This document is a Job Order Contract (JOC)/Construction Manager at Risk (CMAR) Proposal Calculations worksheet from the Streets PHX Street Transportation Department. The form is a standardized template designed for contractors to input detailed cost breakdowns for construction projects, with specific sections for direct costs, indirect costs, taxes, allowances, and contingencies. The worksheet provides a structured method for calculating the total contract amount by systematically accounting for various cost components such as labor, materials, equipment, general conditions, overhead, profit, and taxes.

The calculation template allows for precise financial tracking by breaking down costs into distinct categories including direct costs (labor, materials, equipment), indirect costs (general conditions, bonds, insurance), overhead and profit, and potential owner's allowances. Notably, the form emphasizes that only yellow-highlighted fields should be completed by the contractor, and includes formulas for automatically calculating subtotals and total contract amounts. The document is version 2.0, dated 11/14/2023, and appears to be a standardized tool used by the Streets Transportation Department for transparently evaluating and comparing construction project proposals.

View the file

Other files for this state and local contract opportunity

Other files attached to WATER MAIN REPLACEMENT PROGRAM PLUMBING, 2-STEP JOC, newest first.
File Type Posted
WATER_MAIN_REPLACEMENT_PROGRAM_PLUMBING.pdf PDF
WATER_MAIN_REPLACEMENT_PROGRAM_PLUMBING.pdf PDF
WATER_MAIN_REPLACEMENT_PROGRAM_PLUMBING.pdf PDF
WATER_MAIN_REPLACEMENT_PROGRAM_PLUMBING.pdf PDF
WATER_MAIN_REPLACEMENT_PROGRAM_PLUMBING.pdf PDF
CONSULTANT__CONTRACTOR_REFERENCE_CHECK_.pdf PDF
CONSULTANT__CONTRACTOR_REFERENCE_CHECK_.pdf PDF
CONSULTANT__CONTRACTOR_REFERENCE_CHECK_.pdf PDF
CONSULTANT__CONTRACTOR_REFERENCE_CHECK_.pdf PDF
CONSULTANT__CONTRACTOR_REFERENCE_CHECK_.pdf PDF
JOA_SUMMARY_SHEET_.pdf PDF
JOA_SUMMARY_SHEET_.pdf PDF
JOA_SUMMARY_SHEET_.pdf PDF
JOA_SUMMARY_SHEET_.pdf PDF
JOA_SUBMITTAL_REQUIREMENTS.pdf PDF
JOA_SUBMITTAL_REQUIREMENTS.pdf PDF
JOA_SUBMITTAL_REQUIREMENTS.pdf PDF
JOA_SUBMITTAL_REQUIREMENTS.pdf PDF
JOA_SUBMITTAL_REQUIREMENTS.pdf PDF
SBE_JOC-Contractor's_Statement_of_Utilization_Form.pdf PDF
SBE_JOC-Contractor's_Statement_of_Utilization_Form.pdf PDF
SBE_JOC-Contractor's_Statement_of_Utilization_Form.pdf PDF
SBE_JOC-Contractor's_Statement_of_Utilization_Form.pdf PDF
SBE_JOC-Contractor's_Statement_of_Utilization_Form.pdf PDF
SBE-Letter_of_Intent_Form_and_Instructions.pdf PDF
SBE-Letter_of_Intent_Form_and_Instructions.pdf PDF
SBE-Letter_of_Intent_Form_and_Instructions.pdf PDF
SBE-Letter_of_Intent_Form_and_Instructions.pdf PDF
SBE-Letter_of_Intent_Form_and_Instructions.pdf PDF
SBE_JOC_Clause_Language.pdf PDF
SBE_JOC_Clause_Language.pdf PDF
SBE_JOC_Clause_Language.pdf PDF
SBE_JOC_Clause_Language.pdf PDF
SBE_JOC_Clause_Language.pdf PDF
SUBCONTRACTOR_SELECTION_PLAN.pdf PDF
ADDENDUM_TEMPLATE.doc DOC document
DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf PDF
DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf PDF
SUBCONTRACTOR_SELECTION_PLAN.pdf PDF
ADDENDUM_TEMPLATE.doc DOC document
DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf PDF
SUBCONTRACTOR_SELECTION_PLAN.pdf PDF
DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf PDF
SUBCONTRACTOR_SELECTION_PLAN.pdf PDF
ADDENDUM_TEMPLATE.doc DOC document
SUBCONTRACTOR_SELECTION_PLAN.pdf PDF
ADDENDUM_TEMPLATE.doc DOC document
DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf PDF
ADDENDUM_TEMPLATE.doc DOC document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOC/CMAR Proposal Calculations -worksheet-

JOC Proposal Calculations

ENTRY IN YELLOW FIELDS ONLY

JOC#4108JOCXXX JOA# CONTRACT #

COMPANY NAME:

DIRECT COSTS SECTION

A Cost of Construction -$ A

(Labor, Taxable Materials, Equipment, Warranty) B Cost of Construction (Non-Taxable Materials) -$ B

B1 Contractor's Allowance B1 B2 Contractor's Contingency -$ B2

C Subtotal -$ C=A+B+B1+B2

INDIRECT COSTS

D General Conditions #DIV/0! -$ D

D1 Payment and Performance Bond 0.00% -$ D1 D2 Insurance 0.00% -$ D2

E Subtotal (Direct cost+GC+Bond and Insurance) -$ E= (C+D+D1+D2) Use this $$ to determine Multiplier

F Overhead & Profit (Construction Fee) 0.00% -$ F=(Construction Fee%) * (C+D) (Construction fee on Direct cost and General Conditions)

G Subtotal Direct+Indirect costs+ O&P fee -$ G=C+D+D1+D2+F

TAXES

H Taxes -$ Calculated Tax

(Enter Calculated Taxes)

ALLOWANCES and CONTINGENCIES I Owner's Allowance/Contingency* $0 I

(Specify/define allowances)

K Total Contract amount -$ K = G + H + I