L3.B (Template 3.B) - Past Performance Questionnaire.docx

DOCX document 23 KB Posted

Attached to
Secondary Education Expansion for Development (SEED) Rural Group 2 Activity Federal contract opportunity
Solicitation number
72061222R00005
Issued by
US Agency for International Development Malawi

About this file

This document contains a request for proposal for the Secondary Education Expansion for Development (SEED) Rural Group 2 Activity. USAID/Malawi is seeking proposals from U.S. and non-U.S. nonprofit and for-profit organizations to construct community day secondary schools in 18 districts across Malawi under firm fixed price contracts. The contracts will be divided into 4 lots based on geographical areas, with groups A and B containing 2 large and 2 small lots respectively. Group A lots are reserved for Malawian firms as defined by Malawian law. Proposals are due 120 days from issuance and must respond to all contents of the RFP. Construction is required to be completed within 13 months of award with a 12-month warranty period to follow.

View the file

Other files for this federal contract opportunity

Other files attached to Secondary Education Expansion for Development (SEED) Rural Group 2 Activity, newest first.
File Type Posted
J.2 Lot B2_Samson_Amendment 02.pdf PDF
J.2 Lot B1_Lipunga_Amendment 02.pdf PDF
J.2 Lot A2_Mtimabi_Amendment 02.pdf PDF
J.2 Lot A2_Mwalawang_ombe_Amendment 02.pdf PDF
J.2 Lot A1 _Bale_Amendment 02.pdf PDF
J.2 Lot A1 _Chibweya_Amendment 02.pdf PDF
J.2 Lot A1 _Mpamantha_Amendment 02.pdf PDF
J.2 Lot A1 _Matunkha_Amendment 02.pdf PDF
J.2 Lot A1 _Kambira_Amendment 02.pdf PDF
J.2 Lot A1 _Muselema_Amendment 02.pdf PDF
J.2 Lot A1 _Mpapa_Amendment 02.pdf PDF
J.2 Lot A1 _Kasipa_Amendment 02.pdf PDF
J.2 _Facility Drawings_SCIENCE CLASSROOM_Amendment 02.pdf PDF
J.2 _Facility Drawings_GENERAL_Amendment 02.pdf PDF
SRG 2 Prebid meeting attendance_May 2022.pdf PDF
L1.B (Template 1.B) - Financial Questionnaire.docx DOCX document
L1.C (Template 1.C) - Surety Form.docx DOCX document
J10 Bank Guarantee Template SRG2 final.pdf PDF
J8. PM Plan Template SRG2 FINAL.docx DOCX document
J6 MANGOCHI ESMP REPORT.pdf PDF
J6 NSANJE ESMP REPORT.pdf PDF
J4 Lot A1 SEED BOQ UNPRICED.xls XLS spreadsheet
J4 Lot B2 SEED BOQ UNPRICED.xls XLS spreadsheet
J.2 Site Packages Lot B2 SEED_Therere.pdf PDF
J.2 Site Packages Lot A2 SEED_Khotekhote.pdf PDF
J.2 Site Packages Lot A2 SEED_Chiwambe.pdf PDF
J.2 Site Packages Lot A2 SEED_Luwalika.pdf PDF
J.2 Site Packages Lot A2 SEED_Mandimba.pdf PDF
J.2 Site Packages Lot A2 SEED_Mlindi.pdf PDF
J.2 Site Packages Lot A2 SEED_Kalira.pdf PDF
J.2 Site Packages Lot A2 SEED_Demera.pdf PDF
J.2 Site Packages Lot A2 SEED_Mkombe.pdf PDF
J.2 Site Packages Lot A2 SEED_Mtimabi.pdf PDF
J.2 Site Packages Lot A2 SEED_Nthulu.pdf PDF
J.2 Site Packages Lot A1 SEED_Chitipa.pdf PDF
J.2 Site Packages Lot A1 SEED_Mulembe.pdf PDF
J2 Facility Drawings_TEACHER HOUSING.pdf PDF
J2 Facility Drawings_SCIENCE CLASSROOM.pdf PDF
J6 NKHATABAY ESMP REPORT.pdf PDF
J6 NENO ESMP REPORT.pdf PDF
J6 NTCHEU ESMP REPORT.pdf PDF
J6 THYOLO ESMP REPORT.pdf PDF
J4 Lot A2 SEED BOQ UNPRICED.xls XLS spreadsheet
J.2 Site Packages Lot B2 SEED_Mulonda.pdf PDF
J.2 Site Packages Lot B1 SEED_Kazira.pdf PDF
J.2 Site Packages Lot B1 SEED_Lipunga.pdf PDF
J.2 Site Packages Lot B1 SEED_Gumulira.pdf PDF
J.2 Site Packages Lot A2 SEED_Lulanga.pdf PDF
J.2 Site Packages Lot A1 SEED_Chuba.pdf PDF
J.2 Site Packages Lot A1 SEED_Bundi.pdf PDF
Show all 50

Secondary Education Expansion for Development (SEED) Rural Group 2 Activity has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template 3.B

PAST PERFORMANCE QUESTIONNAIRE

USAID SOL XXXXXXXXXXXXXX

To be completed by the CLIENT, OWNER or VENDOR and submitted by Offeror

CONTRACT INFORMATION

1. Contractor Information Firm Name:

Address:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: ☐ Prime Contractor ☐ Sub Contractor ☐ Joint Venture ☐ Other (Explain) Percent of project work performed by contractor:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number (if applicable):

Delivery/Task Order Number (if applicable):

Contract Type: ☐ Firm Fixed Price ☐Cost Reimbursement ☐ Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explanation if Different:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explanation if Different:

4. Project Description:

Complexity of Work ☐ High ☐ Med ☐ Routine

CLIENT/OWNER/VENDOR INFORMATION

5. POC Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client/owner/vendor’s (your) role in the project.

Provide a brief assessment of specific strengths or weaknesses in your relationship/association with the contractor over the duration of this project. Areas to be addressed could include:

· Timeliness of Performance

· Effective and Efficient use of Resources

· Quality of Technical Approach

· Quality of Problem Identification

· Non-Conformances and Corrective-Action Plans

· Cost Control

· Efficiency of Accounting and Billing Systems

· Communication and Business Behaviour.

7. Date Questionnaire was completed (mm/dd/yy):

8. Client/Owner/Vendor’s Signature:

USAID RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

Revised April 2011

Template 3.B - PPQ rev.1 02/22 Page of

RATING DEFINITION NOTE

(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been NO significant weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

Contractor Information (Firm Name): ________________________________________________ Client/Owner/Vendor Information (Name): ________________________________________________________

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY

a) Quality of technical data/report preparation efforts
E VG S M U N
b) Ability to meet quality standards specified for technical performance
E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N

3. CUSTOMER SATISFACTION

a) To what extent were the end users satisfied with the project?
E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction
E VG S M U N

4. MANAGEMENT/PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort
E VG S M U N
c) Government Property Control
E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel
E VG S M U N
e) Utilization of Small Business concerns
E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines
E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)
E VG S M U N

Contractor Information (Firm Name): ________________________________________________ Client Information (Name): ________________________________________________________

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the user’s rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

image2.png image1.png

File details come from the government source that posted it. Updated .