JOA_SUMMARY_SHEET_.pdf
PDF 182 KB Posted
- Attached to
- WATER MAIN REPLACEMENT PROGRAM PLUMBING, 2-STEP JOC State and local contract opportunity
- Solicitation number
- JOC247-B
- Issued by
- Maricopa County, Phoenix City, Arizona
About this file
This is a Job Order Contract (JOC) proposal calculation worksheet for the City of Phoenix Water Main Replacement Program Plumbing project. The document provides a standardized template for contractors to calculate their total contract amount through a structured cost breakdown process. A pre-submittal meeting is scheduled for October 7, 2025, at 1:00 pm, with Statements of Qualifications due by 12:00 pm on October 17, 2025, submitted via the City's Procurement Portal. Following the initial qualifications review, the top four finalists will be invited to submit a Request for Proposal. The contract term is 36 months or $3,000,000 per JOC, whichever occurs first, with an option to renew for an additional 24-month term. Up to two contractors will be selected through this two-step selection process to provide plumbing services on private property related to water main replacements within Maricopa County.
The proposal calculation worksheet requires contractors to enter direct costs including labor, materials, equipment, and warranty items; non-taxable materials; contractor's allowance; and contractor's contingency. Indirect costs encompassing general conditions, payment and performance bonds, and insurance are calculated as percentages applied to applicable cost categories. Contractors must then apply overhead and profit as a percentage of direct costs and general conditions, followed by taxes and owner's allowance or contingency to arrive at the total contract amount. Individual Job Order Agreements are intended not to exceed $1,000,000, with no single agreement exceeding $2,000,000 without additional council approval. A Small Business Enterprise (SBE) goal of 7% applies to each Job Order Agreement, requiring contractors to demonstrate good faith efforts in utilizing certified small businesses and provide monthly reports documenting subcontractor participation. Contractors must provide performance and payment bonds and utilize UNIFIER, a web-based project management database, with failure to meet SBE goals or comply with program requirements resulting in potential penalties including payment withholding, rejection of future bids, and contract cancellation.
View the file
Other files for this state and local contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOC/CMAR Proposal Calculations -worksheet-
JOC Proposal Calculations
ENTRY IN YELLOW FIELDS ONLY
JOC#4108JOCXXX JOA# CONTRACT #
COMPANY NAME:
DIRECT COSTS SECTION
A Cost of Construction -$ A
(Labor, Taxable Materials, Equipment, Warranty) B Cost of Construction (Non-Taxable Materials) -$ B
B1 Contractor's Allowance B1 B2 Contractor's Contingency -$ B2
C Subtotal -$ C=A+B+B1+B2
INDIRECT COSTS
D General Conditions #DIV/0! -$ D
D1 Payment and Performance Bond 0.00% -$ D1 D2 Insurance 0.00% -$ D2
E Subtotal (Direct cost+GC+Bond and Insurance) -$ E= (C+D+D1+D2) Use this $$ to determine Multiplier
F Overhead & Profit (Construction Fee) 0.00% -$ F=(Construction Fee%) * (C+D) (Construction fee on Direct cost and General Conditions)
G Subtotal Direct+Indirect costs+ O&P fee -$ G=C+D+D1+D2+F
TAXES
H Taxes -$ Calculated Tax
(Enter Calculated Taxes)
ALLOWANCES and CONTINGENCIES I Owner's Allowance/Contingency* $0 I
(Specify/define allowances)
K Total Contract amount -$ K = G + H + I
*Markups (Taxes, O&P, Bond and Insurance) to be applied to Allowances once approved
PROJECT # / TITLE:
V.2 11/14/2023
Sheet1