J.5_signed GAOA_CabinCreek.DWG_FINAL_05_30_2023.pdf
PDF 29 MB Posted
- Solicitation number
- 1240LT23R0003
- Issued by
-
Department of Agriculture Forest Service
About this file
This document provides details on a federal contract opportunity for reconstruction work at the GAOA West Zone Campground located in the Payette National Forest and Council Ranger District. The solicitation number is 1240LT23R0003 and is seeking proposals to reconstruct campground facilities including campsites, access roads, signage, and other associated site infrastructure work. Proposals are due by June 30, 2023 and the contract is expected to be awarded by August 15, 2023. The contracting agency is the United States Department of Agriculture Forest Service. The accompanying file is engineering drawings of the campground that offer additional specifications for the required reconstruction services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1_QA.docx | DOCX document | |
| Amendment 1.pdf | ||
| J.2_Wage Rate Decision.pdf | ||
| J.4_Specs-HuckleberryCG.pdf | ||
| J.8_Site Visit Attendance.pdf | ||
| J.9_Determination of Responsibility.pdf | ||
| J.3_GAOA_CabinCreek_Specs_FINAL_4.28.2023.pdf | ||
| J.7_GAOA_Cabin_Creek_Staking_Notes.pdf | ||
| J.6_signed plans Huckleberry CG Reconstruction 5_10_2023.pdf | ||
| J.1_SOI for WZ CGs and Huckleberry CG.xlsx | XLSX spreadsheet | |
| 1240LT23R0003.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION
VICINITY MAP
SHEET OF1 41
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OR DEP. DIR. OF ENGINEERING DATE
FOREST SUPERVISOR DATE
3/2 5/2
3 1 0:
R
TA
ND
ER
SO
N C:
\U
SE
RS
\R
TA
ND
ER
SO
N\
BO
X\
EN
GD
ES
IG
N\
PA
YE
TT
E\
CA
BI
NC
RE
EK
CA
MP
GR
OU
ND
.20
\D
RA
W
IN
GS
\01
-0 3_
G1 -G
3.C
AB
IN
CR
EE
K.
SC
H.
VI
CI
NI
TY
MA
P.
DW
G;
CABIN CREEK
CAMPGROUND
PROJECT SITE
COUNCIL, IDAHO
United States Department of Agriculture Forest Service
IDAHO
ADAMS COUNTY
R4 INTERMOUNTAIN REGION
PAYETTE NATIONAL FOREST
COUNCIL DISTRICT
GAOA WEST ZONE
CAMPGROUND RECONSTRUCTION
(CABIN CREEK)
THE PROJECT IS LOCATED ON THE COUNCIL RANGER DISTRICT OF THE PAYETTE NATIONAL FOREST, ADAMS COUNTY, IDAHO. GPS COORDINATES: 44.653999, -116.273324. IT IS LOCATED APPROXIMATELY 16 MILES BY ROAD SOUTHEAST OF COUNCIL, IDAHO. FROM HIGHWAY 95, THE PROJECT MAY BE ACCESSED VIA IDAHO
MIDDLE FORK ROAD (FOREST RD 186).
PROJECT LOCATION
WILLIAM
PERRY
Digitally signed by
WILLIAM PERRY
Date: 2023.05.05 09:11:33 -06'00' Digitally signed by
JEFFREY JONES
Date: 2023.05.09 13:57:54 -06'00' Digitally signed by Linda L Jackson Date: 2023.05.10 10:16:43 -06'00'
SCOTT
BINGHAM
Digitally signed by
SCOTT BINGHAM
Date: 2023.05.26 09:28:05 -06'00'
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
THE CABIN CREEK CAMPGROUND RECONSTRUCTION PROJECT CONSISTS OF TWO CAMPGROUND LOOPS IN CLOSE PROXIMITY.
THE FIRST LOOP, CABIN CREEK NORTH INVOLVES RECONSTRUCTION OF AGGREGATE ROADS, FAMILY UNITS, TENT PADS, A
VAULT TOILET AND THE ADDITION OF TRAILS AT THE EXISTING CAMPGROUND LOOP. THE CABIN CREEK SOUTH LOOP INVOLVES
THE CONSTRUCTION OF AGGREGATE ROADS, DEVELOPED FAMILY UNIT SITES, TENT PADS, A VAULT TOILET AS WELL AS
VARIOUS EQUESTRIAN ELEMENTS AND TRAILS AT THE SOUTH SIDE. BOTH OF THESE LOOPS ARE CONNECTED WITH A NEW ROAD
ALIGNMENT CREATING A SAFER INTERSECTION AT FOREST ROAD 186. THE WORK ASSOCIATED WITH THIS PROJECT INCLUDES:
1. BASE BID: CABIN CREEK NORTH CAMPGROUND
a. DEMOLITION:
1) REMOVAL AND RELOCATION OF EXISTING CATTLEGUARD
2) REMOVAL AND DISPOSAL OF EXISTING AGGREGATE ROAD AND SPURS
3) REMOVAL AND DISPOSAL OF THE EXISTING VAULT TOILET
4) REMOVAL AND DISPOSAL OF WOOD POST AND RAIL PERIMETER FENCE
5) REMOVAL AND DISPOSAL OF BARBED WIRE FENCE AND POSTS
6) REMOVAL AND DISPOSAL OF EXISTING PICNIC TABLES AND FIRE RINGS
7) REMOVAL AND DISPOSAL OF WOOD POST UNIT MARKERS
8) REMOVAL AND DISPOSAL OF EXISTING CULVERTS
9) REMOVAL AND DISPOSAL OF EXISTING BULLETIN BOARD
10) SELECTIVE REMOVAL OF DENSE CANOPY VEGETATION
b. NEW CONSTRUCTION:
1) REALIGNING AND RECONSTRUCTING PORTIONS OF THE EXISTING AGGREGATE ROADWAY AND CAMPGROUND SPURS
2) CONSTRUCTING NEW AGGREGATE ROADWAYS, PARKING AREAS, AND CAMPGROUND SPURS, INCLUDING CULVERTS
3) INSTALLING A NEW CATTLE GUARD
4) CONSTRUCTING NEW CAMPGROUND SITES, INCLUDING ALL NEW SITE FURNITURE FOR SINGLE AND DOUBLE FAMILY UNIT
CAMPSITES AND NEW UNIT MARKERS
5) CONSTRUCTING NEW TENT PADS
6) INSTALLATION OF A NEW SINGLE-UNIT COMFORT STATION BUILDING
7) INSTALLATION OF BARRIER ROCKS
8) CONSTRUCTION OF HEAVY TIMBER STAIRS
9) INSTALLING A THREE-PANEL BULLETIN BOARD AND FEE TUBE
10) INSTALLATION OF MINOR SITE I.D. SIGN AND APPROACH SIGNS AND POSTS
11) INSTALLATION OF TRAIL SIGNS AND POSTS
12) INSTALLATION OF REGULATORY SIGNS AND POSTS
13) CONSTRUCTING IMPROVEMENTS TO THE HOST SEWER SYSTEM
14) CONSTRUCTING A NEW CONCRETE PAD AT THE HOST SITE FOR FUTURE PROPANE SYSTEM TO BE COMPLETED BY
OTHERS.
15) CONSTRUCTION OF BUCK & POLE PERIMETER FENCE AND TRAIL PASS-THROUGHS
16) CONSTRUCTION OF AGGREGATE AND NATIVE SURFACE PEDESTRIAN TRAILS
2. BID OPTION 1: CABIN CREEK SOUTH CAMPGROUND ROADS AND COMFORT STATION - CONSTRUCTION OF SOUTH SIDE ROADS, SPURS, PATHWAYS AND COMFORT STATION. SEE SCHEDULE OF ITEMS (SOI). BELOW IS AN OVERVIEW OF THOSE ITEMS:
a. BID OPTION 1 DEMOLITION:
1) REMOVAL OF THE EXISTING OUTDOOR WOOD TOILET
2) OBLITERATION OF THE ENTRANCE ROADS
3) SELECTIVE REMOVAL OF LARGE MATURE EVERGREEN TREES AND DENSE CANOPY VEGETATION
b. BID OPTION 1 NEW CONSTRUCTION:
1) CONSTRUCTING NEW AGGREGATE ROADWAYS, PARKING AREAS, AND CAMPGROUND SPURS.
2) INSTALLATION OF A NEW SINGLE-UNIT COMFORT STATION BUILDING
3) CONSTRUCTION OF AGGREGATE AND NATIVE SURFACE PEDESTRIAN TRAILS
3. BID OPTION 2: CABIN CREEK SOUTH CAMPGROUND FURNISHINGS - CONSTRUCTION OF SOUTH SIDE FURNITURE, EQUESTRIAN
FACILITIES, AND SIGNAGE. SEE SCHEDULE OF ITEMS (SOI). BELOW IS AN OVERVIEW OF THOSE ITEMS:
a. BID OPTION 2 NEW CONSTRUCTION:
1) CONSTRUCTING NEW CAMPGROUND SITES, INCLUDING ALL NEW SITE FURNITURE FOR SINGLE FAMILY UNIT CAMPSITES
AND NEW UNIT MARKERS
2) CONSTRUCTING NEW TENT PADS
3) INSTALLATION OF BARRIER ROCKS
4) CONSTRUCTING EQUESTRIAN ELEMENTS INCLUDING STEEL CORRAL, HITCHING POSTS AND LOADING RAMP
5) CONSTRUCTION OF BUCK & POLE PERIMETER FENCE AND TRAIL PASS-THROUGHS
6) INSTALLING A THREE-PANEL BULLETIN BOARD AND FEE TUBE
7) INSTALLATION OF MINOR SITE I.D. SIGN AND APPROACH SIGNS AND POSTS
8) INSTALLATION OF TRAIL SIGNS AND POSTS
9) INSTALLATION OF REGULATORY SIGNS AND POSTS
PROJECT DESCRIPTION
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 /23
:0
7 K
CA
RN
ES
X :\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\01
-0 3_
G1 -G
3.C
AB
IN
CR
EE
K.
SC
H.
VI
CI
NI
TY
MA
P.
DW
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
INDEX OF SHEETS -
PROJECT DESCRIPTION
05/01/2023
RB/KC/KS
RB/KC/KS
R. ANDERSON
FINAL
G2 2 41
INDEX OF SHEETS
SHEET DWG SHEET TITLE
1 G1 COVER SHEET
2 G2 INDEX OF SHEETS - PROJECT DESCRIPTION
3 G3 SCHEDULE OF ITEMS
4 DE1 EXISTING CONDITIONS - DEMOLITION PLAN
5 S1 SITE PLAN - OVERVIEW
6 S2
SITE PLAN - CABIN CREEK CAMPGROUND (SOUTH)
7 S3
SITE PLAN - CABIN CREEK CAMPGROUND (NORTH)
8 D1 FAMILY UNIT AND AGGREGATE PAD DETAILS
9 D2
8-FOOT WOOD PLANK PICNIC TABLE (EMBEDDED POST)
10 D3 METAL FIRE RING DETAILS
11 D4 HORSE LOADING RAMP DETAILS
12 D5 FEE TUBE AND UNIT MARKER DETAILS
13 D6 BARRIER ROCK INSTALLATION DETAILS
14 D7 AGGREGATE AND NATIVE SURFACE PATH DETAILS
15 D8 3 PANEL BULLETIN BOARD - SHEET A
16 D9 3 PANEL BULLETIN BOARD - SHEET B
17 D10 TENT PAD DETAILS
18 D11
STEEL HITCHING POST, CORRAL FENCE AND FENCE DETAILS
19 D12 HORSE CORRAL AND GATE DETAILS
20 D13 COMFORT STATION INSTALLATION - VAULT BUILDING
21 D14 HEAVY TIMBER STAIRS DETAILS
22 D15
MINOR SITE IDENTIFICATION SIGN DETAILS (RSE)
23 D16 SIGN LIST AND INSTALLATION DETAILS
24 D17 BUCK AND POLE FENCE DETAILS
25 D18 BUCK AND POLE FENCE DETAILS CONT'D.
26 D19 TRAIL GATE AND PASS THROUGH DETAILS
27 D20 PLANNED HOST UNIT LPG PAD AND UNDERGROUND HOLDING TANK DETAILS
28 D21 PLANNED HOST UNIT UNDERGROUND HOLDING TANK DETAILS
29 D22 PLANNED HOST UNIT LPG PAD DETAILS
30 R1 ROAD PLANS OVERVIEW
31 R2 CABIN CREEK ROAD PLAN AND PROFILE - STA. 0+00 TO 4+40
32 R3 CABIN CREEK ROAD PLAN AND PROFILE - STA. 4+40 TO 8+80
33 R4 CABIN CREEK ROAD PLAN AND PROFILE - STA. 8+20 TO 12+20
34 R5 CABIN CREEK ROAD PLAN AND PROFILE - STA. 12+20 TO 16+60
35 R6 CABIN CREEK ROAD PLAN AND PROFILE - STA. 16+60 TO 21+20
36 R7 FEE STATION AND CORRAL PULLOUTS PLAN AND PROFILES
37 R8 TYPICAL ROAD CROSS-SECTIONS
38 R9 SPUR DETAILS
39 R10 CULVERT INSTALLATION DETAILS
40 R11 CATTLEGUARD DETAILS
41 R12 ROCKERY RETAINING WALL DETAILS
Solicitation No: 1240LT23R0003 J.5 Attachment
SCHEDULE OF ITEMS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/2 /23
:0
7 K
CA
RN
ES
X :\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\01
-0 3_
G1 -G
3.C
AB
IN
CR
EE
K.
SC
H.
VI
CI
NI
TY
MA
P.
DW
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
SCHEDULE OF ITEMS
05/02/2023
RB/DW/SB
RB/DW/SB
R. ANDERSON
FINAL
G3 3 41
Solicitation No: 1240LT23R0003 J.5 Attachment
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 /23
:3
5 K
CA
RN
ES
X :\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\04
_0 7_
DE
1-
S1 -S
3.C
AB
IN
CR
EE
K.
SI
TE
PL
AN
.D W
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
EXISTING CONDITIONS
DEMOLITION PLAN
02/25/2023
KS/RB/KC
KS/RB/KC
R. ANDERSON
FINAL
DE1
4 41
OBLITERATE AND
SCARIFY EXISTING
ENTRANCE ROADS
TO HIGHWAY 95
F
O
R
E
S
T
R
O
A
D
CABIN CREEK
CAMPGROUND SOUTH
CABIN CREEK
CAMPGROUND NORTH
EXISTING HAND PUMP
(TO REMAIN)
REMOVE AND DISPOSE OF EXISTING
COMFORT STATION BUILDING. PUMP VAULT,
REMOVE AND BACKFILL.
REMOVE AND DISPOSE OF
BULLETIN BOARD
REMOVE AND DISPOSE OF
PERIMETER FENCE, TYP.
REMOVE AND DISPOSE OF PICNIC
TABLES AND FIRE RINGS, TYP.
EXISTING COMFORT
STATION BUILDING
(TO REMAIN)
DEMOLITION NOTES:
1. REMOVE AND DISPOSE OF ALL EXISTING FENCING, WOOD FRAME COMFORT STATION BUILDING, OUTDOOR WOOD TOILET STAND, BULLETIN BOARD KIOSK, SITE FURNISHINGS INCLUDING, BUT NOT
LIMITED TO PICNIC TABLES, FIRE RINGS, PEDESTAL GRILLS, UTILITY TABLES, AND OTHER
DEMOLITION DEBRIS OFF OF USFS LAND.
2. EXISTING BARRIER ROCKS MAY BE SALVAGED FOR REUSE IF MEETING THE SPECIFICATIONS FOR
NEW BARRIER ROCKS.
3. REMOVE AND DISPOSE OF THE CATTLE GUARD (NOT SALVAGED).
4. UNLESS OTHERWISE INDICATED, EXISTING ROADS AND PARKING AREAS THAT WILL NOT BE
COVERED WITH NEW ROAD SURFACING OR IMPROVEMENTS SHALL BE OBLITERATED AND
SCARIFIED. ROADS TO BE OBLITERATED SHALL BE RE-CONTOURED TO MATCH SURROUNDING
GROUND, RIPPED TO A DEPTH OF 12", AND LEFT IN A STATE TO BE SEEDED.
5. DEMOLITION MATERIAL AND SLASH SHALL BE REMOVED AND DISPOSED OF OFF GOVERNMENT
PROPERTY IN A SANITARY LANDSFILL.
REMOVE AND DISPOSE
OF SITE I.D. SIGN
REMOVE AND DISPOSE OF WOOD POST
UNIT MARKERS, TYP.
REMOVE AND SALVAGE
CATTLE GUARD (SEE NOTES)
EXISTING TREES, TYP.
RIVER
EXISTING CULVERTS TO BE REMOVED
AND REPLACED, TYP.
APPROXIMATE EDGE
OF RIVER
EXISTING DENSE CANOPY
VEGETATION REQUIRING
SELECTIVE REMOVAL, TYP.
EXISTING DENSE UNDERSTORY VEGETATION
REQUIRING SELECTIVE REMOVAL, TYP.
REMOVE AND DISPOSE OF
OUTDOOR WOOD TOILET STAND
F
O
R
E
EXISTING PIT MAY BE
USED FOR STORAGE
AND STAGING
F
O
R
E
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text 60'
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/2 /23
:2
5 K
CA
RN
ES
X :\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\04
_0 7_
DE
1-
S1 -S
3.C
AB
IN
CR
EE
K.
SI
TE
PL
AN
.D W
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
SITE PLAN
OVERVIEW
05/02/2023
KS/RB/KC
KS/RB/KC
R. ANDERSON
FINAL
S1 5 41
TO
HIGHWAY
F
O
R
E
CABIN CREEK
CAMPGROUND SOUTH
CABIN CREEK
CAMPGROUND NORTH
SEE SHEET S3
S
E
H
E
CONSTRUCT WOOD BUCK AND
POLE PERIMETER FENCE, TYP.
CONSTRUCT WOOD BUCK AND
POLE PERIMETER FENCE, TYP.
RIVER
CONSTRUCT WOOD BUCK AND
POLE PERIMETER FENCE, TYP.
CONSTRUCT WOOD BUCK AND
POLE PERIMETER FENCE, TYP.
LEGEND *LEGEND SCALE: 1"=60'
SINGLE FAMILY UNIT (16' x 22')
DOUBLE UNIT FAMILY UNIT (24' x 24')
TENT PAD, SINGLE (16' BY 16')
HORSE HITCHING POST & PAD
(25' x 20')
HORSE HITCHING POST & PAD - MODIFIED
(25' X 7')
T
CABIN CREEK C.G. NORTH INFO:
SINGLE FAMILY UNIT
10 UNITS X 5 PAOT = 50
DOUBLE FAMILY UNIT
1 UNITS X 10 PAOT = 10
HOST SITE = 1*
TOTAL PAOT = 60
*HOST SITE AMENITIES AT SINGLE
FAMILY UNIT SITE #1
SINGLE-UNIT VAULT COMFORT
STATION BUILDING
AGGREGATE PATH (4' WIDTH)
NATIVE SURFACE PATH (3' WIDTH)
EXISTING HAND PUMP
REGULATORY SIGN
BARRIER ROCK
CABIN CREEK C.G. SOUTH INFO:
SINGLE FAMILY UNIT
6 UNITS X 5 PAOT = 30
DOUBLE FAMILY UNIT
0 UNITS X 10 PAOT = 0
HOST SITE = 0
TOTAL PAOT = 45
EXISTING VEGETATION
EXISTING DENSE CANOPY VEGETATION
REQUIRING SELECTIVE REMOVAL
EXISTING DENSE UNDERSTORY VEGETATION
REQUIRING SELECTIVE REMOVAL
F
O
R
E
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text
LPG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
60'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/3 /23
:1
1 K
CA
RN
ES
X :\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\04
_0 7_
DE
1-
S1 -S
3.C
AB
IN
CR
EE
K.
SI
TE
PL
AN
.D W
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
SITE PLAN
CABIN CREEK
CAMPGROUND
(SOUTH)
05/02/2023
KS/RB/KC
KS/RB/KC
R. ANDERSON
FINAL
S2 6 41
RIVER
CONSTRUCT WOOD BUCK AND
POLE PERIMETER FENCE, TYP.
(SEE SHEET D18)
INSTALL APPROACH
SIGN #8 ASSEMBLY
(SEE SHEET D16)
CONSTRUCT 4-FOOT WIDE
AGGREGATE PATH, TYP.
(SEE SHEET D7)
CONSTRUCT 20' x 40' HORSE CORRAL
(SEE SHEET D12)
CONSTRUCT DOUBLE UNLOADING RAMP
(SEE SHEET D4)
INSTALL 3-PANEL BULLETIN BOARD
(SEE SHEET D8)
CONSTRUCT SINGLE
FAMILY UNIT, TYP.
(SEE SHEET D1)
CONSTRUCT 4-FOOT WIDE
AGGREGATE PATH, TYP.
(SEE SHEET D7)
INSTALL UNIT MARKER, TYP.
(SEE SHEET D5)
CONSTRUCT TENT PAD, TYP.
(SEE SHEET D10)
INSTALL SINGLE-UNIT
VAULT COMFORT STATION
(SEE SHEET D13)
CONSTRUCT MODIFIED
HITCHING POST & PAD, TYP.
(SEE SHEET D11)
INSTALL CATTLE GUARD
(SEE SHEET R11)
T
T
T
INSTALL GOVERNMENT FURNISHED FEE TUBE
(SEE SHEET D5)
T
T
UNSURFACED TRAILER LOADING AREA,
CLEAR EXISTING VEGETATION (15' X 30'), TYP.
T
CONSTRUCT TRAIL GATE WITH
FENCE PASS-THROUGH, TYP.
(SEE SHEET D19)
CONSTRUCT HITCHING
POST & PAD, TYP.
(SEE SHEET D11)
CONSTRUCT WOOD BUCK AND
POLE PERIMETER FENCE, TYP.
(SEE SHEET D17)
INSTALL MINOR SITE I.D. SIGN
'CABIN CREEK CAMPGROUND SOUTH'
(SEE SHEET D15)
INSTALL APPROACH SIGN #9
ASSEMBLY (SEE SHEET D16)
INSTALL BARRIER ROCK, TYP.
(SEE SHEET D6)
INSTALL SIGN #3
(SEE SHEET D16)
INSTALL SIGN #1
(SEE SHEET D16)
INSTALL SIGN #3
(SEE SHEET D16)
INSTALL SIGN #2
(SEE SHEET D16)
CONSTRUCT WOOD BUCK AND
POLE PERIMETER FENCE, TYP.
(SEE SHEET D17)
CONSTRUCT HITCHING
POST & PAD, TYP.
(SEE SHEET D11)
INSTALL SIGNS #1
(SEE SHEET D16)
INSTALL SIGN #5
(SEE SHEET D16)
INSTALL SIGN #5
(SEE SHEET D16)
CONSTRUCT 3-FOOT WIDE
NATIVE SURFACE TRAIL, TYP.
(SEE SHEET D7)
CONSTRUCT TRAIL GATE WITH
FENCE PASS-THROUGH, TYP.
(SEE SHEET D19)
INSTALL SIGN #5
SEE SHEET D16
INSTALL SIGN #3
(SEE SHEET D16)
CONSTRUCT
ROCKERY WALL.
(SEE SHEET R12)
CONSTRUCT CATTLE GATE - LEAVE
ONE CORNER SECTION OF RAILS
FASTENED IN WIRE HOOPS TO EASILY
SLIDE OUT FOR TEMPORARY REMOVAL
INSTALL GUIDE
SIGN #10 ASSEMBLY
(SEE SHEET D16)
GENERAL NOTE:
DIRECTIONAL ARROWS ON ROADS
ARE FOR ILLUSTRATION ONLY.
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text 30'
AutoCAD SHX Text 60'
30'
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/3 /23
:1
1 K
CA
RN
ES
X :\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\04
_0 7_
DE
1-
S1 -S
3.C
AB
IN
CR
EE
K.
SI
TE
PL
AN
.D W
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
SITE PLAN
CABIN CREEK
CAMPGROUND
(NORTH)
05/03/2023
KS/RB/KC
KS/RB/KC
R. ANDERSON
FINAL
S3 7 41
INSTALL MINOR SITE I.D. SIGN
'CABIN CREEK CAMPGROUND
NORTH' (SEE SHEET D15)
CONSTRUCT 3-FOOT WIDE
NATIVE SURFACE TRAIL TO
BUCK AND POLE FENCELINE
(SEE SHEET D7)
TRAIL TO WILDERNESS TO BE CONSTRUCTED BY
OTHERS, NOT IN CONTRACT
EXISTING COMFORT
STATION BUILDING
(TO REMAIN)
EXISTING HAND PUMP (TO REMAIN)
ROTATE HANDLE 90° CLOCKWISE
FOR ACCESSIBILITY
T
T
T
T
T
T
T
T
T
T
T
T
CONSTRUCT CONCRETE PAD FOR LPG
TANK (TANK BY OTHERS) AND INSTALL
IN-GROUND SEWER HOLDING TANK
(SEE SHEET D20-D22)
EXISTING DRAINAGE OR
STREAM, TYP.
CONSTRUCT ACCESSIBLE PARKING STALL
FOR HAND PUMP AND COMFORT STATION
(SEE R SHEETS)
CONSTRUCT WOOD BUCK AND
POLE PERIMETER FENCE, TYP.
(SEE SHEET D17)
CONSTRUCT 4-FOOT WIDE AGGREGATE PATH, TYP.
(SEE SHEET D7)
INSTALL 3-PANEL BULLETIN BOARD
(SEE SHEET D8)
CONSTRUCT SINGLE
FAMILY UNIT, TYP.
(SEE SHEET D1)
CONSTRUCT 4-FOOT WIDE
AGGREGATE PATH, TYP.
(SEE SHEET D7)
INSTALL UNIT MARKER, TYP.
(SEE SHEET D5)
CONSTRUCT TENT PAD, TYP.
(SEE SHEET D10)
INSTALL SINGLE-UNIT
VAULT COMFORT STATION
(SEE SHEET D13)
INSTALL CATTLE GUARD
(SEE SHEET R11)
INSTALL GOVERNMENT
FURNISHED FEE TUBE
(SEE SHEET D5)
CONSTRUCT TRAIL GATE WITH
FENCE PASS-THROUGH, TYP.
(SEE SHEET D19)
INSTALL SIGN #3
(SEE SHEET D16)
INSTALL SIGN #4
(SEE SHEET D16)
CONSTRUCT TRAIL GATE WITH
FENCE PASS-THROUGH, TYP.
(SEE SHEET D19)
INSTALL SIGN #3
(SEE SHEET D16)
CONSTRUCT WOOD BUCK AND
POLE PERIMETER FENCE, TYP.
(SEE SHEET D17)
INSTALL BARRIER ROCK, TYP.
(SEE SHEET D6)
CONSTRUCT HEAVY TIMBER STAIRS, TYP.
(SEE SHEET D14)
CONSTRUCT 4-FOOT WIDE AGGREGATE PATH, TYP.
(SEE SHEET D7)
INSTALL SIGN #2
(SEE SHEET D16)
INSTALL SIGN #1
(SEE SHEET D16)
CONSTRUCT DOUBLE
FAMILY UNIT, TYP.
(SEE SHEET D1)
INSTALL SIGN #5 & #5
(SEE SHEET D16)
INSTALL SIGN #5
(SEE SHEET D16)
INSTALL SIGN #6 & #7
(SEE SHEET D16)
INSTALL SIGN #6 & #7
(SEE SHEET D16)
CONSTRUCT CATTLE GATE - LEAVE
ONE CORNER SECTION OF RAILS
FASTENED IN WIRE HOOPS TO EASILY
SLIDE OUT FOR TEMPORARY REMOVAL
INSTALL GUIDE SIGN #11 ASSEMBLY AS
DIRECTED BY CONTRACTING OFFICER
APPROX 300' OFF-SITE (SEE SHEET D16)
GENERAL NOTE:
DIRECTIONAL ARROWS ON ROADS
ARE FOR ILLUSTRATION ONLY.
CONSTRUCT HEAVY
TIMBER STAIRS, TYP.
(SEE SHEET D14)
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text
LPG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text 30'
AutoCAD SHX Text 60'
30'
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/2 3/2
3 1 4:
R
YA
NB
UD
GE
C :\U
SE
RS
\R
TA
ND
ER
SO
N\
BO
X\
EN
GD
ES
IG
N\
PA
YE
TT
E\
CA
BI
NC
RE
EK
CA
MP
GR
OU
ND
.20
\D
RA
W
IN
GS
\D
_F
AM
IL
Y_
UN
IT
S_
AG
G_
PA
D.
DW
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
FAMILY UNIT AND
AGGREGATE PAD
DETAILS
02/19/2023
R. BUDGE
R. BUDGE
R. ANDERSON
FINAL
D1 8 41
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text 4-FOOT WIDE AGGREGATE PATH BETWEEN FAMILY UNIT AND PARKING SPUR. INSTALL IN LOCATIONS AS SHOWN ON THE SITE PLAN OR AS STAKED. (SEE SHEET D7)
AutoCAD SHX Text
INSTALL PICNIC TABLE (2) TYP. (SEE SHEET D2)
AutoCAD SHX Text
INSTALL FIRE RING (SEE SHEET D3)
AutoCAD SHX Text
INSTALL 4-INCH DEPTH AGGREGATE - GRADING G
AutoCAD SHX Text
INSTALL FIRE RING (SEE SHEET D3)
AutoCAD SHX Text 4-FOOT WIDE AGGREGATE PATH BETWEEN FAMILY UNIT AND PARKING SPUR. INSTALL IN LOCATIONS AS SHOWN ON THE SITE PLAN OR AS STAKED. (SEE SHEET D7)
AutoCAD SHX Text
INSTALL PICNIC TABLE, TYP. (SEE SHEET D2)
AutoCAD SHX Text
INSTALL 4-INCH DEPTH AGGREGATE - GRADING G
AutoCAD SHX Text
4" MIN. DEPTH COMPACTED SURFACE COARSE GRAVEL - GRADING G OVER WEED BARRIER
AutoCAD SHX Text
NATIVE SOIL
AutoCAD SHX Text
EDGE OF AGGREGATE PAD
AutoCAD SHX Text
3:1 CUT MAXIMUM
AutoCAD SHX Text
PROVIDE 4" DEEP DRAINAGE SWALE
AutoCAD SHX Text
FINISH GRADE EVEN WITH AGGREGATE PAD
AutoCAD SHX Text
1% OUTSLOPE
AutoCAD SHX Text 4:1 FILL SLOPE PREFERABLE (LESS THAN 1-FOOT FILL) 3:1 MAXIMUM (GREATER THAN 1-FOOT FILL)
AutoCAD SHX Text
2-FOOT SHOULDER
AutoCAD SHX Text
2-FOOT SHOULDER
AutoCAD SHX Text
SINGLE FAMILY UNIT (NO SCALE) (NO SCALE)(NO SCALE)
AutoCAD SHX Text
(PLAN VIEW)
AutoCAD SHX Text
DOUBLE FAMILY UNIT (NO SCALE) (NO SCALE)(NO SCALE)
AutoCAD SHX Text
(PLAN VIEW)
AutoCAD SHX Text
TYPICAL FAMILY UNIT CUT AND FILL (NO SCALE) (NO SCALE)(NO SCALE)
AutoCAD SHX Text
(SECTION VIEW)
AutoCAD SHX Text NOTE: 1. ALL SITE FURNISHINGS SHALL BE FURNISHED AND ALL SITE FURNISHINGS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR. 2. ALL AGGREGATE FOR FAMILY UNITS AND PATHS SHALL BE ALL AGGREGATE FOR FAMILY UNITS AND PATHS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR. 3. FAMILY UNITS THAT ARE NOT LOCATED WITHIN 5-FEET OF SPURS FAMILY UNITS THAT ARE NOT LOCATED WITHIN 5-FEET OF SPURS SHOULD BE STAKED TO SELF BALANCE (CUTS AND FILLS).
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Solicitation No: 1240LT23R0003 J.5 Attachment
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 0/2
3 1 5:
K
CA
RN
ES
X
:\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\D
_H
OR
SE
L
OA
DI
NG
R
AM
P.
DW
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
HORSE LOADING RAMP
DETAILS
04/25/2023
K. SHROSBREE
K. SHROSBREE
R.BUDGE
FINAL
D4 11 41
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text 3" x 10" x 8'-0" BUMPER STOP
AutoCAD SHX Text SECURE WITH SIX 8"L x 3/16"
AutoCAD SHX Text 2" x 6" RAILING SECURED TO
AutoCAD SHX Text POST WITH 8" L x 3/16"
AutoCAD SHX Text
THREADED OLY LOG SCREW
AutoCAD SHX Text
%%UNOTES ON RAMP:
AutoCAD SHX Text
1. TREAT ALL TIMBER AS PER SPECIFICATIONS.
AutoCAD SHX Text
2. BEVEL EXPOSED ENDS 45%%D 1" FROM END.
AutoCAD SHX Text
3. USE ROAD BASE GRAVEL FOR TOP 6" FILL.
AutoCAD SHX Text
4. USE HARDWARE PER SPECIFICATIONS
AutoCAD SHX Text
5. ALL POSTS SHALL BE SET 3'-0" BELOW
AutoCAD SHX Text
NATURAL GROUND.
AutoCAD SHX Text 3'-0"
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text 1'-11"
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text
1" CHAMFER
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text 5'-0"
AutoCAD SHX Text
8'-0" LONG
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text 2"
AutoCAD SHX Text
1" CHAMFER
AutoCAD SHX Text
8 :1 SLOPE(12.5%%%)
AutoCAD SHX Text
%%UFRONT ELEVATION
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text 4" x 6" TIMBER SECURED
AutoCAD SHX Text TO POST WITH 10" L x 3/16"
AutoCAD SHX Text
THREADED OLY LOG SCREW
AutoCAD SHX Text
COUNTER SUNK
AutoCAD SHX Text 16'-0"
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 1'-3"
AutoCAD SHX Text 3'-8"
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text
%%USIDE ELEVATION
AutoCAD SHX Text 4" x 6" TIMBER SECURED
AutoCAD SHX Text TO POST WITH 10" L x 3/16"
AutoCAD SHX Text
THREADED OLY LOG
AutoCAD SHX Text
SCREW COUNTER SUNK
AutoCAD SHX Text 6" x 6" x 8'-0" POSTS
AutoCAD SHX Text 2" x 6" RAILING
AutoCAD SHX Text 6" x 6" x 8'-0" POSTS
AutoCAD SHX Text 6" x 6" x 5'-0" POST
AutoCAD SHX Text 4" x 6" TIMBER
AutoCAD SHX Text
FILL
AutoCAD SHX Text 9'-6"
AutoCAD SHX Text 4"
AutoCAD SHX Text A
AutoCAD SHX Text
%%UPLAN
AutoCAD SHX Text A
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 16'-0"
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text 1'-3"
AutoCAD SHX Text 3'-8"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text
BUMPER STOP
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text 4" x 6" TIMBER
AutoCAD SHX Text
THREADED OLY LOG SCREW
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/2 3/2
3 1 3:
R
YA
NB
UD
GE
C :\U
SE
RS
\R
TA
ND
ER
SO
N\
BO
X\
EN
GD
ES
IG
N\
PA
YE
TT
E\
CA
BI
NC
RE
EK
CA
MP
GR
OU
ND
.20
\D
RA
W
IN
GS
\D
_U
NI
T_
MR
KR
_F
EE
_T
UB
E.
DW
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
FEE TUBE AND UNIT
MARKER DETAILS
10/19/2022
R. BUDGE
K. SHROSBREE
R. ANDERSON
FINAL
D5 12 41
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text
SIDE ELEVATION
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text 4" x 4" x 5'-0" REDWOOD OR CEDAR SQUARE POST, S4S CONSTRUCTION GRADE #1, SEAL WITH 2 COATS OF SEAL WITH 2 COATS OF EXTERIOR PENETRATING STAIN (FEDERAL STANDARD 595 NO. 20059)
AutoCAD SHX Text
GROUND LINE
AutoCAD SHX Text
NATIVE SOIL
AutoCAD SHX Text
1-3/4" VANDAL RESISTANT SCREWS
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
PLAQUE DETAIL
AutoCAD SHX Text
SEE PLAQUE DETAIL (THIS SHEET)
AutoCAD SHX Text 3/4" THICK ROUTED HDPE PLAQUE W/ UNIT NUMBERS. C.O. TO PROVIDE NUMBERING SEQUENCE TO CONTRACTOR PRIOR TO ORDERING
AutoCAD SHX Text
ROAD SHOULDER
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
UNIT MARKER POST
AutoCAD SHX Text
SPUR
AutoCAD SHX Text
ANGLE VARIES
AutoCAD SHX Text
TRAVEL WAY
AutoCAD SHX Text 3'
AutoCAD SHX Text 3'
AutoCAD SHX Text
SET ON 6" DEPTH OF 1" TO 2" DRAIN ROCK, TYP
AutoCAD SHX Text
INSTALL MEDIUM HARDENED STEEL BINDER CLIP WITH 2" WOOD SCREW
AutoCAD SHX Text NOTES: 1. INSTALL UNIT MARKERS IN THE LOCATIONS AS INSTALL UNIT MARKERS IN THE LOCATIONS AS SHOWN ON DRAWINGS OR AS DIRECTED BY CONTRACTING OFFICER. 2. SEE SPECIFICATION 101415 FOR HDPE PLAQUE. SEE SPECIFICATION 101415 FOR HDPE PLAQUE. 3. INSTALL UNIT MARKER POSTS LEVEL AND PLUMB.INSTALL UNIT MARKER POSTS LEVEL AND PLUMB.
AutoCAD SHX Text
FRONT ELEVATION
AutoCAD SHX Text
UNIT MARKER DETAILS (NO SCALE)
AutoCAD SHX Text
UNIT MARKER POST LOCATION
AutoCAD SHX Text
INSTALL HDPE PLAQUE CENTERED ON POST TOP CHAMFER
AutoCAD SHX Text
NUMBER PLAQUE SHALL BE FACED TOWARDS ONCOMING TRAVEL
AutoCAD SHX Text
EXCAVATED AND COMPACTED BACK FILL
AutoCAD SHX Text
HDPE PLAQUE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
FEE TUBE INSTALLATION (NO SCALE)
AutoCAD SHX Text NOTES: 1. FEE TUBES WILL BE GOVERNMENT FEE TUBES WILL BE GOVERNMENT FURNISHED, MANUFACTURED BY IRON RANGER LLC. (MODEL# FS836) SEE SITE PLAN SHEETS FOR LOCATIONS AND/OR AS FIELD STAKED BY THE CONTRACTING OFFICER. 2. INSTALL FEE TUBE LEVEL AND INSTALL FEE TUBE LEVEL AND PLUMB.
AutoCAD SHX Text
THIS SIDE FACES ROAD.
AutoCAD SHX Text 34"
AutoCAD SHX Text 2'
AutoCAD SHX Text 50"
AutoCAD SHX Text
SECTION - ELEVATION VIEW
AutoCAD SHX Text
AGGREGATE (GRADING C)
AutoCAD SHX Text
PLACE 24"L #4 REBAR THROUGH BOTH SETS OF HOLES AT INSTALLATION
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
CONCRETE BASE
AutoCAD SHX Text
UNDISTURBED NATIVE SOIL
AutoCAD SHX Text
8" MIN
AutoCAD SHX Text
4" MIN
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/2 3/2
3 1 3:
R
YA
NB
UD
GE
C :\U
SE
RS
\R
TA
ND
ER
SO
N\
BO
X\
EN
GD
ES
IG
N\
PA
YE
TT
E\
CA
BI
NC
RE
EK
CA
MP
GR
OU
ND
.20
\D
RA
W
IN
GS
\D
_B
AR
RI
ER
_R
OC
KS
_D
ET
AI
LS
.D
W G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
BARRIER ROCK
INSTALLATION DETAILS
10/19/2022
R. BUDGE
R.BUDGE
R. ANDERSON
FINAL
D6 13 41
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text NOTES 1. SET FRACTURED OR SOILED SIDE OF ROCK INTO EARTH. WEATHERED SIDE SET FRACTURED OR SOILED SIDE OF ROCK INTO EARTH. WEATHERED SIDE SHOULD FACE UP. 2. PLACE BARRIER ROCKS SO THEY APPEAR AS NATURAL AVOID PLACING IN LONG PLACE BARRIER ROCKS SO THEY APPEAR AS NATURAL AVOID PLACING IN LONG ROWS WITH EQUAL SPACING. 3. ROCKS WITHIN CONSTRUCTION AREA FOR SALVAGE AND USE SHALL BE APPROVED ROCKS WITHIN CONSTRUCTION AREA FOR SALVAGE AND USE SHALL BE APPROVED BY THE CONTRACTING OFFICER. 4. EXISTING ROCKS IN THE CAMPGROUND THAT MEET THE SIZE AND WEIGHT EXISTING ROCKS IN THE CAMPGROUND THAT MEET THE SIZE AND WEIGHT REQUIREMENTS MAY BE HARVESTED AND RE-USED. 5. SEE SPECIFICATION 322205 FOR BARRIER ROCK WEIGHT AND SIZE.SEE SPECIFICATION 322205 FOR BARRIER ROCK WEIGHT AND SIZE.
AutoCAD SHX Text
24" MIN.
AutoCAD SHX Text
1/3 DEPTH MIN.
AutoCAD SHX Text
30" (MIN. SPACING)
AutoCAD SHX Text
48" (MAX. SPACING)
AutoCAD SHX Text
4'-0" (MIN. SPACING)
AutoCAD SHX Text
4'-9" (MAX. SPACING)
AutoCAD SHX Text
ROAD SHOULDER
AutoCAD SHX Text
18" MIN.
AutoCAD SHX Text
18" MIN.
AutoCAD SHX Text
ACTUAL SPACING SHALL BE AS STAKED
AutoCAD SHX Text
EXISTING TREES
AutoCAD SHX Text
EXISTING TREES
AutoCAD SHX Text
30" (MIN. SPACING)
AutoCAD SHX Text
48" (MAX. SPACING)
AutoCAD SHX Text
ROCK BARRIER - DETAIL (NO SCALE)
AutoCAD SHX Text
ELEVATION VIEW
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/1 /23
:1
8 K
CA
RN
ES
X :\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\D
_3
-P
AN
EL
_B
UL
LE
TI
N_
BO
AR
D_ A_
RO
CK
AR
T.
DW
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
3 PANEL BULLETIN
BOARD - SHEET A
05/03/2023
K. SHROSBREE
K. SHROSBREE
R. BUDGE
FINAL
D8 15 41
Solicitation No: 1240LT23R0003 J.5 Attachment
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 5/2
3 1 1:
K
CA
RN
ES
X
:\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\D
_T
EN
T_
PA
D.
DW
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
TENT PAD DETAILS
04/25/2023
R.BUDGE
R.BUDGE
R. ANDERSON
FINAL
D10 17 41
Solicitation No: 1240LT23R0003 J.5 Attachment
INSTALL WEATHERED STEEL HITCH POST
(SEE DETAIL THIS SHEET)
CONCRETE FOOTER, TYP.
(SEE DETAIL THIS SHEET)
INSTALL BARRIER ROCK, TYP.
(SEE C SHEETS AND SHEET D6)
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 5/2
3 1 1:
K
CA
RN
ES
X
:\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\D
_M
ET
AL
_H
IT
CH
IN
G_
PO
ST
_A
ND
_F
EN
CE
.D
W G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
STEEL HITCHING POST,
CORRAL FENCE AND
FENCE DETAILS
04/25/2023
R.BUDGE
R.BUDGE
R. ANDERSON
FINAL
D11 18 41
Solicitation No: 1240LT23R0003 J.5 Attachment
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/3 /23
:5
7 K
CA
RN
ES
X :\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\D
_H
OR
SE
_C
OR
RA
L.
DW
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
HORSE CORRAL AND
GATE DETAILS
05/03/2023
R.BUDGE
K. SHROSBREE
R. ANDERSON
FINAL
D12 19 41
A A'
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text
NATIVE SOIL
AutoCAD SHX Text INSTALL 4" SCH. 40 WEATHERED STEEL POSTS AND RAILS, TYP. (SEE DETAIL ON SHEET D11)
AutoCAD SHX Text
INSTALL CONCRETE FOOTER, TYP. (SEE SHEET D11)
AutoCAD SHX Text
SEE GATE DETAIL (THIS SHEET)
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
2" SCH. 40 WEATHERED STEEL PIPE NEW OR USED IN NEAR NEW CONDITION
AutoCAD SHX Text
CONCRETE FOOTER, TYP. (SEE SHEET D11)
AutoCAD SHX Text INSTALL 4" SCH. 40 WEATHERED STEEL POSTS AND RAILS, TYP. (SEE DETAIL ON SHEET D11)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
WEATHERED STEEL POST HORSE CORRAL LAYOUT (NO SCALE) (NO SCALE)(NO SCALE)
AutoCAD SHX Text
(PLAN VIEW)
AutoCAD SHX Text
(SECTION-ELEVATION VIEW A-A')
AutoCAD SHX Text
GATE DETAIL (NO SCALE) (NO SCALE)(NO SCALE)
AutoCAD SHX Text
(ELEVATION VIEW)
AutoCAD SHX Text NOTES: 1. SEE SHEET D11 FOR STEEL POST AND POLE CORRAL AND FENCE AND CONCRETE FOOTER DETAILS. SEE SHEET D11 FOR STEEL POST AND POLE CORRAL AND FENCE AND CONCRETE FOOTER DETAILS. 2. GATE FASTENERS, HINGES AND LATCHES SHALL BE PROPOSED BY THE CONTRACTOR AND APPROVED GATE FASTENERS, HINGES AND LATCHES SHALL BE PROPOSED BY THE CONTRACTOR AND APPROVED BY THE COR BEFORE INSTALLATION. 3. THE HORSE CORRAL INSIDE THE PERIMETER POST AND POLE FENCE SHALL BE CLEARED AND THE HORSE CORRAL INSIDE THE PERIMETER POST AND POLE FENCE SHALL BE CLEARED AND GRUBBED. WITH THE EXCEPTION OF TREES IN EXCESS OF 8" TRUNK DIAMETER, VEGETATION, ROCKS AND INERT MATERIAL OVER 6-INCHES IN SIZE SHALL BE REMOVED AND DISPOSED OF.
*CONSTRUCT (#) GATES, # AT THE HORSE CORRAL AND # ON TRAIL AT BUCK & POLE FENCE OPENINGS AS SHOWN ON SHEET S2 - S3.
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/2 3/2
3 1 4:
R
YA
NB
UD
GE
C :\U
SE
RS
\R
TA
ND
ER
SO
N\
BO
X\
EN
GD
ES
IG
N\
PA
YE
TT
E\
CA
BI
NC
RE
EK
CA
MP
GR
OU
ND
.20
\D
RA
W
IN
GS
\D
_H
EA
VY
_T
IM
BE
R_
ST
AI
RS
.D W
G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
HEAVY TIMBER STAIRS
DETAILS
10/19/2022
R. BUDGE
R. BUDGE
R. ANDERSON
FINAL
D14 21 41
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text
CRUSHED AGGREGATE BASE (4" UNIFORM DEPTH)
AutoCAD SHX Text 30" #6 REBAR SPIKE (INSTALL 6" FROM OUTSIDE EDGE AND COUNTER SINK 1" BELOW TIMBER TREAD, 2 PER RISER)
AutoCAD SHX Text
2% SLOPE
AutoCAD SHX Text
7"H X 9"W X4'L TREATED TIMBER STAIR
AutoCAD SHX Text
NATIVE SOIL
AutoCAD SHX Text
7"H X4"W TREATED TIMBER STRINGERS (TWO VERTICALLY STACKED ON EACH SIDE)
AutoCAD SHX Text NOTES: 1. TIMBER STAIRS SHALL BE INSTALLED FLAT AND PLUMB. TIMBER STAIRS SHALL BE INSTALLED FLAT AND PLUMB. 2. STAIR TREADS AND RISERS SHALL BE CONSISTENT WITHIN EACH STAIR SECTION. STAIR TREADS AND RISERS SHALL BE CONSISTENT WITHIN EACH STAIR SECTION. 3. EXTEND SLOPING STRINGER AT LANDINGS TO BE FLUSH WITH HORIZONTAL STRINGERS. EXTEND SLOPING STRINGER AT LANDINGS TO BE FLUSH WITH HORIZONTAL STRINGERS. 4. ANCHOR RISERS AND TREADS TO STRINGER WITH 3/16" DIA X 8" LONG OLY LOG ANCHOR RISERS AND TREADS TO STRINGER WITH 3/16" DIA X 8" LONG OLY LOG SCREWS EACH SIDE - PREDRILL 9/32" PILOT HOLES. 5. LANDINGS OVER 4' LONG OR ON A CORNER SHALL BE FILLED WITH CRUSHED LANDINGS OVER 4' LONG OR ON A CORNER SHALL BE FILLED WITH CRUSHED AGGREGATE BASE. STRAIGHT LANDINGS LESS THAN 4' LONG SHALL HAVE A TREATED TIMBER TREAD. 6. 7" X 9" TREAD TIMBERS MAY BE CUT OR ROTATED TO PLACE NARROW SIDE UP TO 7" X 9" TREAD TIMBERS MAY BE CUT OR ROTATED TO PLACE NARROW SIDE UP TO CREATE THE REQUIRED TREAD LENGTH TO WITHIN 1" TOLERANCE.
AutoCAD SHX Text
OLY LOG SCREW (SEE NOTE #4)
AutoCAD SHX Text
2% SLOPE
AutoCAD SHX Text
PATH
AutoCAD SHX Text
TREAD
AutoCAD SHX Text
HORIZONTAL STRINGER
AutoCAD SHX Text
SLOPING STRINGER
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
7"H X 9"W X 8'L TREATED TIMBER STAIR (TYP)
AutoCAD SHX Text
HORIZONTAL STRINGER
AutoCAD SHX Text
SLOPING STRINGER
AutoCAD SHX Text
SLOPING STRINGER
AutoCAD SHX Text
SLOPING STRINGER
AutoCAD SHX Text
7"H X 9"W X4'L TREATED TIMBER TREAD (TYP)
AutoCAD SHX Text
LANDING (AGGREGATE OR HEAVY TIMBERS, SEE S SHEETS)
AutoCAD SHX Text
SECTION - VIEW
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
TREATED TIMBER STAIRS (NTS) (NTS) (SECTION VIEW)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
CAMPGROUND
Cabin Creek
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 5/2
3 1 1:
K
CA
RN
ES
X
:\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\D
_S
IT
E_
ID
EN
TI
FI
CA
TI
ON
_M
IN
OR
_R
SE
.D
W G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
MINOR SITE
IDENTIFICATION SIGN
DETAILS (RSE)
04/25/2023
R.BUDGE
R.BUDGE
R. ANDERSON
FINAL
D15 22 41
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
(REQUIRES DOUBLE 4" X 6" POST BASE)
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text
FACILITY NAME ASA SERIES D (INITIAL CAPS LOWER CASE)
AutoCAD SHX Text B
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text 3 34
AutoCAD SHX Text 4D
AutoCAD SHX Text
PANEL DIMENSIONS (INCHES)
AutoCAD SHX Text
LAYOUT DIMENSIONS MEASURED FROM BOTTOM OF PANEL (INCHES)
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SIGN FACE
AutoCAD SHX Text
MINOR SITE ID SIGN
AutoCAD SHX Text
SITE IDENTIFICATION SIGN LAYOUT
AutoCAD SHX Text
LETTER SIZE (INCHES)
AutoCAD SHX Text
HDPE SIGN (WITH ROUTED LETTERS)
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text 3"
AutoCAD SHX Text 5'-0"
AutoCAD SHX Text
3'-0" (MIN.)
AutoCAD SHX Text
3/5 X SIGN LENGTH
AutoCAD SHX Text
SIGN BOARD RSE-C (SEE FS MANUAL EM-7100-15)
AutoCAD SHX Text
4" X 6" TREATED POST (TYP.)
AutoCAD SHX Text
NATIVE SOIL WITH APPROVED COMPACTED BACKFILL AROUND POSTS (TYP.)
AutoCAD SHX Text
FINISH GRADE
AutoCAD SHX Text NOTES: 1. DIMENSIONS FOR SIGN INSTALLATION ARE SCHEMATIC. DIMENSIONS FOR SIGN INSTALLATION ARE SCHEMATIC. 2. SIGNS WILL BE LOCATED BY THE CONTRACTING OFFICER. SIGNS WILL BE LOCATED BY THE CONTRACTING OFFICER. 3. SEE SPECIFICATION 101415 FOR SIGN SUBSTRATE AND 101400 SEE SPECIFICATION 101415 FOR SIGN SUBSTRATE AND 101400 FOR SIGN POST MATERIALS. 4. ALL SIGNS SHALL BE INSTALLED USING VANDAL RESISTANT ALL SIGNS SHALL BE INSTALLED USING VANDAL RESISTANT BOLTS AND NUTS. 5. ALL SIGNS SHALL BE IN ACCORDANCE WITH FS MANUAL EM ALL SIGNS SHALL BE IN ACCORDANCE WITH FS MANUAL EM 7100-15 CHAPTER 7B.
AutoCAD SHX Text 10 34
AutoCAD SHX Text 4D
AutoCAD SHX Text
FACILITY TYPE ASA SERIES D (UPPER CASE)
AutoCAD SHX Text
MINOR SITE ID SIGN RSE-2 TABLE
AutoCAD SHX Text
FACILITY NAME (UPPER PANEL)
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text
FACILITY TYPE (LOWER PANEL)
AutoCAD SHX Text
SIGN PANEL TEXT
AutoCAD SHX Text
FACILITY NAME
AutoCAD SHX Text
FACILITY TYPE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 13 12
AutoCAD SHX Text REVERSIBLE SIGN ATTACHED TO ABOVE SIGN BOARD WITH TWO EYE BOLTS SET 2-INCHES FROM OUTER EDGE (SEE TABLE THIS SHEET)
AutoCAD SHX Text
STATUS
AutoCAD SHX Text A
AutoCAD SHX Text
STATUS (REVERSIBLE)
AutoCAD SHX Text
FACILITY STATUS (UPPER CASE)
AutoCAD SHX Text 3D
AutoCAD SHX Text
BOTTOM LEGEND YELLOW-CREAM LETTERS (#23695) ON BROWN (#20059) BACKGROUND
AutoCAD SHX Text
TOP LEGEND BROWN LETTERS (#20059) ON YELLOW-CREAM (#23695) BACKGROUND
AutoCAD SHX Text
CAMPGROUND
AutoCAD SHX Text
CABIN CREEK
AutoCAD SHX Text S3
AutoCAD SHX Text
FRONT OPEN
AutoCAD SHX Text
BACK FULL
AutoCAD SHX Text
CAMPGROUND
AutoCAD SHX Text
HORSE CABIN FLAT
AutoCAD SHX Text S2
AutoCAD SHX Text
FRONT OPEN
AutoCAD SHX Text
BACK FULL
AutoCAD SHX Text
AutoCAD SHX Text 3 34
AutoCAD SHX Text 4D
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 10 34
AutoCAD SHX Text 4D
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text 13 12
AutoCAD SHX Text 3D
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Cabin Creek CG
TO
TR 152
[horse trail]
TO
[horse trail][camping]
Cabin Creek CG
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 5/2
3 1 5:
K
CA
RN
ES
X
:\P
AY
ET
TE
\C
AB
IN
CR
EE
KC
AM
PG
RO
UN
D.
\D
RA
W
IN
GS
\D
_S
IG
N_
LI
ST
_IN
ST
AL
LA
TI
ON
.D
W G;
R4
INTERMOUNTAIN REGION
GAOA WEST ZONE
CAMPGROUND
RECONSTRUCTION
(CABIN CREEK)
PAYETTE NATIONAL
FOREST
COUNCIL RANGER DISTRICT
SIGN LIST AND
INSTALLATION DETAILS
02/25/2023
R. BUDGE
R. BUDGE
R. ANDERSON
FINAL
D16 23 41
Solicitation No: 1240LT23R0003 J.5 Attachment
Project Name: GAOA West Zone Campground Reconstruction
AutoCAD SHX Text
SINGLE POST SIGNS
AutoCAD SHX Text
SIGN INSTALLATION DETAILS (NO SCALE) (NO SCALE)(NO SCALE)
AutoCAD SHX Text
NATIVE SOIL WITH APPROVED COMPACTED BACKFILL AROUND POSTS (TYP.)
AutoCAD SHX Text
LETTER SIZE VARIES
AutoCAD SHX Text
SIGN BOARD
AutoCAD SHX Text
5/16" X 3" BOLTS (TYP.)
AutoCAD SHX Text
4" X 6" TREATED POST (TYP.)
AutoCAD SHX Text
4" X 4" TREATED POST (TYP.)
AutoCAD SHX Text
SURFACED AREA
AutoCAD SHX Text
3'-0" (MIN.)
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text 3"
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
REFLECTIVE WHITE LEGEND ON REFLECTIVE BROWN BACKGROUND
AutoCAD SHX Text
7'-0" MIN.
AutoCAD SHX Text
EDGE OF PAVEMENT OR TRAVEL WAY ON CRUSHED AGGREGATE
AutoCAD SHX Text
6' TO 12'
AutoCAD SHX Text
DOUBLE POST SIGNS
AutoCAD SHX Text
LETTER SIZE VARIES
AutoCAD SHX Text
SIGN BOARD
AutoCAD SHX Text 3"
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
7'-0" (5'-0" HORSE TRAILER PARKING SIGNS)
AutoCAD SHX Text
4" X 4" TREATED POST
AutoCAD SHX Text 38"
AutoCAD SHX Text
3'-0" (MIN.)
AutoCAD SHX Text
TB-1 (SEE TRAIL SIGN LIST, THIS SHEET)
AutoCAD SHX Text 30"
AutoCAD SHX Text
1" CHAMFERED TOP (4 SIDES)
AutoCAD SHX Text 6" x 6" x 5'-0" REDWOOD OR CEDAR SQUARE POST, S4S CONSTRUCTION GRADE #1, SEAL SEAL WITH 2 COATS OF EXTERIOR PENETRATING STAIN (FEDERAL STANDARD 595 NO. 20059)
AutoCAD SHX Text A EDGE OF PANEL TO TOP AND BOTTOM OF TEXT - OF THE CAPITAL LETTER HEIGHT. EDGE OF PANEL TO TOP AND BOTTOM OF TEXT - OF THE CAPITAL LETTER HEIGHT. 34 OF THE CAPITAL LETTER HEIGHT. B EDGE OF PANEL TO BEGINNING AND END OF LINES - OF THE CAPITAL LETTER HEIGHT. 34 OF THE CAPITAL LETTER HEIGHT. C BETWEEN LINES - OF THE CAPITAL LETTER HEIGHT. 34 OF THE CAPITAL LETTER HEIGHT. REQUIREMENTS FOR SPACING BETWEEN LETTERS SHALL CONFORM TO THE STANDARD ALPHABETS FOR TRAFFIC CONTROL DEVICES IN THE FHWA "STANDARD HIGHWAY SIGNS" BOOK. NOTE: SPACING MAY BE REDUCED 25 PERCENT ON C AND D SERIES TEXT, 3 INCHES AND SMALLER WHEN NECESSARY TO FIT THE MESSAGE ON THE SIGN. INCREASING SPACING TO 125 PERCENT MAKES SIGNS EASIER TO READ. BORDER STANDARD: BORDERS SHOULD BE OF SIMILAR PROPORTIONS BUT SHOULD NOT EXCEED THE STROKE WIDTH OF THE MAJOR LETTERING ON THE SIGN. SIGNS SHALL HAVE A BROWN BACKGROUND WITH REFLECTIVE LETTERS AND BORDER. SEE FS MANUAL EM 7100-15 FOR SIGN PANEL LAYOUT AND SPECIFICATION 101400.
AutoCAD SHX Text
APPROACH SIGN DETAILS (NO SCALE) (NO SCALE)
AutoCAD SHX Text
DIMENSIONS (INCHES)
AutoCAD SHX Text
UPPER CASE LETTERS AND NUMBERS
AutoCAD SHX Text 4D
AutoCAD SHX Text
LOWER CASE LETTERS
AutoCAD SHX Text 3D
AutoCAD SHX Text
MINIMUM BORDER AND SEPARATION LINE
AutoCAD SHX Text
AutoCAD SHX Text
FRD-4-4 SIGN
AutoCAD SHX Text
SIGN #8 (1 REQ.)
AutoCAD SHX Text
ALUMINUM SIGNS (DOUBLE-POST)
AutoCAD SHX Text
SIGN #9 (1 REQ.)
AutoCAD SHX Text
FRD-4-4 SIGN
AutoCAD SHX Text
ALUMINUM SIGNS (SINGLE-POST)
AutoCAD SHX Text
STOP R1-1-24 (3 REQ.) R1-1-24 (3 REQ.) (3 REQ.)
AutoCAD SHX Text
SIGN #1:
AutoCAD SHX Text
ONE WAY R6-2-18 (2 REQ.) R6-2-18 (2 REQ.) R6-2-18 (2 REQ.)
AutoCAD SHX Text
SIGN #2:
AutoCAD SHX Text NOTES: : 1. ALL SIGN BOARDS INSTALLED ON SINGLE POSTS SHALL BE CENTERED. ALL SIGN BOARDS INSTALLED ON SINGLE POSTS SHALL BE CENTERED. 2. DIMENSIONS FOR SIGN INSTALLATION ARE SCHEMATIC. DIMENSIONS FOR SIGN INSTALLATION ARE SCHEMATIC. 3. DIRECTIONAL SIGNS WILL BE LOCATED BY THE CONTRACTING OFFICER. DIRECTIONAL SIGNS WILL BE LOCATED BY THE CONTRACTING OFFICER. 4. SEE SPECIFICATION 101400 FOR SIGN POST AND MATERIALS. SEE SPECIFICATION 101400 FOR SIGN POST AND MATERIALS. 5. ALL SIGNS SHALL BE INSTALLED USING VANDAL-RESISTANT HARDWARE. ALL SIGNS SHALL BE INSTALLED USING VANDAL-RESISTANT HARDWARE. 6. INSTALLATION DATE AND VANDAL WARNING LABELS SHALL BE INSTALLED INSTALLATION DATE AND VANDAL WARNING LABELS SHALL BE INSTALLED ON ALL SIGNS IN ACCORDANCE WITH FS MANUAL EM 7100-15.
AutoCAD SHX Text
SIGN LIST
AutoCAD SHX Text
15 MINUTE PARKING FRD-2-4 (6 REQ.) FRD-2-4 (6 REQ.) (6 REQ.)
AutoCAD SHX Text
SIGN #3:
AutoCAD SHX Text
DO NOT ENTER FRD-2-4 (1 REQ.) FRD-2-4 (1 REQ.)FRD-2-4 (1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .