ITB_FAC260961_Fire_Station_6_Station_Slide__Exhibit_A_Scope_of_Work.pdf

PDF 129 KB Posted

Attached to
Fire Station #6 Station Slide
Solicitation number
ITB# FAC/260961
Issued by
Marion County, Orlando City, Florida

About this file

This Scope of Work document outlines requirements for the City of Ocala, Florida's procurement of fire station slide/pole installation services at Fire Station #6. The project involves providing and installing a fire station slide or pole at the facility located at 5220 Southwest 50th Court, Ocala, FL 34474. A mandatory pre-bid meeting is scheduled for August 5, 2026 at 9:00 AM EST at Fire Station #6. The ITB number is FAC/260961.

The document establishes the technical and operational requirements that the selected contractor must meet for the design, fabrication, and installation of the fire station slide/pole system. Specific details regarding pricing terms, contract duration, performance specifications, materials standards, safety requirements, and installation timelines are contained within the full scope of work documentation. Contractors interested in bidding on this opportunity must attend the mandatory pre-bid meeting and submit responsive proposals in accordance with the City of Ocala's procurement procedures and any applicable addenda issued prior to the bid submission deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A – SCOPE OF WORK CONTRACT# FAC/260961

A - 1

BACKGROUND

The City of Ocala requires the services of an experienced contractor to provide and install a fire station slide/pole at Fire Station #6 located at 5220 South West 50th Court, Ocala, FL 34474.

MANDATORY PRE-BID MEETING: MANDATORY PRE-BID MEETING: SCHEDULED FOR WEDNESDAY,

AUGUST 5, 2026, AT 9:00 AM, LOCATED AT OCALA FIRE RESCUE STATION 6, 5220 SW 50TH CT, OCALA, FL 34474.

EXPERIENCE AND LICENSING REQUIREMENTS

1. Licensing Requirement: Contractor must possess a valid General Contractor’s License in the State of Florida to submit a bid for this project.

2. Experience Requirement: Contractor must possess 5 years’ experience in providing Interior wall construction, drywall finishing, electrical, plumbing, and mechanical.

INSURANCE REQUIREMENTS

1. Commercial General Liability: with limits of $1,000,000 per occurrence/$2,000,000 aggregate.

2. Commercial Automotive Liability: a combined limit of not less than $1,000,000.

3. Workers’ Compensation and Employer’s Liability: per Florida statutory requirements.

PERMIT REQUIREMENTS

1. Permits Required: Contractor will be responsible for obtaining the following City of Ocala permits at no additional cost to the City, as well as any necessary engineering to complete said permits.

• Building

• Certificate of Occupancy

• Any others needed to complete the project

2. Construction Permit Applications: For construction permits and related documents, please visit:

https://www.ocalafl.org/government/city-departments-a-h/growth-management/building/construction-permits

CONSTRUCTION TIMEFRAME

1. Construction Time: The Contract time to Final Completion of the project is 2 weeks after all permits have been issued. Contractor agrees, as a condition for submitting a bid, that this project will be completed at the time agreed upon between the City and the Contractor. The Contractor agrees to commence work on the date specified in a written “Notice to Proceed” by the city. Such “Notice to Proceed” will be issued at the pre-construction conference. The Contractor must be able to mobilize and begin construction no later than 10 calendar days after notification and complete the project by the time limit specified in the “Notice to Proceed.”

LIQUIDATED DAMAGES

1. The Contractor shall pay the City $250.00 for each calendar day that expires after the time specified for completion, until work is completed.

https://www.ocalafl.org/government/city-departments-a-h/growth-management/building/construction-permits https://www.ocalafl.org/government/city-departments-a-h/growth-management/building/construction-permits

Exhibit A – SCOPE OF WORK CONTRACT# FAC/260961

A - 2

2. Nothing in this section is intended to limit the right to obtain injunctive relief or any and all relief as may be appropriate. Permission allowing the Contractor to continue and finish any part of the work after the time fixed for its completion or after the date to which the time for completion may have been extended shall in no way operate as a waiver on the part of the City of any of its rights under this Agreement.

ANTICIPATED TASKS, DELIVERABLES AND HOURS

1. Anticipated Tasks: The Contractor may be required to perform the following types of services for the City of Ocala. This list is not an attempt to exclusively define those specific activities the Contractor will perform.

• Demolition and removal of the existing fire pole, including all associated mounting hardware and components necessary to facilitate the installation of the new system. Refer to Exhibit B – Existing Pole for an overview of the existing fire pole and deck configuration.

• Construct a deck capable of supporting installation of a new fire pole with safety handrail.

Wood-frame construction methods may be used to build the deck. (Deck depth must be no less than 5 inches thick) Exhibit C - Model 19 Example.

• Construct the fire pole opening in accordance with the manufacturer's requirements for the Model 19 Fire Pole System. The opening dimensions and clearances shall conform to the specifications shown in Exhibit D – Fire Pole Specs Model 19.

• Furnish and install one (1) Model 19 Fire Pole Kit, manufactured by McIntire Brass Works, Inc., in the newly constructed deck. The fire pole shall be installed in accordance with the manufacturer's installation requirements and shall be level, plumb, and centered within the floor opening. The Model 19 Fire Pole Kit shall be purchased directly from McIntire Brass Works, Inc. and is available at: https://www.slidepole.com/model19.htm.

• Extend and reconnect the existing guardrail across the newly constructed deck to provide continuous fall protection. The completed railing shall match the existing railing as closely as possible in appearance, height, and construction. Refer to Exhibit B – Existing Pole.

• The contractor shall field verify all existing dimensions and site conditions prior to fabrication or construction.

• All work shall comply with the Florida Building Code and all other applicable codes, standards, and regulations. The contractor is responsible for ensuring full compliance across all trades, including but not limited to building, electrical, plumbing, mechanical, fire protection, and life-safety systems. All work must pass all required inspections and approvals from the Authority Having Jurisdiction

1. Deliverables: The Contractor shall provide weekly reports of all Task Work Orders in progress.

Deliverables shall be accepted by the City of Ocala Project Manager before payment for such work.

2. Working Hours: The normal/standard working hours for this project are 6:00 AM – 6:00 PM Monday through Sunday. Contractor shall provide (forty-eight) 48-hour advance notice to the City Project Manager for work outside of normal shift hours. The City may decline the request.

https://www.slidepole.com/model19.htm

Exhibit A – SCOPE OF WORK CONTRACT# FAC/260961

A - 3

3. Emergency Work Hours: The Contractor must have available staff on site and prepared to begin work within two (2) hours of notification of any work deemed “Emergency” (this includes all storm-related emergencies). If the work is not completed or staff is not on site by contract timelines the contract will be considered in default.

A. Upon declaration of default, the City will have full power to appropriate or use any or all suitable and acceptable materials and equipment on the site and may enter an agreement with others to complete the work under the contract or may use other methods to complete the work in an acceptable manner. The City will charge all costs that the City incurs because of the Contractor’s default, including the costs of completing the work under the contract, against the Contractor.

B. If, after default notice by the City, and prior to any action by the City to otherwise complete the work under the contract, the Contractor establishes their intent to prosecute the work in accordance with the City’s requirements, then the City may allow the Contractor to resume the work, in which case the City will deduct from any monies due or that may become due under the contract, any costs to the City incurred by the delay, or from any reason attributable to the delay.

PROJECT SPECIFICATIONS

This project will require the Contractor to follow the following specifications:

1. All work must be in compliance with the Florida Building Code, latest edition. For information, please visit the following link: https://floridabuilding.org/c/default.aspx

2. The Contractor must have up-to-date copies of shop drawings, plans, and bid documents at job sites at all times.

3. All material & construction equipment must meet OSHA Standard Specifications for construction, electrical, plumbing, and mechanical, latest edition. Substantial completion date will start warranty period for each project assigned.

CONTRACTOR EMPLOYEES AND EQUIPMENT

1. An employee roster must be provided for all projects assigned.

2. Contractor must utilize competent employees in performing the work. Employees performing the work must be properly licensed or qualified as required by the scope/project.

3. The Contractor shall provide an assigned Project Manager, who will be the primary point of contact.

Contractor must provide a valid telephone number, email, and address at all times to the City Project Manager. The telephone must be answered during normal working hours, or voicemail must be available to take a message.

4. At the request of the City, the Contractor must replace any incompetent, unfaithful, abusive, or disorderly person in their employment. The City and the Contractor must each be promptly notified by the other of any complaints received.

5. The employees of the Contractor must wear suitable work clothes and personal protective equipment as defined by OSHA (hard hats, safety glasses, ear protection, safety shoes, etc.)

6. Contractor will operate as an independent contractor and not as an agent, representative, partner or employee of the City of Ocala, and shall control their operations at the work site, and be solely responsible for the acts or omissions of their employees.

https://floridabuilding.org/c/default.aspx

Exhibit A – SCOPE OF WORK CONTRACT# FAC/260961

A - 4

7. No smoking is allowed on City property or projects.

8. Contractor must possess/obtain all required equipment to perform the work. A list of equipment shall be provided to the City upon request.

9. All company vehicles and uniforms must have a visible company name/logo.

CITY OF OCALA RESPONSIBILITIES

1. The City of Ocala will furnish the following services/data to the Contractor for the performance of services:

A. Provide access to drawings, specifications, schedules, reports, and other information prepared by/for the City of Ocala pertinent to the Contractor’s responsibilities.

B. Access to City buildings and facilities to perform the work.

2. The City reserves the right to purchase any materials for the Contractor to use. The Contractor shall not charge a mark-up fee for material furnished by the City.

CONTRACTOR RESPONSIBILITIES

1. The Contractor shall complete all work performed under this contract in accordance with policies and procedures of the City of Ocala and all applicable State and Federal laws, policies, procedures, and guidelines.

2. The Contractor shall obtain and pay for any and all licenses, additional equipment, dumping and/or disposal fees, etc., required to fulfill this contract.

3. Construction/Installation shall be in compliance with all requirements and instructions of applicable manufacturers.

4. If the Contractor is advised to leave a property by the property owner or their representative, the Contractor shall leave at once without altercation. Contractor shall then contact the City Project Manager within 24 hours and advise of the reason for not completing the assigned project.

5. Contractor will be responsible for inspectors’ overtime.

6. Contractor is responsible for any and all damages including but not limited to buildings, curbing, pavement, landscaping, or irrigation systems caused by their activity. Should any public or private property be damaged or destroyed, the Contractor, at their expense, shall repair or make restoration as acceptable to the City of destroyed or damaged property no later than one (1) month from the date damage occurred.

7. Data collected by the Contractor shall be in a format compatible with or easily converted to City’s databases. A sequential naming convention should be applied to the files and documentation provided to the city.

8. The Contractor shall ensure that all documents prepared under this contract have been prepared on a Windows-based operating system computer using the most current version of Microsoft Office, which includes: Word, Excel, Power Point, Access, or any other software as specified and approved by City staff.

Exhibit A – SCOPE OF WORK CONTRACT# FAC/260961

A - 5

CONSTRUCTION WORK AREAS

1. The City of Ocala is not responsible for providing property or lay down yards to the Contractor for their materials or equipment. If private property is used, the City requires a copy of the agreement between the property owner and the Contractor. Utilizing private property without written permission is prohibited.

SITE HOUSEKEEPING AND CLEANUP

1. Waste/Debris: The Contractor shall keep the premises free at all times from accumulation of waste materials and rubbish caused by operations and employees. Contractor will provide approved containers for collection and disposal of waste materials, debris, and rubbish. Contractor shall dispose of debris in a legal manner. At least once weekly, dispose of such waste materials, debris, and rubbish off-site.

2. Cleanup: Periodic cleanup to avoid hazards or interference with operations at the site, and to leave the site in a reasonably neat condition. The work site will be completely cleaned after each day of work.

3. Water Use: The use of water to prevent the blowing of dust and debris during cutting operations and or cleaning operations is mandatory.

4. Final Cleaning: Upon completion of work, clean entire work area/project site as applicable.

A. Leave the work and adjacent areas affected in a cleaned condition satisfactory to the City Project Manager.

B. The Contractor shall clean and remove from the premises, all surplus and discarded materials, rubbish, and temporary structures, and shall restore in an acceptable manner all property, both public and private, which has been damaged during the prosecution of the work and shall have the work in a neat and presentable condition. Note: Any and all debris shall be removed from the premises. New construction debris, trash, etc., shall not be left on site.

C. Broom clean the exterior paved driveways and parking areas and hose clean sidewalks and concrete exposed surfaces if impacted by work or included in work area.

D. All furnishings and equipment shall be placed back in the original locations.

E. All work areas must be returned to original condition.

SUBMITTALS

1. Submit copies of permits and approvals for construction as required by laws and regulations of governing agencies.

2. Submit temporary construction parking area plans, storage yard, storage trailer location, staging area plan, and plan for disposal of waste materials.

Exhibit A – SCOPE OF WORK CONTRACT# FAC/260961

A - 6

SAFETY

1. The Contractor is solely responsible for ensuring safety during construction, and for conformance to all applicable OSHA standards; and local, state, and national codes concerning safety provisions for their employees, sub-contractors, all building and site occupants, staff, public, and all persons in or around the work area.

2. Job site visits by City staff do not constitute approval, awareness, or liability for any hazardous condition.

3. Contractor shall be responsible for securing their equipment, materials, clothing, and other property.

4. Prior to completion, storage and adequate protection of all material and equipment will be the Contractor’s responsibility.

5. In no event shall the City be responsible for any damages to any of the Contractor's equipment, materials, property, or clothing lost, damaged, destroyed, or stolen.

WARRANTY

1. Contractor will provide a five-year material and labor warranty from the date of substantial completion, against operational failure caused by defective material or workmanship which occurs during normal use.

2. All manufacturer warranty documentation and owner/operator manuals must be provided before final payment request.

INVOICING

1. All original invoices will be sent to: Charles Stewart, Project Manager, Facilities Department, 1805 NE 30th Avenue, Building 200, Ocala, FL 34470, email: cstewart@ocalafl.gov

2. Contractor will invoice at the completion of the project once all final inspections have been approved.

PRICING AND AWARD

1. Bids will be received on a lump sum basis. Lump sum amount must include all direct and indirect costs to complete the project.

2. Award will be made to the lowest contractor, meeting all requirements outlined herein.