JOA_SUMMARY_SHEET_.pdf
PDF 182 KB Posted
- Attached to
- WATER MAIN REPLACEMENT PROGRAM PLUMBING, 2-STEP JOC State and local contract opportunity
- Solicitation number
- JOC247-B
- Issued by
- Maricopa County, Phoenix City, Arizona
About this file
This document is a Job Order Contract (JOC)/Construction Manager at Risk (CMAR) Proposal Calculation Worksheet from the Streets PHX Street Transportation Department. The worksheet is a standardized template for calculating project costs, designed to be completed by contractors bidding on transportation-related construction projects. The form provides a comprehensive breakdown of direct and indirect costs, including construction expenses, materials, labor, equipment, warranties, general conditions, bonds, insurance, overhead, profit, and taxes.
The calculation worksheet allows for detailed financial modeling of project costs, with specific sections for entering various cost components. Key calculations include subtotals for direct costs, indirect costs, overhead and profit, and total contract amount. The form includes placeholders for JOC number, contract number, company name, and project details. A note indicates that markups for taxes, overhead and profit, bonds, and insurance will be applied to allowances once approved. The document is version 2, dated 11/14/2023, suggesting it is a recent template used by the Street Transportation Department for soliciting and evaluating construction project proposals.
View the file
Other files for this state and local contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOC/CMAR Proposal Calculations -worksheet-
JOC Proposal Calculations
ENTRY IN YELLOW FIELDS ONLY
JOC#4108JOCXXX JOA# CONTRACT #
COMPANY NAME:
DIRECT COSTS SECTION
A Cost of Construction -$ A
(Labor, Taxable Materials, Equipment, Warranty) B Cost of Construction (Non-Taxable Materials) -$ B
B1 Contractor's Allowance B1 B2 Contractor's Contingency -$ B2
C Subtotal -$ C=A+B+B1+B2
INDIRECT COSTS
D General Conditions #DIV/0! -$ D
D1 Payment and Performance Bond 0.00% -$ D1 D2 Insurance 0.00% -$ D2
E Subtotal (Direct cost+GC+Bond and Insurance) -$ E= (C+D+D1+D2) Use this $$ to determine Multiplier
F Overhead & Profit (Construction Fee) 0.00% -$ F=(Construction Fee%) * (C+D) (Construction fee on Direct cost and General Conditions)
G Subtotal Direct+Indirect costs+ O&P fee -$ G=C+D+D1+D2+F
TAXES
H Taxes -$ Calculated Tax
(Enter Calculated Taxes)
ALLOWANCES and CONTINGENCIES I Owner's Allowance/Contingency* $0 I
(Specify/define allowances)
K Total Contract amount -$ K = G + H + I
*Markups (Taxes, O&P, Bond and Insurance) to be applied to Allowances once approved
PROJECT # / TITLE:
V.2 11/14/2023
Sheet1