J.7_GAOA_Cabin_Creek_Staking_Notes.pdf

PDF 3 MB Posted

Attached to
GAOA West Zone Campground Reconstruction-Payette NF/Council RD
Solicitation number
1240LT23R0003
Issued by

About this file

This document package includes engineering drawings and specifications for stakeout of road, parking area, and campsite reconstruction at the Cabin Creek Campground located on the Payette National Forest in Idaho. The drawings depict survey control points, roadway and parking area alignments, and stakeout table data. Notes indicate that the contractor shall complete staking per specification 010250. Control points from a 2021 survey are shown but may no longer be present, requiring verification. A best-fit coordinate system using reliable benchmarks must be approved prior to construction staking. Solicitation 1240LT23R0003 seeks a contractor to perform the GAOA West Zone Campground Reconstruction-Payette NF/Council RD project per the engineering drawings and specifications provided.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTROL POINTS

POINT

NORTHING

1089285.25

1089396.12

1089668.78

1089446.33

1089567.70

1089721.17

1089189.03

1089004.57

1088852.16

1089238.90

EASTING

2488583.75

2488638.00

2488500.38

2488406.33

2488285.63

2488370.52

2488493.02

2488431.42

2488233.97

2488359.00

ELEV.

4143.98

4151.25

4159.89

4149.20

4153.32

4160.70

4133.62

4122.65

4112.87

4138.45

DESC.

NAIL

NAIL

NAIL

NAIL

NAIL

NAIL

NAIL

NAIL

NAIL

NAIL

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/9 /23

:0

6 K

CA

RN

ES

X :\P

AY

ET

TE

\C

AB

IN

CR

EE

KC

AM

PG

RO

UN

D.

\D

RA

W

IN

GS

\R

1- R7

_C

AB

IN

CR

EE

K-

RO

AD

S.

DW

G;

R4

INTERMOUNTAIN REGION

GAOA WEST ZONE

CAMPGROUND

RECONSTRUCTION

(CABIN CREEK)

PAYETTE

NATIONAL FOREST

COUNCIL RANGER DISTRICT

SURVEY CONTROL

AND STAKEOUT

(SOUTH)

5/09/2023

K. CARNES

K. CARNES

R. ANDERSON

V1 1 4

SEE SHEET V2 FOR SOUTH

STAKEOUT POINT TABLES

CABIN CREEK

CAMPGROUND SOUTH

C

A

B

I N

C

R

E

E

K

O

A

D

F

M

D

D

L

D

NOTES:

1. STAKING FOR CONSTRUCTION OF ROADS, SPURS, AND PARKING AREAS SHALL BE COMPLETED BY THE

CONTRACTOR. STAKING SHALL BE IN ACCORDANCE WITH SPECIFICATION 010250.

2. CONTROL POINTS SHOWN WERE CREATED DURING A TOPOGRAPHIC SURVEY COMPLETED IN NOVEMBER

2021, BUT MAY NO LONGER BE PRESENT AND UNDAMAGED. VERIFY ALL FOUND CONTROL POINTS FOR

HORIZONTAL AND VERTICAL ACCURACY.

3. SOME CONTROL POINTS LISTED IN THE TABLE ARE OUTSIDE OF THE MAPPED AREA ON THIS PAGE BUT

ARE ACCEPTABLE FOR ADDITIONAL CONTROL OR VERIFICATION.

4. A "BEST FIT" OF ALL RELIABLE BENCHMARKS WILL BE CONSIDERED SUITABLE FOR A PROJECT

COORDINATE SYSTEM. FOR EACH FOUND POINT, PROVIDE TO THE CONTRACTING OFFICER:

4.1. THE ACTUAL AND CALCULATED COORDINATES, AND

4.2. THE BEARING AND DISTANCE BETWEEN THE ACTUAL AND CALCULATED COORDINATES..

CONTINUE WITH CONSTRUCTION POINT STAKEOUT ONLY AFTER APPROVAL OF THE COORDINATE SYSTEM

BY THE CONTRACTING OFFICER.

Solicitation No: 1240LT23R0003 J.7 Attachment

Project Name: GAOA West Zone Campground Reconstruction

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 25'

AutoCAD SHX Text 50'

AutoCAD SHX Text 25'

ROADWAY POINTS

POINT

NORTHING

1088832.72

1088827.16

1088748.65

1088716.34

1088714.17

1088725.96

1088828.40

1088830.71

1088870.09

1088874.01

1088918.03

1088896.48

1088932.75

1088934.94

1088970.44

1088935.02

1088932.40

1088946.44

1088961.25

1088967.98

1088973.02

1088994.69

1088983.84

1089041.08

1089020.94

1089058.80

1089079.05

1089148.37

1089156.51

1088856.12

EASTING

2488244.71

2488231.02

2488233.95

2488203.85

2488190.14

2488156.45

2488191.79

2488222.84

2488242.20

2488246.94

2488300.96

2488296.08

2488347.98

2488325.36

2488378.98

2488356.20

2488371.28

2488392.69

2488396.29

2488410.21

2488382.87

2488404.91

2488425.89

2488447.82

2488460.22

2488485.00

2488470.75

2488518.22

2488497.68

2488236.29

ELEV.

4112.26

4112.41

4108.65

4106.39

4105.76

4104.52

4109.73

4111.12

4113.85

4114.15

4117.58

4116.45

4119.27

4118.94

4120.56

4119.49

4119.73

4120.24

4120.50

4121.02

4120.66

4121.86

4122.13

4125.99

4125.22

4128.06

4129.11

4133.47

4133.73

4113.04

DESC.

RADIUS RETURN

RADIUS RETURN

SPUR 17 RETURN

SPUR 17 RETURN

SPUR 16 RETURN

SPUR 16 RETURN

SPUR 15 RETURN

RADIUS RETURN

SPUR 15 RETURN

SPUR 14 RETURN

SPUR 14 RETURN

SPUR 13 RETURN

SPUR 13 RETURN

SPUR 12 RETURN

SPUR 12 RETURN

PULLOUT RETURN

PULLOUT CORNER

PULLOUT CORNER

PULLOUT RETURN

PULLOUT RETURN

PULLOUT RETURN

GRADE

GRADE

GRADE

GRADE

PULLOUT RETURN

PULLOUT RETURN

RADIUS RETURN

RADIUS RETURN

STA 0+40 C/L INTERSECT

SPUR AND PULLOUT POINTS

POINT

NORTHING

1088968.63

1088974.57

1089020.79

1089021.02

1088980.79

1088981.02

1088907.29

1088892.02

1088842.19

1088845.61

1088881.89

1088885.31

1088898.72

1088922.80

1088968.94

1088964.67

1088929.41

1088925.14

1088860.05

1088873.83

1088916.27

1088916.87

1088876.28

1088876.87

1088705.81

1088718.17

EASTING

2488343.27

2488371.22

2488342.85

2488370.85

2488343.17

2488371.17

2488334.33

2488304.23

2488326.31

2488298.52

2488331.20

2488303.41

2488260.97

2488293.03

2488271.83

2488299.50

2488265.72

2488293.39

2488206.30

2488234.01

2488205.11

2488233.10

2488205.95

2488233.95

2488166.48

2488156.31

ELEV.

4120.06

4120.76

4120.95

4121.51

4120.35

4120.91

4118.23

4117.45

4117.73

4117.17

4117.93

4117.37

4115.66

4117.73

4118.10

4118.66

4117.30

4117.86

4112.30

4113.32

4113.27

4113.83

4112.87

4113.43

4104.48

4104.13

DESC.

SPUR 12 RETURN

SPUR 12 RETURN

SPUR 12 CORNER

SPUR 12 CORNER

GRADE BREAK

GRADE BREAK

SPUR 13 RETURN

SPUR 13 RETURN

SPUR 13 CORNER

SPUR 13 CORNER

GRADE BREAK

GRADE BREAK

SPUR 14 RETURN

SPUR 14 RETURN

SPUR 14 CORNER

SPUR 14 CORNER

GRADE BREAK

GRADE BREAK

SPUR 15 RETURN

SPUR 15 RETURN

SPUR 15 CORNER

SPUR 15 CORNER

GRADE BREAK

GRADE BREAK

SPUR 16 RETURN

SPUR 16 RETURN

SPUR AND PULLOUT POINTS

POINT

NORTHING

1088676.68

1088689.33

1088701.17

1088713.82

1088735.06

1088710.90

1088665.43

1088667.52

1088705.09

1088707.18

1088983.73

1089062.73

1089027.84

1089022.05

1089056.58

1089039.29

1089024.08

1088964.75

1088960.01

1088954.22

1088991.32

1088984.96

1088966.02

1088993.06

1088978.07

EASTING

2488128.87

2488119.07

2488160.49

2488150.70

2488229.59

2488210.27

2488220.41

2488204.55

2488225.64

2488209.77

2488387.01

2488439.11

2488383.34

2488402.48

2488406.05

2488416.11

2488480.03

2488442.90

2488446.05

2488457.85

2488476.07

2488440.84

2488447.26

2488453.27

2488469.57

ELEV.

4103.22

4102.90

4104.02

4103.70

0.00

4106.95

4106.10

4106.42

4106.50

4106.82

4121.11

4125.88

4123.70

4124.10

4124.50

4124.50

4125.45

4122.96

4123.26

4123.13

4124.15

4123.40

4123.14

4123.80

4123.58

DESC.

SPUR 16 CORNER

SPUR 16 CORNER

GRADE BREAK

GRADE BREAK

SPUR 17 RETURN

SPUR 17 RETURN

SPUR 17 CORNER

SPUR 17 CORNER

GRADE BREAK

GRADE BREAK

FEE RETURN

FEE RETURN

GRADE BREAK

GRADE BREAK

GRADE BREAK

GRADE BREAK

CORRAL RETURN

RADIUS RETURN

RAMP BASE

RAMP BASE

TANGENT POINT

GRADE BREAK

GRADE BREAK

GRADE BREAK

GRADE BREAK

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/9 /23

:0

6 K

CA

RN

ES

X :\P

AY

ET

TE

\C

AB

IN

CR

EE

KC

AM

PG

RO

UN

D.

\D

RA

W

IN

GS

\R

1- R7

_C

AB

IN

CR

EE

K-

RO

AD

S.

DW

G;

R4

INTERMOUNTAIN REGION

GAOA WEST ZONE

CAMPGROUND

RECONSTRUCTION

(CABIN CREEK)

PAYETTE

NATIONAL FOREST

COUNCIL RANGER DISTRICT

SURVEY STAKEOUT

POINT TABLES

(SOUTH)

5/09/2023

K. CARNES

K. CARNES

R. ANDERSON

V2 2 4

NOTES:

1. STAKING FOR CONSTRUCTION OF ROADS, SPURS, AND PARKING AREAS SHALL BE

COMPLETED BY THE CONTRACTOR. STAKING SHALL BE IN ACCORDANCE WITH

SPECIFICATION 010250.

2. IF NO ELEVATION OR AN ELEVATION OF "0.00" IS PROVIDED FOR A STAKEOUT POINT,

MATCH.EXISTING GROUND OR FIELD ESTABLISH TO MATCH GRADES OF ADJACENT

IMPROVEMENTS.

CABIN CREEK CAMPGROUND SOUTH - POINT TABLES

(SEE SHEET V1 FOR PLAN VIEW POINT LOCATIONS)

Solicitation No: 1240LT23R0003 J.7 Attachment

Project Name: GAOA West Zone Campground Reconstruction

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

411412

CONTROL POINTS

POINT

NORTHING

1089285.25

1089396.12

1089668.78

1089446.33

1089567.70

1089721.17

1089189.03

1089004.57

1088852.16

1089238.90

EASTING

2488583.75

2488638.00

2488500.38

2488406.33

2488285.63

2488370.52

2488493.02

2488431.42

2488233.97

2488359.00

ELEV.

4143.98

4151.25

4159.89

4149.20

4153.32

4160.70

4133.62

4122.65

4112.87

4138.45

DESC.

NAIL

NAIL

NAIL

NAIL

NAIL

NAIL

NAIL

NAIL

NAIL

NAIL

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/9 /23

:0

6 K

CA

RN

ES

X :\P

AY

ET

TE

\C

AB

IN

CR

EE

KC

AM

PG

RO

UN

D.

\D

RA

W

IN

GS

\R

1- R7

_C

AB

IN

CR

EE

K-

RO

AD

S.

DW

G;

R4

INTERMOUNTAIN REGION

GAOA WEST ZONE

CAMPGROUND

RECONSTRUCTION

(CABIN CREEK)

PAYETTE

NATIONAL FOREST

COUNCIL RANGER DISTRICT

SURVEY CONTROL

AND STAKEOUT

(NORTH)

5/09/2023

K. CARNES

K. CARNES

R. ANDERSON

V3 3 4

CABIN CREEK

CAMPGROUND NORTH

C

A

B

N

C

E

A

D

M

D

D

L

W

H I T

E

L I C

S

SEE SHEET V4 FOR NORTH

STAKEOUT POINT TABLES

NOTES:

1. STAKING FOR CONSTRUCTION OF ROADS, SPURS, AND PARKING AREAS SHALL BE COMPLETED BY THE

CONTRACTOR. STAKING SHALL BE IN ACCORDANCE WITH SPECIFICATION 010250.

2. CONTROL POINTS SHOWN WERE CREATED DURING A TOPOGRAPHIC SURVEY COMPLETED IN NOVEMBER

2021, BUT MAY NO LONGER BE PRESENT AND UNDAMAGED. VERIFY ALL FOUND CONTROL POINTS FOR

HORIZONTAL AND VERTICAL ACCURACY.

3. SOME CONTROL POINTS LISTED IN THE TABLE ARE OUTSIDE OF THE MAPPED AREA ON THIS PAGE BUT

ARE ACCEPTABLE FOR ADDITIONAL CONTROL OR VERIFICATION.

4. A "BEST FIT" OF ALL RELIABLE BENCHMARKS WILL BE CONSIDERED SUITABLE FOR A PROJECT

COORDINATE SYSTEM. FOR EACH FOUND POINT, PROVIDE TO THE CONTRACTING OFFICER:

4.1. THE ACTUAL AND CALCULATED COORDINATES, AND

4.2. THE BEARING AND DISTANCE BETWEEN THE ACTUAL AND CALCULATED COORDINATES..

CONTINUE WITH CONSTRUCTION POINT STAKEOUT ONLY AFTER APPROVAL OF THE COORDINATE SYSTEM

BY THE CONTRACTING OFFICER.

Solicitation No: 1240LT23R0003 J.7 Attachment

Project Name: GAOA West Zone Campground Reconstruction

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text

LPG

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 25'

AutoCAD SHX Text 50'

25'

ROADWAY POINTS

POINT

NORTHING

1089406.07

1089241.04

1089330.01

1089371.63

1089444.50

1089387.25

1089390.23

1089397.36

1089433.87

1089447.76

1089450.59

1089460.79

1089527.16

1089565.69

1089619.67

1089685.29

1089698.73

1089715.42

1089713.54

1089708.47

1089688.59

1089656.30

EASTING

2488582.65

2488522.58

2488571.72

2488561.04

2488586.67

2488588.58

2488590.98

2488604.06

2488614.82

2488603.73

2488602.65

2488601.64

2488594.37

2488569.53

2488550.06

2488481.48

2488427.35

2488408.53

2488352.88

2488304.13

2488268.51

2488249.43

ELEV.

4151.78

4136.87

4146.81

4149.72

4152.58

4151.46

4151.60

4151.94

4152.81

4153.05

4153.13

4153.49

4158.26

4161.10

4162.20

4160.39

4160.04

4160.49

4161.67

4162.89

4162.17

4160.05

DESC.

STA 20+92.1 C/L INTERSECT

RADIUS RETURN

FR591 RETURN

RADIUS RETURN

RADIUS RETURN

PULLOUT RETURN

PULLOUT RETURN

PULLOUT CORNER

PULLOUT CORNER

PULLOUT RETURN

PULLOUT RETURN

SPUR 1 RETURN

SPUR 1 RETURN

SPUR 2 RETURN

SPUR 2 RETURN

SPUR 3 RETURN

SPUR 3 RETURN

SPUR 4 RETURN

SPUR 4 RETURN

SPUR 5 RETURN

SPUR 5 RETURN

SPUR 6 RETURN

ROADWAY POINTS

POINT

NORTHING

1089651.72

1089624.44

1089610.36

1089570.29

1089535.08

1089558.08

1089525.09

1089518.37

1089477.25

1089449.83

1089430.21

1089433.99

1089421.73

1089409.28

1089270.19

1089319.62

1089327.68

1089310.74

1089263.11

1089306.48

1089364.32

1089337.77

EASTING

2488262.68

2488261.50

2488250.83

2488283.83

2488333.77

2488325.48

2488361.04

2488365.70

2488394.22

2488400.34

2488452.01

2488496.27

2488547.39

2488539.26

2488565.14

2488587.85

2488597.38

2488611.42

2488540.55

2488589.53

2488666.53

2488627.97

ELEV.

4160.00

4158.12

4157.13

4154.12

4152.34

4153.09

4152.00

4151.81

4150.63

4149.78

4149.49

4150.15

4150.99

4150.58

4141.34

4147.18

4148.51

4148.07

4139.33

4146.16

0.00

4150.72

DESC.

PARKING RETURN

PARKING RETURN

SPUR 6 RETURN

SPUR 7 RETURN

SPUR 7 RETURN

SPUR 8 RETURN

SPUR 8 RETURN

SPUR 9 RETURN

SPUR 9 RETURN

SPUR 10 RETURN

SPUR 10 RETURN

SPUR 11 RETURN

SPUR 11 RETURN

RADIUS RETURN

FR591 RETURN

FR591 RETURN

TRANSITION

TRANSITION

FR591 C/L BEGIN

FR591 C/L POC

FR591 C/L POT

FR591 C/L MATCH GRADE

SPUR AND PULLOUT POINTS

POINT

NORTHING

1089465.01

1089506.73

1089434.06

1089449.29

1089486.77

1089494.38

1089480.24

1089586.02

1089566.07

1089533.96

1089527.73

1089570.80

1089564.57

1089679.76

1089666.95

1089631.47

1089634.59

1089673.82

1089670.67

1089724.36

1089724.02

1089752.98

1089767.49

1089705.15

1089714.80

1089756.42

1089761.07

1089718.19

1089722.89

1089645.46

1089629.05

1089629.89

1089640.75

1089625.20

1089623.34

1089654.72

EASTING

2488609.91

2488607.16

2488646.28

2488659.24

2488615.20

2488621.68

2488622.87

2488551.23

2488560.17

2488529.23

2488543.97

2488544.80

2488559.54

2488474.51

2488460.75

2488467.80

2488483.49

2488475.69

2488459.82

2488376.92

2488405.63

2488436.16

2488422.39

2488278.49

2488298.19

2488310.99

2488295.68

2488299.23

2488283.94

2488266.60

2488266.37

2488262.91

2488286.03

2488282.25

2488243.92

2488240.60

ELEV.

4155.93

4156.78

4156.41

4156.81

4156.42

4156.62

4156.33

4161.16

4159.83

4158.70

4158.86

4159.50

4159.66

4159.88

4159.34

4158.97

4159.29

4159.69

4159.37

4161.04

4161.26

4162.10

4162.30

4163.05

4164.13

4165.22

4165.38

4164.42

4164.58

4159.03

4158.80

4158.87

4158.63

4158.47

4160.11

DESC.

SPUR 1 RETURN

SPUR 1 RETURN

SPUR 1 CORNER

SPUR 1 CORNER

SPUR 1 CORNER

SPUR 1 CORNER

GRADE BREAK

SPUR 2 RETURN

SPUR 2 RETURN

SPUR 2 CORNER

SPUR 2 CORNER

GRADE BREAK

GRADE BREAK

SPUR 3 RETURN

SPUR 3 RETURN

SPUR 3 CORNER

SPUR 3 CORNER

GRADE BREAK

GRADE BREAK

SPUR 4 RETURN

SPUR 4 RETURN

SPUR 4 CORNER

SPUR 4 CORNER

SPUR 5 RETURN

SPUR 5 RETURN

SPUR 5 CORNER

SPUR 5 CORNER

GRADE BREAK

GRADE BREAK

PARKING RETURN

PARKING RETURN

GRADE BREAK

PARKING CORNER

PARKING CORNER

SPUR 6 RETURN

SPUR 6 RETURN

SPUR AND PULLOUT POINTS

POINT

NORTHING

1089691.58

1089682.07

1089659.43

1089649.91

1089543.33

1089561.21

1089563.01

1089547.03

1089544.12

1089539.32

1089563.24

1089605.53

1089602.10

1089566.46

1089511.85

1089519.76

1089556.56

1089561.29

1089523.13

1089527.85

1089427.19

1089441.37

1089403.71

1089414.47

1089407.14

1089417.91

1089414.77

1089436.29

1089438.45

1089441.19

1089486.40

1089477.09

1089451.00

1089441.69

EASTING

2488213.33

2488200.47

2488237.12

2488224.26

2488311.70

2488280.65

2488250.49

2488249.54

2488298.48

2488354.87

2488333.24

2488340.35

2488324.72

2488348.91

2488388.88

2488374.58

2488402.71

2488387.42

2488392.37

2488377.08

2488424.99

2488399.49

2488377.38

2488372.07

2488357.20

2488351.89

2488399.80

2488389.19

2488525.89

2488501.85

2488500.66

2488482.96

2488519.28

2488501.58

ELEV.

4161.12

4160.80

4160.52

4160.20

4153.32

4153.47

4153.15

4152.91

4154.55

4155.26

4155.34

4154.86

4152.49

4153.14

4154.37

4154.69

4153.67

4153.99

4149.19

4149.19

4148.14

4148.38

4148.21

4148.40

4148.39

4148.87

4150.95

4151.36

4152.60

4152.20

4151.80

4151.40

DESC.

SPUR 6 CORNER

SPUR 6 CORNER

GRADE BREAK

GRADE BREAK

SPUR 7 RETURN

SPUR 7 RETURN

SPUR 7 CORNER

SPUR 7 CORNER

GRADE

SPUR 8 RETURN

SPUR 8 RETURN

SPUR 8 CORNER

SPUR 8 CORNER

GRADE BREAK

SPUR 9 RETURN

SPUR 9 RETURN

SPUR 9 CORNER

SPUR 9 CORNER

GRADE BREAK

GRADE BREAK

SPUR 10 RETURN

SPUR 10 RETURN

SPUR 10 CORNER

SPUR 10 CORNER

SPUR 10 CORNER

SPUR 10 CORNER

GRADE BREAK

GRADE BREAK

SPUR 11 RETURN

SPUR 11 RETURN

SPUR 11 CORNER

SPUR 11 CORNER

GRADE BREAK

GRADE BREAK

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/9 /23

:0

6 K

CA

RN

ES

X :\P

AY

ET

TE

\C

AB

IN

CR

EE

KC

AM

PG

RO

UN

D.

\D

RA

W

IN

GS

\R

1- R7

_C

AB

IN

CR

EE

K-

RO

AD

S.

DW

G;

R4

INTERMOUNTAIN REGION

GAOA WEST ZONE

CAMPGROUND

RECONSTRUCTION

(CABIN CREEK)

PAYETTE

NATIONAL FOREST

COUNCIL RANGER DISTRICT

SURVEY STAKEOUT

POINT TABLES

(NORTH)

5/09/2023

K. CARNES

K. CARNES

R. ANDERSON

V4 4 4

CABIN CREEK CAMPGROUND NORTH - POINT TABLES

(SEE SHEET V3 FOR PLAN VIEW POINT LOCATIONS)

NOTES:

1. STAKING FOR CONSTRUCTION OF ROADS, SPURS, AND PARKING AREAS

SHALL BE COMPLETED BY THE CONTRACTOR. STAKING SHALL BE IN

ACCORDANCE WITH SPECIFICATION 010250.

2. IF NO ELEVATION OR AN ELEVATION OF "0.00" IS PROVIDED FOR A STAKEOUT

POINT, MATCH.EXISTING GROUND OR FIELD ESTABLISH TO MATCH GRADES

OF ADJACENT IMPROVEMENTS.

Solicitation No: 1240LT23R0003 J.7 Attachment

Project Name: GAOA West Zone Campground Reconstruction

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
V1 - Stkout
V2-Stkout.pdf
Sheets and Views
V2 - Stkout
V3-Stkout.pdf
Sheets and Views
V3 - Stkout
V4-Stkout.pdf
Sheets and Views
V4 - Stkout

File details come from the government source that posted it. Updated .