J.2 Site Packages Lot A1 SEED_Mpamantha.pdf

PDF 4 MB Posted

Attached to
Secondary Education Expansion for Development (SEED) Rural Group 2 Activity Federal contract opportunity
Solicitation number
72061222R00005
Issued by
US Agency for International Development Malawi

About this file

This is a Request for Proposal for construction services under the Secondary Education Expansion for Development (SEED) Rural Group 2 Activity in Malawi. USAID seeks proposals to construct Community Day Secondary Schools in 18 districts across Malawi under four firm fixed price contracts covering a 25-month period of performance. The sites are divided into two groups across four lots based on geography. Group A consists of two large lots of 19-20 schools each set aside for Malawian firms only. Group B consists of two small lots of six schools each conducted under full and open competition open to Malawian firms. Offerors may bid on one or both lots in each group, and USAID may award each group to one or two separate offerors. Proposals are valid for 120 days, with questions due by a specified date and proposals due by a specified date. The purpose is to increase access to secondary education in Malawi in support of the Government's commitment.

View the file

Other files for this federal contract opportunity

Other files attached to Secondary Education Expansion for Development (SEED) Rural Group 2 Activity, newest first.
File Type Posted
J.2 Lot B2_Therere_Amendment 02.pdf PDF
J.2 Lot B1_Chunzu_Amendment 02.pdf PDF
J.2 Lot A2_Mlindi_Amendment 02.pdf PDF
J.2 Lot A2_Kalira_Amendment 02.pdf PDF
J.2 Lot A2_Mkombe_Amendment 02.pdf PDF
J.2 Lot A2_Tambala_Amendment 02.pdf PDF
J.2 Lot A2_Dzundu_Amendment 02.pdf PDF
J.2 Lot A2_Nthulu_Amendment 02.pdf PDF
J.2 Lot A1 _Kanyazuka_Amendment 02.pdf PDF
J.2 Lot A1 _Mayoka_Amendment 02.pdf PDF
J.2 Lot A1 _Bula_Amendment 02.pdf PDF
J.2 _Utility Drawings_Amendment 02.pdf PDF
J.2 Lot B1_Kazira_Amendment 02.pdf PDF
J.2 Lot A2_Chitimbe_Amendment 02.pdf PDF
J.2 Lot A1 _Chuba_Amendment 02.pdf PDF
SRG2 Pre-Bid Meeting Presentation_Final.pdf PDF
L3.B (Template 3.B) - Past Performance Questionnaire.docx DOCX document
J6 NKHATABAY ESMP REPORT.pdf PDF
J6 NENO ESMP REPORT.pdf PDF
J6 NTCHEU ESMP REPORT.pdf PDF
J6 THYOLO ESMP REPORT.pdf PDF
J4 Lot A2 SEED BOQ UNPRICED.xls XLS spreadsheet
J.2 Site Packages Lot B2 SEED_Mulonda.pdf PDF
J.2 Site Packages Lot B1 SEED_Kazira.pdf PDF
J.2 Site Packages Lot B1 SEED_Lipunga.pdf PDF
J.2 Site Packages Lot B1 SEED_Gumulira.pdf PDF
J.2 Site Packages Lot A2 SEED_Lulanga.pdf PDF
J.2 Site Packages Lot A1 SEED_Chuba.pdf PDF
J.2 Site Packages Lot A1 SEED_Bundi.pdf PDF
J2 SEED Procurement_Utility Drawings.pdf PDF
RFP No. 72061222R00005 SEED Rural Group 2.pdf PDF
J6 DOWA ESMP REPORT.pdf PDF
L2.A (Template 2.A) - USAID - CV Biography.docx DOCX document
J11 IEE SRG2 FINAL.pdf PDF
J9 Monthly Report Template SRG2 FINAL.pdf PDF
J7 Child Safeguarding SRG2 FINAL.pdf PDF
J6 MCHINJI ESMP REPORT.pdf PDF
J6 RUMPHI ESMP REPORT.pdf PDF
J6 KARONGA ESMP REPORT.pdf PDF
J6 CHIKWAWA ESMP REPORT.pdf PDF
J6 NTCHISIC ESMP REPORT.pdf PDF
J.2 Site Packages Lot B2 SEED_Samson.pdf PDF
J.2 Site Packages Lot B2 SEED_Kandeu.pdf PDF
J.2 Site Packages Lot B1 SEED_Chunzu.pdf PDF
J.2 Site Packages Lot B1 SEED_Fanuel.pdf PDF
J.2 Site Packages Lot B1 SEED_Mwangala.pdf PDF
J.2 Site Packages Lot A2 SEED_Dzundu.pdf PDF
J.2 Site Packages Lot A2 SEED_Mokhotho.pdf PDF
J.2 Site Packages Lot A2 SEED_Tambala.pdf PDF
J.2 Site Packages Lot A2 SEED_Mwalawang_ombe.pdf PDF
Show all 50

Secondary Education Expansion for Development (SEED) Rural Group 2 Activity has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR PROCUREMENT

SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED)

NKHOTAKOTA - MPAMANTHA

PLOTTED: 2/23/2022 1:39:06 AM Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMANTHA_G-001.DWG

23 FEBRUARY 2022

THE CONTENTS OF THIS DOCUMENT ARE THE SOLE RESPONSIBILITY OF

THE CONTRACTOR AND DO NOT NECESSARILY REFLECT THE VIEWS OF

USAID OR THE UNITED STATES GOVERNMENT.

THE DRAWINGS CONTAINED HEREIN WERE DEVELOPED BY TETRA TECH

INC, MARLBOROUGH, MA UNDER CONTRACT NO. AID-OAA-I-15-00052,

TASK ORDER NO. 72061219F00002.

TETRA TECH

SEED CONTRACT MANAGEMENT CONSULTANT

SEED RURAL GROUP 2 CONSTRUCTION SERVICES

LOT A1

LATITUDE: -13.0963494°

LONGITUDE: 34.2491188°

GENERAL NOTES:

1. THESE DRAWINGS AND THE TECHNICAL

SPECIFICATIONS TOGETHER DESCRIBE THE WORK TO

BE PERFORMED. IN THE CASE OF CONFLICT BETWEEN

THE DRAWINGS AND THE SPECIFICATIONS, THE

REQUIREMENTS OF THE SPECIFICATIONS SHALL TAKE

PRECEDENCE.

2. IN CASE OF CONFLICT WITHIN THE DRAWINGS, THE

FOLLOWING PRECEDENCE SHALL APPLY: SCHEDULES

AND NOTES OVER LARGE-SCALE GRAPHICAL DETAILS

OVER SMALL-SCALE GRAPHICAL DETAILS.

3. ANY DISCREPANCY DISCOVERED WITHIN THE PLANS

AND SPECIFICATIONS SHALL BE BROUGHT TO THE

ATTENTION OF THE ENGINEER OR USAID USING

PROCEDURES DEFINED IN THE CONTRACT.

4. LEVELS AND DIMENSIONS SHALL BE CHECKED BEFORE

ANY WORK COMMENCES.

5. ANY MENTION OF APPROVAL REQUIREMENTS BY THE

ENGINEER SHALL BE CONSTRUED TO MEAN APPROVAL

IN ACCORDANCE WITH THE REQUIREMENTS OF THE

CONTRACT. APPROVAL THAT REQUIRES A SHOP

DRAWING OR SUBMITTAL MUST BE DONE IN

ACCORDANCE WITH THE CONTRACT.

6. THE ENGINEER SHALL BE GIVEN AT LEAST 24 HOURS

NOTICE OF WORK PLANNED OR IN-PLACE AND

REQUIRING INSPECTION OR TESTING. THE ENGINEER

MAY AT THEIR DISCRETION ON A CASE-BY-CASE BASIS

REQUIRE ADDITIONAL NOTICE WHERE ADDITIONAL

TRAVEL TIME IS REASONABLY REQUIRED.

7. CONTRACTOR SHALL INSTALL AND MAINTAIN

CONSTRUCTION PERIMETER FENCE AND PROVIDE

24-HOUR SITE SECURITY FOR THE DURATION OF THE

CONSTRUCTION PERIOD OF PERFORMANCE. THE FINAL

ALIGNMENT OF THE CONSTRUCTION PERIMETER FENCE

SHALL BE CONFIRMED WITH THE ENGINEER PRIOR TO

INSTALLATION.

8. THE CONTRACTOR SHALL ESTABLISH A CONSTRUCTION

ACCESS ROAD OR ROADS AS SHOWN ON THE PLANS

AND ALIGNMENT AGREED WITH THE ENGINEER. THE

CONTRACTOR MUST COORDINATE WITH THE

COMMUNITY ON THE OFF-SITE ACCESS ROUTE (ROAD

CONNECTING THE PROJECT PROPERTY WITH PUBLIC

ROAD). THE COMMUNITY IDENTIFIED THE ACCESS

ROUTE DURING DESIGN AS INDICATED IN THE

DRAWINGS, HOWEVER, THE CONTRACTOR SHALL

CONFIRM AND OBTAIN PERMISSION FROM COMMUNITY.

9. THE CONSTRUCTION GATE TO THE SITE SHALL BE AT

THE PROJECT PROPERTY LIMITS AND NOT ON

NEIGHBORING PROPERTIES.

10.PROJECT SIGN BOARD, TRAFFIC CONTROL SIGNAGE,

HEALTH AND SAFETY SIGNAGE, AND OTHER NOTICES

REQUIRED DURING CONSTRUCTION MUST BE INSTALLED

AND MAINTAINED AT EACH SITE BY THE CONTRACTOR

FOR THE DURATION OF THE PROJECT. ALL

CONSTRUCTION SIGNAGE MUST BE REMOVED AT

DEMOBILIZATION UNLESS OTHERWISE INSTRUCTED BY

THE ENGINEER.

11.A SHOP DRAWING OF THE PROJECT SIGN BOARD SHALL

BE SUBMITTED FOR USAID APPROVAL PRIOR TO

FABRICATION AND INSTALLATION. THE SHOP DRAWING

SHALL FOLLOW THE PROJECT SIGN BOARD TEMPLATE

PROVIDED IN THE DRAWINGS. THE ENGINEER MUST

APPROVE LOCATION OF PROJECT SIGN BOARD

12.THE CONTRACTOR SHALL INSTALL A SCHOOL PLAQUE

ON THE SCIENCE CLASSROOM, OR OTHER LOCATION

SPECIFIED BY USAID; USAID WILL PROVIDE THE PLAQUE

FOR EACH SCHOOL.

13.SANITATION FACILITIES MUST BE PROVIDED AND

MAINTAINED ON SITE FOR CONTRACTOR'S AND

SUBCONTRACTOR PERSONNEL AT EACH SITE

THROUGHOUT THE CONSTRUCTION PERIOD OF

PERFORMANCE.

14.NO BURNING OF WASTE OR ANY MATERIAL IS ACCEPTED

ON SITE PER MALAWI ENVIRONMENT PROTECTION

AUTHORITY(MEPA) GUIDELINES.

15.THE CONTRACTOR MUST COORDINATE WITH

COMMUNITY FOR USE OF ANY EXISTING BOREHOLE(S)

NEAR THE SITE, IF ANY. CONTRACTOR IS RESPONSIBLE

TO REPAIR ANY DAMAGE TO THE EXISTING

BOREHOLE(S) CAUSED BY CONTRACTOR USE.

CONTRACTOR RESPONSIBLE FOR ANY WATER USAGE

FEE.

GENERAL SITE CONDITION NOTES:

1. SITE CONDITIONS MAY VARY FROM THE DRAWINGS.

CONTRACTOR MUST FAMILIARIZE THEMSELVES WITH

EXISTING SITE CONDITIONS AND NOTIFY USAID OF

SIGNIFICANT VARIATIONS. MINOR MODIFICATIONS TO

SITE LAYOUT AND ORIENTATION OF BUILDING, LATRINES

AND BOREHOLE SHALL BE DONE AT NO ADDITIONAL

COST TO USAID. ANY MODIFICATION MUST BE

APPROVED BY THE ENGINEER.

2. TRIAL PITS WERE EXCAVATED DURING DESIGN PHASE

TO 2.5 M DEPTH BELOW EXISTING GRADING. GENERAL

SOIL CONDITIONS OBSERVED ARE NOTED IN THE

SITE-SPECIFIC EXISTING CONDITIONS SHEETS.

3. BENCHMARKS AND PROPERTY CORNERS WERE

SURVEYED PRIOR TO CONSTRUCTION. THE

CONTRACTOR MAY BE REQUIRED TO RE-ESTABLISH THE

BENCHMARK AS PART OF THE SETTING OUT AND SITE

LAYOUT WORK AT NO ADDITIONAL COST TO USAID.

GENERAL SETTING OUT & SITE LAYOUT NOTES:

1. NO SURVEY BEACONS, BENCHMARKS OR BOUNDARY

PEGS AND THE LIKE MAY BE REMOVED OR DAMAGED IN

ANY WAY BY THE CONTRACTOR OR ANY ONE ON SITE.

2. THE MAJOR GRIDLINES AS WELL AS THE OVERALL

OUTLINE OF ALL THE WORKS MUST BE SET OUT

ACCORDING TO THE ENGINEERS DRAWINGS, AND

WRITTEN APPROVAL BY THE ENGINEER MUST BE GIVEN

AS PERMISSION TO PROCEED WITH ANY WORKS. ANY

DISCREPANCIES OR AMBIGUITIES RELATING TO THE

ABOVEMENTIONED MUST BE BROUGHT TO THE

ATTENTION OF THE ENGINEER IMMEDIATELY BY MEANS

OF A RFI (REQUEST FOR INFORMATION).

3. TOLERANCES, UNLESS OTHERWISE INDICATED ON

SPECIFICATIONS AND/OR DRAWINGS, WILL BE TO LEVEL

II ACCORDING TO S.A.B.S. 1200.

4. CONTRACTOR SHALL LAYOUT THE SITE FOLLOWING THE

DRAWINGS AND IN COORDINATION WITH USAID. THE

CONTRACTOR MAY BE REQUIRED TO MAKE MINOR

MODIFICATIONS TO BUILDING, LATRINE AND BOREHOLE

ORIENTATION AT NO ADDITIONAL COST TO THE

CONTRACT, DURING SETTING OUT OF THE SITE LAYOUT

IF DEEMED NECESSARY BY USAID BASED ON EXISTING

CONDITIONS ON THE SITE OR OTHER CONSTRAINTS.

MINOR LAYOUT ADJUSTMENTS MAY TAKE PLACE TO

AVOID CUTTING TREES OR VEGETATION. ADJUSTMENTS

WILL BE DONE IN A MANNER NOT TO INCREASE

EARTHWORK OR PROJECT COST.

5. CONTRACTOR SHALL MAINTAIN SEPARATION BETWEEN

PROPOSED SEED RURAL BUILDINGS AND ANY

EXISTING/ABANDONED BUILDINGS ON SITE. THE

CONTRACTOR SHALL PROTECT EXISTING STRUCTURES

ON SITE UNLESS IDENTIFIED FOR REMOVAL.

6. TREES WITHIN THE GRADING LIMITS ARE TO BE

REMOVED UNLESS THE SITE GRADING CAN BE DONE

WITHOUT SIGNIFICANT IMPACT TO THE TREES. ALL

TREES TO BE REMOVED MUST BE CONFIRMED BY THE

ENGINEER PRIOR TO CUTTING THE TREE. THE INTENT IS

TO MINIMIZE REMOVAL OF TREES, SHRUBS, AND

VEGETATION TO THE EXTENT FEASIBLE TO COMPLETE

THE WORK. TREES AND ROOTS MUST BE REMOVED

FROM AND AROUND ALL PROPOSED BUILDING

LOCATIONS. TREES TO BE REMOVED MUST BE

IDENTIFIED AND MARKED BY THE CONTRACTOR PRIOR

TO REMOVAL

7. SHOULD THE CONTRACTOR ENCOUNTER HARD ROCK

DURING TRIAL PIT EXPLORATION FOR THE LATRINE PITS,

THE CONTRACTOR SHALL NOTIFY USAID AND DESCRIBE

THE CONDITIONS. TOGETHER WITH USAID, THE

CONTRACTOR MUST IDENTIFY A NEW LOCATION FOR

THE LATRINE THAT MEETS THE SITE LAYOUT

CONDITIONS OF OFFSET BETWEEN BUILDINGS,

DISTANCE FROM WATER SOURCES, AND DOWNWIND OF

CLASSROOMS. LATRINE TEST PITS SHALL BE

CONSIDERED INCIDENTAL TO LATRINE CONSTRUCTION.

8. THE CONTRACTOR MUST PROVIDE TOOLS AND

EQUIPMENT TO EXCAVATE WEATHERED ROCK FOUND IN

PIT LATRINES AND/OR BUILDING FOUNDATIONS.

MECHANICAL TOOLS AND EQUIPMENT MAY BE

REQUIRED AT SOME OF THE SITES TO COMPLETE

LATRINE PIT EXCAVATION.

9. SHOULD A LATRINE LOCATION NEED TO BE CHANGED,

LATRINES SHALL BE PLACED AT LEAST 30 METERS FROM

EXISTING AND/OR PROPOSED BOREHOLES AND AN

ACCEPTABLE DISTANCE FROM BUILDINGS.

10.CONTRACTOR SHALL COORDINATE LOCATION OF THE

LATRINE RAMPS WITH USAID AND SHALL TAKE INTO

ACCOUNT THE SITE DRAINAGE, GRADING, AND

ACCESSIBILITY.

11.TOPSOIL IN THE COMPACTED EARTHEN PATHWAY SHALL

BE REMOVED AND REPLACED WITH THE LOWEST

PLASTICITY MATERIAL AVAILABLE ON-SITE.

12.ALIGNMENT OF THE COMPACTED EARTHEN PATHWAY

AND ACCESS ROAD MAY BE ADJUSTED TO AVOID

CUTTING TREES TO THE EXTENT AGREED BY THE

ENGINEER.

13.CONTRACTOR SHALL PERFORM ANY DEWATERING

REQUIRED TO PROPERLY COMPLETE THE WORK.

DEWATERING DISCHARGE MUST BE DONE IN A MANNER

THAT DOESN'T POLLUTE DOWNSTREAM WATER BODIES

OR CAUSE EROSION.

14.THE PROPOSED BOREHOLE SHALL BE DRILLED AND

WELL DEVELOPED TO THE DEPTH SPECIFIED IN THE

BOQ. THE CONTRACTOR SHALL CONDUCT A YIELD TEST

FOR EACH NEW BOREHOLE IN ACCORDANCE WITH THE

CONTRACT AND SPECIFICATIONS.

15.SOAKAWAY PITS SHALL BE CONSTRUCTED AT

CLASSROOM LATRINES AND AT TEACHER HOUSES.

LOCATION OF SOAKAWAY PITS TO BE CONFIRMED

DURING SETTING OUT.

16.THE MAXIMUM ALLOWABLE LONGITUDINAL SLOPE OF

CONCRETE WALKWAYS IS 5%. CONTRACTOR SHALL

VERIFY COMPLIANCE WITH THIS MAXIMUM DURING SITE

LAYOUT OR DURING ANY ADJUSTMENT TO SITE LAYOUT.

17.TOPSOIL UNDER PROPOSED CONCRETE WALKWAYS

SHALL BE REMOVED AND THE WALKWAY SHALL BE

PLACED DIRECTLY ON SUITABLE SUBSOIL OR ON A

MINIMUM OF 60 CM OF SUITABLE COMPACTED

EMBANKMENT.

GENERAL SITE GRADING, DRAINAGE AND EARTHWORK NOTES:

1. ALL FOUNDATION EXCAVATIONS ARE TO BE INSPECTED

AND APPROVED BY THE ENGINEER BEFORE FIXING

STEEL REINFORCING AND BEFORE CASTING CONCRETE.

2. WHERE SUITABLE FOUNDING MATERIAL IS NOT

ENCOUNTERED AT THE DEPTH SHOWN ON THE

FOUNDATION DRAWINGS, EXCAVATION IS TO PROCEED

TO A DEPTH AS APPROVED BY THE ENGINEER ON SITE.

COMPENSATION FOR ANY ADDITIONAL EXCAVATION

SHALL BE AS ALLOWED FOR IN THE CONTRACT.

3. FOUNDATION OVER EXCAVATION SHALL BE BACKFILLED

TO PLAN LEVEL WITH LEAN CONCRETE IF SO ORDERED

BY THE ENGINEER.

4. ALL EARTH FILL UNDER STRUCTURE FOUNDATIONS AND

SLABS ON GRADE SHALL BE PLACED IN LOOSE LAYERS

NOT EXCEEDING 200MM AND COMPACTED TO MIN 95%

AASHTO-T99(STANDARD PROCTOR) OR APPROVED

EQUIVALENT METHODOLOGY.(STRUCTURAL BACKFILL

MUST BE APPROVED BY USAID PRIOR TO DELIVERY TO

SITE. SOIL SAMPLE TEST MUST BE CONDUCTED AND

DEEMED ACCEPTABLE BY USAID PRIOR TO USE AS

STRUCTURAL BACKFILL)

5. EXPANSIVE SOIL WITHIN 80CM OF THE BOTTOM OF THE

FOOTINGS AND/OR WITHIN 140CM OF THE BOTTOM OF

SLAB ON GRADE SHALL BE REMOVED AND REPLACED

WITH APPROVED FILL MATERIAL. REFER TO CONTRACT

REQUIREMENTS.

6. CONTRACTOR SHALL ROUGH GRADE THE SITE READY

FOR BUILDING CONSTRUCTION AND ACCESS ROUTE.

7. ALL BUILDINGS SHALL BE CONSTRUCTED ON CUT OR

FULLY COMPACTED, APPROVED, BACKFILL MATERIAL.

COMPACTION SHALL MEET THE REQUIREMENTS AND

TESTING INCLUDED IN THE TECHNICAL SPECIFICATIONS.

8. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO

PROPERTY AREA THAT IS NOT INCLUDED IN THE

GRADING LIMITS.

9. CONTRACTOR SHALL MINIMIZE REMOVAL OF TOPSOIL,

VEGETATION, AND TREES TO THE EXTENT FEASIBLE IN

GRADING THE SITE AND COMPLETING CONSTRUCTION.

10.DRAINAGE FEATURES MUST BE INSTALLED ON CUT

MATERIAL. IF NOT INSTALLED ON CUT MATERIAL, THE

AREA SHALL BE APPROVED BACKFILL MATERIAL

COMPACTED PER THE TECHNICAL SPECIFICATIONS.

11.DRAINAGE FEATURES AND SITE GRADING MUST BE

COORDINATED TO ENSURE STORMWATER FLOWS AWAY

FROM BUILDINGS, ACROSS THE SITE, AND TO AN

OFFSITE LOCATION AS SHOWN IN THE DRAWINGS.

CONTRACTOR MAY BE REQUIRED TO ADJUST LOCATION

OF DRAINAGE FEATURES TO FIT WITH THE FINAL SITE

GRADES.

12.FOR ANY GRADING OR TEMPORARY WORK REQUIRED

OUTSIDE PROJECT PROPERTY LIMITS, THE

CONTRACTOR MUST OBTAIN TEMPORARY PERMISSION

FROM NEIGHBORING PROPERTY TO COMPLETE THE

WORK.

13.CONTRACTOR MUST MINIMIZE DISTURBANCE OF AREA

WITHIN 30 METERS OF A SWAMP OR WETLAND.

14.LATRINE ROOF DRAINAGE (RUNOFF) SHALL BE

COLLECTED AND CONVEYED ALONG THE REAR OF EACH

LATRINE. SEE FACILITY PACKAGE DETAILS FOR WORK

TO BE DONE TO THE CONCRETE SLAB THAT RUNOFF

FLOWS AWAY FROM EACH LATRINE AND NOT INTO THE

LATRINE PIT.

GENERAL EROSION AND SEDIMENT CONTROL/SLOPE

STABILITY NOTES:

1. CONTRACTOR SHALL INSTALL TEMPORARY EROSION

AND SEDIMENT (E&S) CONTROL MEASURES AS

SPECIFIED IN THE DRAWINGS AND TECHNICAL

SPECIFICATIONS. THE E&S MEASURES MUST BE

MAINTAINED FOR THE DURATION OF THE

CONSTRUCTION PERIOD OF PERFORMANCE AND SHALL

BE REMOVED DURING DEMOBILIZATION.

2. CONTRACTOR IS RESPONSIBLE TO CONTROL RAINFALL

RUNOFF AND EROSION ON SITE DURING CONSTRUCTION

THROUGH PERMANENT OR TEMPORARY DIVERSION,

CHECK DAMS, SLOPE STABILITY, AND NATURAL

CHANNELS.

3. CONTRACTOR SHALL INSTALL LONG TERM EROSION

AND SEDIMENT CONTROL MEASURES AS SPECIFIED IN

THE DRAWINGS AND TECHNICAL SPECIFICATIONS.

4. THE CONTRACTOR SHALL PROTECT SLOPES FOR

EROSION BY MINIMIZING STEEPNESS OF THE SLOPE,

REPLACE VEGETATION, AND PLANT NEW VEGETATION

PER THE TECHNICAL SPECIFICATIONS. THE

CONTRACTOR IS RESPONSIBLE TO WATER AND

MAINTAIN GRASS SPRIGGING AND OTHER PLANTS

PLANTED UNDER THIS CONTRACT.

5. CONTRACTOR SHALL PROVIDE AND PLANT TREES AT A

LOCATION SPECIFIED BY USAID AND THE COMMUNITY.

THE CONTRACTOR IS RESPONSIBLE TO WATER AND

MAINTAIN THE TREES IN ACCORDANCE WITH THE

TECHNICAL SPECIFICATIONS. REFER TO THE CONTRACT

FOR NUMBER OF TREE SEEDLINGS TO BE PLANTED PER

EACH MATURE TREE CUT.

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:42:57 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMANTHA_G-020.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

M R

H

JT

M

SP

M

-0 6-

SE

ED

_B O

N D

O _C

-1

.D W

G

G-020

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

IN

D

EX

O

F D

R

AW

IN

G

S

G

EN

ER

AL

N O

TE

S

INDEX OF DRAWINGS

SHEET REF.

NUMBER

ISSUE

STATUS TITLE

GENERAL DRAWINGS

G-001 COVER SHEET

G-020 INDEX OF DRAWINGS & GENERAL NOTES

CIVIL DRAWINGS

C-100 SURVEY

C-101 EXISTING CONDITIONS AND DEMOLITION

C-102 EXISTING CONDITIONS AND DEMOLITION

C-111 OVERALL SITE LAYOUT

C-112 SITE LAYOUT

C-113 SITE LAYOUT

C-121 GRADING AND DRAINAGE

C-122 GRADING AND DRAINAGE

C-131 EROSION CONTROL AND STABILIZATION

C-132 EROSION CONTROL AND STABILIZATION

146° 47' 25.6"

235° 2 2' 16.1"

266° 37' 3.7"

° 0

2'

9.

0"

92° 59' 53.7"

216.14 m

58.537 m

304.51 m

6.

m

186.83 m

MP1

MP2

MP3

MP4

MP5

MPAMANTHA PROPOSED SCHOOL SITE

NKHOTAKOTA DISTRICT

AREA: 52270m²

AREA: 15.39 ACRES (5.227 HECTARES)

BM1

BM2

499.50

4.

5.

2.

501.50

502.50502.50503.50

0.

499.50

498.50

498.50

5.

4.

503.00

502.00

501.00

502.00503.00

2.

499.00

500.00

499.00

499.00

498.00

9.0

499.00

9.

500.00

501.00

BRICKS (TYP)

EXISTING FOOTPATH

(TYP)

UNFINISHED

SCHOOL BLOCK

WATER RESERVOIR

HOLE (TYP)

UNFINISHED HOUSE

EXISTING ACCESS ROAD

DRAIN

EXISTING HOUE

RING CULVERT

LATRINE (TYP)

EXISTING HOUE

EXISTING HOUE

DRAIN

SURVEYED PROPERTY

LIMITS

SURVEYED PROPERTY

LIMITS

SURVEYED PROPERTY

LIMITS

1:750

150 30 75m

NORTH ARROW

N

BARSCALE

SURVEY PLAN

1:750

G .C

M

BS

M

BS

-0 7-

SE

ED

_M

PA

M

AN

TH

A_

C -1

.D

W G

C-100

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

SU

R

VE

Y

PL

AN

LEGEND

MAJOR CONTOURS

MINOR CONTOURS

TREE

SURVEYED PROPERTY LIMITS

BOUNDARY BEACON

BENCHMARK

ROAD

FOOT PATH

ANTHILL

BENCHMARK

NAME EASTINGS NORTHINGS ELEVATIONS

CORNER POINT COORDINATES

NAME EASTINGS NORTHINGS ELEVATIONS

PIT LATRINE

1144.00

1144.50

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:43:05 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMATHA_C-100.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

ROCKS

BM1 635518.73 8551812.39 499.36

BM2 635423.45 8551873.18 500.56

MP1 635300.24 8551944.67 503.06

MP2 635486.73 8551933.98 499.75

MP3 635604.20 8551752.59 498.98

MP4 635555.88 8551719.57 499.17

MP5 635251.87 8551703.11 503.50

RESERVOIR

BRICKS

SMALL HOLE

BUILDING

92° 59' 53.7"

186.83 m

MP1

MP2

BM1

BM2

499.50

2.

501.50

0.

499.50

503.00

501.00

501.00

PROTECT

UNFINISHED

SCHOOL BLOCK

PROTECT WATER

RESERVOIR

UNFINISHED HOUSE

EXISTING ACCESS ROAD

PROTECT

LATRINE (TYP)

GRADING LIMITS

PROJECT LIMITS

FILL UP HOLE (SEE NOTE 9)

EXISTING FOOTPATH

(SEE NOTE 7)

BLUEGUM TREES

LIMITS

TP-2 (CLAYEY SANDS)

TP-1 (CLAYEY SANDS)

TP-3 (CLAYEY SANDS)

TP-8 (CLAYEY SANDS)

TP-7 (CLAYEY SANDS)

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

EXISTING CONDITIONS

AND DEMO

1:400

G .C

M

BS

M

BS

-0 7-

SE

ED

_M

PA

M

AN

TH

A_

C -1

.D

W G

C-101

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

AN

D D

EM

O

BENCHMARK

NAME EASTINGS NORTHINGS ELEVATIONS

CORNER POINT COORDINATES

NAME EASTINGS NORTHINGS ELEVATIONS

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:42:09 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMATHA_C-101.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

BM1 635518.73 8551812.39 499.36

BM2 635423.45 8551873.18 500.56

MP1 635300.24 8551944.67 503.06

MP2 635486.73 8551933.98 499.75

MP3 635604.20 8551752.59 498.98

MP4 635555.88 8551719.57 499.17

MP5 635251.87 8551703.11 503.50

MATCHLINESEE SHEETMATCHLINE C-102

LEGEND

MAJOR CONTOURS

MINOR CONTOURS

TREE

SURVEYED PROPERTY LIMITS

BOUNDARY BEACON

BENCHMARK

ROAD

FOOT PATH

ANTHILL

PIT LATRINE

1144.00

1144.50

ROCKS

RESERVOIR

BRICKS

SMALL HOLE

GENERAL NOTES

1. REFER TO GENERAL NOTES FOR TREE REMOVAL INCLUDING

CONFIRMATION FROM SUPERVISING ENGINEER.

2. TREE REMOVAL INCLUDES ROOT REMOVAL AND

BACKFILL/COMPACTION.

3. CONTRACTOR TO CONFIRM WITH ENGINEER LOCATION OF

MATERIAL AND CONSTRUCTION EQUIPMENT LAY DOWN AREA.

4. ALL TRIAL PITS SHOULD BE BACKFILLED WITH SELECTED ON SITE

MATERIAL

5. PROJECT LIMIT LINE SHALL COINCIDE WITH SITE CONSTRUCTION

FENCE(SITE HOARDING)

6. THE CONTRACTOR SHALL LIMIT DISTURBANCE TO EXISTING SITE

BEYOND GRADING LIMITS UNLESS APPROVED BY THE ENGINEER,

THE INTENT IS TO CONFINE CONSTRUCTION ACTIVITIES WITHIN

PROJECT LIMITS

7. EXISTING FOOTPATHS PASSING THROUGH THE PROJECTS LIMITS

SHALL BE RELOCATED BY THE SCHOOL MANAGEMENT AND

COMMUNITY

8. CONTRACTOR SHALL OBTAIN TEMPORARY PERMISSION FROM

NEIGHBORING PROPERTY OWNER TO COMPLETE MINOR

GRADING WORK OUTSIDE SCHOOL PROPERTY BOUNDARY

9. REMOVE BUSH, ANTHILLS,BRICKS AND FILL UP HOLES WITHIN

THE PROJECTS LIMITS AS CONFIRMED BY THE ENGINEER

PROJECTS LIMITS

GRADING LIMITS

TRIAL PIT

AutoCAD SHX Text

PROPOSED TRAFFIC SIGN

AutoCAD SHX Text

PROPOSED PROJECT SIGN BOARD

AutoCAD SHX Text

CONSTRUCTION ACCESS ROAD/SITE ENTRACE

2' 16.1"

266° 37' 3.7"

58.537 m

304.51 m

MP3

MP4

498.50

9.0

499.00

RING CULVERT

DRAIN

SURVEYED PROPERTY

LIMITS

PROTECT TREE (TYP)

GRADING LIMITS

TP-5 (CLAYEY SANDS)

LEGEND

MAJOR CONTOURS

MINOR CONTOURS

TREE

SURVEYED PROPERTY LIMITS

BOUNDARY BEACON

BENCHMARK

ROAD

FOOT PATH

ANTHILL

BENCHMARK

NAME EASTINGS NORTHINGS ELEVATIONS

CORNER POINT COORDINATES

NAME EASTINGS NORTHINGS ELEVATIONS

PIT LATRINE

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

EXISTING CONDITIONS

AND DEMO

1:400

G .C

M

BS

M

BS

-0 7-

SE

ED

_M

PA

M

AN

TH

A_

C -1

.D

W G

C-102

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

AN

D D

EM

O

1144.00

1144.50

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:38:31 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMATHA_C-101.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

ROCKS

BM1 635518.73 8551812.39 499.36

BM2 635423.45 8551873.18 500.56

MP1 635300.24 8551944.67 503.06

MP2 635486.73 8551933.98 499.75

MP3 635604.20 8551752.59 498.98

MP4 635555.88 8551719.57 499.17

MP5 635251.87 8551703.11 503.50

RESERVOIR

BRICKS

SMALL HOLE

GENERAL NOTES

1. REFER TO GENERAL NOTES FOR TREE REMOVAL INCLUDING

CONFIRMATION FROM SUPERVISING ENGINEER.

2. TREE REMOVAL INCLUDES ROOT REMOVAL AND

BACKFILL/COMPACTION.

3. CONTRACTOR TO CONFIRM WITH ENGINEER LOCATION OF

MATERIAL AND CONSTRUCTION EQUIPMENT LAY DOWN AREA.

4. ALL TRIAL PITS SHOULD BE BACKFILLED WITH SELECTED ON SITE

MATERIAL

5. PROJECT LIMIT LINE SHALL COINCIDE WITH SITE CONSTRUCTION

FENCE(SITE HOARDING)

6. THE CONTRACTOR SHALL LIMIT DISTURBANCE TO EXISTING SITE

BEYOND GRADING LIMITS UNLESS APPROVED BY THE ENGINEER,

THE INTENT IS TO CONFINE CONSTRUCTION ACTIVITIES WITHIN

PROJECT LIMITS

7. EXISTING FOOTPATHS PASSING THROUGH THE PROJECTS LIMITS

SHALL BE RELOCATED BY THE SCHOOL MANAGEMENT AND

COMMUNITY

8. CONTRACTOR SHALL OBTAIN TEMPORARY PERMISSION FROM

NEIGHBORING PROPERTY OWNER TO COMPLETE MINOR

GRADING WORK OUTSIDE SCHOOL PROPERTY BOUNDARY

9. REMOVE BUSH, ANTHILLS,BRICKS AND FILL UP HOLES WITHIN

THE PROJECTS LIMITS AS CONFIRMED BY THE ENGINEER

PROJECTS LIMITS

GRADING LIMITS

MATCHLINE SEE SHEET MATCHLINEC-102

TRIAL PIT

AutoCAD SHX Text

PROPOSED TRAFFIC SIGN

AutoCAD SHX Text

ENTRANCE TO TEACHERS HOUSES

2' 16.1"

266° 37' 3.7"

° 0

2'

9.

0"

92° 59' 53.7"

216.14 m

58.537 m

304.51 m

6.

m

186.83 m

MP1

MP2

MP3

MP4

MP5

BM1

BM2

499.50

4.

5.

2.

501.50

502.50502.50503.50

0.

499.50

498.50

498.50

498.50

4.

503.00

502.00

501.00

502.00503.00

2.

499.00

500.00

499.00

499.00

498.00

9.0

499.00

9.

500.00

501.00

BRICKS (TYP)

EXISTING FOOTPATH

(TYP)

UNFINISHED

SCHOOL BLOCK

WATER RESERVOIR

HOLE (TYP)

UNFINISHED HOUSE

EXISTING ACCESS ROAD

DRAIN

EXISTING HOUE

RING CULVERT

LATRINE (TYP)

EXISTING HOUE

EXISTING HOUE

DRAIN

SURVEYED PROPERTY

LIMITS

SURVEYED PROPERTY

LIMITS

SURVEYED PROPERTY

LIMITS

TEACHER

HOUSING LATRINE

TEACHER

HOUSING LATRINE

P-BH

MATCHLINE C-112

C-113

TEACHER

HOUSING

TEACHER

HOUSING

CONCRETE

SIDEWALK

STUDENT LATRINE

(MALE)

COMPACTED

EARTHEN

PATHWAY

TEACHER

LATRINE

CLASSROOM

BLOCK

CLASSROOM

BLOCK

SCIENCE

CLASSROOM

PROJECTS

LIMITS

STUDENT LATRINE

(FEMALE)

EARTHEN

ACCESS ROAD

GRAVEL PARKING

AREA (TYP)

EARTHEN

ACCESS ROAD

N 635532.6155 E 8551838.7687

1:750

150 30 75m

NORTH ARROW

N

BARSCALE

OVERALL SITE PLAN

1:750

G C

PG PG

-1 0-

SE

ED

_M

PA

M

AN

TH

A_

C -1

.D

W G

C-111

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

O

VE

R

AL

L

SI

TE

P

LA

N

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:42:17 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMANTHA_C-111.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

1. THIS SHEET IS INTENDED FOR OVERALL SITE ORIENTATION WITH

EXISTING & PROPOSED FEATURES

GENERAL NOTE

MP1

MP2

SCIENCE

CLASSROOM

CLASSROOM

BLOCK

CLASSROOM

BLOCK

N 635418.7600 E 8551853.1272

N 635442.7600 E 8551853.1272

N 635455.1600 E 8551874.1272

N 635479.1600 E 8551874.1272

CONCRETE

SIDEWALK

STUDENT LATRINE

(FEMALE)

SOAKWAY PIT

STUDENT LATRINE

(MALE)

SOAKWAY PIT

N 635442.7600 E 8551901.9162

N 635426.5600 E 8551901.9162

EARTHEN

ACCESS ROAD

COMPACTED

EARTHEN

PATHWAY

GRAVEL PARKING

AREA (TYP)

TEACHER

LATRINE

SOAKWAY PIT

PROTECT

EXISTING

BUILDING

CONNECT

ACCESS

ROAD TO

EXISTING

ROADWAY

PROTECT

LATRINE

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

SITE PLAN

1:400

G C

PG PG

-1 0-

SE

ED

_M

PA

M

AN

TH

A_

C -1

.D

W G

C-112

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

SI

TE

P

LA

N

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:42:21 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMANTHA_C-112.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

GENERAL NOTES

LEGEND

BEACON

ROAD

SURVEYED PROPERTY LIMITS

PROPOSED BOREHOLE

TRIAL PIT

P-BH

PROJECT LIMIT

EXISTING BUILDING

BM BENCH MARK

1. CONTRACTOR TO INSTALL TEMPORARY CONSTRUCTION FENCE

ALONG PROJECT LIMITS.

2. DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED

3. DURING SETTING OUT OF BUILDINGS, CONFIRM LOCATION OF

EACH BUILDING WITH ENGINEER PRIOR TO FOUNDATION

EXCAVATION

4. COMPLETE TRIAL PIT AT PROPOSED LATRINE LOCATION TO

CHECK FOR HARD ROCK

5. PROVIDE DIAMETER 110mm CLASS 6 UPVC PIPE CONNECTING TO

THE SOAKAWAYS FROM GULLY BOXES OR PIT LATRINES AS

REQUIRED LAID AT A SLOPE OF 1 % MINIMUM

6. REFER TO STANDARD DETAILS FOR TEACHER HOUSE SOAKAWAY

LAYOUT

7. UNLESS OTHERWISE NOTED, TIE PROPOSED DRIVEWAY TO THE

PROMINENT OFF SITE ACCESS POINT

8. SEE BOQ FOR PROPOSE BOREHOLE DEPTH

MATCHLINE SEE SHEET MATCHLINEC-113

TREE

RESERVOIR

PIT LATRINE

SMALL HOLESEE SHEET C-111 FOR P-BH LOCATION

58.537 m

MP3

MP4

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

N 635562.3054 E 8551766.0198

N 635562.3054 E 8551755.2198

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

N 635531.1806 E 8551766.0198

N 635531.1806 E 8551755.2198

EARTHEN

ACCESS ROAD

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

SITE PLAN

1:400

G C

PG PG

-1 0-

SE

ED

_M

PA

M

AN

TH

A_

C -1

.D

W G

C-113

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

SI

TE

P

LA

N

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:42:23 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMANTHA_C-112.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

GENERAL NOTES

LEGEND

BEACON

ROAD

SURVEYED PROPERTY LIMITS

PROPOSED BOREHOLE

TRIAL PIT

P-BH

PROJECT LIMIT

BM BENCH MARK

1. CONTRACTOR TO INSTALL TEMPORARY CONSTRUCTION FENCE

ALONG PROJECT LIMITS.

2. DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED

3. DURING SETTING OUT OF BUILDINGS, CONFIRM LOCATION OF

EACH BUILDING WITH ENGINEER PRIOR TO FOUNDATION

EXCAVATION

4. COMPLETE TRIAL PIT AT PROPOSED LATRINE LOCATION TO

CHECK FOR HARD ROCK

5. PROVIDE DIAMETER 110mm CLASS 6 UPVC PIPE CONNECTING TO

THE SOAKAWAYS FROM GULLY BOXES OR PIT LATRINES AS

REQUIRED LAID AT A SLOPE OF 1 % MINIMUM

6. REFER TO STANDARD DETAILS FOR TEACHER HOUSE SOAKAWAY

LAYOUT

7. UNLESS OTHERWISE NOTED, TIE PROPOSED DRIVEWAY TO THE

PROMINENT OFF SITE ACCESS POINT

8. SEE BOQ FOR PROPOSE BOREHOLE DEPTH

MATCHLINE SEE SHEET MATCHLINEC-112

TREE

SMALL HOLE

MP1

MP2

499.50

2.

501.50

0.

499.50

503.00

501.00

501.00

SCIENCE

CLASSROOM

CLASSROOM

BLOCK

CLASSROOM

BLOCK

STUDENT LATRINE

(FEMALE)

STUDENT LATRINE

(MALE)

TEACHER

LATRINE

SOAKWAY PIT

92° 59' 53.7"

186.83 m

MP1

MP2

499.50

2.

501.50

0.

499.50

503.00

501.00

501.00

SCIENCE

CLASSROOM

CLASSROOM

BLOCK

CLASSROOM

BLOCK

STUDENT LATRINE

(FEMALE)

STUDENT LATRINE

(MALE)

TEACHER

LATRINE

SOAKWAY PIT

0.

0.

1.

502.50

3.

FFE = 501.40

FFE = 500.90

FFE = 501.40

FFE = 501.90

0.

0.

501.50FFE = 502.90

SITE GRADING

AND PROPERTY

LIMITS

SITE GRADING

LIMITS THE CONTRACTOR SHALL

GRADE SITE TO DRAIN STORM

WATER TO EXISTING DRAINAGE

CHANNEL

HP

HP LP

LP

LP

LP

HP

HP

LP

LP

HP

HP

5M 300 mm UPVC DRAIN

PIPE WITH ENDWALL

INV IN = 498.00

INV OUT = 497.96

SEE NOTE 5

SEE NOTE 5

502.50

503.00 502.50

SEE NOTE 5

SEE NOTE 5

0.

501.00

500.50

501.00

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

GRADING AND

DRAINAGE

1:400

KJKG

S

W C

P

-0

5-

SE

ED

_M

PH

ES

I_

C -1

.D

W G

C-121

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

G R

AD

IN

G A

N D

D R

AI

N

AG

E

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:42:31 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMANTHA_C-121.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

MATCHLINE SEE SHEET MATCHLINEC-122

GENERAL NOTES

1. SEE SHEET D-C-503 FOR ROOF DRAINAGE APRON DETAIL.

2. HP AND LP INDICATE THE HIGH POINT AND LOW POINT ALONG

PROPOSED ROOF DRAINAGE APRONS.

3. SPOT ELEVATIONS ARE FOR SITE DRAINAGE.

4. FLOW ARROWS ARE FOR SITE DRAINAGE. FINAL SITE GRADING

SHOULD BE DONE IN ACCORDANCE WITH OVERALL DRAINAGE

PLAN.

5. DRAINAGE PIPE INDICATED ON PLANS WITHOUT SPECIFIC SIZES

OR INVERT INFORMATION SHALL BE 300 MM DIAMETER X 2

METERS LONG MINIMUM. AND PLACED TO SUIT AS-BUILT

GRADES. PROVIDE MINIMUM 1M² RIP-RAP PITCHING AT ALL PIPE

OUTLETS, INCLUDING AT 150 MM ROOF DRAINAGE POINTS.

ENDWALLS ARE NOT REQUIRED.

6. DRAINAGE PIPE WITH INVERT ELEVATIONS SPECIFIED SHALL BE

PROVIDED WITH ENDWALLS. FIELD ADJUST PROPOSED GRADES

TO PROVIDE A MINIMUM OF 30 CM COVER OVER DRAINAGE PIPE

WITH INVERT INFORMATION PROVIDED.

7. SLOPE FOR ALL DRAINAGE PIPE SHALL BE MINIMUM 1.0%.

8. FINISHED GRADES SHALL SLOPE AWAY FROM THE FINISHED

FLOOR OF EACH BUILDING A MINIMUM OF 0.15 M AT 3.0 M (5%)

FROM BUILDING. IF ADJACENT GROUND HAS A CONCRETE PATH,

THE CROSS SLOPE ON THE CONCRETE PATH SHALL BE 2% AWAY

FROM BUILDING.

9. SEE SPECIFICATION DIVISION 31 FOR SITE EXCAVATION,

COMPACTION AND FINISH GRADING REQUIREMENTS.

10. EARTHEN PATHWAYS SLOPE SHALL NOT EXCEED 5%

SITE GRADING LIMITS

EXISTING CONTOUR (MAJOR)

EXISTING CONTOUR (MINOR)

PROPOSED CONTOUR (MAJOR)

PROPOSED CONTOUR (MINOR)

PROPOSED FLOW ARROW

HIGH POINT

LOW POINT

DIVERSION DITCH

HP

LP

1333.00

1333.00

1333.50

1333.50

LEGEND

266° 37' 3.7"

58.537 m

304.51 m

MP3

MP4

498.50

9.0

499.00

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

235° 2 2' 16.1"

266° 37' 3.7"

58.537 m

304.51 m

MP3

MP4

498.50

9.0

499.00

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

FFE = 499.90 FFE = 499.90

9.

499.50

SITE GRADING

AND PROPERTY

LIMITS

SITE GRADING

LIMITS

LP

LP

HP

HP

LP

LP

HP

HP

4M 300 mm UPVC DRAIN

PIPE WITH ENDWALL

INV IN = 498.00

INV OUT = 497.96

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

GRADING AND

DRAINAGE

1:400

KJKG

S

W C

P

-0

5-

SE

ED

_M

PH

ES

I_

C -1

.D

W G

C-122

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

G R

AD

IN

G A

N D

D R

AI

N

AG

E

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:42:33 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMANTHA_C-121.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

MATCHLINE SEE SHEET MATCHLINEC-121

GENERAL NOTES

1. SEE SHEET D-C-503 FOR ROOF DRAINAGE APRON DETAIL.

2. HP AND LP INDICATE THE HIGH POINT AND LOW POINT ALONG

PROPOSED ROOF DRAINAGE APRONS.

3. SPOT ELEVATIONS ARE FOR SITE DRAINAGE.

4. FLOW ARROWS ARE FOR SITE DRAINAGE. FINAL SITE GRADING

SHOULD BE DONE IN ACCORDANCE WITH OVERALL DRAINAGE

PLAN.

5. DRAINAGE PIPE INDICATED ON PLANS WITHOUT SPECIFIC SIZES

OR INVERT INFORMATION SHALL BE 300 MM DIAMETER X 2

METERS LONG MINIMUM. AND PLACED TO SUIT AS-BUILT

GRADES. PROVIDE MINIMUM 1M² RIP-RAP PITCHING AT ALL PIPE

OUTLETS, INCLUDING AT 150 MM ROOF DRAINAGE POINTS.

ENDWALLS ARE NOT REQUIRED.

6. DRAINAGE PIPE WITH INVERT ELEVATIONS SPECIFIED SHALL BE

PROVIDED WITH ENDWALLS. FIELD ADJUST PROPOSED GRADES

TO PROVIDE A MINIMUM OF 30 CM COVER OVER DRAINAGE PIPE

WITH INVERT INFORMATION PROVIDED.

7. SLOPE FOR ALL DRAINAGE PIPE SHALL BE MINIMUM 1.0%.

8. FINISHED GRADES SHALL SLOPE AWAY FROM THE FINISHED

FLOOR OF EACH BUILDING A MINIMUM OF 0.15 M AT 3.0 M (5%)

FROM BUILDING. IF ADJACENT GROUND HAS A CONCRETE PATH,

THE CROSS SLOPE ON THE CONCRETE PATH SHALL BE 2% AWAY

FROM BUILDING.

9. SEE SPECIFICATION DIVISION 31 FOR SITE EXCAVATION,

COMPACTION AND FINISH GRADING REQUIREMENTS.

10. EARTHEN PATHWAYS SLOPE SHALL NOT EXCEED 5%

SITE GRADING LIMITS

EXISTING CONTOUR (MAJOR)

EXISTING CONTOUR (MINOR)

PROPOSED CONTOUR (MAJOR)

PROPOSED CONTOUR (MINOR)

PROPOSED FLOW ARROW

HIGH POINT

LOW POINT

DIVERSION DITCH

HP

LP

1333.00

1333.00

1333.50

1333.50

LEGEND

° 0

2'

9.

0"

92° 59' 53.7"

6.

m

186.83 m

MP1

MP2

2.

501.50

0.

499.50

503.00

502.00

501.00

500.00

500.00

501.00

SCIENCE

CLASSROOM

CLASSROOM

BLOCK

CLASSROOM

BLOCK

STUDENT LATRINE

(FEMALE)

STUDENT LATRINE

(MALE)

TEACHER

LATRINE

SOAKWAY PIT

° 0

2'

9.

0"

92° 59' 53.7"

6.

m

186.83 m

MP1

MP2

2.

501.50

0.

499.50

503.00

502.00

501.00

500.00

500.00

501.00

SCIENCE

CLASSROOM

CLASSROOM

BLOCK

CLASSROOM

BLOCK

STUDENT LATRINE

(FEMALE)

STUDENT LATRINE

(MALE)

TEACHER

LATRINE

SOAKWAY PIT

0.

0.

1.

502.50

3.

FFE = 501.40

FFE = 500.90

FFE = 501.40

FFE = 501.90

FFE = 502.90

0.

0.

501.50FFE = 502.90

SITE GRADING

AND PROPERTY

LIMITS

SITE GRADING

LIMITS

HP

HP LP

LP

LP

LP

HP

HP

LP

LP

HP

HP

502.50

503.00 502.50

0.

501.00

500.50

501.00

° 0

2'

9.

0"

92° 59' 53.7"

6.

m

186.83 m

MP1

MP2

2.

501.50

0.

499.50

503.00

502.00

501.00

500.00

500.00

501.00

SCIENCE

CLASSROOM

CLASSROOM

BLOCK

CLASSROOM

BLOCK

STUDENT LATRINE

(FEMALE)

STUDENT LATRINE

(MALE)

TEACHER

LATRINE

SOAKWAY PIT

° 0

2'

9.

0"

92° 59' 53.7"

6.

m

186.83 m

MP1

MP2

2.

501.50

0.

499.50

503.00

502.00

501.00

500.00

500.00

501.00

SCIENCE

CLASSROOM

CLASSROOM

BLOCK

CLASSROOM

BLOCK

STUDENT LATRINE

(FEMALE)

STUDENT LATRINE

(MALE)

TEACHER

LATRINE

SOAKWAY PIT

0.

0.

1.

502.50

3.

FFE = 501.40

FFE = 500.90

FFE = 501.40

FFE = 501.90

FFE = 502.90

0.

0.

501.50FFE = 502.90

SITE GRADING

AND PROPERTY

LIMITS

SITE GRADING

LIMITS

HP

HP LP

LP

LP

LP

HP

HP

LP

LP

HP

HP

502.50

503.00 502.50

0.

501.00

500.50

501.00

RIPRAP

(2M x 1M)

UNFINISHED

SCHOOL BLOCK

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

EROSION CONTROL

AND STABILIZATION

1:400

KJM

LM

M

LM

-0

7-

SE

ED

_M

PA

M

AN

TH

A_

C -1

.D

W G

C-131

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

ER

O

SI

O

N C

O N

TR

O

L

AN

D S

TA

BI

LI

ZA

TI

O

N

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:45:58 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMANTHA_C-131.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

MATCHLINE SEE SHEET MATCHLINEC-132

SITE GRADING LIMITS

EXISTING CONTOUR (MAJOR)

EXISTING CONTOUR (MINOR)

PROPOSED CONTOUR (MAJOR)

PROPOSED CONTOUR (MINOR)

SILT FENCE

RIP RAP (PITCHING)

SPRIGGING

CHECK DAM

DIVERSION DITCH

1437.00

1433.00

1437.50

1433.50

LEGEND

SF

NOTES

1. RIPRAP PITCHING (100 CM LONG BY 100 CM WIDE) TO BE INSTALLED

AT THE END OF ROOF DRAINAGE APRON OUTLET PIPES FOR

CLASSROOMS. RIPRAP PITCHING (50 CM LONG BY 50 CM WIDE) TO

BE INSTALLED AT THE END OF ROOF DRAINAGE APRON OUTLET

PIPES FOR SCIENCE CLASSROOMS AND TEACHER HOUSING.

2' 16.1"

216.14 m

58.537 m

MP3

MP4

498.50

498.50

498.50

498.50

498.00

9.0

499.00

498.00

9.

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

146° 47' 25.6"

235° 2 2' 16.1"

216.14 m

58.537 m

MP3

MP4

498.50

498.50

498.50

498.50

498.00

9.0

499.00

498.00

9.

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

FFE = 499.90 FFE = 499.90

9.

499.50

SITE GRADING

AND PROPERTY

LIMITS

SITE GRADING

LIMITS

LP

LP

HP

HP

LP

LP

HP

HP

RIPRAP

(2M x 1M)

146° 47' 25.6"

235° 2 2' 16.1"

216.14 m

58.537 m

MP3

MP4

498.50

498.50

498.50

498.50

498.00

9.0

499.00

498.00

9.

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

146° 47' 25.6"

235° 2 2' 16.1"

216.14 m

58.537 m

MP3

MP4

498.50

498.50

498.50

498.50

498.00

9.0

499.00

498.00

9.

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

FFE = 499.90 FFE = 499.90

9.

499.50

SITE GRADING

AND PROPERTY

LIMITS

SITE GRADING

LIMITS

LP

LP

HP

HP

LP

LP

HP

HP

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

EROSION CONTROL

AND STABILIZATION

1:400

KJM

LM

M

LM

-0

7-

SE

ED

_M

PA

M

AN

TH

A_

C -1

.D

W G

C-132

N

KH

O

TA

KO

TA

M

PA

M

AN

TH

A

ER

O

SI

O

N C

O N

TR

O

L

AN

D S

TA

BI

LI

ZA

TI

O

N

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 1:45:59 AM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\CENTRAL\07_MPAMANTHA\SEED_MPAMANTHA_C-131.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

MATCHLINESEE SHEETMATCHLINE C-131

SITE GRADING LIMITS

EXISTING CONTOUR (MAJOR)

EXISTING CONTOUR (MINOR)

PROPOSED CONTOUR (MAJOR)

PROPOSED CONTOUR (MINOR)

SILT FENCE

RIP RAP (PITCHING)

SPRIGGING

CHECK DAM

DIVERSION DITCH

1437.00

1433.00

1437.50

1433.50

LEGEND

SF

NOTES

1. RIPRAP PITCHING (100 CM LONG BY 100 CM WIDE) TO BE INSTALLED

AT THE END OF ROOF DRAINAGE APRON OUTLET PIPES FOR

CLASSROOMS. RIPRAP PITCHING (50 CM LONG BY 50 CM WIDE) TO

BE INSTALLED AT THE END OF ROOF DRAINAGE APRON OUTLET

PIPES FOR SCIENCE CLASSROOMS AND TEACHER HOUSING.

SEED_Mpamantha_G-001-G-001
Sheets and Views
SEED_Mpamantha_G-001-G-001
SEED_Mpamantha_G-020-G-020
Sheets and Views
SEED_Mpamantha_G-020-G-020
SEED_Mpamatha_C-100-C-100
Sheets and Views
SEED_Mpamatha_C-100-C-100
SEED_Mpamatha_C-101-C-101
Sheets and Views
SEED_Mpamatha_C-101-C-101
SEED_Mpamatha_C-101-C-102
Sheets and Views
SEED_Mpamatha_C-101-C-102
SEED_Mpamantha_C-111-C-111
Sheets and Views
SEED_Mpamantha_C-111-C-111
SEED_Mpamantha_C-112-C-112
Sheets and Views
SEED_Mpamantha_C-112-C-112
SEED_Mpamantha_C-112-C-113
Sheets and Views
SEED_Mpamantha_C-112-C-113
SEED_Mpamantha_C-121-C-121
Sheets and Views
SEED_Mpamantha_C-121-C-121
SEED_Mpamantha_C-121-C-122
Sheets and Views
SEED_Mpamantha_C-121-C-122
SEED_Mpamantha_C-131-C-131
Sheets and Views
SEED_Mpamantha_C-131-C-131
SEED_Mpamantha_C-131-C-132
Sheets and Views
SEED_Mpamantha_C-131-C-132

File details come from the government source that posted it. Updated .