ADDENDUM_TEMPLATE.doc

DOC document 94 KB Posted

Attached to
WATER MAIN REPLACEMENT PROGRAM PLUMBING, 2-STEP JOC State and local contract opportunity
Solicitation number
JOC247-B
Issued by
Maricopa County, Phoenix City, Arizona

About this file

This is an Addendum Template document issued by the City of Phoenix Office of the City Engineer for design and construction procurement projects. The template is structured to communicate amendments to bidding and contract documents for a Water Main Replacement Program Plumbing Job Order Contract (JOC) through a two-step selection process. The addendum format allows for modifications including additions, deletions, and replacements to existing contract sections, technical specifications, and plan sheets. Bidders must acknowledge receipt of any issued addendum by referencing the addendum number and date on the proposal form (P-1). A pre-submittal meeting is scheduled for October 7, 2025, at 1:00 pm, with Statements of Qualifications due by 12:00 pm on October 17, 2025. The City of Phoenix will select up to two contractors for this JOC, which will have a primary term of 36 months or $3,000,000 per contract, whichever occurs first, with an optional renewal period of 24 months available.

The procurement includes a Small Business Enterprise (SBE) goal of 7% for each Job Order Agreement, with individual agreements not to exceed $1,000,000 and no single agreement exceeding $2,000,000 without additional city council approval. Contractors will be evaluated on a comprehensive qualifications assessment totaling 1,021 possible points, with the approach to performing services weighted most heavily at 350 points. Contractors must provide performance and payment bonds, utilize UNIFIER project management software, and submit monthly reports documenting subcontractor participation. Non-compliance with SBE goals or program requirements can result in payment withholding, rejection of future bids, and contract cancellation. Qualifications must be submitted through the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix.

View the file

Other files for this state and local contract opportunity

Other files attached to WATER MAIN REPLACEMENT PROGRAM PLUMBING, 2-STEP JOC, newest first.
File Type Posted
WATER_MAIN_REPLACEMENT_PROGRAM_PLUMBING.pdf PDF
WATER_MAIN_REPLACEMENT_PROGRAM_PLUMBING.pdf PDF
WATER_MAIN_REPLACEMENT_PROGRAM_PLUMBING.pdf PDF
WATER_MAIN_REPLACEMENT_PROGRAM_PLUMBING.pdf PDF
WATER_MAIN_REPLACEMENT_PROGRAM_PLUMBING.pdf PDF
CONSULTANT__CONTRACTOR_REFERENCE_CHECK_.pdf PDF
CONSULTANT__CONTRACTOR_REFERENCE_CHECK_.pdf PDF
CONSULTANT__CONTRACTOR_REFERENCE_CHECK_.pdf PDF
CONSULTANT__CONTRACTOR_REFERENCE_CHECK_.pdf PDF
CONSULTANT__CONTRACTOR_REFERENCE_CHECK_.pdf PDF
JOA_SUMMARY_SHEET_.pdf PDF
JOA_SUMMARY_SHEET_.pdf PDF
JOA_SUMMARY_SHEET_.pdf PDF
JOA_SUMMARY_SHEET_.pdf PDF
JOA_SUMMARY_SHEET_.pdf PDF
JOA_SUBMITTAL_REQUIREMENTS.pdf PDF
JOA_SUBMITTAL_REQUIREMENTS.pdf PDF
JOA_SUBMITTAL_REQUIREMENTS.pdf PDF
JOA_SUBMITTAL_REQUIREMENTS.pdf PDF
JOA_SUBMITTAL_REQUIREMENTS.pdf PDF
SBE_JOC-Contractor's_Statement_of_Utilization_Form.pdf PDF
SBE_JOC-Contractor's_Statement_of_Utilization_Form.pdf PDF
SBE_JOC-Contractor's_Statement_of_Utilization_Form.pdf PDF
SBE_JOC-Contractor's_Statement_of_Utilization_Form.pdf PDF
SBE_JOC-Contractor's_Statement_of_Utilization_Form.pdf PDF
SBE-Letter_of_Intent_Form_and_Instructions.pdf PDF
SBE-Letter_of_Intent_Form_and_Instructions.pdf PDF
SBE-Letter_of_Intent_Form_and_Instructions.pdf PDF
SBE-Letter_of_Intent_Form_and_Instructions.pdf PDF
SBE-Letter_of_Intent_Form_and_Instructions.pdf PDF
SBE_JOC_Clause_Language.pdf PDF
SBE_JOC_Clause_Language.pdf PDF
SBE_JOC_Clause_Language.pdf PDF
SBE_JOC_Clause_Language.pdf PDF
SBE_JOC_Clause_Language.pdf PDF
ADDENDUM_TEMPLATE.doc DOC document
SUBCONTRACTOR_SELECTION_PLAN.pdf PDF
ADDENDUM_TEMPLATE.doc DOC document
SUBCONTRACTOR_SELECTION_PLAN.pdf PDF
ADDENDUM_TEMPLATE.doc DOC document
DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf PDF
DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf PDF
DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf PDF
SUBCONTRACTOR_SELECTION_PLAN.pdf PDF
ADDENDUM_TEMPLATE.doc DOC document
DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf PDF
SUBCONTRACTOR_SELECTION_PLAN.pdf PDF
DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf PDF
SUBCONTRACTOR_SELECTION_PLAN.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Phoenix

Office of the City Engineer

Design and Construction Procurement

Project No.

PROJECT TITLE

ADDENDUM NO. 1

ISSUE DATE: _________

Bidders are hereby notified that the Bidding and Contract Documents for the above project, for which Bids are to be received on Month Day, 2021, are amended as follows:

Q1.

A1.

Q2.

A2.

Q3.

A3.

Q4.

A4.

1. Add the following section(s):

a. Document, Sec. __, Subparagraph __, Page ___

b. Document, Sec. __, Subparagraph __, Page ___

2. Delete the following section(s) in entirety:

a. Document, Sec. __, Subparagraph __, Page ___

b. Document, Sec. __, Subparagraph __, Page ___

3. Delete the following section(s) in entirety and replace with the following section(s):

a. Delete Document, Sec. __, Subparagraph __, Page ___ and replace with the following Document, Sec. __, Subparagraph __, Page ___:

b. Delete Document, Sec. __, Subparagraph __, Page ___ and replace with the following Document, Sec. __, Subparagraph __, Page ___:

Technical Specifications

1. Add the following section(s):

a. Document, Sec. __, Subparagraph __, Page ___

b. Document, Sec. __, Subparagraph __, Page ___

2. Delete the following section(s) in entirety:

c. Document, Sec. __, Subparagraph __, Page ___

d. Document, Sec. __, Subparagraph __, Page ___

3. Delete the following section(s) in entirety and replace with the following section(s):

e. Delete Document, Sec. __, Subparagraph __, Page ___ and replace with the following Document, Sec. __, Subparagraph __, Page ___:

f. Delete Document, Sec. __, Subparagraph __, Page ___ and replace with the following Document, Sec. __, Subparagraph __, Page ___:

Plan Sheets:

1.

2.

NOTE:

Bidders must acknowledge receipt of this Addendum by listing the number and date, where provided, on the PROPOSAL P-1.

END OF ADDENDUM