KLF_M5P1_Special_Provisions.pdf

PDF 445 KB Posted

Attached to
Kiefer Landfill- Module 5, Phase 1 Liner Construction
Solicitation number
4711
Issued by
Sacramento County, San Francisco City, California

About this file

This is a Special Provisions document for Contract No. 4711 issued by the County of Sacramento Department of Waste Management and Recycling for the construction of Module 5, Phase 1 Base Liner System at Kiefer Landfill located at 12701 Kiefer Boulevard, Sloughhouse, California. The project encompasses the furnishing of all labor, equipment, and materials necessary to construct a base liner system covering approximately 24 acres, including excavation and stockpiling of soils, geosynthetics installation, construction of a leachate collection and removal system, side slope riser piping, surface water drainage structures, perimeter access road extension, and utility alignments for electrical power, landfill gas header pipe, leachate force main, condensate pipe, and pneumatic pressure pipe. The contract specifies a project completion timeline of 350 working days from the commencement date as defined in the Standard Construction Specifications Section 7-1. The project manager is Jeremy Zuber, P.E., and bidders are required to attend a pre-bid conference as noted in the Notice to Contractors. Pre-bid questions should be directed through the OpenGov website.

The contract requires general liability insurance of no less than $3,000,000 per occurrence and $3,000,000 general aggregate, automobile liability insurance of $2,000,000 combined single limit, and contractor's pollution liability insurance of $3,000,000 minimum. Liquidated damages are assessed at $10,000 per calendar day for delays beyond the contract completion date. An early completion incentive bonus of $500,000 is available to contractors who complete all work and receive field acceptance by March 15, 2028, with no extensions to this deadline permitted. Work may be performed between 5 a.m. and 8 p.m. seven days per week, excluding legal holidays, with no lane closures at the landfill entrance permitted between 5 a.m. and 6 p.m. any day of the week. The contractor is responsible for all surveys, measurements, testing (except for soils, concrete, and aggregate testing performed by the County), Storm Water Pollution Prevention Plan compliance, portable sanitary facilities, temporary utilities, and traffic control. Bidders will be prequalified using the DIR questionnaire per Public Contract Code section 20101, and the award will be made to the lowest qualified, responsive, responsible bidder.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COUNTY OF SACRAMENTO

Department of Waste Management and Recycling

SPECIAL PROVISIONS FOR

MODULE 5, PHASE 1 BASE LINER SYSTEM

KIEFER LANDFILL

Project Manager: Jeremy Zuber, P.E.

Sacramento County Department of Waste Management and Recycling

(916) 875-6808, zuberj@SacCounty.gov

Bidding Documents, Contract Requirements, and Technical Specifications

CONTRACT NO. 4711

August 2026

NOTE: The County of Sacramento Standard Construction Specifications, revised November 2024 are hereby made a part of these Specifications. The Standard Construction Specifications may be downloaded at https://development.saccounty.gov/us/en/construction-management-inspection/standard-construction-specifications.html

JENNIFER CLAIBORNE, DIRECTOR

DEPARTMENT OF WASTE MANAGEMENT AND RECYCLING

https://development.saccounty.gov/us/en/construction-management-inspection/standard-construction-specifications.html https://development.saccounty.gov/us/en/construction-management-inspection/standard-construction-specifications.html

CONTRACT 4711

MODULE 5, PHASE 1 BASE LINER SYSTEM

KIEFER LANDFILL

TABLE OF CONTENTS

Division 1 General Requirements 01000 Special Provisions

Technical Specifications for the Construction of the Module 5, Phase 1 Base Liner System

SECTION DESCRIPTION PAGES

01010 Summary of Work 01010 - 1 to 7 01025 Measurement and Payment 01025 – 1 to 22 01035 Modification Procedures 01035 – 1 to 2 01050 Field Engineering 01050 – 1 to 2 01052 Layout of Work and Surveys 01052 - 1 to 4 01090 References 01090 - 1 to 5 01190 Health and Safety 01190 - 1 to 4 01200 Project Meetings 01200 – 1 to 4 01300 Submittals 01300 - 1 to 4 01310 Construction Schedule 01310 – 1 to 2 01400 Quality Control 01400 - 1 to 3 01500 Construction Facilities 01500 - 1 to 6 01560 Temporary Controls 01560 - 1 to 10 01600 Material and Equipment 01600 - 1 to 2 01630 Product Options and Substitutions 01630 - 1 to 2 01700 Contract Closeout 01700 – 1 to 4

02070 Selective Demolition 02070 – 1 to 2 02110 Clearing, Grubbing, and Stripping 02110 - 1 to 2 02169 Protective Plywood Cover 02169 – 1 to 1 02200 Site Earthwork 02200 - 1 to 23 02230 Surface Water Drainage Structures 02230 - 1 to 5 02270 Erosion and Sediment Control 02270 – 1 to 4 02271 Seeding 02271 – 1 to 5 02589 Electric Leak Location Survey Support 02589 – 1 to 5 02710 High Density Polyethylene (HDPE) Pipe 02710 – 1 to 7 02711 Corrugated High Density Polyethylene (HDPE) Pipe 02711 - 1 to 4 02771 Geotextile 02771 - 1 to 9 02774 Drainage Geocomposite 02774 – 1 to 10 02778 HDPE Geomembrane

02778 – 1 to 29 02779 Geosynthetic Clay Liner 02779 – 1 to 12 03300 Cast In Place Concrete 03300 - 1 to 9 15000 Mechanical System 15000 - 1 to 8 15200 Valves 15200 – 1 to 6 16000 Electrical Work 16000 - 1 to 24

DIVISION 1 - GENERAL REQUIREMENTS

All portions of the County of Sacramento Standard Construction Specifications dated November 1, 2024, are hereby made part of these specifications.

Modifications to the Standard Construction Specifications are noted below. The Standard Construction Specifications along with these project specifications shall be considered as one body of specifications.

MODIFICATIONS TO STANDARD CONSTRUCTION SPECIFICATIONS

3-2 CONSIDERATION OF BIDS

Sentence three of paragraph two shall be deleted and replaced with the following:

If the bid is missing a lump sum price or a unit price, in either the base bid or any alternate, then the bid will be deemed incomplete and the bid will be rejected as non-responsive.

3-3 AWARD OF CONTRACT

Delete the entire section and replace with the following:

If the Contract is awarded, the award will be to the lowest qualified, responsive, responsible Bidder and as noted on the proposal bid form.

Bidders will be prequalified using the DIR questionnaire as described in Public Contract Code section 20101.

3-7 EXECUTION OF CONTRACT

Add the following paragraph to this section:

Agreement forms shall be those shown in Sample Forms of the Standard Construction Specifications.

Any executed documents not handled through DocuSign shall be delivered to the following address:

Department of General Services, Contract and Purchasing Services Division 9660 Ecology Lane, Sacramento, CA 95827

Where electronic submittals of documents are identified as acceptable within these special provisions, the Contractor may contact Crystal Sheehan of the Contract and Purchasing Services Division at sheehanc@saccounty.gov to coordinate an electronic submittal of the required documents via SacDrive in lieu of delivering hard copies or CD/DVD/Flash Drives.

4-1 INTENT OF CONTRACT DOCUMENTS

Add the following paragraphs to this section:

The project specifications use the Construction Specifications Institute (CSI) format. The CSI format divisions shall not operate to make the County an arbiter to establish subcontract limits between Contractor and/or subcontractors. The General Contractor is responsible to the County for all phases of construction and a complete job.

The existing conditions depicted on the drawings and specifications are developed from record information. Exact locations, distances, dimensions, elevations, etc., shall be governed by actual field conditions and verified by the Contractor.

4-1.02 WORK AND LIMITATIONS

1. During the progress of work, the existing facilities shall be maintained without interruption, except by specific arrangement with the Project Inspector and then only at such times as approved in writing by the Project Inspector.

2. The Contractor shall coordinate the work of this contract through the Project Inspector assigned by the Engineer.

4-2 PLANS AND SPECIFICATIONS FURNISHED

The first paragraph shall be deleted and replaced with the following:

The Agency will provide the fully executed Contract for the Contractor’s use in prosecuting the Work. The Agency will not provide copies of Project Plans, Standard Drawings or State Plans, Project Specifications, Standard Construction Specifications or the State Specifications, and Special Provisions. Project Plans and Project Specifications can be downloaded from https://procurement.opengov.com.

https://procurement.opengov.com/

4-6 DOCUMENT PRECEDENCE

3. Project Plans

a) Detail notes shall take precedence over General Notes

b) Larger scale drawings/details shall take precedence over small scale drawings

5-1 AUTHORITY OF AGENCY

Add the following paragraphs to this section:

5-8.01 SUBMITTALS – GENERAL

Sentence one of paragraph three shall be replaced by the following:

Copies of all submittals shall be furnished electronically; an electronic copy will be returned after review.

5-9.01 AGENCY-FURNISHED SURVEYS

The entire section shall be deleted and replaced with the following:

The contractor shall be responsible for and shall perform all surveys and measurements necessary for layout and control of work in accordance with Section 5-9.03 of the Standard Construction Specifications.

5-16 TESTING

Testing of soils, concrete and aggregate shall be performed by the County in accordance with Section 5-16 of the Standard Construction Specifications.

All other tests shall be performed and paid for by the Contractor as required in these contract documents.

6-1.02 PREVAILING WAGE

Add the following sentence to the first paragraph:

All questions regarding labor compliance regulations, including job classifications and pay scales, should be directed to the Agency Labor Compliance Program, telephone (916) 875-2700.

6-11 EXISTING UTILITIES

Add the following paragraphs to this section:

6-11.06 UTILITY SHUTDOWNS and CONNECTIONS

The Project Inspector shall be notified two (2) working days in advance of any contemplated shutdown of electricity or other utility. The Project Inspector’s approval shall be obtained prior to any shutdown activity.

The Contractor shall schedule and coordinate all connections and other work to be performed by public and private utility organizations necessary for the completion of the project.

7-3 PRECONSTRUCTION CONFERENCE AND PROGRESS MEETINGS

Add the following sentence:

Construction meetings will be held weekly.

7-8.01 ALLOWABLE TIMES AND HOURS OF WORK

The entire section shall be deleted and replaced with the following:

Work may be performed between the hours of 5 a.m. through 8 p.m. 7 days per week, excluding Legal Holidays. No lane closures at the entrance to Kiefer Landfill may occur between 5 a.m. and 6 p.m., 7 days per week, including Legal Holidays. When the Contractor wants to work outside of these hours, a written request must be submitted to the Agency at least 7 calendar days in advance of the intended work. The Agency will evaluate the Contractor’s request to determine if there is benefit to the Agency. The Agency can place conditions on approval of off-period work.

7-9 TEMPORARY FACILITIES

The Contractor shall obtain the prior approval of the Project Inspector for acceptable site access or before using any area or space for Contractor’s storage during construction operations. Materials, equipment, etc., shall not be piled or stored in any location which shall interfere with the conduct of normal functions of the building and/or facilities, and shall not constitute a hazard to persons or property. Any required safety precautions such as signs, danger signals, lanterns, barricades, etc., shall be provided by and installed by the Contractor during construction operations.

No advertising signs of any kind will be permitted except by written permission of the Engineer.

7-9.01 FIELD OFFICES

Space for a contractor’s field office shall be made available.

7-9.02 CONSTRUCTION SITE UTILITIES

1. WATER: Contractor may connect a temporary line to the existing water service lines at the site for construction water supply. The contractor may not interfere with Kiefer Landfill operations when accessing water. The Contractor shall be responsible to verify all existing conditions associated with a water connection. Water used in construction must comply with Section 16 of the Standard Construction Specifications.

Contractor shall provide potable drinking water for their own use.

2. ELECTRICAL POWER: Contractor shall be responsible for providing electrical power at the work location. Generator(s) may be used onsite, but must be serviced by the Contractor.

Contractor may arrange for and install power service from SMUD service lines, as necessary.

3. TELEPHONE: Contractor shall not have access to phones on site and therefore, shall arrange for their mobile phone if needed for on-site communication.

7-10 PROTECTION OF WORK, PERSONS AND PROPERTY

Provide temporary fencing, lock boxes etc., as required to protect material storage, equipment and building under construction from theft, vandalism and unauthorized entry.

The Contractor shall be responsible for all damage in the area of Work, or any other area in the building or on the site, caused by Contractor, his employees or subcontractors.

7-15 TIME OF COMPLETION

The time for completion of this contract shall be 350 working days commencing as specified in these Special Provisions and Section 7-1 of the Standard Construction Specifications.

8-10 LIQUIDATED DAMAGES

Liquidated damages shall be $10,000.00 for each calendar day(s) delay beyond the established contract completion date that all work, is not completed. These liquidated damages are based on the estimated Agency costs to enforce the Contract restrictions for allowable times and hours of work.

10-4.06 AGENCY REQUIREMENTS

Add the following sentence to this section:

Water Pollution Control Program is required.

10-7 CONTAMINATED OR HAZARDOUS MATERIALS

1. It is the intent of these Contract Documents to exclude from the work all materials containing asbestos.

2. If asbestos materials are encountered during any work, the Contractor shall immediately notify the Project Inspector in writing.

3. Unless specifically specified, the Contractor shall not install any asbestos-containing building materials. Materials such as mastics, joint compounds and flashing tars shall have a manufacturer’s statement or label verifying that the material is asbestos free.

Add the following paragraphs and tables to this section:

10-7.01 CONCRETE CRYSTALLINE SILICA

On September 23, 2017, the deadline for workplaces in the construction industry to comply with OSHA Final Rule to protect Workers from Exposure to Respirable Crystalline Silica has been in effect. The new rule impacts the following construction related industries; concrete products, ready-mix concrete, asphalt products manufacturing, and aggregates gravel. Crystalline silica is found in products commonly used in road and infrastructure construction – sand, concrete, stone, mortar, asphalt, cement, grout, brick and tile. In addition, OSHA reports that silica dust can be generated in many construction activities, including cutting, sawing, grinding, crushing, sanding and drilling.

1.1 Means and Methods – Contractor is responsible for protecting their employees from respirable Crystalline Silica over permissible exposure limit (PEL) when disturbed during construction activities. The following is the minimal, but not limited to requirements:

a) Workers disturbing concrete should: wear protective gear (i.e.) masks, face shield, goggles or safety glasses, and when indicated, use a respirator device.

b) When working in the field, continually wet the area to keep materials wet and minimize dust blowing in the air.

c) When cutting or sawing, use wet-cutting tools that distribute water during cutting and/or HEPA equipped vacuum equipment.

d) Optimize ventilation to maximize dust controls and minimize dust migration.

e) Understand the characteristics and composition of the items to be sampled. If there is a powdery dust emitted during the sampling process, understand that there could be health implications – and then use Safety Data Sheets or other published materials to explore what these implications are and how to prevent them in accordance with the new OSHA rule.

f) The PEL for airborne respirable crystalline silica is 25 micrograms per cubic meter, calculated as an 8-hour Time Weighted Average TWA.

https://www.globalgilson.com/masonry-saws

g) The contractor is responsible for performing exposure air monitoring for all employees engaged with concrete disturbance work.

(a) Scope and application. This section applies to all occupational exposures to respirable crystalline silica in construction work, except where employee exposure will remain below 25 micrograms per cubic meter of air (25 μg/m3) as an 8-hour time-weighted average (TWA) under any foreseeable conditions.

(b) Definitions. For the purposes of this section the following definitions apply:

Action Level means a concentration of airborne respirable crystalline silica of 25 μg/m3, calculated as an 8-hour TWA.

Chief means the Chief of the Division of Occupational Safety and Health, or designee.

Director means the Director of the National Institute for Occupational Safety and Health (NIOSH), U.S. Department of Health and Human Services, or designee.

Competent Person means an individual who is capable of identifying existing and foreseeable respirable crystalline silica hazards in the workplace and who has authorization to take prompt corrective measures to eliminate or minimize them. The competent person must have the knowledge and ability necessary to fulfill the responsibilities set forth in subsection (g).

Employee Exposure means the exposure to airborne respirable crystalline silica that would occur if the employee were not using a respirator.

High-efficiency Particulate Air (HEPA) Filter means a filter that is at least 99.97 percent efficient in removing mono-dispersed particles of 0.3 micrometers in diameter.

Objective Data means information, such as air monitoring data from industry-wide surveys or calculations based on the composition of a substance, demonstrating employee exposure to respirable crystalline silica associated with a particular product or material or a specific process, task, or activity. The data must reflect workplace conditions closely resembling or with a higher exposure potential than the processes, types of material, control methods, work practices, and environmental conditions in the employer's current operations.

Physician or Other Licensed Health Care Professional (PLHCP) means an individual whose legally permitted scope of practice (i.e., license, registration, or certification) allows him or her to independently provide or be delegated the responsibility to provide some or all of the particular health care services required by subsection (h).

Respirable Crystalline Silica means quartz, cristobalite, and/or tridymite contained in airborne particles that are determined to be respirable by a sampling device designed to meet the characteristics for respirable-particle-size-selective samplers specified in the International Organization for Standardization (ISO) 7708:1995: Air Quality -Particle Size Fraction Definitions for Health-Related Sampling.

Specialist means an American Board Certified Specialist in Pulmonary Disease or an American Board Certified Specialist in Occupational Medicine.

This Section means this respirable crystalline silica standard, Section 1532.3.

(c) Specified exposure control methods. (1) For each employee engaged in a task identified on Table 1, the employer shall fully and properly implement the engineering controls, work practices, and respiratory protection specified for the task on Table 1, unless the employer assesses and limits the exposure of the employee to respirable crystalline silica in accordance with subsection (d).

Table 1 - Specified Exposure Control Methods When Working With Materials Containing Crystalline Silica

Equipment/task Engineering and work practice control methods

Required respiratory protection and minimum assigned protection factor (APF)

≤ 4 hours/shift

> 4 hours/shift

(i) Stationary masonry saws

Use saw equipped with integrated water delivery system that continuously feeds water to the blade. Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions.

None None

(ii) Handheld power saws (any blade diameter)

Use saw equipped with integrated water delivery system that continuously feeds water to the blade. Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions:

• When used outdoors None APF 10

• When used indoors or in an enclosed area

APF 10 APF 10

(iii) Handheld power saws for cutting fiber-cement board (with blade diameter of 8 inches or less)

For tasks performed outdoors only: Use saw equipped with commercially available dust collection system. Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions. Dust collector must provide the air flow recommended by the tool manufacturer, or greater, and have a filter with 99% or greater efficiency.

None None

(iv) Walk-behind saws

Use saw equipped with integrated water delivery system that continuously feeds water to the blade. Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions:

• When used outdoors None None

• When used indoors or in an enclosed area

APF 10 APF 10

(v) Drivable saws For tasks performed outdoors only: Use saw equipped with integrated water delivery system that continuously feeds water to the blade. Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions.

None None

(vi) Rig-mounted core saws or drills

Use tool equipped with integrated water delivery system that supplies water to cutting surface.

Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions.

None None

(vii) Handheld and stand-mounted drills (including impact and rotary hammer drills)

Use drill equipped with commercially available shroud or cowling with dust collection system. Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions. Dust collector must provide the air flow recommended by the tool manufacturer, or greater, and have a filter with 99% or greater efficiency and a filter-cleaning mechanism. Use a HEPA-filtered vacuum when cleaning holes.

None None

(viii) Dowel drilling rigs for concrete

For tasks performed outdoors only: Use shroud around drill bit with a dust collection system. Dust collector must have a filter with 99% or greater efficiency and a filter-cleaning mechanism. Use a HEPA-filtered vacuum when cleaning holes.

APF 10 APF 10

(ix) Vehicle-mounted drilling rigs for rock and concrete

Use dust collection system with close capture hood or shroud around drill bit with a low-flow water spray to wet the dust at the discharge point from the dust collector.

None None

Operate from within an enclosed cab and use water for dust suppression on drill bit.

None None

(x) Jackhammers and handheld powered chipping tools

Use tool with water delivery system that supplies a continuous stream or spray of water at the point of impact:

• When used outdoors None APF 10.

enclosed area

APF 10 APF 10.

Use tool equipped with commercially available shroud and dust collection system Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions. Dust collector must provide the air flow recommended by the tool manufacturer, or greater, and have a filter with 99% or greater efficiency and a filter-cleaning mechanism:

• When used outdoors None APF 10.

enclosed area

APF 10 APF 10.

(xi) Handheld grinders for mortar removal (i.e., tuckpointing)

Use grinder equipped with commercially available shroud and dust collection system. Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions. Dust collector must provide 25 cubic feet per minute (cfm) or greater of airflow per inch of wheel diameter and have a filter with 99% or greater efficiency and a cyclonic

APF 10 APF 25.

pre-separator or filter-cleaning Mechanism

(xii) Handheld grinders for uses other than mortar removal

For tasks performed outdoors only: Use grinder equipped with integrated water delivery system that continuously feeds water to the grinding surface Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions

None None

Use grinder equipped with commercially available shroud and dust collection system. Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions. Dust collector must provide 25 cubic feet per minute (cfm) or greater of airflow per inch of wheel diameter and have a filter with 99% or greater efficiency and a cyclonic pre-separator or filter-cleaning mechanism:

• When used outdoors None None.

enclosed area None APF 10.

(xiii) Walk-behind milling machines and floor grinders

Use machine equipped with integrated water delivery system that continuously feeds water to the cutting surface. Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions.

None None.

Use machine equipped with dust collection system recommended by the manufacturer. Operate and maintain tool in accordance with manufacturer's instructions to minimize dust emissions. Dust collector must provide the air flow recommended by the manu-facturer, or greater, and have a filter with 99% or greater efficiency and a filter-cleaning mechanism. When used indoors or in an enclosed area, use a HEPA-filtered vacuum to remove loose dust in between passes.

None None

(xiv) Small drivable milling machines (less than half-lane)

Use a machine equipped with supplemental water sprays designed to suppress dust. Water must be combined with a surfactant. Operate and maintain machine to minimize dust emissions

None None

(xv) Large drivable milling machines (half-lane and larger)

For cuts of any depth on asphalt only: Use machine equipped with exhaust ventilation on drum enclosure and supplemental water sprays designed to suppress dust.

Operate and maintain machine to minimize dust emissions. For cuts of four inches in depth or less on any substrate:

None None

Use machine equipped with exhaust ventilation on drum enclosure and supplemental water sprays designed to suppress dust.

Operate and maintain machine to minimize dust emissions

Use a machine equipped with supplemental water spray designed to suppress dust. Water must be combined with a surfactant. Operate and maintain machine to minimize dust emissions

None None.

(xvi) Crushing machines

Use equipment designed to deliver water spray or mist for dust suppression at crusher and other points where dust is generated (e.g., hoppers, conveyers, sieves/sizing or vibrating components, and discharge points). Operate and maintain machine in accordance with manufacturer's instructions to minimize dust emissions. Use a ventilated booth that provides fresh, climate-controlled air to the operator, or a remote control station

None None

(xvii) Heavy equipment and utility vehicles used to abrade or fracture silica-containing materials (e.g., hoe-ramming, rock ripping) or used during demolition activities involving silica-containing materials

Operate equipment from within an enclosed cab When employees outside of the cab are engaged in the task, apply water and/or dust suppressants as necessary to minimize dust emissions

None None

(xviii) Heavy equipment and utility vehicles for tasks such as grading and excavating but not including:

Demolishing, abrading, or fracturing silica-

Apply water and/or dust suppressants as necessary to minimize dust emissions.

None None.

When the equipment operator is the only employee engaged in the task, operate equipment from within an enclosed cab.

containing materials.

10-9 SANITARY REGULATIONS

The Contractor shall furnish, install, and remove at completion of the job, all sanitary (portable toilet) facilities required during project construction. Facilities shall be provided in sufficient quantities to comply with CAL-OSHA regulations. All such sanitary facilities shall be made available for use by all workers, subcontractors, consultants, and County personnel associated with the project. The type and location of the facilities shall be subject to acceptance by the Project Inspector. The Contractor shall maintain sanitary facilities in a proper, safe, operating, and sanitary condition for the duration of the work. Contractor’s employees shall not use existing facilities at the site.

12-4.02 TRAFFIC CONTROL PLANS (TCP)

A traffic control plan is required for this Project. The Contractor shall not impede customer or operator traffic at the site.

END OF SECTION

SECTION 01000

1.1 Scope of Work

The work under this contract includes furnishing labor, equipment, and materials to construct the Module 5, Phase 1 base liner system and related structures, including excavating and stockpiling of soils, geosynthetics installation, construction of the leachate collection and removal system (LCRS), and side slope riser piping. The lined area is approximately 24 acres. Work also includes the construction of surface water drainage structures, extension of the perimeter access road, and installation of utility alignments for overhead and underground electrical power, landfill gas header pipe, leachate force main, condensate pipe, and pneumatic pressure pipe.

1.2 Project Location

Kiefer Landfill 12701 Kiefer Boulevard Sloughhouse, CA 95683

1.3 Drawings

The contract drawings are entitled: Module 5, Phase 1 Base Liner System Kiefer Landfill, Contract No. 4711

1.4 General Liability Insurance

Limits of liability must not be less than $3,000,000 per occurrence and $3,000,000 general aggregate.

1.5 Automobile Liability Insurance

Limits of liability must not be less than $2,000,000 combined single limit for private passenger vehicles, light or medium rated trucks, and heavy, extra-heavy, or tractor trailers.

1.6 Builder's Risk Insurance

Builder's Risk Insurance will not be required for this project.

1.7 Contractor’s Pollution Liability Insurance

Contractor’s pollution liability insurance is required and must not be less than $3,000,000.

1.8 Time of Completion

The time for completion of this contract shall be 350 working days commencing as specified in Section 7-1, “Beginning of Work,” of the Standard Construction Specifications.

1.9 Early Completion Incentive

Included in the estimated construction cost is a bonus of $500,000 to the Contractor if all work is completed and field accepted, including completion of all punch list items, by March 15, 2028. No extensions to this date will be considered under any circumstances.

1.10 Liquidated Damages

Liquidated damages shall be $10,000 for each calendar day delay. Refer to Section 8.10 of the County Standard Construction Specifications.

1.11 Pre-Bid Conference

A pre-bid conference will be held as noted in the NOTICE TO CONTRACTORS.

1.12 Standard Construction Specifications

The County of Sacramento Standard Construction Specifications, adopted by the Board of Supervisors and effective November 2024, are hereby made part of these specifications. A copy of the Standard Construction Specifications may be obtained at the cashier's window in Room 101 of the County Administration Building, 827-7th Street, Sacramento.

1.13 Examination of Plans, Specifications, and Site of Work

Direct pre-bid questions to the OpenGov website.

1.14 Accuracy of Drawings and Specifications

The existing conditions depicted on the drawings and specifications are developed from record information. Exact locations, distances, dimensions, elevations, etc., shall be governed by actual field conditions and verified by the contractor. The engineer shall be notified of any discrepancies found prior to the start of work in that area.

1.15 Storage of Supplies, Materials, Equipment, Etc.

The Contractor shall obtain the prior approval of the Engineer for any area or space required for Contractor's storage during construction operations. Materials, equipment, etc., shall not be piled or stored in any location that would interfere with the conduct of normal functions of the buildings and/or facilities, and shall not constitute a hazard to persons or property. The Contractor shall install any required safety precautions such as signs, danger signals, lanterns, barricades, etc., during construction operations.

1.16 Construction Surveys

The Contractor shall be responsible for and shall perform all surveys and measurements necessary for layout and control of work. Surveys shall be performed in accordance with the requirements of Section 5-9.03 of the Standard Construction Specifications.

Testing Testing of materials outside of the base liner system, including soils, asphalt, concrete and aggregate shall be performed by the County in accordance with Section 5-16 Materials Sampling and Testing of the County Standard Construction Specifications. All other tests shall be performed and paid for by the Contractor as required in these contract documents.

1.17 Additional Sets of Contract Documents

Following execution of the Contract, the County will provide electronic files in *.pdf format of contract specifications, drawings, and addenda to the Contractor. Hard copy sets of construction document sets will not be furnished.

1.18 Signs

No advertising signs of any kind will be permitted except by written permission of the Engineer.

1.19 Contractor's Field Office

A space for a Contractor field office shall be made available.

1.20 Engineer's Field Office

An engineer’s field office is not required.

1.21 Temporary Services

A. Water

1. Contractor may connect a temporary line to existing water service lines at the site. The Contractor is to verify conditions at site.

B. Electrical Power

1. Contractor shall coordinate with Site Engineer in order to connect to existing service.

2. Contractor shall arrange for and install power service from SMUD service lines, as necessary.

C. Telephone

1. Contractor may arrange for and install telephone service for his own use. The

Contractor shall not use County telephones.

D. Field Toilets

1. The Contractor shall furnish, install, and remove at completion of the job, all sanitary; i.e., portable toilet facilities required for the completion of the job. The type and location of the facilities shall be subject to acceptance by the Engineer.

2. All sanitary facilities shall be made available for use by all workers, subcontractors, consultants, and County personnel associated with the project.

3. The Contractor shall maintain sanitary facilities in a proper, safe, operating, and sanitary condition for the duration of the work. Facilities shall be provided in sufficient quantities to comply with CAL-OSHA regulations.

4. Existing facilities at site shall not be used by contractor's employees.

E. Fences, Barricades, Warning Signs, And Lights

1. To confirm to CAL-OSHA regulations, other State of California and local codes, rules, regulations, and ordinances for protection of workers, public and private property, provide, install and maintain barricades, warning devices and other protection required therefore.

2. Contractor to provide temporary fencing, etc., as required to protect material storage and equipment from theft and vandalism.

F. Contractor's Access, Work and Storage Areas

1. Contractor to be limited to the area shown on the drawings.

2. The Contractor shall coordinate with the Project Manager as to where the set-up staging area will be located.

1.22 Erosion, Sediment, and Water Pollution Control

The Contractor shall submit a Storm Water Pollution Prevention Plan (SWPPP) to the Site Engineer in compliance with the National Pollutant Discharge Elimination System provisions, Construction General Permit, and site specific SWPPP, and conduct all work in accordance with those requirements. The Contractor shall notify the Site Engineer of any conditions that could lead to noncompliance with the permit requirements. The Contractor shall not be entitled to any time extensions or compensation for any costs due to any action required as a result of Contractor’s failure to comply with those provisions of the SWPPP. The Contractor is responsible to ensure that subcontractor(s) comply with this provision.

1.23 Special Security Requirements

The Contractor's workers and equipment shall be limited to the work areas as designated by this contract.

1.24 Schedule of Work and Limitations

A. Operations During the progress of work, landfill facilities operation shall be maintained without interruption, except by specific arrangement with the County and then only at such times as approved in writing by the Engineer. The Contractor will be required to maintain access to the operating portion of the landfill, including the green waste pad, at all normal times of business. The Contractor will be required to provide traffic control and provide alternate routes of access if construction activities interfere with the flow of traffic along the Landfill's main access road.

B. Coordination of Contract Work with Owner's Operation The Contractor shall coordinate the work of this contract through the Project Manager assigned by the County or Engineer. Progress meetings will be conducted weekly in accordance with the County of Sacramento, Standard Construction Specifications, Section 7.3 Preconstruction Conference and Progress Meeting. The Contractor shall submit a construction schedule and progress schedule in accordance with the County of Sacramento Standard Construction Specifications, Section 7.5.01 Progress Schedule.

C. Site Conditions The Contractor shall be responsible for having determined the site conditions to his or her satisfaction, prior to the submission of a bid, the nature and location of the work, the conformation of the ground, the character and quality of the landfill, the type and quantity of materials to be encountered, the character of equipment and facilities needed preliminary to and during the execution of the work, the general and local conditions, and all other matters which can in any way affect the work under this Contract. The prices established for the work to be done will reflect all costs pertaining to the work. Any claims for extras based on landfill conditions or groundwater table conditions will not be allowed.

1.25 Allowable Work Days and Hours

Work may be performed between the hours of 5 a.m. through 8 p.m., 7 days per week, excluding Legal Holidays.

END OF SECTION 1000

Project Manager: Jeremy Zuber, P.E.
NOTE: The County of Sacramento Standard Construction Specifications, revised November 2024 are hereby made a part of these Specifications. The Standard Construction Specifications may be downloaded at https://development.saccounty.gov/us/en/constructi...
1. WATER: Contractor may connect a temporary line to the existing water service lines at the site for construction water supply. The contractor may not interfere with Kiefer Landfill operations when accessing water. The Contractor shall be responsible...

File details come from the government source that posted it. Updated .