fairbanks, AK

G.POHL

04/01/2014

DOOR SCHEDULE

Door Number Type Glazing Fire Rating Hardware

Frame CommentsWidth Height Thickness Material Finish Material Finish Jamb Head

101A OH 12'-0" 10'-0" 2" IMP ISG PT 1 IHM FF 1/A4.2

101B OH 12'-0" 10'-0" 2" IMP ISG PT 1 IHM FF 1/A4.2

101C FF 3'-0" 7'-0" 2" IMP ISG PT 2 IHM FF 2/A4.2 2/A4.2

101D FF 3'-0" 7'-0" 2" IMP ISG PT 2 IHM FF 2/A4.2 2/A4.2

102 FF 3'-0" 7'-0" 2" IMP PT 3 HM FF

103A FF 3'-0" 7'-0" 2" IMP ISG PT 4 HM FF 2/A4.2 2/A4.2

103B FF 3'-0" 7'-0" 2" IMP PT 5 HM FF

104 FF 3'-0" 7'-0" 2" IMP PT 6 HM FF 3/4" UNDERCUT DOOR TYPES

WINDOW SCHEDULE

Type Mark R.O.

Type Manufacturer Model Material Finish Head Jamb/Sill Head

Height CommentsWidth Height 1 4'-1" 2'-1" Fixed GREATLAND WINDOWS OR EQUAL 300 SERIES FIBERGLASS FF 5/A4.1 5/A4.1 10'-6" 1 4'-1" 2'-1" Fixed GREATLAND WINDOWS OR EQUAL 300 SERIES FIBERGLASS FF 5/A4.1 5/A4.1 10'-6" 1 4'-1" 2'-1" Fixed GREATLAND WINDOWS OR EQUAL 300 SERIES FIBERGLASS FF 5/A4.1 5/A4.1 10'-6" 1 4'-1" 2'-1" Fixed GREATLAND WINDOWS OR EQUAL 300 SERIES FIBERGLASS FF 5/A4.1 5/A4.1 10'-6" 1 4'-1" 2'-1" Fixed GREATLAND WINDOWS OR EQUAL 300 SERIES FIBERGLASS FF 5/A4.1 5/A4.1 10'-6" 1 4'-1" 2'-1" Fixed GREATLAND WINDOWS OR EQUAL 300 SERIES FIBERGLASS FF 5/A4.1 5/A4.1 10'-6"

WINDOW TYPES

ROOM FINISH SCHEDULE

Room Number Room Name Floor Base Walls

Ceiling Finish Wainscot Ceiling Height CommentsNorth East South West

101 GARAGE BAYS SEALED CONCRETE RUBBER BASE GWB GWB GWB GWB GWB 8'-0" 12'-0"

102 MECHANICAL SEALED CONCRETE RUBBER BASE GWB GWB GWB GWB GWB 8'-0" LOFT ABOVE

103 LAW ENFORCEMENT SEALED CONCRETE RUBBER BASE GWB GWB GWB GWB GWB 12'-0"

104 EVIDENCE SEALED CONCRETE RUBBER BASE GWB GWB GWB GWB GWB 12'-0"

105 MECHANICAL LOFT PLYWOOD/PT

TH49

CE

TI

HCRA

LANOISSEFORP

DERETSI

GE

R

S

TA T E O F A L ASK

A

GARY H. POHL

A-4645 ev is io n

Date Stamped:

D at e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway Suite 200 Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

FACILITY

G. POHL

M1.0

MECHANICAL

LEGENDS,

ABREVIATIONS,

AND SCHEDULES

MJP

JET CLL

ALL SYMBOLS DO NOT NECESSARILY APPEAR ON DRAWINGS

DUCT SECTION

SUPPLY OR OUTSIDE AIR

DUCT SECTION

MOTOR OPERATED

MANUAL BALANCING DAMPER

RETURN AIR

DAMPER

THERMOSTATIC EXPANSION VALVE

INTERNALLY LINED DUCT

FIRE DAMPER

AUTOMATIC AIR VENT

ECCENTRIC REDUCER

CONCENTRIC REDUCER

PUMP

PIPE FLANGE

THERMOMETER

UNION

PIPE UP

PIPE DOWN

(UH, EF, AHU, ETC.)

EQUIPMENT DESIGNATION

FLOW RATE, CFM

DIRECTION OF AIR FLOW

GRILLE, REGISTER OR DIFFUSER

DUCT SMOKE DETECTOR

WATER HAMMER ARRESTER

NUMBER OF FIXTURE UNITS

GAS CONCENTRATION SENSOR:

RETURN FOR XX PIPING (SEE ABBREVIATIONS)

SAFETY RELIEF VALVE OR

PRESSURE RELIEF VALVE

BLOW DOWN VALVE

WITH ISOLATION VALVE

PRESSURE GAUGE

STRAINER WITH

PLUG VALVE

BUTTERFLY VALVE

3-WAY CONTROL VALVE

GATE VALVE

GLOBE VALVE

CALIBRATED (MANUAL) BALANCE VALVE

RETURN GRILLE

SUPPLY DIFFUSER

SCHEDULE ITEM NUMBER

BALL VALVE

2-WAY CONTROL VALVE

CHECK VALVE

PRESSURE REDUCING VALVE

TEMPERATURE SENSOR OR THERMOSTAT

COMBINATION FIRE / SMOKE DAMPER

SHEET NOTE REFERENCE

DUCT SECTION

EXHAUST AIR

MOTOR OPERATED

DAMPER

OPPOSED BLADE

PARALLEL BLADE

HVAC DUCT, SINGLE LINE DEPICTION

EXTERNALLY INSULATED DUCT

SIZES SHOWN ARE NET INSIDE

HVAC DUCT, DOUBLE LINE DEPICTION

WITH ISOLATION VALVE

S

BACKDRAFT DAMPER

DIMENSIONS

SIZES SHOWN ARE NET INSIDE

DIMENSIONS

MOTOR OPERATED DAMPER

(VIEWED PERPENDICULAR TO

BLADE SHAFTS)

ARROWS INDICATE THROW DIRECTION

SUPPLY FOR XX PIPING (SEE ABBREVIATIONS)

WITH ISOLATION VALVE

xx = CO2 FOR CARBON DIOXIDE xx = CO FOR CARBON MONOXIDE

DESIGNATION

AUTOMATIC FLOW CONTROL VALVE

WITH FLOW RATE INDICATED, GPM

HEATING OR COOLING COIL

AIR FILTERS

FLEXIBLE ROUND DUCT

MECHANICAL LEGEND

UH

SAD-1

S

T

S

M

M

M

M

M

BOILER SCHEDULE

DESIGNATION

B-1

NOTES:

1. PROVIDE WITH CARLIN EZ-PRO BURNER AND HONEYWELL DIGITAL PRIMARY CONTROL.

HEATING FLUID

50% P. GLYCOL

FUEL

TYPE

#2 FUEL OIL

GROSS INPUT

(MBH)

NET IBR

(MBH)

GPM

EGT

(deg F)

LGT

(deg F)

ELECTRICAL

HP

1/6

VOLTS

PHASE

BASIS OF DESIGN

MFR.

BURNHAM

MODEL

MPO-IQ115

NOTES

COIL SCHEDULE

DESIGNATION

PHC-1

DESCRIPTION

HRV-1 O/A

AIR SIDE

HEAT

TRANSFER

(MBH)

CFM

EAT

(deg F)

-50

LAT

(deg F)

APD

(IN. W.G.)

0.03

FACE

VELOCITY

(FPM)

GLYCOL SIDE

FLUID

50% P.GLYCOL

GPM

1.44

EWT

(deg F)

LWT

(deg F)

WPD

(FT)

0.64

BASIS OF DESIGN

MFR.

HEATCRAFT

MODEL

5BS1101C 12X12

HEAT RECOVERY UNIT SCHEDULE

DESIGNATION

HRV-1

NOTES:

1. SCHEDULE IS BASED ON 99-DXPL01 LIFESTYLE MAX DIGITAL CONTROLLER AT SPEED 5. RECOVERY WAS CALCULATED

BASED ON 90% EFFICIENCY AT 32 F.

SUPPLY

CFM

EXHAUST

CFM

HEAT RECOVERY (WINTER)

MBH

6.3

EAT

(deg F)

LAT

(deg F)

ELECTRICAL

FLA

2.9

VOLTS

PHASE

BASIS OF DESIGN

MFR.

LIFEBREATH

MODEL

300DCS

NOTES

AIR OUTLET SCHEDULE

DESIGNATION

SD-1

RD-1

TG-1

USE

SUPPLY

RETURN

RETURN

UNIT SIZE

(IN)

12.25

12X12

NECK SIZE

(IN)

SP

(IN. W.G.)

0.03

0.04

0.01

FINISH

WHITE

WHITE

WHITE

BASIS OF DESIGN

MFR.

LIFEBREATH

LIFEBREATH

TITUS

MODEL

99-EAG5

99-EAG6

300RS

ABBREVIATIONS

AAV

AF

AFF

BDD

BTU

BTUH

CFM

CLG

CONC

CP

CUH

DB

DN

DPS

DWG

EA (E/A)

EAT

ESP

EGTAUTOMATIC AIR VENT

AIR FLOW SWITCH

ABOVE FINISH FLOOR

BACK DRAFT DAMPER

BRITISH THERMAL UNIT

BRITISH THERMAL UNIT PER HOUR

CUBIC FEET PER MINUTE

CEILING

CONCRETE

CIRCULATION PUMP

CABINUT UNIT HEATER

DRY BULB

DOWN

DIFFERENTIAL PRESSURE SWITCH

DRAWING

EXHAUST AIR

ENTERING AIR TEMPERATURE

EXTERNAL STATIC PRESSURE

ENTERING GLYCOL TEMPERATURE

F.D.

F.S.D.

FF

FOR

FOS

GPH

GPM

HP

HRU

LAT

LF

LGT

MBH

MS

NC

NO

NTS

FIRE DAMPER

FIRE SMOKE DAMPER

FINISH FLOOR

FUEL OIL RETURN

FUEL OIL SUPPLY

GALLONS PER HOUR

GALLONS PER MINUTE

HORSEPOWER

HEAT RECOVERY UNIT

LEAVING AIR TEMP

LINEAR FOOT

LEAVING GLYCOL TEMPERATURE

THOUSANDS BTU PER HOUR

MOTOR STARTER

NORMALLY CLOSED

NORMALLY OPEN

NOT TO SCALE

OA (O/A)

PH

RA (R/A)

RPM

SA (S/A)

SCFM

SD

SP

T

TSP

TYP

UH

V

VTR

W.C.

WB

OUTSIDE AIR

PHASE

RETURN AIR

REVOLUTION PER MINUTE

SUPPLY AIR

STANDARD CUBIC FEET PER MINUTE

SMOKE DETECTOR

STATIC PRESSURE

TEMPERATURE

TOTAL STATIC PRESSURE

TYPICAL

UNIT HEATER

VENT

VENT THRU ROOF

WATER COLUMN

WET BULB

ALL ABBREVIATIONS DO NOT NECESSARILY APPEAR ON DRAWINGS

PUMP SCHEDULE

DESIGNATION

P-1

P-2

P-3

SERVICE

HEATING CIRC

RADIANT FLOOR CIRC

FUEL OIL CIRC

GPM

HEAD

(FT)

FLUID

50% P. GLYCOL

50% P. GLYCOL

FUEL OIL

BODY

CI

CI

CI

TEMP

(deg F)

ELECTRICAL

HP

1/8

45 W

1/3

VOLTS

PHASE

BASIS OF DESIGN

MFR.

TACO

GRUNDFOS

SIMPLEX

MODEL

ALPHA 15-55 F 165

SPS-10-SS

APD AIR PRESSURE DROP

IN INCHES

IN W.G. INCHES OF WATER GAGE

MFR MANUFACTURER

FPM FEET PER MINUTE

LOUVER SCHEDULE

DESIGNATION

LO-1

LO-2

LO-3

SERVICE

HRV-1 SUPPLY

HRV-1 EXHAUST

B-1 COMB. AIR

TYPE

DRAINABLE

DRAINABLE

DRAINABLE

SIZE

(IN)

12X12

12X12

12X12

CFM

FREE AREA

(SQ FT)

0.31

0.31

0.31

FACE VEL.

(FPM)

SP

(IN. W.G.)

0.1

0.1

0.1

DEPTH

(IN)

BASIS OF DESIGN

MFR.

RUSKIN

RUSKIN

RUSKIN

MODEL

ELF6375DX

ELF6375DX

ELF6375DX

UNIT HEATER SCHEDULE

DESIGNATION

UH-1

LOCATION

MECHANICAL 102

MBH

5.3

CFM

GPM

EWT

(deg F)

LWT

(deg F)

WPD

(FT)

<5

ELECTRICAL

HP

1/50

VOLTS

PHASE

BASIS OF DESIGN

MFR.

TRANE

MODEL

UHSA018S

MISCELLANEOUS EQUIPMENT SCHEDULE

DESIGNATION

AS-1

DT-1

ET-1

EQUIPMENT

AIR SEPARATOR

FUEL OIL DAY TANK

HYDRONIC EXPANSION TANK

LOCATION

MECHANICAL 102

MECHANICAL 102

MECHANICAL 102

CAPACITY

15 GPM

25 GAL.

22 GAL. ACCEPT.

ELECTRICAL

KW

1 HP

VOLTS

PHASE

BASIS OF DESIGN

MFR.

SPIROVENT

SIMPLEX

AMTROL

MODEL

VDR125FT

SST 25

AX-40V

POINT OF CONNECTION

EVIDENCE

LAW

ENFORCEMENT

MECHANICAL

T

T

MECHANICAL

T

By R ev is io n

Date Stamped:

D at e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway Suite 200 Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

FACILITY

G. POHL

M2.0

HEATING PLAN

MJP

JET CLL

M2.0

HEATING PLAN

1/4"=1'-0"SCALE:

RADIANT FLOOR

MANIFOLDS

PERIMETER ZONE, 26 BTU/SQ FT, ASSUME

MAXIMUM SURFACE TEMP OF 95°F, TUBE

SPACING AT APPROXIMATELY 6"

PERIMETER ZONE, 26 BTU/SQ FT, ASSUME

MAXIMUM SURFACE TEMP OF 95°F, TUBE

SPACING AT APPROXIMATELY 6"

PERIMETER ZONE, 25 BTU/SQ FT, ASSUME

MAXIMUM SURFACE TEMP OF 95°F, TUBE

SPACING AT APPROXIMATELY 6"

PERIMETER ZONE, 25 BTU/SQ FT, ASSUME

MAXIMUM SURFACE TEMP OF 95°F, TUBE

SPACING AT APPROXIMATELY 6"

INTERIOR ZONE, 26 BTU/SQ FT, ASSUME

MAXIMUM SURFACE TEMP OF 85°F. TUBE

SPACING APPROXIMATELY 12"

BALL VALVE, TYP.

GHS

GHR

UNION, TYP.

UNIT HEATER

HANGER ROD, TYP.

DRAIN PLUG

ROOM T-STAT

TO CYCLE FAN

BALANCING VALVE

PROVIDE AUTO AIR VENT

WHERE PIPE DROPS, IN

DIRECTION OF FLOW, TYP.

FLEX CONNECTION, TYP.

M2.0

ENLARGED BOILER ROOM PLAN

1/2"=1'-0"SCALE:

SEE 2/M2.0 FOR ENLARGED

MECHANICAL ROOM PLAN

12/12 COMBUSTION

AIR OPENING, SEE

4/M2.0 FOR DETAIL

M2.0

UNIT HEATER CONNECTION DETAIL

N.T.S.SCALE:

M2.0

BOILER COMBUSTION AIR INLET DETAIL

N.T.S.SCALE:

2" RIGID

INSULATION

12"

COMBUSTION AIR

WEIGHTED BACKDRAFT

DAMPER, 1.05" W.C.

NOTE: MAINTAIN 3'-0" CLEAR AROUND BOILER FOR MAINTENANCE INSPECTION.

12/12

MECH ROOM

CEILINGNO RADIANT FLOOR HEAT

IN SLAB INSIDE MECH ROOM

GHS/R TO PHC-1

ABOVE

BOILER FLUE

UP THRU ROOF

RADIANT FLOOR HEAT MODULATING

VALVE ON WALL IN THIS AREA

FOS/FOR UP IN

MECHANICAL ROOM

PROTECT FUEL OIL

SUPPLY PIPING ROUTED

ACROSS FLOOR BETWEEN

BOILED AND DAYTANK,

SEE DETAIL 5/M2.1

ev is io n

Date Stamped:

D at e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway Suite 200 Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

FACILITY

G. POHL

M2.1

HEATING DETAILS

MJP

JET CLL

M2.1

HEATING SCHEMATIC

N.T.S.SCALE:

1-1/4" GHS

1-1/4" GHS

1-1/4" GHR

4-WAY CONTROL VALVE

COPPER PIPE TO

PLASTIC CONNECTION,

TYPICAL

3/4" GHS

3/4" GHR

SUPPLY PIPE OUT

TO FLOOR COIL,

TYPICAL

RETURN PIPE BACK

TO RADIANT FLOOR

MANIFOLD, TYPICAL

M2.1

FUEL OIL SYSTEM SCHEMATIC

N.T.S.SCALE:

FUEL FILTER

CHECK

VALVE

OIL AERATOR,

TIGERLOOP OR

APPROVED

EQUIVALENT

HOSE

CONNECTIONS

FUSIBLE LINK

GATE VALVE

OSV

OIL

SAFETY

VALVE

EXISTING BUILDING 1ST FLOOR

NEW STORAGE BUILDING

GARAGE

3/4"

THERMOMETER,

WITH WELL,

TYP.

PROVIDE AIR VENTS

AS NEEDED TO

FACILITATE VENTING

TEMPERATURE SENSOR

M2.1

PROPOSED FUEL OIL PIPE ROUTING

1/16" = 1'-0"SCALE:

ROUTE NEW FUEL OIL PIPING AS HIGH AND AS

CLOSE TO EXISTING COLUMN AS PRACTICABLE,

SEE DETAIL 3/M2.1

BALANCE VALVE, TYP

PRESSURE GAGE, TYP

3-WAY MODULATING CONTROL VALVE

SUPPLY

RETURN

FLEX CONNECTION ON

NON-ISOLATED

EQUIPMENT

COIL DRAIN LINE WITH BALL

VALVE AND HOSE CONNECTION

TO S/A

DOWNSTREAM

TEMPERATURE

CONTROLLER

ISOLATION

VALVE, TYP

THERMOMETER, TYP

M2.1

PREHEAT COIL CONNECTION DETAIL

N.T.S.SCALE:

FOS/FOR FROM EXISTING

BUILDING, SEE 4/M2.1 FOR

ROUTING DETAILS

CONTAINMENT

PIPING

1" FOR CARRIER PIPE

3/4" FOS CARRIER PIPE

ENTRY BOOT

INSIDE MECH

ROOM

FOR BACK FROM

EXISTING BUILDING

DAY TANK VENT

DOUBLE CONTAINMENT PIPE

IN TRENCH, COORDINATE

WITH ELECTRICAL AND CIVIL

3/8" FOS

TO EXISTING FUEL

OIL STORAGE TANK

DAY TANK VENT SHALL

TERMINATE 12' ABOVE

GRADE

FOS TO EXISTING

BUILDING

1-1/4" GHR

3/4 " FOS TO

STORAGE

BUILDING

3/4 " FOS

TO P-3

1 " FOR FROM

STORAGE

BUILDING

FUEL FILTER

M2.1

FUEL OIL PIPING PROTECTION DETAIL

N.T.S.SCALE:

CHECK

VALVE

FOS PIPE

L 1/16"X2"X2" ANGLE WITH 2"X1"' TABS AT

18" O.C. SECURE TABS TO FLOOR WITH

1/4"0X1-1/2" HILTI KWIK-BOLTS OR

APPROVED EQUIVALENT

24 GA. C-SHAPED

GALVANIZED STEEL PIPE

SUPPORT (18" O.C.)

EVIDENCE

LAW

ENFORCEMENT

MECHANICAL

By R ev is io n

Date Stamped:

D at e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102 Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive Suite 201 Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway Suite 200 Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

FACILITY

G. POHL

M3.0

VENTILATING

PLAN

MJP

JET CLL

M3.0

VENTILATING PLAN

1/4"=1'-0"SCALE:

8"Ø

7" Ø

6" Ø

6"Ø

6" Ø

5" Ø

5"Ø

7"Ø 7"Ø

5" Ø

5" Ø

8"Ø

12/12 TRANSFER

DUCT, TYPICAL.

SEE DETAIL 2/M3.0

M3.0

TRANSFER DUCT DETAIL

N.T.S.SCALE:

AIRFLOW

PROVIDE MIN. 12"

CLEARANCE ABOVE

OPENINGS TO ROOF

DUCT SIZE AS

SHOWN ON PLANS

LAW

ENFORCEMENT

ROOM

1" SOUND LINING ALL

INTERIOR SURFACES

ROOF

DECK

ROOM PARTITION TO ROOF DECK,

TYPICAL ALL BUILDING PARTITIONS

GARAGE

SPACE

SHEET NOTES:

HRV SHALL BE INSTALLED ON TOP OF MECHANICAL ROOM CEILING DECK, POSTION

FOR EASE OF SERVICE AND INSPECTION.

UNDERCUT DOOR 3/4" FOR RETURN AIR PATH, SEE ARCHITECTURAL FOR DOOR

DETAIL.

5" Ø

2" PLEATED FILTER

MXS

ELECTRICAL

SITE PLAN

E1.1

1 ELECTRICAL POWER PLAN

2 ELECTRICAL PEDESTAL RISER

B y

R e v i s i o n

Date Stamped:

D a t e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street

Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102

Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive

Suite 201

Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway

Suite 200

Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

FACILITY

G. POHL

CIO

B y

R e v i s i o n

Date Stamped:

D a t e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street

Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102

Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive

Suite 201

Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway

Suite 200

Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

FACILITY

G. POHL

E1.2

DETAILS

MXS

CIO

E1.2

EXISTING BUILDING SUGGESTED PATHING

1/16"=1'-0"SCALE:

E1.2

TRENCHING DETAIL

NTSSCALE:

1.

WIDTH OF TRENCH AND NUMBER OF ELECTRICAL CONDUITS PER TRENCH DETERMINED

IN FIELD (2 SHOWN)

NOTES:

PEA GRAVEL

REPLACE PAVEMENT WHERE SAWCUT AT CROSSINGS.

MATCH EXISTING SURFACE & THICKNESS. 2" AC AND

2" LEVELING COURSE REQUIRED.

UNDISTURBED

FINISHED

GRADE

MARKINGUG CABLE TAPE

SOIL

9"

E1.2

1ST FLOOR ENLARGED PLAN

1/4" = 1'-0"SCALE:

SHEET NOTES:

X

E1.2

1"C + 2"C + 2"C

E1.2

2ND FLOOR ENLARGED PLAN

1/4" = 1'-0"SCALE:

E1.2

FULE OIL SUPPLY & RETURN CARRIER PIPE, SEE MECH.

ELECTRICAL CONDUIT TYP.

PROVIDE BACKFILL IN

ACCORDANCE WITH SPEC.

12"

3 3

A TYP.

B B

C

CC

D

A

A

PANEL SB

A

EMERGENCY LIGHTING

INVERTER (ELI)

D D

D D

D

D

D

D

D

D

D

D a a a a a a a a a a a a a a a b b

ELI-1

ELI-1

aa a a a a b c c c c c d d d

SB-1

a a a a a

PC

B y

R e v i s i o n

Date Stamped:

D a t e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street

Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102

Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive

Suite 201

Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway

Suite 200

Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

FACILITY

G. POHL

E2.1

ELECTRICAL

LIGHTING PLAN

MXS

CIO

E2.1

ELECTRICAL LIGHTING AND SYSTEMS PLAN

1/4"=1'-0"SCALE:

ID

A

B

C

D

E

X

ABBREVIATIONS:

GWB

STR

DESCRIPTION

LED HIGH BAY

LED WRAPAROUND

MANDOOR LIGHT

GARAGE DOOR LIGHT

POLE MOUNT LED

EXIT SIGN

= GYPSUM WALL BOARD

= EXPOSED STRUCTURE

FIXTURE

VOLTAGE

120-277

120-277

120-277

LED

ELEC

WATTS

= LIGHT EMITTING DIODE

= ELECTRONIC

LAMPS

NO.

TYPE/COLOR

LED

3500K

LED

3500K

LED

4000K

LED

4000K

LED

4000K

LED

GREEN

LIGHT FIXTURE SCHEDULE

BALLAST/DRIVER

NO.

HPF

TYPE

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

= HIGH POWER FACTOR

MOUNTING

SURFACE

SURFACE

WALL

WALL

POLE

WALL

MTG

HEIGHT

12'-0"

8'-0"

8'-0"

11'-0"

15'-0"

8'-0"

GENERAL NOTES:

1. MOUNTING HEIGHTS SHOWN ARE TYPICAL FOR FIXTURE TYPE

UNLESS OTHERWISE INDICATED ON THE PLANS.

2. FIXTURE TYPES INDICATED IN EACH ROOM ON THE PLANS ARE

TYPICAL FOR ALL FIXTURES USING THE SAME SYMBOL IN THAT

ROOM UNLESS OTHERWISE INDICATED.

CLG

TYPE

STR

STR

MANUFACTURERS

CATALOG NO.

LITHONIA

IBL-9L-WD-SD125-LP735

LITHONIA

LBL4 LP835

LITHONIA

DSXW1 LED-20C-530-40K-T3S-120-DDBXD

LITHONIA

DSXW2 LED-30C-700-40K-T4M-120-PE-DDBXD

LITHONIA

DSX1 LED-30C-1000-40K-T4M-MVOLT-SPA-DDBXD

LITHONIA

EXG LED M6

NOTES

GENERAL NOTES:

1. ALL CONDUIT INSIDE OF NEW STORAGE BUILDING IS TO BE SURFACE MOUNT.

2. TURN OVER ALL PROGRAMS, CONFIGURATION FILES AND COMPUTER INTERFACES FOR

PROGRAMMING LIGHT FIXTURES.

3. COORDINATE WITH OWNER FOR EXACT OCCUPANCY / PHOTO SENSOR DIMMING CONTROL

SETTINGS.

4. EXIT SIGNS TO BE POWERED FROM EMERGENCY LIGHTING CIRCUIT ELI-1.

E2.1

LIGHT POLE DETAIL

NTSSCALE:

SHEET NOTES:

1. PROVIDE UL-924 RELAY FOR EMERGENCY LIGHT FIXTURES. PROVIDE UL-924 WITH DIMMER

OVERRIDE FOR DIMMED LIGHT FIXTURES. MONITOR CIRCUIT SB-1 FOR EMERGENCY LIGHT

ACTIVATION.

X

C

L R

T

Y P

M

I N

T O

P

B

O T

T O

M

M

I N

UGE

PANEL SB WITH

TRANSFORMER

B-1

UH-1

GDO-1 GDO-2

WP

WP

WPWP

360-

MS MS MS

MSMS

EMERGENCY LIGHTING INVERTER (ELI)

P-1 P-2 P-3

HRV-1

MS

+18"+18"

+18"

+18"

MS

+18"

+24"

SB-12

SB-8

SB-6

SB-4

SB-2

SB-18

SB-16

SB-7

SB-5

SB-9

SB-14

WP

SB-11

360-

SB-10

SB-21

SB-15

GDO-1

CONTROL

GDO-2

CONTROL

SB-13

SB-19

SB-17

B y

R e v i s i o n

Date Stamped:

D a t e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street

Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102

Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive

Suite 201

Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway

Suite 200

Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

FACILITY

G. POHL

E3.1

ELECTRICAL

POWER PLAN

MXS

CIO

E3.1

ELECTRICAL POWER PLAN

1/4"=1'-0"SCALE:

GENERAL NOTES:

1. ALL CONDUIT INSIDE OF NEW STORAGE BUILDING IS TO BE SURFACE MOUNT.

2. ALL RECEPTACLES ARE TO BE MOUNTED AT 48" ABOVE FINISHED FLOOR UNLESS OTHERWISE NOTED.

3. METER FOR METER / BREAKER DISCONNECT TO BE PROVIDED BY CONTRACTOR.

CKT

PANEL NOTES

LOAD

LIGHTING

LIGHTING INVERTER

GARAGE DOOR

GARAGE DOOR

REC - TELECOM *GFCI*

DAY TANK

B-1 1/6 HP

UH-1, HRV-1

P-1

P-2

P-3

SPARE

SPARE

SPARE

PROVIDE TVSS FOR THIS PANEL

PROVIDE SQUARE D MODEL # MPZ15S40F PANELBOARD OR EQUAL.

CONNECTED LOAD

NEC DEMAND

BRANCH

BKR

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

13.8

14.1

VA

KVA

AMPS

KVA

AMPS

PANEL 'SB'

CONN KVA

A

1.8

2.3

1.3

0.9

1.7

0.0

0.0

7.9

B

1.2

2.1

0.4

1.7

0.5

0.0

0.0

5.8

BRANCH

VA

BKR

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

20/1

LOAD

REC *GFCI*

REC *GFCI*

REC *GFCI*

REC *GFCI*

REC - MAN DOOR

REC - MAN DOOR

REC - MAN DOOR

HEADBOLT HEATER

HEADBOLT HEATER

FIRE ALARM BOOSTER PANEL

SPARE

SPARE

SPARE

SPARE

PANEL SPECIFICATIONS

MAINS RATING AMPS -

MAIN CIRCUIT BREAKER AMPERES -

CAPACITY ONE-POLE CIRCUITS -

SYSTEM VOLTAGE -

PHASE, NO. OF WIRES -

AIC RATING -

MOUNTING -

PRI 60A SEC 80A

240/120

1 PH, 3 W

10,000

SURFACE

CKT

E3.1

PARTIAL 1-LINE DIAGRAM

NTSSCALE:

E3.1

GROUNDING DIAGRAM

NTSSCALE:

S

PP

UGC

WP

110cd

S

S

P

B y

R e v i s i o n

Date Stamped:

D a t e

Project:

Date

Checked

Drawn

Project Mgr.

Sheet Contents:

Sheet No.:

1098931

BLM/FDO

STORAGE

Project Location: Fairbanks, AK www.USKH.com

2515 'A' Street

Anchorage, Alaska 99503

(907) 276-4245

544 4th Avenue, Suite 102

Fairbanks, Alaska 99701

(907) 452-2128

3017 Clinton Drive

Suite 201

Juneau, Alaska 99801

(907) 790-2901

351 W. Parks Highway

Suite 200

Wasilla, Alaska 99654

(907) 376-7815

04/01/2014

04/01/2014

FACILITY

G. POHL

E4.1

ELECTRICAL

SYSTEMS PLAN

MXS

CIO

E4.1

ELECTRICAL LIGHTING AND SYSTEMS PLAN

1/4"=1'-0"SCALE:

X

E4.1

COMM/SECURITY/ PAGING DETAIL

NTSSCALE:

E4.1

FIRE ALARM DETAIL

NTSSCALE:

S S

1098931- Structural 22x34-sigstamp.pdf
1098931S00
Layout1
1098931S10
Layout1
1098931S20
Layout1
1098931S21
Layout1
1098931-Mechanical 22x34.pdf
1098931-M1.0
M1.0
1098931-M2.0 HEATING
M2.0
1098931-M2.1 HEATING DETAILS
M1.0
1098931-M3.0 VENTILATING
M1.0

File details come from the government source that posted it. Updated .